CN104372935A - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN104372935A
CN104372935A CN201410601008.3A CN201410601008A CN104372935A CN 104372935 A CN104372935 A CN 104372935A CN 201410601008 A CN201410601008 A CN 201410601008A CN 104372935 A CN104372935 A CN 104372935A
Authority
CN
China
Prior art keywords
scaffold
bearing plate
loaded plate
pipe fitting
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410601008.3A
Other languages
Chinese (zh)
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201410601008.3A priority Critical patent/CN104372935A/en
Publication of CN104372935A publication Critical patent/CN104372935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a scaffold which is formed by connecting pipe fittings through fasteners. The scaffold further comprises a bearing plate. The bearing plate is a rectangular plate. Arc hooks are arranged on the two long side edges of the bearing plate. The inner arc faces of the hooks are matched with the arc faces of the pipe fittings. The bearing plate which is additionally arranged on the scaffold not only plays the role of a worker operating platform, but also plays the connection role of a traditional short cross-bar, so that the scaffold is conveniently and rapidly erected, and the security coefficient is high.

Description

Scaffold
Technical field
The present invention relates to building implement technical field, especially a kind of scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, the scaffold used at present mainly adopts steel pipe, connection card and miscellaneous part to set up according to predetermined specification, required fixed structure cannot be set up on existing support body in the process set up temporarily, and the different parts for support body needs the steel pipe using different size, cause scaffolding kind more, and frame structure is complicated, all need to expend too much artificial in the process of assembling and dismounting, with regard to single constructor, labour intensity is large; During assembling, the uniformity of support body different parts syndeton is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes support body to there is many potential safety hazards; Therefore based on foregoing problems, be necessary to do further improvement for the structure of existing building scaffold.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, propose a kind of scaffold, structure is ingenious, use safety.
In order to realize foregoing invention object, the invention provides following technical scheme: a kind of scaffold, is connected and composed through fastener by pipe fitting, also comprise loaded plate, this loaded plate is rectangle tabular, its two long side is equipped with arc hook, and the cambered surface of this hook intrados and pipe fitting is coincide.
Further, this arc hook is symmetrical arranged on two long sides, and every side at least arranges 3.
Further, the girth of the intrados of this arc hook is at least 1/2nd of pipe fitting outer circumference.
Compared with prior art, the present invention has the following advantages: on scaffold, set up loaded plate, and this loaded plate can play the effect of operative's platform, can also play the connection function of traditional hyphen bar; Make to set up scaffold convenient and swift, security effectiveness is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of scaffold of the present invention;
Fig. 2 is the structural representation of loaded plate.
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection scope of the present invention.
A kind of scaffold as shown in Figure 1, comprises pipe fitting and fastener 3, and pipe fitting comprises standpipe 1 and long transverse tube 2, and standpipe 1 is connected through fastener 3 snap close with long transverse tube 2; Two standpipes 1 are connected to a long transverse tube 2 and connect through fastener 3, identical syndeton is arranged side by side, a loaded plate 4 is set up between two structures be arranged side by side, this loaded plate 4 is rectangle tabular, its two long side is equipped with arc hook 41, the cambered surface of this hook 41 intrados and long transverse tube 2 is coincide, and namely the both sides hook 41 of loaded plate 4 is hung on long transverse tube 2.
Traditional pin hand cradle needs to adopt a short transversal pipe between two identical standpipes 1 and long transverse tube 2 syndeton, and two identical syndetons are arranged side by side; No matter eliminate this short transversal pipe structure in the present invention, directly adopt loaded plate 4 to connect, and loaded plate 4 itself is workbench, be installation foot hand cradle or in use scaffold process, all facilitate operative, safety factor is high.
As illustrated in fig. 1 and 2, this arc hook 41 is symmetrical arranged on two long sides, and every side at least arranges 3, and whole loaded plate 4 is firmly hung on long transverse tube 2.The girth of the intrados of this arc hook 41 is at least 1/2nd of long transverse tube 2 outer circumference.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. a scaffold, is connected and composed through fastener by pipe fitting, it is characterized in that: also comprise loaded plate, and this loaded plate is rectangle tabular, its two long side is equipped with arc hook, and the cambered surface of this hook intrados and pipe fitting is coincide.
2. scaffold as claimed in claim 1, is characterized in that: this arc hook is symmetrical arranged on two long sides, and every side at least arranges 3.
3. scaffold as claimed in claim 2, is characterized in that: the girth of the intrados of this arc hook is at least 1/2nd of pipe fitting outer circumference.
CN201410601008.3A 2014-10-31 2014-10-31 Scaffold Pending CN104372935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410601008.3A CN104372935A (en) 2014-10-31 2014-10-31 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410601008.3A CN104372935A (en) 2014-10-31 2014-10-31 Scaffold

Publications (1)

Publication Number Publication Date
CN104372935A true CN104372935A (en) 2015-02-25

Family

ID=52552101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410601008.3A Pending CN104372935A (en) 2014-10-31 2014-10-31 Scaffold

Country Status (1)

Country Link
CN (1) CN104372935A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461021A (en) * 2017-08-31 2017-12-12 南京理工大学 A kind of scaffold device of improvement
CN111962849A (en) * 2020-07-31 2020-11-20 晟通科技集团有限公司 Operation platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004011290A (en) * 2002-06-07 2004-01-15 Hoan Shizai:Kk Spacer for preventing displacement of ledger plate for temporary scaffolding
WO2008013460A1 (en) * 2006-07-27 2008-01-31 Wls Intellectual Property Limited A scaffolding platform
CN202559712U (en) * 2012-04-17 2012-11-28 中天建设集团有限公司 Exterior grate scaffold board
CN203160668U (en) * 2013-02-04 2013-08-28 中天建设集团有限公司天津分公司 Buckled type scaffold floor
CN204174915U (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004011290A (en) * 2002-06-07 2004-01-15 Hoan Shizai:Kk Spacer for preventing displacement of ledger plate for temporary scaffolding
WO2008013460A1 (en) * 2006-07-27 2008-01-31 Wls Intellectual Property Limited A scaffolding platform
CN202559712U (en) * 2012-04-17 2012-11-28 中天建设集团有限公司 Exterior grate scaffold board
CN203160668U (en) * 2013-02-04 2013-08-28 中天建设集团有限公司天津分公司 Buckled type scaffold floor
CN204174915U (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461021A (en) * 2017-08-31 2017-12-12 南京理工大学 A kind of scaffold device of improvement
CN111962849A (en) * 2020-07-31 2020-11-20 晟通科技集团有限公司 Operation platform

Similar Documents

Publication Publication Date Title
CN101624871A (en) Instrumental operation platform for shear wall formwork of elevator shaft
CN104372923B (en) Scaffolding
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN204826593U (en) A portable supplementary operation platform for steel construction support body
CN204174915U (en) Scaffold
CN104372935A (en) Scaffold
CN204199651U (en) Foldable mobile scaffold
CN205742975U (en) A kind of direct plugging type scaffold
CN104372939A (en) Scaffold
CN205531248U (en) Construction scaffolding component
CN205840303U (en) A kind of button bar adaptor
CN207110442U (en) The connector that a kind of scaffold uses
CN205545078U (en) Novel distributed roof photovoltaic support
CN204174904U (en) Scaffold
CN205046830U (en) Formula steel pipe scaffold is detained to bowl
CN204174919U (en) Scaffold
CN104389415A (en) Scaffold
CN204163358U (en) Scaffold
CN204531362U (en) Scaffold
CN104372922A (en) Scaffold
CN204174903U (en) Scaffold
CN204456811U (en) A kind of Portable scaffold
CN204163359U (en) Scaffold
CN205677220U (en) A kind of construction support for shuttering
CN205259558U (en) Novel scaffold for fitment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150225

RJ01 Rejection of invention patent application after publication