CN205602603U - Box equipment drive unit of battery system line - Google Patents

Box equipment drive unit of battery system line Download PDF

Info

Publication number
CN205602603U
CN205602603U CN201620339767.1U CN201620339767U CN205602603U CN 205602603 U CN205602603 U CN 205602603U CN 201620339767 U CN201620339767 U CN 201620339767U CN 205602603 U CN205602603 U CN 205602603U
Authority
CN
China
Prior art keywords
platform
station
box
production
battery system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620339767.1U
Other languages
Chinese (zh)
Inventor
卢胜
张耀华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yi power electronic Polytron Technologies Inc
Original Assignee
Fujian Yidongli Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yidongli Electronic Technology Co Ltd filed Critical Fujian Yidongli Electronic Technology Co Ltd
Priority to CN201620339767.1U priority Critical patent/CN205602603U/en
Application granted granted Critical
Publication of CN205602603U publication Critical patent/CN205602603U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Multi-Process Working Machines And Systems (AREA)

Abstract

The utility model provides a box equipment drive unit of battery system line, relates to the production facility of battery system box. A balanced, production material distribution is placed, the PQC station sets up the scheduling problem has a box equipment drive unit of battery system line that can effectively solve production processes's incorporation and split, transport, the the production water line of big weight box is provided. Be equipped with equipment station, stopper, conveying platform, moving platform and frock board, the equipment station is used for placing the box, and the stopper is located between equipment station and the moving platform, adopts the locating pin to connect soon between conveying platform, moving platform and the frock board, and moving platform's both ends below is equipped with the jacking respectively and moves the microscope carrier, and the jacking moves the microscope carrier to be passed through worm wheel lead screw device and be connected with the motor, and the box moves the microscope carrier through the jacking and shifts to the moving platform on. Being convenient for, the transport is shifted and improvement space utilization.

Description

A kind of battery system casing assembles gear unit line
Technical field
This utility model relates to the production equipment of battery system casing, especially relates to a kind of battery system casing and assembles gear unit line.
Background technology
Existing battery system casing assembles gear unit line and uses PLC Based Intelligent Control, the length of wire body can be increased according to the quantity required of production process station, designer's quantity, meet flowing water balance and material transmission, and the tradition workshop production and assembly big casing of battery typically uses one-stop production and assembly and common production line balance to assemble two kinds of assembling modes, their feature respectively:
(1), one-stop production and assembly are exactly that the big case of battery is positioned over fixed position, during production and assembly, big casing does not has displacement, all accessories in case big to battery use many people to assemble one by one, and this production and assembly mode advantage is: 1., heavy weight Battery case during production and assembly, do not carry operation;2. productive temp and flowing water balance need not, be considered;Major defect is: 1., causes accessory material and excessively concentrates;2. and to employee skill higher (skill set requirements is comprehensive) is required;3., production efficiency is low;4., it is unfavorable for that what PQC worked carries out.
, the production and assembly mode of common streamline be to assemble operation to be performed according to Battery case to arrange station, each station installs different material accessories, and the Battery case transmission by streamline in production process, by being front moved rearwards by.The advantage of this kind of production and assembly mode is: 1., material accessory is clear needed for each station, it is easy to distribution;2., personnel's skill set requirements is the highest;3., the most one-stop production of production efficiency increases;4., it is easy to PQC work carry out;So its major defect has: 1., wire body is long requires higher to flowing water rhythm control;2., wire body Design of length good after, for the change of technique and the merging of operation station or fractionation, it is impossible to carry out wire body transformation or transformation difficulty is higher;3., for produced problem in production process, can only be transferred to outside line solve, shift loaded down with trivial details and affect production efficiency.
Summary of the invention
The purpose of this utility model is to provide and can effectively solve the problems such as the merging of production process and fractionation, the carrying of big weight casing, the balance of production line, production material distribution is placed, PQC station is arranged and have a kind of battery system casing assembling gear unit line.
This utility model is provided with assembling station, stopper, delivery platform, mobile platform and working plate;
Described assembling station is used for placing casing, stopper is located between assembling station and mobile platform, alignment pin is used to connect soon between delivery platform, mobile platform and working plate, the two ends of mobile platform are respectively arranged below with jacking transferring platform, jacking transferring platform is connected with motor by Worm gear feed screw device, and casing is transferred on mobile platform by jacking transferring platform.
When this utility model uses, production management personnel can be on the premise of self staffing and technological requirement, length and the station of this element line are set, and this element line also allows for solving production and assembly problem on line, solve to cause sluggishness or the stopping of whole production line because of the production problem of local station.This utility model effectively solves the problems such as the merging of production process and fractionation, the carrying of big weight casing, the balance of production line, production material distribution is placed, PQC station is arranged, and improves the flexibility of production.Platform maximum height of the present utility model can be 600mm, casing is positioned over assembling station by forklift by production and assembly, after completing the operation of front station, it is transferred to mobile platform by the effect of jacking transferring platform, casing station backward flows, during to the station mobile platform specified, it is transferred to another assembling station and carries out production and assembly operation, it is simple to carrying transfer and raising space availability ratio.
Accompanying drawing explanation
Fig. 1 is the structure composition schematic diagram of this utility model embodiment.
Fig. 2 is the jacking transferring platform structural representation of this utility model embodiment.
Detailed description of the invention
Seeing Fig. 1 and 2, this utility model embodiment is provided with assembling station 1, stopper 2, delivery platform 3, mobile platform 4 and working plate (being not drawn in the drawings);Described assembling station 1 is used for placing casing, casing is transferred on mobile platform 4 by jacking transferring platform 6, stopper 2 is located between assembling station 1 and mobile platform 4, delivery platform 3, between mobile platform 4 and working plate use alignment pin connect soon, the two ends of mobile platform 4 are respectively arranged below with jacking transferring platform 6, and jacking transferring platform 6 is connected with motor 8 by turbine lead screw device 7.
Design platform height is 500~600mm, and with the use of pallet height (140mm) and the casing oneself height (about 250mm) of storing casing, the total height of its employee operation meets the operation height of human engineering.Pin is used to connect soon between delivery platform, mobile platform, assembling station, simple installation;Delivery platform, mobile platform, assembling station and auxiliary component, electrical equipment etc. can be increased according to the increase of station.
Specifically used method given below:
1, station is assembled before the casing forklift carrying out production and assembly being needed to deliver to, after completing the operation of this station, start jacking transferring platform, casing is pushed to mobile platform and starts delivery platform casing is delivered to lower station, when arriving the mobile platform that the next one assembles station, conveying stops and pushing to assemble station carrying out production activity.
2, when station quantity increases, delivery platform, mobile platform and assembling connection between station, and all parts fixing employing alignment pin, easy installation and removal need to only be increased.

Claims (1)

1. a battery system casing assembles gear unit line, it is characterised in that be provided with assembling station, stopper, delivery platform, mobile platform and working plate;
Described assembling station is used for placing casing, stopper is located between assembling station and mobile platform, alignment pin is used to connect soon between delivery platform, mobile platform and working plate, the two ends of mobile platform are respectively arranged below with jacking transferring platform, jacking transferring platform is connected with motor by Worm gear feed screw device, and casing is transferred on mobile platform by jacking transferring platform.
CN201620339767.1U 2016-04-21 2016-04-21 Box equipment drive unit of battery system line Expired - Fee Related CN205602603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620339767.1U CN205602603U (en) 2016-04-21 2016-04-21 Box equipment drive unit of battery system line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620339767.1U CN205602603U (en) 2016-04-21 2016-04-21 Box equipment drive unit of battery system line

Publications (1)

Publication Number Publication Date
CN205602603U true CN205602603U (en) 2016-09-28

Family

ID=56970403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620339767.1U Expired - Fee Related CN205602603U (en) 2016-04-21 2016-04-21 Box equipment drive unit of battery system line

Country Status (1)

Country Link
CN (1) CN205602603U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109360994A (en) * 2018-11-09 2019-02-19 安徽巡鹰新能源科技有限公司 A kind of battery processing device
CN109399131A (en) * 2018-12-18 2019-03-01 常州嘉业智能装备科技有限公司 A kind of material automatic transportation mechanism
CN109625886A (en) * 2018-12-27 2019-04-16 珠海格力智能装备有限公司 Shunt lifting device and the controller test assembly line with it
CN110419824A (en) * 2019-06-21 2019-11-08 安徽一诺青春工业设计有限公司 A kind of shoe-making assembly line with the working plate to work independently
CN110802410A (en) * 2019-11-18 2020-02-18 江苏星之海智能科技有限公司 Combined type digit control machine tool
CN114538016A (en) * 2022-02-22 2022-05-27 银川市立恒电气设备有限公司 Multi-station integrated intelligent dispatching and distributing assembly line
DE102023107366B3 (en) 2023-03-23 2024-06-06 Mb Automation Gmbh & Co. Kg Device for producing layer arrangements for battery or fuel cells and production plant for producing stacked layer arrangements

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109360994A (en) * 2018-11-09 2019-02-19 安徽巡鹰新能源科技有限公司 A kind of battery processing device
CN109399131A (en) * 2018-12-18 2019-03-01 常州嘉业智能装备科技有限公司 A kind of material automatic transportation mechanism
CN109625886A (en) * 2018-12-27 2019-04-16 珠海格力智能装备有限公司 Shunt lifting device and the controller test assembly line with it
CN109625886B (en) * 2018-12-27 2021-08-06 珠海格力智能装备有限公司 Shunt lifting device and controller test assembly line with same
CN110419824A (en) * 2019-06-21 2019-11-08 安徽一诺青春工业设计有限公司 A kind of shoe-making assembly line with the working plate to work independently
CN110419824B (en) * 2019-06-21 2021-03-30 浙江名将鞋业有限公司 Shoemaking assembly line with tooling plate working independently
CN110802410A (en) * 2019-11-18 2020-02-18 江苏星之海智能科技有限公司 Combined type digit control machine tool
CN114538016A (en) * 2022-02-22 2022-05-27 银川市立恒电气设备有限公司 Multi-station integrated intelligent dispatching and distributing assembly line
DE102023107366B3 (en) 2023-03-23 2024-06-06 Mb Automation Gmbh & Co. Kg Device for producing layer arrangements for battery or fuel cells and production plant for producing stacked layer arrangements

Similar Documents

Publication Publication Date Title
CN205602603U (en) Box equipment drive unit of battery system line
CN104801899B (en) A kind of ground slidingtype flexibility always spells system
CN202594329U (en) Gearbox assembly assembling production line
CN105252179B (en) Control method for automatic flexible welding production line oriented to multiple classes of small assemblies
CN205652760U (en) Automatic change automobile body transfer chain
CN105479162B (en) Battery automatically assembles equipment
CN102848496B (en) Die changing device
CN205346110U (en) A production line for parachute kit equipment
CN204917029U (en) Coaster cyclic delivery equipment
CN103303674A (en) Automatic feeding and discharging device for tire production
CN101330159A (en) Forwarding system for charging battery module
CN205147798U (en) Assembly line
CN206425711U (en) Multi-vehicle-type shares welding and assembling production lines structure
CN208746868U (en) A kind of fixture storehouse realizing manipulator fixture and taking automatically
CN208544260U (en) New-energy electric vehicle battery fills the system of changing automatically
CN208531718U (en) A kind of conveying tilting device
CN207747071U (en) A kind of work piece carrying mechanism in reciprocating paint finishing
CN110068788B (en) Flexible intelligent calibrating device and method compatible with calibration of various electric energy meters
CN202825199U (en) Automobile air conditioner intelligent assembly line
CN214779175U (en) Jacking delivery robot
CN105305160A (en) Truss-type flexible automatic assembly system
CN113084517A (en) Be used for electric jar part intelligence positioning system
CN208217727U (en) A kind of composite orbit Special connecting device
CN206813245U (en) A kind of flat-bulb steel clamp
CN206447180U (en) A kind of product conveying device for assembly line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 364101, lotus Industrial Zone, Gao Zhen Town, Yongding County, Fujian, Longyan

Patentee after: Fujian Yi power electronic Polytron Technologies Inc

Address before: 364101, lotus Industrial Zone, Gao Zhen Town, Yongding County, Fujian, Longyan

Patentee before: FUJIAN YIDONGLI ELECTRONIC TECHNOLOGY CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200421