CN205259558U - Novel scaffold for fitment - Google Patents

Novel scaffold for fitment Download PDF

Info

Publication number
CN205259558U
CN205259558U CN201520963342.3U CN201520963342U CN205259558U CN 205259558 U CN205259558 U CN 205259558U CN 201520963342 U CN201520963342 U CN 201520963342U CN 205259558 U CN205259558 U CN 205259558U
Authority
CN
China
Prior art keywords
pillar
cross bar
support frame
horizontal pole
fitment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520963342.3U
Other languages
Chinese (zh)
Inventor
熊金亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenmingshi Decoration Engineering Co Ltd
Original Assignee
Shenzhen Shenmingshi Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenmingshi Decoration Engineering Co Ltd filed Critical Shenzhen Shenmingshi Decoration Engineering Co Ltd
Priority to CN201520963342.3U priority Critical patent/CN205259558U/en
Application granted granted Critical
Publication of CN205259558U publication Critical patent/CN205259558U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to fitment instrument field provides a novel scaffold for fitment, including pillar, horizontal pole, oblique railing and branch, the pillar is equipped with four, the horizontal pole is established the pillar both ends, the horizontal pole with the pillar welding, the railing is established to one side between the pillar, the pillar passes through the oblique mutual fixed connection of railing, branch is installed the horizontal pole middle part, branch with be provided with the second horizontal pole between the pillar, be provided with the support frame on the horizontal pole, the support frame outside is provided with the couple, the support frame with the couple welding, the support frame passes through the couple is held with the horizontal pole card and is connected, be provided with the wire net in the support frame, the pillar bottom is provided with the truckle, and this novel scaffold for fitment structural stability is good, and it is convenient to move, and safe and reliable can realize the not fitment operation of co -altitude.

Description

A kind of novel finishing scaffold
Technical field
The utility model belongs to finishing field of tool, relates in particular to a kind of novel finishing scaffold.
Background technology
Scaffold refers to that job site is that workman operates and solve various supports vertical and that horizontal transport is set up.On construction site, be used in the higher place that cannot directly construct of exterior wall, inside fitting or floor height. Existing at presentScaffold move inconvenience, complex structure, inconvenient operation.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, provides a kind of structural stability good,Conveniently moving, safe and reliable, can realize the finishing scaffold of the fitment operation of differing heights.
The utility model is a kind of novel finishing scaffold of realizing like this, comprises pillar, cross bar, obliqueRailing and pole, described pillar is provided with four, and described cross bar is located at described pillar two ends, described cross bar and instituteState pillar welding, described oblique railing is located between described pillar, and described pillar is mutually solid by described oblique railingFixed connection, described pole is arranged on described cross bar middle part, between described pole and described pillar, is provided with secondCross bar, is provided with bracing frame on described cross bar, and support frame as described above arranged outside has hook, support frame as described above withDescribed welding hook, support frame as described above is held and is connected with cross bar by described hook, in support frame as described above, arrangesHave steel wire, described column bottom is provided with castor.
Support frame as described above is provided with three, can on bracing frame, carry out the fitment operation of three differing heights.
Described castor outside is provided with castor lock, and castor lock side is just fixed castor, ensures installation processSafe and reliable.
Described oblique railing is 45 ° of inclination angles and arranges, and tiltedly railing can keep corbeling stability high.
Described pillar height is greater than 2m, can carry out the finishing of indoor ceiling on pillar.
The beneficial effects of the utility model are: pillar, cross bar and the oblique railing of setting ensure that structural stability is good,Simple and reliable for structure; The second cross bar arranging facilitates finishing personnel to enter into operation on bracing frame; The extension arrangingThe hook bracing frame that is easy for installation and removal; The steel wire arranging ensures that job safety is reliable on bracing frame, simultaneouslyCan reduce the weight of scaffold; The castor arranging keeps conveniently moving.
Brief description of the drawings
In order to be illustrated more clearly in the technical solution of the utility model, below will be to required use in embodimentAccompanying drawing be briefly described, apparently, the accompanying drawing in the following describes is only of the present utility model oneA little embodiment, for those of ordinary skill in the art, are not paying under the prerequisite of creative work, alsoCan obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structure chart of a kind of novel finishing scaffold that provides of the utility model embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, to the technical side in the utility model embodimentCase is clearly and completely described.
As shown in Figure 1, a kind of novel finishing scaffold, comprises pillar 1, cross bar 2, oblique railing 3 andPole 4, pillar 1 is provided with four, and pillar 1 is highly greater than 2m, and cross bar 2 is located at pillar 1 two ends, cross bar2 weld with pillar 1, and tiltedly railing 3 is located between pillar 1, and tiltedly railing 3 is 45 ° of inclination angles settings, pillar 1Be mutually permanently connected by oblique railing 3, pole 4 is arranged on cross bar 2 middle parts, between pole 4 and pillar 1Be provided with the second cross bar 5, be provided with bracing frame 6 on cross bar 2, bracing frame 6 is provided with three, outside bracing frame 6Side is provided with hook 7, bracing frame 6 and hook 7 welding, bracing frame 6 by link up with 7 with cross bar 2 companies of holdingConnect, be provided with steel wire 8 in bracing frame 6, pillar 1 bottom is provided with castor 9, and castor 9 outsides are provided withCastor lock 10.
The beneficial effects of the utility model are: pillar 1, cross bar 2 and the oblique railing 3 of setting ensure Stability Analysis of StructuresProperty is good, simple and reliable for structure; The second cross bar 5 arranging facilitates finishing personnel to enter into operation on bracing frame 6;Hook 7 bracing frame 6 that is easy for installation and removal arranging; The steel wire 8 arranging ensures operation on bracing frame 6Safe and reliable, the while can be reduced the weight of scaffold; The castor 9 arranging keeps conveniently moving.
The above is preferred embodiment of the present utility model, it should be pointed out that general for the artLogical technical staff, is not departing under the prerequisite of the utility model principle, can also make some improvement andRetouching, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (5)

1. a novel finishing scaffold, is characterized in that: comprise pillar, cross bar, oblique railing and prop upBar, described pillar is provided with four, and described cross bar is located at described pillar two ends, described cross bar and the weldering of described pillarConnect, described oblique railing is located between described pillar, and described pillar is mutually permanently connected by described oblique railing,Described pole is arranged on described cross bar middle part, is provided with the second cross bar, institute between described pole and described pillarState on cross bar and be provided with bracing frame, support frame as described above arranged outside has hook, support frame as described above and described hookWelding, support frame as described above is held and is connected with cross bar by described hook, is provided with steel wire in support frame as described above,Described column bottom is provided with castor.
2. a kind of novel finishing scaffold according to claim 1, is characterized in that: describedSupport is provided with three.
3. a kind of novel finishing scaffold according to claim 1, is characterized in that: described pinWheel outside is provided with castor lock.
4. a kind of novel finishing scaffold according to claim 1, is characterized in that: described obliqueRailing is 45 ° of inclination angles and arranges.
5. a kind of novel finishing scaffold according to claim 1, is characterized in that: describedPost height is greater than 2m.
CN201520963342.3U 2015-11-27 2015-11-27 Novel scaffold for fitment Expired - Fee Related CN205259558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520963342.3U CN205259558U (en) 2015-11-27 2015-11-27 Novel scaffold for fitment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520963342.3U CN205259558U (en) 2015-11-27 2015-11-27 Novel scaffold for fitment

Publications (1)

Publication Number Publication Date
CN205259558U true CN205259558U (en) 2016-05-25

Family

ID=56001092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520963342.3U Expired - Fee Related CN205259558U (en) 2015-11-27 2015-11-27 Novel scaffold for fitment

Country Status (1)

Country Link
CN (1) CN205259558U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107804802A (en) * 2017-12-13 2018-03-16 泰兴市汇辰过滤器制造有限公司 A kind of ship lifting device easy to remove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107804802A (en) * 2017-12-13 2018-03-16 泰兴市汇辰过滤器制造有限公司 A kind of ship lifting device easy to remove

Similar Documents

Publication Publication Date Title
CN202055497U (en) Movable combination scaffold for construction works
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN204826593U (en) A portable supplementary operation platform for steel construction support body
CN205259558U (en) Novel scaffold for fitment
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN205077842U (en) Multi -use architecture support
CN203531345U (en) Movable cantilever frame
CN205976397U (en) Portable handling frame
CN204826727U (en) Reinforcing bar processing protection canopy that can dismantle, has enough to meet need
CN204174915U (en) Scaffold
CN204038917U (en) Dismountable external hanging service platform
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN207959863U (en) A kind of door-type scaffold
CN102817464B (en) Construction device for painting anti-corrosion and fireproof paint of building
CN207749810U (en) A kind of Novel moveable scaffold
CN207228603U (en) One kind is used for interior decoration scaffold
CN205502549U (en) Split type scaffold of hanging
CN104372935A (en) Scaffold
CN205730031U (en) A kind of hanging rack for safety belt
CN204059914U (en) Attachment type raise scaffold
CN205605106U (en) Outwork ladder
CN203640245U (en) Scaffold structure for building exterior wall construction
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN204199654U (en) The adjustable overarm bracing or strutting arrangement of a kind of building operations
CN204163369U (en) A kind of collapsible attaching lifting exterior wall scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20181127

CF01 Termination of patent right due to non-payment of annual fee