CN204826601U - Scaffold that building engineering used - Google Patents

Scaffold that building engineering used Download PDF

Info

Publication number
CN204826601U
CN204826601U CN201520622627.0U CN201520622627U CN204826601U CN 204826601 U CN204826601 U CN 204826601U CN 201520622627 U CN201520622627 U CN 201520622627U CN 204826601 U CN204826601 U CN 204826601U
Authority
CN
China
Prior art keywords
montant
scaffold
screw
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520622627.0U
Other languages
Chinese (zh)
Inventor
李清湛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520622627.0U priority Critical patent/CN204826601U/en
Application granted granted Critical
Publication of CN204826601U publication Critical patent/CN204826601U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a scaffold that building engineering used, including a plurality of horizontal poles and montant, still include the connecting piece, the connecting piece is connected on the montant, the both ends of horizontal pole link to each other with adjacent connecting piece respectively, the connecting piece includes the fixed loop, sets up sleeve and the first screw of spiro union on the fixed loop on the fixed loop periphery wall, the fixed loop cup joints the outside at the montant, the horizontal pole is pegged graft in the sleeve and through the second screw fixation, the equipartition is fluted on the periphery wall of montant, the recess distributes along the length direction of montant, it is inside and balanced with the bottom of recess that first screw extends to the fixed loop, the utility model has the advantages of simple structure, simple to operate, the sound construction degree is high.

Description

A kind of scaffold of construction work
Technical field
The utility model belongs to building appliance technical field, relates to a kind of scaffold of construction work.
Background technology
The scaffold of the construction work of current building site has a variety of, wherein the scaffold of portal architecture engineering and the scaffold of bowl fastening type construction work more conventional.The scaffold of portal architecture engineering has multiple door frame to build to form framed bent, and this structure not only complicated but also diagonal member very easily fractures, and bearing strength is poor, and profile is large, inconvenience transport.The scaffold of bowl fastening type construction work is mainly by being welded on the formation framed bent that is clasped of bowl button on column and cross bar, complex structure, part is many, install complicated and easily cause operator injured, and after a cross bar and column continuous damage, the tie point of this column and other cross bar also can be and then slack and undisciplined, causes potential safety hazard.
Summary of the invention
For the problems referred to above, it is simple, easy for installation that the technical problems to be solved in the utility model is to provide a kind of structure, the scaffold of the construction work that sound construction degree is high.
The scaffold of construction work of the present utility model, comprise some cross bars and montant, also comprise connector, described connector is connected on montant, the two ends of described cross bar are connected with adjacent connector respectively, described connector comprises retainer ring, the first screw being arranged on the sleeve on retainer ring periphery wall and being screwed onto on retainer ring, described Fixing shrink ring is connected on the outside of montant, described cross bar to be plugged in sleeve and to be fixed by the second screw, the periphery wall of described montant is evenly equipped with groove, described groove distributes along the length direction of montant, described first screw extends to retainer ring inside and offsets with the bottom of groove.
The scaffold of construction work of the present utility model, wherein, described first screw and sleeve interval are arranged.
The scaffold of construction work of the present utility model, wherein, each retainer ring is provided with four sleeves and four the first screws.
The scaffold of construction work of the present utility model, wherein, described groove is toroidal cavity.
The utility model beneficial effect: a kind of structure of the present utility model is simple, easy for installation, the scaffold of the construction work that sound construction degree is high, during installation, is socketed in connector on montant, and connector is moved to the position of groove, and pretension first screw; Then cross bar is connected on adjacent connector, and is fixed by the second screw; Last the first screw tightened again on each connector, makes connector and montant fastening, realizes fixing of the present utility model.The utility model can realize, to installation of the present utility model, having advantage easy for installation by aforesaid operations, is screwed in the groove on montant simultaneously, connector can be made to be fixed on firmly on montant, improve the firmness of structure by the first screw.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following concrete enforcement and accompanying drawing.
Fig. 1 is main TV structure schematic diagram of the present utility model;
Fig. 2 is plan structure schematic diagram of the present utility model.
Detailed description of the invention
The scaffold of construction work as depicted in figs. 1 and 2, comprise some cross bars 1 and montant 2, also comprise connector 3, described connector 3 is connected on montant 2, the two ends of described cross bar 1 are connected with adjacent connector 3 respectively, described connector 3 comprises retainer ring 31, the first screw 33 being arranged on the sleeve 32 on retainer ring 31 periphery wall and being screwed onto on retainer ring 31, described retainer ring 31 is socketed in the outside of montant 2, described cross bar 1 to be plugged in sleeve 32 and to be fixed by the second screw 34, the periphery wall of described montant 2 is evenly equipped with groove 21, described groove 21 distributes along the length direction of montant 2, described first screw 33 extends to retainer ring 31 inside and offsets with the bottom of groove 21, described first screw 33 and sleeve 32 interval are arranged, each retainer ring 31 is provided with four sleeves 32 and four the first screws 33, described groove 21 is toroidal cavity, during installation, connector is socketed on montant, and connector is moved to the position of groove, and pretension first screw, then cross bar is connected on adjacent connector, and is fixed by the second screw, last the first screw tightened again on each connector, makes connector and montant fastening, realizes fixing of the present utility model.The utility model can realize, to installation of the present utility model, having advantage easy for installation by aforesaid operations, is screwed in the groove on montant simultaneously, connector can be made to be fixed on firmly on montant, improve the firmness of structure by the first screw.
Embodiment recited above is only be described preferred embodiment of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection domain of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.

Claims (4)

1. the scaffold of a construction work, comprise some cross bars (1) and montant (2), it is characterized in that: also comprise connector (3), described connector (3) is connected on montant (2), the two ends of described cross bar (1) are connected with adjacent connector (3) respectively, described connector (3) comprises retainer ring (31), the first screw (33) being arranged on the sleeve (32) on retainer ring (31) periphery wall and being screwed onto on retainer ring (31), described retainer ring (31) is socketed in the outside of montant (2), described cross bar (1) is plugged in sleeve (32) and is also fixed by the second screw (34), the periphery wall of described montant (2) is evenly equipped with groove (21), described groove (21) distributes along the length direction of montant (2), described first screw (33) extends to retainer ring (31) inside and offsets with the bottom of groove (21).
2. the scaffold of construction work according to claim 1, is characterized in that: described first screw (33) and sleeve (32) interval are arranged.
3. the scaffold of construction work according to claim 1, is characterized in that: each retainer ring (31) is provided with four sleeves (32) and four the first screws (33).
4. the scaffold of construction work according to claim 1, is characterized in that: described groove (21) is toroidal cavity.
CN201520622627.0U 2015-08-14 2015-08-14 Scaffold that building engineering used Expired - Fee Related CN204826601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520622627.0U CN204826601U (en) 2015-08-14 2015-08-14 Scaffold that building engineering used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520622627.0U CN204826601U (en) 2015-08-14 2015-08-14 Scaffold that building engineering used

Publications (1)

Publication Number Publication Date
CN204826601U true CN204826601U (en) 2015-12-02

Family

ID=54684216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520622627.0U Expired - Fee Related CN204826601U (en) 2015-08-14 2015-08-14 Scaffold that building engineering used

Country Status (1)

Country Link
CN (1) CN204826601U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806242A (en) * 2017-09-22 2018-03-16 中建八局第二建设有限公司 A kind of high intensity scaffold fastenings for building
CN108756205A (en) * 2018-07-02 2018-11-06 福州大学 Simple rack nodal connection device and its installation method
CN109356344A (en) * 2018-12-04 2019-02-19 金螳螂精装科技(苏州)有限公司 A kind of full glass staircase structure of non-division formula
CN109868987A (en) * 2019-01-25 2019-06-11 天长市华利机械实业有限公司 A kind of door frame converter and its application method for scaffold
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806242A (en) * 2017-09-22 2018-03-16 中建八局第二建设有限公司 A kind of high intensity scaffold fastenings for building
CN107806242B (en) * 2017-09-22 2023-06-16 中建八局第二建设有限公司 High strength scaffold connecting piece for building
CN108756205A (en) * 2018-07-02 2018-11-06 福州大学 Simple rack nodal connection device and its installation method
CN109356344A (en) * 2018-12-04 2019-02-19 金螳螂精装科技(苏州)有限公司 A kind of full glass staircase structure of non-division formula
CN109868987A (en) * 2019-01-25 2019-06-11 天长市华利机械实业有限公司 A kind of door frame converter and its application method for scaffold
CN109868987B (en) * 2019-01-25 2021-01-26 天长市华利机械实业有限公司 Portal frame converter for scaffold and using method thereof
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Similar Documents

Publication Publication Date Title
CN204826601U (en) Scaffold that building engineering used
CN206054455U (en) A kind of new electric hold hoop
CN104372939A (en) Scaffold
CN104372923B (en) Scaffolding
CN204174904U (en) Scaffold
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN205046830U (en) Formula steel pipe scaffold is detained to bowl
CN205804596U (en) A kind of a few formed steel construction assemblies
CN204174915U (en) Scaffold
CN206607902U (en) A kind of construction guardrail
CN106760942A (en) A kind of railing of easy disassembly
CN105421756B (en) A kind of total sub-semigroup
CN204174919U (en) Scaffold
CN104372935A (en) Scaffold
CN204627393U (en) A kind of self-supporting folding ladder
CN205776939U (en) A kind of glass curtain wall supporting mechanism
CN204163359U (en) Scaffold
CN203905455U (en) Scaffold for constructional engineering
CN105587161A (en) Building fence for civil engineering
CN204318157U (en) A kind of dismountable Military bed rack of mosquito net
CN204174903U (en) Scaffold
CN204212517U (en) Pole arm anchor ear
CN205549598U (en) Combined house toy
CN204139484U (en) A kind of Combined indoor stairs
CN209924596U (en) Combined safety protection enclosure wall for construction engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20160814

CF01 Termination of patent right due to non-payment of annual fee