CN204174915U CN201420642098.6U CN201420642098U CN204174915U CN 204174915 U CN204174915 U CN 204174915U CN 201420642098 U CN201420642098 U CN 201420642098U CN 204174915 U CN204174915 U CN 204174915U
Authority
CN
China
Prior art keywords
scaffold
loaded plate
utility
pipe fitting
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420642098.6U
Other languages
Chinese (zh)
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201420642098.6U priority Critical patent/CN204174915U/en
Application granted granted Critical
Publication of CN204174915U publication Critical patent/CN204174915U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of scaffold, connected and composed by pipe fitting through fastener, also comprise loaded plate, this loaded plate is rectangle tabular, its two long side is equipped with arc hook, and the cambered surface of this hook intrados and pipe fitting is coincide.The utility model sets up loaded plate on scaffold, and this loaded plate can play the effect of operative's platform, can also play the connection function of traditional hyphen bar; Make to set up scaffold convenient and swift, safety factor is high.

Description

Scaffold
Technical field
The utility model relates to building implement technical field, especially a kind of scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, the scaffold used at present mainly adopts steel pipe, connection card and miscellaneous part to set up according to predetermined specification, required fixed structure cannot be set up on existing support body in the process set up temporarily, and the different parts for support body needs the steel pipe using different size, cause scaffolding kind more, and frame structure is complicated, all need to expend too much artificial in the process of assembling and dismounting, with regard to single constructor, labour intensity is large; During assembling, the uniformity of support body different parts syndeton is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes support body to there is many potential safety hazards; Therefore based on foregoing problems, be necessary to do further improvement for the structure of existing building scaffold.
Utility model content
The utility model is for the deficiencies in the prior art, and propose a kind of scaffold, structure is ingenious, use safety.
In order to realize above-mentioned utility model object, the utility model provides following technical scheme: a kind of scaffold, is connected and composed through fastener by pipe fitting, also comprise loaded plate, this loaded plate is rectangle tabular, its two long side is equipped with arc hook, and the cambered surface of this hook intrados and pipe fitting is coincide.
Further, this arc hook is symmetrical arranged on two long sides, and every side at least arranges 3.
Further, the girth of the intrados of this arc hook is at least 1/2nd of pipe fitting outer circumference.
Compared with prior art, the utility model has the following advantages: on scaffold, set up loaded plate, and this loaded plate can play the effect of operative's platform, can also play the connection function of traditional hyphen bar; Make to set up scaffold convenient and swift, security effectiveness is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model scaffold;
Fig. 2 is the structural representation of loaded plate.
Detailed description of the invention
Be described in detail the utility model below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection domain of the present utility model.
A kind of scaffold as shown in Figure 1, comprises pipe fitting and fastener 3, and pipe fitting comprises standpipe 1 and long transverse tube 2, and standpipe 1 is connected through fastener 3 snap close with long transverse tube 2; Two standpipes 1 are connected to a long transverse tube 2 and connect through fastener 3, identical syndeton is arranged side by side, a loaded plate 4 is set up between two structures be arranged side by side, this loaded plate 4 is rectangle tabular, its two long side is equipped with arc hook 41, the cambered surface of this hook 41 intrados and long transverse tube 2 is coincide, and namely the both sides hook 41 of loaded plate 4 is hung on long transverse tube 2.
Traditional pin hand cradle needs to adopt a short transversal pipe between two identical standpipes 1 and long transverse tube 2 syndeton, and two identical syndetons are arranged side by side; No matter eliminate this short transversal pipe structure in the utility model, directly adopt loaded plate 4 to connect, and loaded plate 4 itself is workbench, be installation foot hand cradle or in use scaffold process, all facilitate operative, safety factor is high.
As illustrated in fig. 1 and 2, this arc hook 41 is symmetrical arranged on two long sides, and every side at least arranges 3, and whole loaded plate 4 is firmly hung on long transverse tube 2.The girth of the intrados of this arc hook 41 is at least 1/2nd of long transverse tube 2 outer circumference.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. a scaffold, is connected and composed through fastener by pipe fitting, it is characterized in that: also comprise loaded plate, and this loaded plate is rectangle tabular, its two long side is equipped with arc hook, and the cambered surface of this hook intrados and pipe fitting is coincide.
2. scaffold as claimed in claim 1, is characterized in that: this arc hook is symmetrical arranged on two long sides, and every side at least arranges 3.
3. scaffold as claimed in claim 2, is characterized in that: the girth of the intrados of this arc hook is at least 1/2nd of pipe fitting outer circumference.
CN201420642098.6U 2014-10-31 2014-10-31 Scaffold Expired - Fee Related CN204174915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420642098.6U CN204174915U (en) 2014-10-31 2014-10-31 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420642098.6U CN204174915U (en) 2014-10-31 2014-10-31 Scaffold

Publications (1)

Publication Number Publication Date
CN204174915U true CN204174915U (en) 2015-02-25

Family

ID=52563733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420642098.6U Expired - Fee Related CN204174915U (en) 2014-10-31 2014-10-31 Scaffold

Country Status (1)

Country Link
CN (1) CN204174915U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372935A (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold
CN107152158A (en) * 2017-06-21 2017-09-12 上海森大机械制造有限公司 A kind of fixed scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372935A (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold
CN107152158A (en) * 2017-06-21 2017-09-12 上海森大机械制造有限公司 A kind of fixed scaffold

Similar Documents

Publication Publication Date Title
CN104372923B (en) Scaffolding
CN204174915U (en) Scaffold
CN204826593U (en) A portable supplementary operation platform for steel construction support body
CN204174902U (en) Scaffold
CN205802864U (en) Novel architecture lowering or hoisting gear
CN205742975U (en) A kind of direct plugging type scaffold
CN104372935A (en) Scaffold
CN104372939A (en) Scaffold
CN207110442U (en) The connector that a kind of scaffold uses
CN203531345U (en) Movable cantilever frame
CN204163358U (en) Scaffold
CN205840303U (en) A kind of button bar adaptor
CN204174919U (en) Scaffold
CN204174904U (en) Scaffold
CN204174903U (en) Scaffold
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN204531362U (en) Scaffold
CN204163359U (en) Scaffold
CN106996160A (en) A kind of steel construction assembled wallboard
CN104372922A (en) Scaffold
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN207686266U (en) A kind of means for fastening scaffolding of fast demountable
CN205677220U (en) A kind of construction support for shuttering
CN204357098U (en) Overarm scaffold floor
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

Termination date: 20151031