CN105421756B - A kind of total sub-semigroup - Google Patents

A kind of total sub-semigroup Download PDF

Info

Publication number
CN105421756B
CN105421756B CN201510876227.7A CN201510876227A CN105421756B CN 105421756 B CN105421756 B CN 105421756B CN 201510876227 A CN201510876227 A CN 201510876227A CN 105421756 B CN105421756 B CN 105421756B
Authority
CN
China
Prior art keywords
bowl
button
cross bar
post
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510876227.7A
Other languages
Chinese (zh)
Other versions
CN105421756A (en
Inventor
潘燕清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Original Assignee
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd filed Critical WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority to CN201510876227.7A priority Critical patent/CN105421756B/en
Publication of CN105421756A publication Critical patent/CN105421756A/en
Application granted granted Critical
Publication of CN105421756B publication Critical patent/CN105421756B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/22Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Food-Manufacturing Devices (AREA)

Abstract

The invention discloses a kind of total sub-semigroup, including vertical rod, upper bowl button, cross bar and lower bowl button, a left side for the cross bar, the outer ring of right both sides is socketed with cross bar plug, the inner side of the cross bar plug is provided with groove, the cross bar plug it is upper, lower two ends are equipped with side button column, the upper end of the vertical rod is also socketed with bowl button, the bottom of upper bowl button is provided with bowl post, the lower end of the vertical rod is also socketed with lower bowl button, the top of the lower bowl button is provided with lower bowl post, the both sides of the other end of upper bowl post and lower bowl post are respectively equipped with side button slightly, this total sub-semigroup, it is simple in construction, it is easy for installation, it is integrally provided with bowl button, upper bowl post, lower bowl button and lower bowl post, it is convenient to lock vertical rod and cross bar, and bowl button stay is additionally provided with vertical rod, bowl button can be fixed on to the upper end of stay, improve cross bar and the steadiness of vertical rod.

Description

A kind of total sub-semigroup
Technical field
The present invention relates to Construction Formwork & Scaffold Technology field, specially a kind of total sub-semigroup.
Background technology
Bowl button-type multifunction scaffold is on the advanced joint for drawing foreign same type scaffold and the basis of accessory technique On, a kind of new type scaffold developed with reference to China's actual conditions.Bowl button-type multifunction scaffold joint construction rationally, makes Technique is simple, and operation is easily, wide using scope, can fully meet a variety of buildings such as house, bridges and culverts, tunnel, chimney, water tower Construction requirement.Compared with other type scaffolds, bowl button-type multifunction scaffold is a kind of Novel pin for having a broad development prospect Hand cradle.
The scaffold used in current building trade, particularly inner support frame, mostly steel pipe type, gate-type and common bowl fastening type Deng, common total sub-semigroup because bowl button and vertical rod are that activity is installed, security is not also high, and latches shorter, and both sides are horizontal Plug on frame is shorter, and clasping effects are poor, without corresponding locking device, once bowl button is broken, whole cross bar also easily comes off, Use, and its it is dangerous.
The content of the invention
It is simple in construction it is an object of the invention to provide a kind of total sub-semigroup, it is overall corresponding to be connect equipped with multiple Mouth plug, the effective stability for ensureing connection, greatly improves the safety used, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the present invention provides following technical scheme:A kind of total sub-semigroup, including vertical rod, upper bowl Button, cross bar and lower bowl button, the arranged on left and right sides of the vertical rod are provided with cam, and it is tight that the upper/lower terminal of the cam is equipped with bowl padlock Piece, the outer ring of the arranged on left and right sides of the cross bar is socketed with cross bar plug, and the inner side of the cross bar plug is provided with groove, described The upper/lower terminal of cross bar plug is equipped with side button column, and the upper end of the vertical rod is also socketed with bowl button, the bottom of upper bowl button Bowl post is installed, the lower end of the vertical rod is also socketed with lower bowl button, the top of the lower bowl button is provided with lower bowl post, it is described on The both sides of the other end of bowl post and lower bowl post are respectively equipped with side button slightly.
It is preferred that, the groove on the supporting cross bar plug of cam correspondence in the vertical rod.
It is preferred that, the side button column correspondence on the cross bar plug is buckled slightly with the side put on bowl post and lower bowl post.
It is preferred that, the top of upper bowl button is provided with limited post.
It is preferred that, the inner chamber of upper bowl post and lower bowl post is additionally provided with spiral lines, the vertical rod in cam upper and lower two The surface at end is additionally provided with spiral dimpled grain.
Compared with prior art, the beneficial effects of the invention are as follows:This total sub-semigroup, it is simple in construction, it is easy for installation, it is whole Body is provided with upper bowl button, upper bowl post, lower bowl button and lower bowl post, convenient to lock vertical rod and cross bar, and is additionally provided with vertical rod bowl Stay is detained, bowl button can be fixed on to the upper end of stay, cross bar and the steadiness of vertical rod is improved.
And the inner chamber of upper bowl post and lower bowl post is provided with spiral lines, the spiral lines coordinates the spiral dimpled grain in vertical rod, Effective guarantee bowl button is firm to be tightened in vertical rod, bowl button will not be caused to be turned over by sled and come off because of cross bar stress.
The scaffold of this bowl fastening type is provided with cross bar plug simultaneously, and side button column and groove are provided with cross bar plug, and correspondence is vertical Slightly, being connected in vertical rod for effective guarantee cross bar stabilizing plugs will not come off or break because of bowl button for cam and side button on bar Split, cause cross bar to drop, cross bar can be because due to cam and side button linking closely and be fixed in vertical rod slightly on the contrary.
Brief description of the drawings
Fig. 1 is structure front schematic view of the present invention.
In figure:1 vertical rod, 2 limited posts, on 3 bowl button, 4 sides button slightly, 5 side button columns, 6 cross bars, 7 bowls of button stays, 8 lower bowls of posts, 9 times bowl buttons, 10 cams, 11 cross bar plugs, 12 grooves, bowl post on 13.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme:A kind of total sub-semigroup, including vertical rod 1, upper bowl button 3, Cross bar 6 and lower bowl button 9, the arranged on left and right sides of vertical rod 1 are provided with cam 10, and the upper/lower terminal of cam 10 is equipped with bowl button stay 7, This total sub-semigroup, it is simple in construction, it is easy for installation, bowl button 3, upper bowl post 13, lower bowl button 9 and lower bowl post 8 are integrally provided with, side Just vertical rod 1 and cross bar 6 are locked, and bowl button stay 7 is additionally provided with vertical rod 1, bowl button can be fixed on stay Upper end, improves the steadiness of cross bar 6 and vertical rod 1.
The outer ring of the arranged on left and right sides of cross bar 6 is socketed with cross bar plug 11, and the inner side of cross bar plug 11 is provided with groove 12, The groove 12 on the supporting cross bar plug 11 of the correspondence of cam 10 in vertical rod 1, the upper/lower terminal of cross bar plug 11 is equipped with side button column 5, the upper end of vertical rod 1 is also socketed with bowl button 3, and the top of upper bowl button 3 is provided with limited post 2, and the bottom of upper bowl button 3 is provided with bowl Post 13, the lower end of vertical rod 1 is also socketed with lower bowl button 9, and the top of lower bowl button 9 is provided with lower bowl post 8, upper bowl post 13 and lower bowl post 8 The both sides of the other end be respectively equipped with side button slightly 4, the correspondence of side button column 5 on cross bar plug 11 is with putting bowl post 13 and lower bowl post 8 On side button slightly 4, while the scaffold of this bowl fastening type is provided with cross bar plug 11, provided with side button column 5 and recessed on cross bar plug 11 Cam 10 and side button slightly 4 in groove 12, correspondence vertical rod 1, effective guarantee cross bar plug 11 is firm to be connected in vertical rod 1, no Because bowl button comes off or is broken cross bar 6 can be caused to drop, cross bar 6 can be because due to cam 10 and linking closely for side button slightly 4 on the contrary It is fixed in vertical rod 1.
The inner chamber of upper bowl post 13 and lower bowl post 8 is additionally provided with spiral lines, and vertical rod 1 is on the surface of the upper/lower terminal of cam 10 Spiral dimpled grain is additionally provided with, and the inner chamber of upper bowl post 13 and lower bowl post 8 is provided with spiral lines, and the spiral lines coordinates in vertical rod 1 Spiral dimpled grain, it is effective to ensure that bowl button is firm and is tightened in vertical rod 1, because of the stress of cross bar 6 bowl button will not be caused to be turned over by sled Come off.
Operation principle:In use, check upper bowl button 3, lower bowl button 9, upper bowl post 13 and lower bowl post 8 whether strain cracking, so After check whether each socket aligns, then cross bar plug 11 is pushed into the position locked with cam 10 and groove 12, simultaneously will Upper bowl button 3 and lower bowl button 9 are moved toward center, side is detained slightly 4 and are fastened side button column 5, then screw spiral bowl post.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of total sub-semigroup, including vertical rod(1), upper bowl button(3), cross bar(6)With lower bowl button(9), it is characterised in that:Institute State vertical rod(1)Arranged on left and right sides be provided with cam(10), the cam(10)Upper/lower terminal be equipped with bowl button stay(7), The cross bar(6)The outer ring of arranged on left and right sides be socketed with cross bar plug(11), the cross bar plug(11)Inner side provided with recessed Groove(12), the cross bar plug(11)Upper/lower terminal be equipped with side button column(5), the vertical rod(1)Upper end be also socketed with Bowl button(3), upper bowl button(3)Bottom bowl post is installed(13), the vertical rod(1)Lower end be also socketed with lower bowl button (9), the lower bowl button(9)Top lower bowl post is installed(8), upper bowl post(13)With lower bowl post(8)The other end two Side is respectively equipped with side button slightly(4), the vertical rod(1)On cam(10)The supporting cross bar plug of correspondence(11)On groove(12), The cross bar plug(11)On side button column(5)Correspondence, which is matched somebody with somebody, puts a bowl post(13)With lower bowl post(8)On side button slightly(4).
2. a kind of total sub-semigroup according to claim 1, it is characterised in that:Upper bowl button(3)Top be provided with Limited post(2).
3. a kind of total sub-semigroup according to claim 1, it is characterised in that:Upper bowl post(13)With lower bowl post (8)Inner chamber be additionally provided with spiral lines, the vertical rod(1)In cam(10)The surface of upper/lower terminal be additionally provided with spiral dimpled grain.
CN201510876227.7A 2015-12-03 2015-12-03 A kind of total sub-semigroup Expired - Fee Related CN105421756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510876227.7A CN105421756B (en) 2015-12-03 2015-12-03 A kind of total sub-semigroup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510876227.7A CN105421756B (en) 2015-12-03 2015-12-03 A kind of total sub-semigroup

Publications (2)

Publication Number Publication Date
CN105421756A CN105421756A (en) 2016-03-23
CN105421756B true CN105421756B (en) 2017-09-19

Family

ID=55500261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510876227.7A Expired - Fee Related CN105421756B (en) 2015-12-03 2015-12-03 A kind of total sub-semigroup

Country Status (1)

Country Link
CN (1) CN105421756B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339432A (en) * 2018-10-30 2019-02-15 宁波职业技术学院 A kind of bridging arrangement and its installation method of gravity self locking scaffold

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2573117B2 (en) * 1991-10-01 1997-01-22 明興金属工業株式会社 Connecting device in temporary frame structure
CN201581631U (en) * 2009-12-22 2010-09-15 龚高 Supporting structure of disc locking type scaffold
CN104179348A (en) * 2014-09-15 2014-12-03 无锡市晨源建筑器材有限公司 Scaffold structure for connecting joints
CN104264976B (en) * 2014-10-11 2015-12-02 北京天恒建设工程有限公司 A kind of packaged type scaffold bowl fastening type fastener and method of operating thereof
CN205330146U (en) * 2015-12-03 2016-06-22 无锡市晨源建筑器材有限公司 Formula scaffold is detained to bowl

Also Published As

Publication number Publication date
CN105421756A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN204212399U (en) Flip-shell is to clasp
CN207092597U (en) A kind of easy-to-mount building construction
CN105421756B (en) A kind of total sub-semigroup
CN203374008U (en) Elevator shaft inclined plane protective structure
CN205558265U (en) A banded column is detained for concrete column formwork support
CN205330146U (en) Formula scaffold is detained to bowl
CN207469718U (en) A kind of exterior wall scaffold drawknot device being used in turn
CN206220649U (en) Construction guard fender
CN206784977U (en) Construction stair are easily assembled temporary guard rail
CN206722361U (en) A kind of scaffold of architectural engineering
CN205591507U (en) Scaffold frame of easily dismantling
CN205577605U (en) Electric power safety barrier easy to assemble and dismantle
CN210013444U (en) Closed cantilever scaffold system
CN208137413U (en) A kind of bowl fastening type steel pipe scaffold
CN204899264U (en) Take building construction protection fence of protection network
CN207499379U (en) A kind of scaffold with fixed diagonal brace
CN204919536U (en) A tubular pile end plate for square pile foundation
CN208309898U (en) A kind of grange masonry wall structure
CN212656589U (en) Novel railing node component is prevented temporarily in building site
CN201908433U (en) Telescopic angle steel guardrail
CN204960193U (en) Guardrail bar is prevented to movable stair of dismantling
CN204781885U (en) Novel crown cornice shaped steel operation platform that encorbelments
CN203452001U (en) Country foot bridge railing structure
CN206971601U (en) A kind of floor guard rail installed part
CN103993755B (en) A kind of ruggedized construction and method strengthening the connection of ancient houses building wall column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170919

Termination date: 20181203

CF01 Termination of patent right due to non-payment of annual fee