CN204780764U - Ecological wallboard formula barricade shore protection with ribbing of environment friendly - Google Patents
Ecological wallboard formula barricade shore protection with ribbing of environment friendly Download PDFInfo
- Publication number
- CN204780764U CN204780764U CN201520392463.7U CN201520392463U CN204780764U CN 204780764 U CN204780764 U CN 204780764U CN 201520392463 U CN201520392463 U CN 201520392463U CN 204780764 U CN204780764 U CN 204780764U
- Authority
- CN
- China
- Prior art keywords
- ecological
- wall
- shore protection
- concrete
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model discloses an ecological wallboard formula barricade shore protection with ribbing of environment friendly is mainly by ecological wall, sheet pile, rib wall, precast pile, anchor rope, ecological concrete, the concrete layer that permeates water, planting soil and vegetation composition, the sheet pile is beaten along the shore protection and is established, and the sheet pile interval sets up the rib wall, is equipped with the slot in the sheet pile at rib wall position, and the precast pile is fixed in in the slot, ecological wall is connected with the precast pile through the plug at its both ends, ecological wall is formed by ecological precast concrete, is provided with ecological hole and splice bar in the wall of ecological wall, and the stiffening rib passes through the splice bar and is connected with ecological wall, the anchor rope has been inserted on the shore protection is domatic to the injection concrete layer that permeates water, planting soil is laid to ecological wall and permeate water and built ecological concrete between the concrete layer on ecological concrete, the vegetation is planted in the ecological hole of planting soil and ecological wall.
Description
Technical field
The utility model relates to a kind of Ecological Retaining Wall shore protection, particularly the environmentally friendly ecology of one wallboard type barricade with ribbing shore protection.
Background technology
Traditional bank protection structure mainly contains reinforced earth bank protection structure, grouts or placed rockfill bank protection structure, cast-in-situ concrete Form Gravity Breast Wall bank protection structure and precast concrete block bank protection structure etc., these bank protection structures are firm, durable, be widely used in the bank protection work such as navigation channel, river, harbour, but also there is many deficiencies, as large in differential settlement, destruction ecological environment, resistance to overturning difference etc.
At present, for the problem that existing bank protection structure differential settlement is large, the mode that general employing sets sheet pile solves, wherein reinforced concrete sheet pile is because of its long-lived feature, in Practical Project, have more cost performance, but conventional steel bar concrete sheet pile exist set difficulty, structure thick and heavy, with the shortcoming such as run-of-bank gravel slope connectivity difference.The problem of ecological environment is destroyed for existing bank protection structure, generally improve by the mode of back fill course after wall being planted green vegetation, but this traditional approach still destroys resource function and the ecological functions in navigation channel, also destroy navigation channel, river biological chain simultaneously, cause environment to worsen.For the problem of resistance to overturning difference, usually adopt the mode of later stage artificial second consolidation to alleviate, both wasted time and energy, and be difficult to again fundamentally solve problems.
Therefore, need badly at present seek a kind of can meet simultaneously intensity large, take into account the band Ecological Retaining Wall shore protection that amphibious, easy construction saves.
Summary of the invention
The purpose of this utility model overcomes above-mentioned defect or the deficiencies in the prior art, provides a kind of environmentally friendly ecology wallboard type barricade with ribbing shore protection.The purpose of this utility model is achieved through the following technical solutions:
A kind of environmentally friendly ecology wallboard type barricade with ribbing shore protection, is characterized in that described barricade shore protection is primarily of Ecological Wall, sheet pile, rib wall, preformed pile, anchor cable, eco-concrete, pervious concrete layer, planting soil and vegetation composition; Sheet pile sets along shore protection, and sheet pile interval arranges rib wall, in the sheet pile of rib wall portion position, be provided with slot, and preformed pile is fixed in slot; Ecological Wall is connected with preformed pile by the plug at its two ends; Ecological Wall forms by eco-concrete is prefabricated, and in the wall body of Ecological Wall, be provided with ecological hole and dowel, ribs is connected with Ecological Wall by dowel; On shore protection is domatic, is inserted with anchor cable, and sprays pervious concrete layer; Built eco-concrete between Ecological Wall and pervious concrete layer, eco-concrete lays planting soil, vegetation is planted in the ecological hole of planting soil and Ecological Wall.
Ecological hole by outer and in large from little change, horizontally set vegetation in ecological hole.
Rib wall progressively reduces from top to bottom, in upside-down triangle shape.
Each parts in environmentally friendly ecology wallboard type with ribbing barricade shore protection in the utility model are all prefabricated to be formed, quality controllable, and what adopt is rigid foundation, and continuity is good, intensity is large, stability is high, applied widely, ensure that shore protection quality.
Have employed rib wall type structure in the junction of sheet pile and preformed pile in the utility model, ensure that intensity and the fixing of junction.
The horizontally set ecosystem in the utility model, does not only weaken the ecological value of shore protection, and what also add shore protection barricade can usable floor area.
Accompanying drawing explanation
Fig. 1 is environmentally friendly ecology wallboard type barricade with ribbing shore protection sectional drawing.
Fig. 2 is construction process portion.
Fig. 3 is Ecological Wall schematic diagram.
In figure: 1-Ecological Wall; The ecological hole of 2-; 3-dowel; 4-plug; 5-ribs; 6-sheet pile; 7-rib wall; 8-preformed pile; 9-slot; 10-rolling earth behind retaining wall; 11-anchor cable; 12-pervious concrete layer; 13-eco-concrete; 14-planting soil; 15-vegetation.
Detailed description of the invention
Forming primarily of Ecological Wall 1, sheet pile 6, rib wall 7, preformed pile 8, anchor cable 11, eco-concrete 13, pervious concrete layer 12, planting soil 14 and vegetation 15 as shown in Figure 1-Figure 3.
Sheet pile 6 sets along shore protection, and sheet pile 6 interval arranges rib wall 7, in the sheet pile of rib wall portion position, be provided with slot 9, and preformed pile 8 is fixed in slot 9.
Ecological Wall 1 is connected with preformed pile 8 by the plug 4 at its two ends.Ecological Wall 1 forms by eco-concrete is prefabricated, and in the wall body of Ecological Wall 1, be provided with ecological hole 2 and dowel 3, ribs 5 is connected with Ecological Wall 1 by dowel 3.
On shore protection is domatic, is inserted with anchor cable 11, and sprays pervious concrete layer 13; Built eco-concrete 13 between Ecological Wall 1 and pervious concrete layer 12, eco-concrete 13 is laid planting soil 14,15 kinds, vegetation is planted in the ecological hole 2 of planting soil 14 and Ecological Wall 1.
The construction method of environmentally friendly ecology wallboard type barricade with ribbing shore protection comprises the following steps:
Shown in Fig. 1 and Fig. 2, set the sheet pile 6 that 0.75m is thick, 2.5m is long, 7m is dark at the scene, and arrange every 2.5m spacing at sheet pile 6 top and grow tall and be the rib wall 7 of 1.25m, rib wall 7 progressively reduces from top to bottom, the Breadth Maximum that outer ribs wall 7 exceeds sheet pile 6 is 0.2m, the Breadth Maximum that interior side rib wall 7 exceeds sheet pile 6 is 0.3m, in upside-down triangle shape, be provided with in the sheet pile 6 at rib wall 7 position one long × wide × be the slot 9 of 0.56m × 0.56m × 1.00m deeply, for the connection with top preformed pile 8.
The making length of side is 0.55m, is highly the square preformed pile 8 of 3m, the offside of square preformed pile 8 arranges the groove be convenient to Ecological Wall 1 and connected, groove shapes is consistent with the shape of the plug 4 in Ecological Wall 1, the thickness of Ecological Wall 1 is 0.35m, highly for 3m, length are 2.5m, up and down an ecological hole 2 is set every 0.5m, ecological hole 2 is by outer and inner large from little change, diameter gradually changes to 20cm from 10cm, by dowel 3, ribs 5 is connected with Ecological Wall 1, the length of ribs 5 is 3m, and wide height is respectively 0.25cm.Prefabricated Ecological Wall 1 is inserted connection respectively along the groove of preformed pile 8 both sides.
After the connection work of preformed pile 8, Ecological Wall 1, sheet pile 6, rib wall 7 completes, rolling earth behind retaining wall 10 domatic on the anchor cable 11 that diameter is 10cm, length is 5 ~ 10m is set, and the thick pervious concrete layer 12 of about 20cm is sprayed on domatic, for anchoring anchor cable 11, then laterally bury vegetation 15 underground in the ecological hole 2 in Ecological Wall 1, between Ecological Wall 1 and rolling earth behind retaining wall 10, build the absolute altitude place, ecological hole 2 of eco-concrete 13 to row on afterwards.
Reach until eco-concrete 13 backfilling working carrying out planting soil 14 after design strength, and vegetation 15 is set on planting soil 14, finally complete the construction working of environmentally friendly ecology wallboard type barricade with ribbing shore protection.
Above-mentioned detailed description of the invention does not limit the technical solution of the utility model in any form, and the technical scheme that the mode that every employing is equal to replacement or equivalent transformation obtains all drops in protection domain of the present utility model.
Claims (3)
1. an environmentally friendly ecology wallboard type barricade with ribbing shore protection, is characterized in that described barricade shore protection is primarily of Ecological Wall, sheet pile, rib wall, preformed pile, anchor cable, eco-concrete, pervious concrete layer, planting soil and vegetation composition; Sheet pile sets along shore protection, and sheet pile interval arranges rib wall, in the sheet pile of rib wall portion position, be provided with slot, and preformed pile is fixed in slot; Ecological Wall is connected with preformed pile by the plug at its two ends; Ecological Wall forms by eco-concrete is prefabricated, and in the wall body of Ecological Wall, be provided with ecological hole and dowel, ribs is connected with Ecological Wall by dowel; On shore protection is domatic, is inserted with anchor cable, and sprays pervious concrete layer; Built eco-concrete between Ecological Wall and pervious concrete layer, eco-concrete lays planting soil, vegetation is planted in the ecological hole of planting soil and Ecological Wall.
2. environmentally friendly ecology according to claim 1 wallboard type barricade with ribbing shore protection, it is characterized in that ecological hole by outer and in large from little change, horizontally set vegetation in ecological hole.
3. environmentally friendly ecology according to claim 1 wallboard type barricade with ribbing shore protection, is characterized in that rib wall progressively reduces from top to bottom, in upside-down triangle shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520392463.7U CN204780764U (en) | 2015-06-09 | 2015-06-09 | Ecological wallboard formula barricade shore protection with ribbing of environment friendly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520392463.7U CN204780764U (en) | 2015-06-09 | 2015-06-09 | Ecological wallboard formula barricade shore protection with ribbing of environment friendly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204780764U true CN204780764U (en) | 2015-11-18 |
Family
ID=54520848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520392463.7U Expired - Fee Related CN204780764U (en) | 2015-06-09 | 2015-06-09 | Ecological wallboard formula barricade shore protection with ribbing of environment friendly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204780764U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839590A (en) * | 2016-02-26 | 2016-08-10 | 重庆三峡学院 | Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area |
CN106087872A (en) * | 2016-08-11 | 2016-11-09 | 河海大学 | A kind of bank protection structure and construction method |
CN106759104A (en) * | 2016-12-29 | 2017-05-31 | 浙江大学城市学院 | Ecological slope protection structure and construction method |
CN106869080A (en) * | 2015-12-14 | 2017-06-20 | 关隆股份有限公司 | Dyke greening method and dyke |
CN108166444A (en) * | 2018-03-12 | 2018-06-15 | 浙江省水利水电勘测设计院 | A kind of assembled can spontaneous bank protection structure |
CN113317188A (en) * | 2021-05-31 | 2021-08-31 | 张红峰 | Amphibious planting bin for water conservancy and water conservation engineering |
-
2015
- 2015-06-09 CN CN201520392463.7U patent/CN204780764U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869080A (en) * | 2015-12-14 | 2017-06-20 | 关隆股份有限公司 | Dyke greening method and dyke |
CN105839590A (en) * | 2016-02-26 | 2016-08-10 | 重庆三峡学院 | Contour planting ecological management method and structural body thereof in medium-steep soil slope drawdown area |
CN106087872A (en) * | 2016-08-11 | 2016-11-09 | 河海大学 | A kind of bank protection structure and construction method |
CN106759104A (en) * | 2016-12-29 | 2017-05-31 | 浙江大学城市学院 | Ecological slope protection structure and construction method |
CN108166444A (en) * | 2018-03-12 | 2018-06-15 | 浙江省水利水电勘测设计院 | A kind of assembled can spontaneous bank protection structure |
CN113317188A (en) * | 2021-05-31 | 2021-08-31 | 张红峰 | Amphibious planting bin for water conservancy and water conservation engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204780764U (en) | Ecological wallboard formula barricade shore protection with ribbing of environment friendly | |
CN203741868U (en) | Reinforced concrete retaining wall structure with combined anchor wire | |
CN103422501B (en) | Anti-floating anchor rod structure in sand seam geology and construction method thereof | |
CN103074898A (en) | Multi-row pile foundation pit support structure and construction method thereof | |
CN203729308U (en) | Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall | |
CN104389320A (en) | Construction method of pile foundation anchor rope prestress high retaining wall | |
CN103924602A (en) | Deep soft soil foundation pit construction method | |
CN206752667U (en) | A kind of basement barrier wall structure | |
CN105804007A (en) | Reinforced soil bank wall structure based on beach soft foundation | |
CN206204972U (en) | A kind of prefabricated tubular pile as well-points dewatering | |
CN106120822B (en) | A kind of method for protecting support and device that prevent mud stone from coming down | |
CN203238642U (en) | Supporting retaining wall of foundation pit | |
CN104895008B (en) | The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection | |
CN206157760U (en) | Honeycomb geotechnique check room retaining wall with ecological recovery function | |
CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
CN103243721A (en) | Raft foundation and core tube excavation construction method of high-rise building under weak geological conditions | |
CN105040707A (en) | Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall | |
CN210658432U (en) | Assembled concrete box retaining wall | |
CN204238239U (en) | Pile foundation prestressd anchor cable height wall-retaining structure | |
CN203429645U (en) | Slope support structure assembly | |
CN102943480A (en) | Loess foundation pit supporting method | |
CN203530959U (en) | High-strength underground diaphragm wall | |
CN206143783U (en) | Prevent supporting device on mud stone landslide | |
CN103195077A (en) | Dam foundation reinforcement frame structure and dam foundation reinforcement method | |
CN203129163U (en) | Reinforcing framework structure for dam foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 Termination date: 20170609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |