CN101418542B - Cable system construction method of spatial self-anchored rope-suspension bridge - Google Patents

Cable system construction method of spatial self-anchored rope-suspension bridge Download PDF

Info

Publication number
CN101418542B
CN101418542B CN 200810203206 CN200810203206A CN101418542B CN 101418542 B CN101418542 B CN 101418542B CN 200810203206 CN200810203206 CN 200810203206 CN 200810203206 A CN200810203206 A CN 200810203206A CN 101418542 B CN101418542 B CN 101418542B
Authority
CN
China
Prior art keywords
cable
main push
bridge
towing rope
interim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200810203206
Other languages
Chinese (zh)
Other versions
CN101418542A (en
Inventor
沈洋
郝维索
张剑英
臧瑜
戴建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN 200810203206 priority Critical patent/CN101418542B/en
Publication of CN101418542A publication Critical patent/CN101418542A/en
Application granted granted Critical
Publication of CN101418542B publication Critical patent/CN101418542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for constructing a cable system of a spatial self-anchoring type suspension bridge. The method is characterized in that a cat path and a main cable are arranged on the vertical surface to form a hollow cable type; and the completed bridge linearity of the main cable is formed through traversing the main cable and stretching slings. Through the proposal, the method has obvious technical characteristics: 1. the main cable is arranged on the vertical surface and is favorable for braiding the cable; 2. the cable tightening operation is carried out on the vertical surface so as to be favorable for tightening the cable and ensuring the gap rate; and 3. firstly, a temporary inhaul cable is used to traverse the main cable in order that the main cable linearity is close to a completed bridge state; and secondly, the sling is stretched and is favorable for controlling the spatial angle of a cable clip and positioning the sling in a transverse oblique anchor tube. The method has the advantages that the construction method is simple, is favorable for the braiding and molding of the main cable and the spatial positioning of the angles of the cable clip and the slings and realizes the completed bridge linearity of the main cable.

Description

A kind of cable system construction method of spatial self-anchored rope-suspension bridge
Technical field:
The present invention relates to the technical field of construction of bridge, specifically a kind of cable system construction method of spatial self-anchored rope-suspension bridge.
Background technology:
Self-anchored suspension bridge is owing to will transmitting by stiff girder the horizontal force of main push-towing rope, necessary first erection construction support or trestle aspect construction, then set up stiff girder on support or trestle, finally set up again main push-towing rope, hoist cable is installed, carry out the adjustment of hoist cable power, make the deadweight of stiff girder be delivered to main push-towing rope by hoist cable, have the process of an individual system conversion.
Traditional parallel rope face Cable System of Self-anchored Suspension Bridge construction is in the braided cable moulding of vertical plane, then vertical Plane Installation hoist cable, the conversion of vertical plane system.But construction is not all right for the space Cable System of Self-anchored Suspension Bridge, because be the vertical plane at empty cable state main push-towing rope, becoming the bridge state is but the inclined-plane, space, there is a process changed to space from plane, change bad meeting and make the angular deviation of cord clip otic placode excessive, even main push-towing rope occurs reversing, rouses the silk phenomenon, thereby makes main push-towing rope, cord clip unbalance stress, reduce safety factor, affect workmanship.
Therefore, to adopt which kind of job practices to carry out funicular system construction be very important to the space self-anchored suspension bridge.
Summary of the invention:
An object of the present invention is to provide a kind of cable system construction method of spatial self-anchored rope-suspension bridge, in order to solve the construction difficult problem of space Cable System of Self-anchored Suspension Bridge.
To achieve these goals, technical scheme of the present invention is: set up cat road and main push-towing rope at vertical guide, form empty cable type; Adopt the interim hoist cable stretch-draw of multiple spot, main push-towing rope traversing, make main push-towing rope approach into bridge linear; Then carry out the adjustment of cord clip space angle, by the permanent hoist cable of root stretch-draw, form main push-towing rope and become the bridge line style, complete the system conversion.
Concrete steps comprise: A, at vertical guide, set up cat road and main push-towing rope; B, the tight cable of vertical guide; C, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment; D, in across the multipair interim drag-line of symmetrical stretch-draw, will in be flared to across main push-towing rope is traversing that to approach into bridge linear; E, permanent cord clip angle are accurately located, permanent hoist cable stretch-draw anchor, saddle pushing tow; F, full-bridge Suo Li adjust, and remove interim cord clip and interim hoist cable; G, main push-towing rope twine silk, protection, the ancillary works construction.For pick up speed, also dismountable Temporary Piers support, deck paving in step G.
The obvious technical characterstic that the present invention forms by the such scheme feature, one, vertical guide sets up main push-towing rope, is conducive to braided cable; Its two, tight cable is operated in vertical guide to carry out, and is conducive to tight cable, guarantees void content; Its three, first use the traversing main push-towing rope of interim drag-line, make the main push-towing rope line style approach into the bridge state, then the stretch-draw hoist cable, be conducive to control and the location of hoist cable in the lateral inclination anchor tube of cord clip space angle.The invention has the advantages that job practices is simple, be beneficial to the space orientation of the moulding of main push-towing rope braided cable and cord clip, hoist cable angle, realize that main push-towing rope becomes the bridge line style.
The accompanying drawing explanation:
Fig. 1 is empty cable state main push-towing rope elevational schematic view
Fig. 2 is empty cable state main push-towing rope floor map
Fig. 3 is empty cable state main push-towing rope schematic cross-sectional view
The A place enlarged drawing that Fig. 4 is Fig. 3
Fig. 5 is that interim hoist cable facade is arranged schematic diagram
Fig. 6 is for becoming bridge state elevational schematic view
Fig. 7 is for becoming bridge state plane schematic diagram
Fig. 8 is for becoming bridge state main push-towing rope schematic cross-sectional view
The B place enlarged drawing that Fig. 9 is Fig. 7
Figure 10 Wei Mao road general arrangement elevational schematic view
Figure 11 Wei Mao road general arrangement floor map
Figure 12 is cord clip, hoist cable connection diagram
The B-B sectional view that Figure 13 is Figure 12
The specific embodiment:
Below in conjunction with accompanying drawing and example, the present invention is further described.
1, vertical guide sets up the cat road
,Mao road 1 You Mao road track cable, crossbeam, manrope, veil, horizontal compositions such as wind resistance steadying line 7, anchoring adjustment System as shown in Figure 10 and Figure 11.Cat road track cable 1 can be with three across isolating construction.Two end bays are respectively established a width and are merged the cat road.In across main push-towing rope due to needs through the space transfer process, so the Zhong Kuamao road adopts two width independence cat roads.
2, vertical guide braided cable
Main push-towing rope 2 is arranged on 1 top, cat road, and main cable unit cable strand adopts vertical guide erection technique comparative maturity, is divided into general Strand Erection and Datum Strand Erection two classes.Main construction sequence is: the strand traction; On strand, carry, traversing shaping enters saddle; The strand sag adjustment; The anchor span tension adjustment.First set up Datum Strand, after observing, adjusting, then take Datum Strand as benchmark sets up general strand.
3, the tight cable of vertical guide
Tight cable work must be carried out in two steps, i.e. pretension cable and formal tight cable.The method that binding strap on strand adopts Jin Lan limit, limit to remove, a unsuitable complete removal.Formal tight cable adopts special-purpose tight cable machine that main push-towing rope is made into to circle.The direction of formal tight cable should be carried out to the king-post direction from span centre, and end bay is carried out to the king-post direction by anchorage.The schematic diagram that Fig. 1~Fig. 4 is empty cable state main push-towing rope.
4, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment
Multipair interim cord clip and interim hoist cable 3 are installed in vertical guide.Interim cord clip, hoist cable and permanent cord clip, hoist cable be not all at same position, and length is also different.Consider it is interim member, the strength of materials can be considered suitable reduction.Interim cord clip is arranged on main push-towing rope 2, and interim hoist cable 3 one ends are connected with main push-towing rope 2 by interim cord clip, and the other end is connected with Bridge beam 4.Because the permanent hoist cable of this bridge is the Spatial Cable face, this just requires permanent cord clip accurately to locate.First carry out permanent cord clip initial alignment, the three dimensional space coordinate accurate positioning, the cord clip bolt is just twisted, and tonnage is less, does not make the cord clip slippage.Permanent cord clip is only pursued and installs to tower top by span centre and anchorage place.
5, in across the multipair interim drag-line of symmetrical stretch-draw, will in be flared to across main push-towing rope is traversing that to approach into bridge linear
Adopt multipoint method, as required, in across the multipair interim drag-line of symmetrical stretch-draw, will in be flared to across main push-towing rope is traversing that to approach into bridge linear, the space angle of controlling cord clip and hoist cable with become the bridge angle more approaching, when guaranteeing the hoist cable installation, can penetrate in the girder anchor tube.This process is the key of cable system construction method of spatial self-anchored rope-suspension bridge.Determine some, several to interim drag-line, need obtain by analog computation.Purpose is by several stretch-draw to interim hoist cable, and after making main push-towing rope traversing, the hoist cable lateral slip angle can meet the required precision of design.According to span, the about 50m of spacing left and right between general interim hoist cable.Fig. 5 is that interim hoist cable is arranged schematic diagram, and Fig. 6~Fig. 9 is into the schematic diagram of bridge state main push-towing rope.
6, permanent cord clip angle accurately locate, permanent hoist cable stretch-draw anchor, saddle pushing tow
The about 10m of permanent hoist cable spacing left and right, the every corresponding permanent cord clip in hoist cable upper end.Main push-towing rope is traversing be flared to approach into bridge linear after, just can carry out the accurate location adjustment of permanent cord clip.Under this state, due to depth-width ratio, higher near the cord clip position of king-post, with the lateral angles of girder anchor point, with becoming the bridge state, approach, and the cord clip position of close span centre is lower, with the lateral angles of girder anchor point with become bridge state difference distance also very large.Therefore, the tension sequence of hoist cable should carry out stretch-draw to the span centre direction from king-post 6, can make the differential seat angle between cord clip otic placode and hoist cable meet required precision.For eliminating the impact of the hoist cable of stretch-draw on other hoist cable own, the accurate adjustment of cord clip angle must be carried out after a upper hoist cable stretch-draw is complete simultaneously.
By the gauge point of doing on main push-towing rope in advance, use universal bevel protractor, measure the angle that now main push-towing rope reverses, according to survey data and corrected Calculation value, cord clip otic placode angle is carried out to accurate adjustment.The result of calculating according to work progress system converting analogue, Space Nonlinear and the requirement of hoist cable safety factor due to main push-towing rope, have the part rope to need the spreading anchoring in stretching process.Along with the stretch-draw of hoist cable, to becoming, bridge is linear to be drawn close gradually for main push-towing rope linear, and the cord clip angular deviation is also more and more less.Excessive for preventing the hoist cable lateral angles, be provided with stiffening ring device 8 on each permanent cord clip, can regulate the space angle of cord clip by drag cable, make in be controlled at ± 2 degree of hoist cable lateral slip angle in stretching process.
7, system conversion, full-bridge Suo Li adjust
In system conversion process, along with the stretch-draw of permanent hoist cable, the Suo Li of interim hoist cable is decreased to zero gradually, at this moment interim hoist cable can be removed.Permanent one-phase is to hang cable force and linear dual control, with Suo Liwei master.Mainly by regulate the order and the number of times that hang cable force and the permanent rope of stretch-draw temporarily, solve.Permanent one complete, after the de-frame of girder steel, carry out the full-bridge adjustment to hanging cable force as required.The permanent two-stage, to hang cable force and linear dual control, take linear as main.Be now accelerating construction progress, can first carry out the construction of deck paving and the second bridge deck main cable protection system, carry out as required funiculus posterior medullae spinalis power and always adjust after becoming bridge.
8, main push-towing rope twines silk, protection, the ancillary works construction
Finally carrying out main push-towing rope system anticorrosive coating ,Mao road removes.Complete space Cable System of Self-anchored Suspension Bridge construction, Cheng Qiao.
Technical standard and the standard in the present invention, used comprise:
(1) " highway bridge and culvert design general specification " (JTG D60-2004)
(2) " highway bridge and culvert construction technique normalizing " (JTJ041-2000)
(3) " highway suspension bridge design specifications " (declaration original text)

Claims (2)

1. a cable system construction method of spatial self-anchored rope-suspension bridge, is characterized in that vertical guide sets up cat road and main push-towing rope, forms empty cable type; Adopt the interim hoist cable stretch-draw of multiple spot, main push-towing rope traversing, make main push-towing rope approach into bridge linear; Then carry out the adjustment of cord clip space angle, by the permanent hoist cable of root stretch-draw, form main push-towing rope and become the bridge line style, complete the system conversion.
2. cable system construction method of spatial self-anchored rope-suspension bridge as claimed in claim 1, is characterized in that the method comprises the steps: A, at vertical guide, sets up cat road and main push-towing rope; B, the tight cable of vertical guide; C, interim cord clip, interim hoist cable are installed, permanent cord clip vertical guide initial alignment; D, in across the multipair interim drag-line of symmetrical stretch-draw, will in be flared to across main push-towing rope is traversing that to approach into bridge linear; E, permanent cord clip angle are accurately located, permanent hoist cable stretch-draw anchor, saddle pushing tow; F, full-bridge Suo Li adjust, and remove interim cord clip and interim hoist cable; G, main push-towing rope twine silk, protection, the ancillary works construction.
CN 200810203206 2008-11-21 2008-11-21 Cable system construction method of spatial self-anchored rope-suspension bridge Active CN101418542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810203206 CN101418542B (en) 2008-11-21 2008-11-21 Cable system construction method of spatial self-anchored rope-suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810203206 CN101418542B (en) 2008-11-21 2008-11-21 Cable system construction method of spatial self-anchored rope-suspension bridge

Publications (2)

Publication Number Publication Date
CN101418542A CN101418542A (en) 2009-04-29
CN101418542B true CN101418542B (en) 2013-12-25

Family

ID=40629529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810203206 Active CN101418542B (en) 2008-11-21 2008-11-21 Cable system construction method of spatial self-anchored rope-suspension bridge

Country Status (1)

Country Link
CN (1) CN101418542B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021887A (en) * 2010-09-16 2011-04-20 长沙理工大学 Suspender tensioning method of double-tower single-span self-anchored suspension bridge with high-cross dip and spatial cable
CN102839605B (en) * 2012-09-25 2014-07-23 长沙理工大学 Sag control method for small-sag datum strand
CN103233427B (en) * 2013-04-27 2015-04-22 长沙理工大学 Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge
CN103266570B (en) * 2013-05-28 2015-07-15 中交二公局第五工程有限公司 Method for accurately installing and positioning suspension bridge main cable anchor system
CN104060545B (en) * 2014-07-10 2016-02-10 中交二航局第四工程有限公司 Can be used for the suspension trestle waterborne of pumping of concrete and construction method thereof and purposes
CN104404873B (en) * 2014-10-20 2017-04-26 上海市政工程设计研究总院(集团)有限公司 Self-anchored suspension bridge main cable anchoring method
CN105603879B (en) * 2015-12-29 2017-06-23 四川石油天然气建设工程有限责任公司 The construction technology in large-scale pipeline crossing construction cat road
CN105780658B (en) * 2016-03-11 2017-11-14 中国建筑第六工程局有限公司 A kind of Spatial Cable face structural cables system is laterally to pulling method
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
CN107059650B (en) * 2017-06-28 2019-06-28 四川公路桥梁建设集团有限公司 Suspension bridge main push device
CN108229035B (en) * 2018-01-09 2020-11-06 安徽省交通控股集团有限公司 Design method for cable-stayed bridge wire-dividing clamping type saddle
CN108396633A (en) * 2018-02-02 2018-08-14 中铁四局集团第二工程有限公司 Across the valley suspension bridge pumping beam body concrete construction method of one kind and device
CN108360378B (en) * 2018-02-08 2024-03-19 江苏法尔胜缆索有限公司 Saddle-entering device and saddle-entering method for suspension bridge strand deep partition plate
CN109653077B (en) * 2019-02-02 2024-02-02 中交公路长大桥建设国家工程研究中心有限公司 Three main cable double-tower column suspension bridge
CN110468724B (en) * 2019-08-30 2020-12-01 西安市政设计研究院有限公司 Auxiliary device for main cable construction of space cable suspension bridge and main cable construction method
CN110644370B (en) * 2019-09-30 2021-03-02 中铁大桥局第七工程有限公司 Cable hoisting system of space self-anchored suspension bridge and construction method thereof
CN113565023B (en) * 2020-08-27 2022-11-08 孙德明 Wind-resistant suspension bridge
CN113152290B (en) * 2021-04-09 2022-09-09 中建三局集团有限公司 System conversion device and conversion construction method of space cable surface self-anchoring suspension bridge
CN115162200A (en) * 2022-08-23 2022-10-11 广东湾区交通建设投资有限公司 Suspension bridge main cable strand erection and position restraining method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007132077A (en) * 2005-11-10 2007-05-31 Yokogawa Bridge Corp Construction method of rigid-frame bridge with angle brace member, and rigid-frame bridge with angle brace member
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN101187199A (en) * 2007-12-24 2008-05-28 中铁大桥局股份有限公司 Self-anchoring type suspension bridge system conversion construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007132077A (en) * 2005-11-10 2007-05-31 Yokogawa Bridge Corp Construction method of rigid-frame bridge with angle brace member, and rigid-frame bridge with angle brace member
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN101187199A (en) * 2007-12-24 2008-05-28 中铁大桥局股份有限公司 Self-anchoring type suspension bridge system conversion construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张剑英,郝维索,戴建国,沈洋.杭州钱塘江江东大桥总体设计.《第十八届全国桥梁学术会议论文集(上册)》.2008,393-400页. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology

Also Published As

Publication number Publication date
CN101418542A (en) 2009-04-29

Similar Documents

Publication Publication Date Title
CN101418542B (en) Cable system construction method of spatial self-anchored rope-suspension bridge
CN105421248B (en) Large-Span Continuous girder span building up station turns and closure construction method
CN104060544B (en) The construction technology that a kind of pipeline suspension crossing bridge body of a bridge is installed
CN101476293A (en) Non-stand construction method for large bridge arch rib
CN101838969B (en) Method for stretching single-tower double-span self-anchored suspension bridge sling of side-span splay cable knot in supportless way
CN103938552B (en) Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
CN106245527B (en) A kind of erection method of dicyclic suspender and Long span cat road track cable
CN107447665B (en) A kind of laying method of self-anchored suspension bridge construction cat road carrying rope
CN101781879A (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN104846747B (en) A kind of self-anchored suspension bridge suspender tension technique based on self equilibrium systems
CN201825671U (en) Hoisting trolley for track plate
CN104695715A (en) Construction method of beam string structure of roof
CN101392501A (en) Erection method for wide span steel box bridge
CN104746437A (en) Self-anchoring type mounting method of suspension bridge
CN112391950B (en) Device and method for adjusting center line deviation of closure opening of high-tower and low-tower cable-stayed bridge
CN109468941A (en) A kind of curve tower abnormity cable-stayed bridge and its construction method
CN108103949A (en) A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN208917704U (en) Curve lightweight I-beam beam bridge hauling construction cantilever end control device
CN108221694B (en) The method for installing long-span arch bridge tie-rod
CN106835981A (en) A kind of self-balance type inhaul cable anchorage structure suitable in bridge pier and bridge tower
CN203782578U (en) Foldable support pulley device for towing catwalk top by main cable strand of suspension bridge
CN104060545A (en) Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof
CN105113414A (en) Method for quickly setting up main ropes of suspension bridge
CN105586832A (en) Suspension type catwalk surface net mounting system
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant