CN205502549U - Split type scaffold of hanging - Google Patents

Split type scaffold of hanging Download PDF

Info

Publication number
CN205502549U
CN205502549U CN201620143203.0U CN201620143203U CN205502549U CN 205502549 U CN205502549 U CN 205502549U CN 201620143203 U CN201620143203 U CN 201620143203U CN 205502549 U CN205502549 U CN 205502549U
Authority
CN
China
Prior art keywords
split type
scaffold
rod
model
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620143203.0U
Other languages
Chinese (zh)
Inventor
张利
邹世超
曾思慧
韩显涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Building & Installation Engineering Group Co Ltd
Original Assignee
China Coal Building & Installation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Building & Installation Engineering Group Co Ltd filed Critical China Coal Building & Installation Engineering Group Co Ltd
Priority to CN201620143203.0U priority Critical patent/CN205502549U/en
Application granted granted Critical
Publication of CN205502549U publication Critical patent/CN205502549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a split type scaffold of hanging belongs to the building field, jib including a plurality of vertical settings, the upper portion of jib sets up rings, be connected with the bracing piece of a plurality of horizontal settings between the bottom of jib through the connecting piece, the bracing piece includes the body of rod and is located the tip and the decurrent kink of direction of the body of rod, be provided with on the connecting piece and be used for making the first jack that the kink passed, be provided with the ledger board on the bracing piece. The utility model discloses simple structure, install and remove the convenience, repeatedly usable, when unconditionally using crane or console mode scaffold, the utility model provides a hang the inconvenience and the difficulty of facility installation under tall and big space roof, dome, the skew wall.

Description

Split type hanging scaffold
Technical field
This utility model relates to building field, particularly relates to a kind of split type hanging scaffold.
Background technology
Scaffold be for ensure high-rise working safely, be smoothed out construction and set up a kind of provisional set Execute.The popular convenience being contemplated to workmen of scaffold, the various supports set up at the construction field (site). Scaffold is used in that building external, building interior or floor height are more high cannot directly construct at the construction field (site) Place, is mainly used in the upper and lower operation of workmen, perimeter security net is gone along with sb. to guard him, and high-altitude installation component Etc. occasion.Some engineering also uses when template with scaffold, and therefore, scaffold is at building, traffic road The fields such as bridge, mine, advertising, municipal administration are widely used.
In coal storage field, top, major diameter ball storehouse carries out the peace of multiple spot coal supply technique erecting by overhang In dress, generally should use crane or set up landing leg hand cradle and carry out operation, without crane or construction Place is higher when cannot set up landing leg hand cradle, then workmen cannot be made to arrive the predetermined area and execute Work.
Utility model content
The technical problems to be solved in the utility model is to provide one and can conveniently be mounted on tall and big The split type hanging scaffold of the hanging facility under space top board, dome or skew wall.
For solving above-mentioned technical problem, this utility model provides technical scheme as follows:
A kind of split type hanging scaffold, including some longitudinally disposed suspension rods, the top of described suspension rod Arranging suspension ring, being connected by connector between the bottom of described suspension rod has the support of some horizontally sets Bar, described support bar includes the body of rod and is positioned at the end of the described body of rod and the kink that direction is downward, institute State the first jack being provided with on connector for making described kink pass;Arrange on described support bar There is scaffold board.
Further, the middle part of described connector be provided with for make described suspension rod pass second insert Hole.
Further, described connector has the trench structure of the body of rod that can accommodate described support bar.
Further, there are some horizontally sets also by connector connection between the middle part of described suspension rod Support bar.
Further, described scaffold board is bayonet type scaffold board.
Further, the stepped ramp type in the range of described bayonet type scaffold board is 0 °-45 ° of inclination angle.
Further, the middle part of described suspension rod is additionally provided with railing.
Further, the outside of described scaffold board is arranged above skirting board.
This utility model has the advantages that
Split type hanging scaffold of the present utility model, during installation, can be by the bending of described support bar Portion is located in the first jack of described connector fixing, and scaffold board rides upon described support member On, then, by suspension ring, this utility model is suspended on precalculated position, during dismounting, by described bending Portion splits out from the first jack, unloads described scaffold board.This utility model simple in construction, mounting or dismounting Convenient, reusable, when unconditional use crane or console model scaffold, this utility model solution Determine and hung inconvenience and the difficulty of erection of equipment under large space top board, dome, skew wall.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of split type hanging scaffold of the present utility model;
Fig. 2 is the front view of the local attachment structure of suspension rod of the present utility model, connector and support bar;
Fig. 3 is the top view of the local attachment structure of suspension rod of the present utility model, connector and support bar;
Fig. 4 is the partial structurtes schematic diagram of the bayonet type scaffold board of stepped ramp type of the present utility model.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearer, below To be described in detail in conjunction with the drawings and the specific embodiments.
This utility model provides a kind of split type hanging scaffold, as shown in Figure 1-2, including some vertical To the suspension rod 1 arranged, the top of suspension rod 1 arranges suspension ring 2, by connecting between the bottom of suspension rod 1 Part 3 connects the support bar 4 having some horizontally sets, and support bar 4 includes the body of rod 41 and is positioned at the body of rod The downward kink 42 in the end of 41 and direction, connector 3 is provided with for making kink 42 wear The first jack 31 crossed;Scaffold board 5 it is provided with on support bar 4.
In this utility model, during installation, the kink 42 of support bar 4 can be located in connector 3 The first jack 31 in fixing, and scaffold board 5 is ridden upon on support member, then, by suspension ring 2 This utility model is suspended on precalculated position;During dismounting, kink 42 is torn open from the first jack 31 Go out, unload scaffold board 5.In this utility model, connector 3 and suspension rod 1 can be designed as one Body structure, it is also possible to for Split type structure, when connector 3 and suspension rod 1 are Split type structure, Ke Yixian The jack that suspension rod 1 is pre-designed through connector 3, then be fixed, it is also possible to directly will connect Part 3 is fixed on the sidewall of suspension rod 1, and wherein, fixed form can use buckle or screw bolt and nut The modes such as combination, this utility model simple in construction, are convenient to mount and dismount, reusable, unconditionally make During with crane or console model scaffold, this utility model solves large space top board, dome, skew wall The inconvenience of lower hanging erection of equipment and difficulty.
As a kind of improvement of the present utility model, as it is shown on figure 3, the middle part of connector 3 is provided with use In the second jack 32 making suspension rod 1 pass.
In this utility model, convenient in order to place after dismantling, suspension rod 1 and connector 3 can be designed For Split type structure, it is preferred that the middle part of connector 3 be provided with for make suspension rod 1 pass second insert Hole 32, during installation, by suspension rod 1 through the second jack 32, and can fix.In this structure, hang Bar 1 is more firm with the connection of connector 3.
As further improvement of the utility model, connector 3 has the bar that can accommodate support bar 4 The trench structure of body 41.
In this utility model, connector 3 is designed with there is the body of rod 41 that can accommodate support bar 4 Trench structure, so, the body of rod 41 of support bar 4 just can be stably fixed to connector 3 In trench structure, in order to avoid causing support bar 4 to rock with the relative of connector 3.
In order to strengthen the stability connected between suspension rod 1, improve the safety of workmen's work high above the ground, Connect also by connector 3 between the middle part of suspension rod 1 and have the support bar 4 of some horizontally sets.
Preferably, scaffold board 5 can be bayonet type scaffold board 5.Bayonet type scaffold board 5 can include Scaffold board face and the scaffold board bayonet socket being fixed on bayonet type scaffold board 5 two ends, scaffold board bayonet socket and support Bar 4 engages, and the bayonet type scaffold board 5 in this utility model is installed, convenient disassembly.
In order to more easily solve inconvenience and the difficulty of construction under skew wall, as shown in Figure 4, bayonet type foot Palm 5 can be the stepped ramp type in the range of 0 °-45 ° of inclination angle, with convenient construction personnel under skew wall Hanging facility is installed.
In this utility model, the middle part of suspension rod 1 is also provided with railing 6, and railing 6 can be uniform Be arranged between support bar 4, the setting of railing 6 further increases workmen's work high above the ground Safety.
Further improving as of the present utility model, the outside of scaffold board 5 is arranged above skirt Plate 7 (also known as foot guard plate), the effect of skirting board 7 is: if there being object to drop, roll down to scaffold Time on limit, skirting board 7 can be blocked, it is to avoid falling object from high altitude.Preferably, the height of skirting board 7 Degree not lower than 180mm.
The above is preferred implementation of the present utility model, it is noted that for the art Those of ordinary skill for, on the premise of without departing from principle described in the utility model, it is also possible to make Going out some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (8)

1. a split type hanging scaffold, it is characterised in that include some longitudinally disposed suspension rods, The top of described suspension rod arranges suspension ring, and being connected by connector between the bottom of described suspension rod has some horizontal strokes To the support bar arranged, described support bar includes that the body of rod and the end and the direction that are positioned at the described body of rod are downward Kink, described connector is provided with the first jack for making described kink pass;Described Scaffold board it is provided with on support bar.
Split type hanging scaffold the most according to claim 1, it is characterised in that described company The middle part of fitting is provided with the second jack for making described suspension rod pass.
Split type hanging scaffold the most according to claim 2, it is characterised in that described company Fitting has the trench structure of the body of rod that can accommodate described support bar.
Split type hanging scaffold the most according to claim 3, it is characterised in that described in hang Connect also by connector between the middle part of bar and have the support bar of some horizontally sets.
Split type hanging scaffold the most according to claim 4, it is characterised in that described foot Palm is bayonet type scaffold board.
6. according to the split type hanging scaffold described in claim 5, it is characterised in that described Bayonet type scaffold board is the stepped ramp type in the range of 0 °-45 ° of inclination angle.
7. according to described split type hanging scaffold arbitrary in claim 1-6, it is characterised in that The middle part of described suspension rod is additionally provided with railing.
Split type hanging scaffold the most according to claim 7, it is characterised in that described foot The outside of palm is arranged above skirting board.
CN201620143203.0U 2016-02-25 2016-02-25 Split type scaffold of hanging Expired - Fee Related CN205502549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620143203.0U CN205502549U (en) 2016-02-25 2016-02-25 Split type scaffold of hanging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620143203.0U CN205502549U (en) 2016-02-25 2016-02-25 Split type scaffold of hanging

Publications (1)

Publication Number Publication Date
CN205502549U true CN205502549U (en) 2016-08-24

Family

ID=56727095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620143203.0U Expired - Fee Related CN205502549U (en) 2016-02-25 2016-02-25 Split type scaffold of hanging

Country Status (1)

Country Link
CN (1) CN205502549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916772A (en) * 2017-11-22 2018-04-17 中冶建工集团有限公司 A kind of hanging-type construction platform and installation method for curved surface ceiling construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916772A (en) * 2017-11-22 2018-04-17 中冶建工集团有限公司 A kind of hanging-type construction platform and installation method for curved surface ceiling construction

Similar Documents

Publication Publication Date Title
CN201598820U (en) Single point suspension external hanging bracket
CN103206074A (en) Elevator shaft template construction method, platform and support
CN208056596U (en) A kind of Novel engineering exterior wall scaffold
CN205036066U (en) A aerial work platform for construction of steel cylinder body structure
CN207144428U (en) A kind of easy-to-dismount building scaffold
CN207245138U (en) Boat scaffold adjustable in pitch
CN205713096U (en) A kind of roofing cantilevered structure form bracing system
CN205259628U (en) Pipe truss structure anchor clamps formula safety protective guard pole
CN205477339U (en) A cage ladder that is used for steel construction factory building shingle nail to install
CN205502549U (en) Split type scaffold of hanging
CN204418629U (en) A kind of integrated form climbing frame
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN104372923B (en) Scaffolding
CN204238537U (en) A kind of elevated hoistway operation platform
CN204311717U (en) Detachable combined Mobile operating platform
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN204038917U (en) Dismountable external hanging service platform
CN205472340U (en) People's passageway on instrument formula tower crane
CN207749848U (en) A kind of fall arrest construction holder
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN203977833U (en) A kind of wall-attached builder's jack
CN207847045U (en) A kind of swinging scaffold for building
CN204098465U (en) Lifting false work falls in a kind of frame guide rail formula
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN205259558U (en) Novel scaffold for fitment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20190225