CN104532843B - A kind of steel column location straightening method of stand column pile - Google Patents

A kind of steel column location straightening method of stand column pile Download PDF

Info

Publication number
CN104532843B
CN104532843B CN201410823394.0A CN201410823394A CN104532843B CN 104532843 B CN104532843 B CN 104532843B CN 201410823394 A CN201410823394 A CN 201410823394A CN 104532843 B CN104532843 B CN 104532843B
Authority
CN
China
Prior art keywords
steel
column
roller bearing
steel column
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410823394.0A
Other languages
Chinese (zh)
Other versions
CN104532843A (en
Inventor
黎明中
吴宗庆
任若微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201410823394.0A priority Critical patent/CN104532843B/en
Publication of CN104532843A publication Critical patent/CN104532843A/en
Application granted granted Critical
Publication of CN104532843B publication Critical patent/CN104532843B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to a kind of steel column location straightening method of stand column pile.It is characterized in that it comprises the steps: 1) prepare stand column pile steel column location machine straightening device: stand column pile steel column location machine straightening device include 2 groups location bar straightening mechanisms;Described location bar straightening mechanism includes steel wire, annular air-pocket, steel pipe clip, ring-shaped clip, the first roller bearing, the second roller bearing, the 3rd roller bearing, the 4th roller bearing, ratchet, directive wheel;2) after column stake holes completes, positioning action platform is installed in aperture;3) steel reinforcement cage made, steel column are hung in column stake holes from operating platform respectively;4) being adjusted the top of steel column, the bottom of steel column is by pawl wheel movement about the steel wire of tensioning of four direction, front and back on ground, thus the perpendicularity of adjusting post finally ensures the perpendicularity of column;5) disturbing concrete;Remove.The method is easy to operate, location is reliable, the simple in construction of the device used, easily manufacture, reusable.

Description

A kind of steel column location straightening method of stand column pile
Technical field
The present invention relates to a kind of steel column location straightening method of stand column pile.
Background technology
Constantly expansion, the continuous atrophy of land used along with city size so that construction site is narrow and cutting depth The situations such as increase occur, conventional suitable way substantially embodies deficiency and problem.In order to solve such problem, China is with reference to external Advanced construction experience, use Top-down Construction Technique, it is achieved that on the ground and underground structure synchronous construction, shorten the duration, fall Low construction costs.Interim vertical supporting system during reverse construction typically uses steel column to insert the following stand column pile of base plate Form, steel column is usually the column of angles, steel core concrete column etc., stand column pile can to use the form such as bored concrete pile or steel-pipe pile, Reverse construction bears the vertical load such as superstructure and construction loads, and after construction terminates, as middle support column is another As a part for underground structure post after external wrapping concrete, bear superstructure load, thus the location of middle support column and hang down Straight degree must strictly meet requirement.General provision middle support column misalignment of axe controls in ± 10mm, absolute altitude control ± In 10mm, degree control is within 1/300 ~ 1/600.Therefore, the construction of steel column must take special location and straightening, At present, the vertical adjustment method of steel column mainly has air-bag method, machinery vertical adjustment method and fairlead tube method, achieves certain effect.On Stating three kinds of methods and have certain practicality and limitation, the perpendicularity of support column is carried out by air-bag method by putting into the air bag in hole Correcting and location, vertical adjustment is effective, but is restricted by stroke is big, it is impossible to vertical adjustment reaches apart from big steel column perpendicularity with hole wall Design requirement, further, since air bag is filled with the annular space between conduit and stake holes, therefore, in follow-up concreting Mud returns out in hole and causes certain obstruction to affect construction quality.Machinery vertical adjustment method is economical and practical, but is only used for rigidity relatively The tone pitch of big steel column.Fairlead tube method tone pitch is easier to, and effect is also preferable, but owing to guide thimble is outside steel column, makes Become aperture to become the problem such as big, rear two methods be all fixing steel pipe post top be not fine from stressing conditions.Accordingly, it would be desirable to send out Bright a kind of tone pitch that can meet steel column and fixing, meanwhile, again can easy to operation, method that operating expenses is low.
Chinese Patent Application No. 201410222301.9, title: a kind of high accuracy vertical pillars stake method of construction, this is special Profit is the perpendicularity regulating steel pipe post with the bottom of steel wire rope tractive steel pipe post, but due to steel wire rope only at the bottom of steel column End is connected, not at the bottom of hole, other are fixed, therefore, although after steel pipe post has adjusted, still easily being sent out by other external influences Raw mobile.
Chinese Patent Application No. 201320057678.4, title: a kind of rotation is dug a steel core concrete column contrary sequence method location and adjusted Hang down device.The determination of this patent is only in ground secured adjusted, from the point of view of the steel pipe post of overlength, because bottom is not fixed, its Overall stationary state is not fine, and therefore the scope of application is wide, is only used for steel pipe less, and it is vertical that length is shorter, rigidity is bigger Stanchion.
Summary of the invention
It is an object of the invention to provide a kind of steel column location straightening method of stand column pile, solve in existing method hole Deep steel pipe post does not has good control method to constrain the perpendicularity problem of more effectively regulation steel pipe post, and the method is grasped Make convenient, location is reliable, the simple in construction of the device used, easily manufacture, reusable.
For achieving the above object, the technical solution used in the present invention is: the steel column location straightening side of a kind of stand column pile Method, it is characterised in that it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups are determined Position bar straightening mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and mutually perpendicular direction is arranged;
Described location bar straightening mechanism include steel wire 2, annular air-pocket 3, steel pipe clip 4, ring-shaped clip the 5, first roller bearing 6, Second roller bearing the 8, the 3rd roller bearing the 9, the 4th roller bearing 10, ratchet 11, directive wheel 12, the lateral part of ring-shaped clip 5 is wrapped in annular In air bag 3, during use, to be enclosed within steel column 1 outer and be positioned at column stake holes 21 for ring-shaped clip 5, and steel pipe clip 4 is stuck in steel column 1 On, steel pipe clip 4 is between ring-shaped clip 5 and steel column 1;It is positioned on the ring-shaped clip 5 on the left of steel column 1 and is fixed with first Roller bearing frame 7, the first roller bearing frame 7 is provided with the first roller bearing 6, is positioned on the steel pipe clip 4 on the left of steel column 1 and is fixed with the second roller bearing Frame, the second roller bearing frame is provided with the second roller bearing 8, is positioned on the steel pipe clip 4 on the right side of steel column 1 and is fixed with the 3rd roller bearing frame, the Three roller bearing framves are provided with the 3rd roller bearing 9, are positioned on the ring-shaped clip 5 on the right side of steel column 1 and are fixed with the 4th roller bearing frame, the 4th roller bearing Frame is provided with the 4th roller bearing 10;Ratchet 11, directive wheel 12 are respectively provided at the left and right sides of steel column 1 upper end;Steel wire 2 is wound on ratchet 11 On, the left end of steel wire 2 is fixed on the second roller bearing frame after the right flank of the second roller bearing 8, the left surface of the first roller bearing 6, steel wire 2 Right-hand member be fixed on the 3rd roller bearing frame after the left surface of directive wheel the 12, the 3rd roller bearing 9, the right flank of the 4th roller bearing 10;
2) after column stake holes 21 completes, positioning action platform 22 is installed in aperture, will after positioning with transit survey The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes 21 from operating platform respectively;
In steel column 1 decentralization process, annular air-pocket 3, ring-shaped clip 5, steel pipe clip 4 are installed in the outside of steel column, Gu The steel wire reserved, transfers with steel column, and the positioning action platform that steel column 1 is transferred to after design attitude on the ground is first solid Determine the top of steel column 1, then to be allowed to be fully contacted with hole wall, by the bottom of steel column 1 to annular air-pocket 3 inflation by trachea It is fixed on the preferable soil layer of stress;
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column 1 can be with computer It is connected, by deviational survey data, artificial or computer controls top and the bottom of steel column 1 are adjusted, steel column 1 time Portion is by the shifting about the steel wire of tensioning of four direction, front and back respectively of the pawl wheel of two groups of location bar straightening mechanisms on ground Dynamic, thus the perpendicularity of adjusting post finally ensures the perpendicularity of column;
5) watering and smash concrete Lumen catheter, concrete has some strength (intensity of dismountable annular air-pocket) to remove gas afterwards Pipe and annular air-pocket, backfill element soil or sandstone, remove positioning action platform.
Innovative point: use the air bag (annular air-pocket) of band annular, ring-shaped clip to be fixed on the hole wall in certain depth, use Steel wire is connected and by buckling the assembly such as the steel pipe clip of steel pipe, ratchet, directive wheel (pulley) at steel column four direction Carry out straightening and location.Meanwhile, positioning action platform on ground uses general measure to position and fix steel column (or to claim steel pipe Column) top, have the requirement reaching to meet design accuracy that the steel column of upper and lower two fixing points is more reliable.
The invention has the beneficial effects as follows: solve deep steel pipe post in existing method hole there is no good control method and Constraining the perpendicularity problem more effectively regulating steel pipe post, the method is easy to operate, location is reliable, the knot of the device used Structure is simple, easily manufacture, reusable, low cost, effect is notable, beneficially popularization and application.
Accompanying drawing explanation
Fig. 1 is the structural representation of the steel column location machine straightening device of stand column pile of the present invention.
Fig. 2 is the enlarged drawing in A portion in Fig. 1.
Fig. 3 is the sectional view in Fig. 2 along line B-B.
Fig. 4 is the structural representation of steel pipe clip of the present invention.
Fig. 5 is the top view of steel pipe clip of the present invention.
Fig. 6 is the side view of ratchet of the present invention.
Fig. 7 be ratchet of the present invention structural representation.
Fig. 8 is the structural representation of positioning action platform of the present invention.
Fig. 9 is the enlarged drawing in C portion in Fig. 1.
In figure: 1-steel column, 2-steel wire, 3-annular air-pocket, 4-steel pipe clip, 5-ring-shaped clip, 6-the first roller bearing, 7- One roller bearing frame, 8-the second roller bearing, 9-the 3rd roller bearing, 10-the 4th roller bearing, 11-ratchet, 12-directive wheel, 13-positioner, 14- Sensor, 15-ground upper ground surface, 16-basement ground, absolute altitude at the bottom of 17-steel core concrete column, 18-socket cap peg, 19-sealing Plate, 20-puts more energy into ring flat-plate, 21-column stake holes, 22-positioning action platform.
Detailed description of the invention
As shown in figs 1-9, a kind of steel column location straightening method of stand column pile, it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups are determined Position bar straightening mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and [first location bar straightening mechanism is arranged in the left and right sides of steel column (left side in Fig. 2 is left, and the right is right), second location bar straightening mechanism is arranged in side before and after steel column], and be mutually perpendicular to (as shown in Figure 3) is arranged in direction;
Described location bar straightening mechanism (first location bar straightening mechanism) include steel wire 2, annular air-pocket 3, steel pipe clip 4, Ring-shaped clip the 5, first roller bearing the 6, second roller bearing the 8, the 3rd roller bearing the 9, the 4th roller bearing 10, ratchet 11, directive wheel 12, ring-shaped clip 5 Lateral part be wrapped in annular air-pocket 3 that (air bag, ring-shaped clip are annular, ring-shaped clip section approximation C-shaped, i.e. annular Clip 5 is fixed on annular air-pocket 3, will not fall down), during use, ring-shaped clip 5 is enclosed within outer (near steel column 1 of steel column 1 Side is referred to as inner side) and (annular air-pocket 3 and ring-shaped clip 5 lean against the column stake holes 21 of certain depth to be positioned at column stake holes 21 On interior hole wall, depending on the degree of depth is according to soil property), steel pipe clip 4 is stuck on steel column 1 (being i.e. fixed on steel column), steel pipe strap Hoop 4 is between ring-shaped clip 5 and steel column 1;It is positioned on the ring-shaped clip 5 on the left of steel column 1 and is fixed with the first roller bearing frame 7, First roller bearing frame 7 is provided with first roller bearing 6(the first roller bearing and can roll), it is positioned on the steel pipe clip 4 on the left of steel column 1 and is fixed with Second roller bearing frame, the second roller bearing frame is provided with second roller bearing 8(the second roller bearing and can roll), it is positioned at the steel pipe strap on the right side of steel column 1 Being fixed with the 3rd roller bearing frame on hoop 4, the 3rd roller bearing frame is provided with the 3rd roller bearing 9(the 3rd roller bearing and can roll), it is positioned at steel column 1 right Being fixed with the 4th roller bearing frame on the ring-shaped clip 5 of side, the 4th roller bearing frame is provided with the 4th roller bearing 10(the 4th roller bearing and can roll);Spine Wheel 11, directive wheel 12 are respectively provided at the left and right sides of steel column 1 upper end;Steel wire 2 is wound on ratchet 11, and the left end of steel wire 2 is through second The right flank of roller bearing 8, the first roller bearing 6 left surface after be fixed on or on the second roller bearing frame, the right-hand member of steel wire 2 through directive wheel 12, The left surface of the 3rd roller bearing 9, the 4th roller bearing 10 right flank after be fixed on the 3rd roller bearing frame;Left rotation and right rotation ratchet 11, adjustable Joint ratchet 11 left side or the length of the right steel wire, from regulating between the first roller bearing 6 and the second roller bearing 8, the 3rd roller bearing 9 and the 4th rolling The spacing (i.e. adjusting the left and right perpendicularity of steel column 1, second location bar straightening mechanism to adjust perpendicularity before and after steel column 1) of axle 10;
2) after column stake holes 21 completes, positioning action platform 22 is installed in aperture, will after positioning with transit survey The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes 21 from operating platform respectively (computer control is set Make vertical watch-dog;Being surveyed by theodolite and vertically reset for vertical control, positioning action platform positions, by two vertical direction Theodolite determines operating platform center and direction, and steel column hangs in hole through operating platform pilot hole, then by theodolite is Operating platform is checked, and corrects operating platform if any deviation);
In steel column 1 decentralization process, simultaneously on four limits outside the post of steel column appropriate location at a depth below peace at 1/2 Dress annular air-pocket 3, ring-shaped clip 5, steel pipe clip 4, the steel wire temporarily fixed, to transfer with steel column, steel column 1 is transferred After design attitude, the top of steel column 1 first fixed by positioning action platform on the ground, then by trachea to annular air-pocket 3 Inflation is allowed to be fully contacted with hole wall, and the bottom of steel column 1 is fixed on the preferable soil layer of stress;
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column 1 can be with computer It is connected, by deviational survey data, artificial or computer controls top and the bottom of steel column 1 are adjusted, steel column 1 time Portion is respectively by the group pawl wheel of two groups of location bar straightening mechanisms on ground about the steel wire of tensioning of four direction, front and back Mobile (can also be connected with computer and be automatically adjusted), thus the perpendicularity of adjusting post finally ensures the perpendicularity of column, power Strive its degree control within 1/600;
5) after disturbing concrete, Lumen catheter speed wants slow and light, must not clash into steel column and correct perpendicularity at any time;Water Some strength (intensity of dismountable annular air-pocket) afterwards dismounting trachea and annular gas, backfill element soil is had until bored concrete pile after smashing concrete Or sandstone, remove positioning action platform;Strengthen protection, prevent accidental impact from causing deformation.

Claims (1)

1. the steel column location straightening method of a stand column pile, it is characterised in that it comprises the steps:
1) the steel column location machine straightening device of stand column pile is prepared: the steel column location machine straightening device of stand column pile includes that 2 groups of location are adjusted Straight mechanism, the structure of 2 groups of location bar straightening mechanisms is identical, and mutually perpendicular direction is arranged;
Described location bar straightening mechanism includes steel wire (2), annular air-pocket (3), steel pipe clip (4), ring-shaped clip (5), the first rolling Axle (6), the second roller bearing (8), the 3rd roller bearing (9), the 4th roller bearing (10), ratchet (11) and directive wheel (12), ring-shaped clip (5) In lateral part is wrapped in annular air-pocket (3), during use, ring-shaped clip (5) is enclosed within steel column (1) and outward and is positioned at column stake holes (21), in, steel pipe clip (4) is stuck on steel column (1), and steel pipe clip (4) is positioned between ring-shaped clip (5) and steel column (1); Being positioned on the ring-shaped clip (5) in steel column (1) left side and be fixed with the first roller bearing frame (7), the first roller bearing frame (7) is provided with the first rolling Axle (6), is positioned on the steel pipe clip (4) in steel column (1) left side and is fixed with the second roller bearing frame, and the second roller bearing frame is provided with the second rolling Axle (8), is positioned on the steel pipe clip (4) on steel column (1) right side and is fixed with the 3rd roller bearing frame, and the 3rd roller bearing frame is provided with the 3rd rolling Axle (9), is positioned on the ring-shaped clip (5) on steel column (1) right side and is fixed with the 4th roller bearing frame, and the 4th roller bearing frame is provided with the 4th rolling Axle (10);Ratchet (11) and directive wheel (12) are respectively provided at the left and right sides of steel column (1) upper end;Steel wire (2) is wound on ratchet (11) On, the left end of steel wire (2) is fixed on the second roller bearing frame after the right flank of the second roller bearing (8), the left surface of the first roller bearing (6) On, the right-hand member of steel wire (2) is fixing after the right flank of directive wheel (12), the left surface of the 3rd roller bearing (9) and the 4th roller bearing (10) On the 3rd roller bearing frame;
2) after column stake holes (21) completes, positioning action platform (22) is installed in aperture, will after positioning with transit survey The reinforcing in place of positioning action platform;
3) steel reinforcement cage made, steel column are hung in column stake holes (21) from positioning action platform respectively;
In steel column (1) decentralization process, annular air-pocket (3), ring-shaped clip (5) and steel pipe clip are installed in the outside of steel column (4), the steel wire fixed, to transfer with steel column, steel column (1) transfers to after design attitude positioning action on the ground The top of steel column (1) first fixed by platform, then is allowed to contact with hole wall to annular air-pocket (3) inflation by trachea, is stood by steel The preferable soil layer of stress is fixed in the bottom of post (1);
4) terminal laying inclinometer or vertical reference, inclinometer or vertical reference on steel column (1) is connected with computer Connecing, by deviational survey data, by being manually adjusted top and the bottom of steel column (1), ground is passed through in the bottom of steel column (1) The ratchet of upper two groups of location bar straightening mechanisms carries out left and right on the steel wire of tensioning of four direction and front and back rotates, thus regulates steel The perpendicularity of column finally ensures the perpendicularity of steel column;
5) watering and smash concrete Lumen catheter, concrete removes trachea and annular air-pocket after having some strength;Backfill element soil or sand Stone, removes positioning action platform.
CN201410823394.0A 2014-12-26 2014-12-26 A kind of steel column location straightening method of stand column pile Active CN104532843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410823394.0A CN104532843B (en) 2014-12-26 2014-12-26 A kind of steel column location straightening method of stand column pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410823394.0A CN104532843B (en) 2014-12-26 2014-12-26 A kind of steel column location straightening method of stand column pile

Publications (2)

Publication Number Publication Date
CN104532843A CN104532843A (en) 2015-04-22
CN104532843B true CN104532843B (en) 2016-08-24

Family

ID=52848451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410823394.0A Active CN104532843B (en) 2014-12-26 2014-12-26 A kind of steel column location straightening method of stand column pile

Country Status (1)

Country Link
CN (1) CN104532843B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821887B (en) * 2016-04-05 2017-09-26 东通岩土科技(杭州)有限公司 A kind of stand column pile installation method constructed in boulder bed
CN105714825A (en) * 2016-04-28 2016-06-29 山东省建筑科学研究院 Core pile guide device suitable for cemented soil core inserting combination pile and core pile guide method
CN106759558B (en) * 2017-01-22 2019-04-12 上海森信建设集团有限公司 A kind of control is buried in the earth the construction method of stand column pile direction and verticality
CN109083211B (en) * 2018-08-30 2020-08-28 南京江宁区上峰国银标准件厂 Precise automatic cast-in-place pile righting equipment and use method thereof
CN110016910A (en) * 2019-04-26 2019-07-16 重庆交通大学 Gasbag-type high-precision positioner and construction method can be recycled in a kind of steel pipe post stake
CN110080207A (en) * 2019-04-29 2019-08-02 山东大学 A kind of assembled steel tubular pole connector and application method
CN110258540B (en) * 2019-06-25 2020-12-22 安徽皖宏建筑工程有限公司 Construction method of cast-in-situ bored pile
CN113502806B (en) * 2021-07-15 2022-09-06 江苏天力建设集团有限公司 Concrete-filled steel tube stand column for weathered geological reverse construction method and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202850027U (en) * 2012-09-03 2013-04-03 湖北中南勘察基础工程有限公司 Reverse building method pile foundation construction steel column location verticality adjustment device
CN203113336U (en) * 2013-01-31 2013-08-07 广东省建筑设计研究院 Locating and perpendicularity adjusting device of rotary-drilling pile concrete-filled steel tubular column reverse construction method
CN203160245U (en) * 2013-04-03 2013-08-28 中铁十局集团第二工程有限公司 Positioning device for temporary steel-pipe column pile
CN103993597A (en) * 2014-05-23 2014-08-20 上海森信建设工程有限公司 High-precision vertical column pile construction method
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2799778B2 (en) * 1991-03-06 1998-09-21 清水建設株式会社 Construction method of steel tube concrete pillar
JP3701648B2 (en) * 2002-11-13 2005-10-05 株式会社竹中工務店 Steel pipe construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202850027U (en) * 2012-09-03 2013-04-03 湖北中南勘察基础工程有限公司 Reverse building method pile foundation construction steel column location verticality adjustment device
CN203113336U (en) * 2013-01-31 2013-08-07 广东省建筑设计研究院 Locating and perpendicularity adjusting device of rotary-drilling pile concrete-filled steel tubular column reverse construction method
CN203160245U (en) * 2013-04-03 2013-08-28 中铁十局集团第二工程有限公司 Positioning device for temporary steel-pipe column pile
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN103993597A (en) * 2014-05-23 2014-08-20 上海森信建设工程有限公司 High-precision vertical column pile construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
半逆作法施工技术在旋流沉淀池工程中的应用;黎明中;《土工基础》;20031231;第17卷(第4期);第10-12页 *
灌注桩钢立柱垂直度控制***的设计和研制;仲葆文等;《华东理工大学学报》;20040630;第306-310页 *

Also Published As

Publication number Publication date
CN104532843A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104532843B (en) A kind of steel column location straightening method of stand column pile
CN103899337B (en) Wide tunnel waterproof board installation platform and installation method
CN207048069U (en) A kind of pipe gallery segmental timbering
CN102767182A (en) Verticality adjustment system for lattice column correcting mount and construction method thereof
CN106958244B (en) The installation and locating method of ultra-deep and large diameter steel pipe column
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN218150940U (en) Adjustable tunnel is first to be propped up and two lining supporting devices
CN110886902A (en) Natural gas conveying pipeline engineering laying and building method
CN114198107A (en) Multifunctional reduced-scale shield model free of shield machine model and test method thereof
CN110130923B (en) A shaped steel supporting bow member structure for tunnel
CN106400784A (en) Construction method for manufacturing cast-in-place pile through cast-in-place pile reinforcement cage
CN206987509U (en) Supply line's electric pole plants lever apparatus
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN107190736A (en) Suitable for the flexible shroud and its construction method of steel reinforcement cage under coral reef geology
CN105155580B (en) A kind of underground large-size spherical tank inside panel support meanss and construction method
CN210134427U (en) Composite steel pipe pile rapping fine-adjustment guiding system
CN207063007U (en) A kind of walling crib ruggedized construction
CN105926637A (en) Prestressing force support system for protecting existing subway and design and construction method
JP2002097718A (en) Erection method for steel-pipe column
CN206036408U (en) Span pipeline normal position of foundation ditch and suspend protection architecture in midair
JP5032255B2 (en) Rockfall protection and avalanche prevention facility
CN212612036U (en) Single arch rib framing and turning system of steel box arch bridge
CN104631496B (en) Temporary access road above a kind of ballast water tank water and the installation method of this passage
CN208831156U (en) A kind of cable wind rope anchoring device for locating of fans installation
CN111678007A (en) Fixing device for installing and embedding earth-rock dam pressure measuring pipe and inclinometer pipe

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant