CN106120822B - A kind of method for protecting support and device that prevent mud stone from coming down - Google Patents

A kind of method for protecting support and device that prevent mud stone from coming down Download PDF

Info

Publication number
CN106120822B
CN106120822B CN201610699637.3A CN201610699637A CN106120822B CN 106120822 B CN106120822 B CN 106120822B CN 201610699637 A CN201610699637 A CN 201610699637A CN 106120822 B CN106120822 B CN 106120822B
Authority
CN
China
Prior art keywords
slope
drainpipe
anchor pole
mud stone
concrete cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610699637.3A
Other languages
Chinese (zh)
Other versions
CN106120822A (en
Inventor
欧阳章智
张克楠
胡云
段浩
郭如春
李旋
李卉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou construction engineering eighth Construction Group Co.,Ltd.
Original Assignee
Guizhou Construction Engineering Group Eighth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Construction Engineering Group Eighth Construction Engineering Co Ltd filed Critical Guizhou Construction Engineering Group Eighth Construction Engineering Co Ltd
Priority to CN201610699637.3A priority Critical patent/CN106120822B/en
Publication of CN106120822A publication Critical patent/CN106120822A/en
Application granted granted Critical
Publication of CN106120822B publication Critical patent/CN106120822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of method for protecting support and device that prevent mud stone from coming down, the present invention, which will design excavation line and be located at outside building on the top of slope other than abutment wall 2M, to be located;It is from top to bottom excavated by design requirement slope slope ratio when construction, is excavated per 1.5m pauses are excavated downwards, interim suspension roof support is carried out to the layer, and squeezed into drainpipe in slopes and carry out drainage sunk well;To the supporting when excavating and draining until reaching bottom of slope under successively;Then foundation trench is excavated in bottom of slope, foundation trench outer wall is concreting body, utilizes the mud stone material excavated to be filled compacting in foundation trench;Later on foundation trench by the way of placement layer by layer constructing concrete cavity, be used in combination mud stone material to be filled in cavity and tamp, until top of the slope;Finally anchor pole and drainpipe are fixed on the outside of concrete cavity.The configuration of the present invention is simple, cost are relatively low, waste is few, security performance is high, constructing operation is quick.

Description

A kind of method for protecting support and device that prevent mud stone from coming down
Technical field
The present invention relates to a kind of method for protecting support and device that prevent mud stone from coming down, belong to civil engineering support engineering technical field.
Background technology
Southwestern China area is widely distributed mud stone.Mud stone has the characteristics that easy-weathering, aquation.Mud stone intensity after weathering It significantly reduces, the geological disasters such as avalanche and shallow failure easily occurs.With the fast development of Chinese economy, nowadays all kinds of civil engineering works Journey spreads entire southwest, and in Daxing civil engineering area, the generation on Artificial Side-slope and landslide is difficult to avoid that.It is all kinds of In civil engineering, Artificial Side-slope is frequently involved with landslide engineering to be needed to ensure top of the slope existing building safety problem, especially for mud It is the form of the non-rock of rock that rock side slope is this more to pay attention to, and just can guarantee that the safety of entire engineering promotes.But existing mud The protection on rockslide slope or support pattern still cannot meet the needs of production and construction.
Invention content
The object of the present invention is to provide it is a kind of it is simple in structure, cost is relatively low, security performance is high, constructing operation efficiently The method for protecting support and device for preventing mud stone from coming down, with overcome the deficiencies in the prior art.
The technical proposal of the invention is realized in this way:
A kind of method for protecting support for preventing mud stone from coming down of the present invention is that design excavation line is located at and is built apart from top of the slope by this method It builds and locates other than outer abutment wall 2M;It is from top to bottom excavated by design requirement slope slope ratio when construction, is suspended per 1.5M is excavated downwards It excavates, interim suspension roof support is carried out to the layer, and squeeze into drainpipe in slopes and carry out drainage sunk well;To when excavating under successively Supporting and draining are until reach bottom of slope;Then foundation trench is excavated in bottom of slope, foundation trench outer wall is concreting body, and excavation is utilized in foundation trench The mud stone material to get off is filled compacting;Later on foundation trench by the way of placement layer by layer constructing concrete cavity, be used in combination Mud stone material is filled in compacting in cavity, until top of the slope;Finally anchor pole and drainpipe are fixed on the outside of concrete cavity.
In preceding method, the anchor pole tilts down 15 degree and squeezes into slopes, and using determinant arrangement mode, anchor pole is vertical and horizontal It is 1.5M to spacing;Anchor pole is anchored using full bonding mode in slope;When carrying out interim suspension roof support, anchor pole protruded length is answered Ensure that anchor pole can run through concrete cavity, and ensures that anchor pole is reliably fixed.
In preceding method, the drainpipe tilts squeeze into slopes upwards, and draining tube end in depth descends Shuifu County to collect as possible Position, drainpipe use plum blossom-shaped arrangement mode, and spacing is 2~3M between drainpipe;Drainpipe use caliber for 100MMPVC drains floral tube, and drainpipe protruded length is it is ensured that can run through concrete cavity, and stretch out outside concrete cavity.
In preceding method, the lower section on the outside of concrete cavity at the drainpipe stretching is equipped with planting groove, in planting groove Filled with cultivated plant soil, ploughs to plant in soil and plant vine plant.
In preceding method, the slope height is not more than 12M.
According to a kind of suspension device for preventing mud stone from coming down for the present invention that the above method is constituted, including side slope and side slope top The building in portion;Apart from 2 meters of skin to be externally provided with design excavation line, it is close to design excavation line and is equipped with concrete cavity, The anchor pole and drainpipe that shale layer in side slope is stretched into through concrete cavity are equipped on the outside of concrete cavity, anchor pole tilts down 15 Degree stretches into shale layer, and drainpipe tilts the underground water enrichment positions for stretching into shale layer upwards;Concrete cavity bottom is equipped with foundation trench, Mud stone backfill is filled in foundation trench and concrete cavity;Lower section is equipped with planting groove at drainpipe outlet on the outside of concrete cavity, It is filled in planting groove and ploughs plant soil, ploughed interior kind of plant soil and be implanted with vine plant.
In aforementioned device, the side slope distance from top terrace absolute altitude is not more than 12M;The concrete cavity bottom and foundation trench Below terrace absolute altitude.
In aforementioned device, the anchor pole uses determinant arrangement mode, and anchor pole is anyhow 1.5M to spacing;Anchor pole and side It is perfused with binder between shale layer in slope.
In aforementioned device, the drainpipe uses plum blossom-shaped arrangement mode, and the spacing between drainpipe is 2~3M;Row Water pipe uses caliber to drain floral tube for 100MMPVC.
By adopting the above-described technical solution, compared with prior art, the present invention the present invention utilizes excavation mud stone itself Strength characteristics carries out being wrapped to form a kind of reliable antiskid retaining wall of stress using concrete cavity, with anchor pole, draining floral tube, kind The integral structure of flute profile is planted, the spies such as simple in structure, cost is relatively low, it is high to reduce waste, security performance, constructing operation is quick are possessed Point, to ensure the abundant safety of personnel and building on the top of slope filling during construction and follow-up use in work progress Divide safety, while greening technique meets existing engineering ecology construction demand, meets the requirement of national energy conservation and emission reduction.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
In figure label for:1- anchor poles, 2- drainpipes, 3- concrete cavities, 4- planting grooves, 5- plough plant soil, 6- vine plants, 7- designs excavation line, 8- side slopes, 9- buildings, 10- shale layers.
Specific implementation mode
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as to any of the present invention Limitation.
A kind of method for protecting support for preventing mud stone from coming down of the present invention, as shown in Figure 1:This method will design excavation line be located at away from Locate from other than abutment wall 2M outside building on the top of slope;It is from top to bottom excavated by design requirement slope slope ratio when construction, per excavation downwards 1.5M pauses are excavated, and interim suspension roof support is carried out to the layer, and are squeezed into drainpipe in slopes and carried out drainage sunk well;Under successively to When excavating, supporting and draining are until reach bottom of slope;Then foundation trench is excavated in bottom of slope, foundation trench outer wall is concreting body, in foundation trench It is filled compacting using the mud stone material excavated;Constructing concrete is empty by the way of placement layer by layer on foundation trench later Chamber is used in combination mud stone material to be filled in cavity and is tamped, until top of the slope;It is finally that anchor pole and drainpipe and concrete cavity outside is solid It is fixed.Anchor pole tilts down 15 degree and squeezes into slopes, and using determinant arrangement mode, anchor pole is anyhow 1.5M to spacing;Anchor pole Using being anchored in full bonding mode and slope;When carrying out interim suspension roof support, anchor pole protruded length is it is ensured that anchor pole can run through mixed Solidifying soil cavity, and ensure that anchor pole is reliably fixed.Drainpipe tilts squeeze into slopes upwards, and draining tube end gos deep into underground water as possible Enrichment positions, drainpipe use plum blossom-shaped arrangement mode, and spacing is 2~3M between drainpipe;Drainpipe use caliber for 100MMPVC drains floral tube, and drainpipe protruded length is it is ensured that can run through concrete cavity, and stretch out outside concrete cavity.Row The lower section on the outside of concrete cavity at water pipe stretching is equipped with planting groove, is filled with to plough in planting groove and plants soil, ploughs in plant soil and plant Vine plant.Slope height is not more than 12M.
According to a kind of suspension device for preventing mud stone from coming down for the present invention that the above method is constituted, as shown in Figure 1, the device Including the building 9 at the top of side slope 8 and side slope;Excavation line 7 is designed apart from 9 exterior wall of building to be externally provided with for 2 meters, is close to design and is opened It digs line 7 and is equipped with concrete cavity 3,3 outside of concrete cavity is equipped with stretches into shale layer 10 in side slope 8 through concrete cavity 3 Anchor pole 1 and drainpipe 2, anchor pole 1 tilt down 15 degree and stretch into shale layer 10, and drainpipe 2 tilts the ground for stretching into shale layer 10 upwards Lower water enrichment positions;3 bottom of concrete cavity is equipped with foundation trench, and mud stone backfill is filled in foundation trench and concrete cavity 3;Coagulation It is equipped with planting groove 4 below 3 outside drainpipe of native cavity, 2 exit, is filled with to plough in planting groove 4 and plants soil 5, plough plantation in plant soil 5 There is vine plant 6.8 distance from top terrace absolute altitude of side slope is not more than 12M;3 bottom of the concrete cavity and foundation trench are located at terrace Below absolute altitude.Anchor pole 1 uses determinant arrangement mode, and anchor pole 1 is anyhow 1.5M to spacing;Anchor pole 1 and the mud stone in side slope It is perfused with binder between layer 10.Drainpipe 2 uses plum blossom-shaped arrangement mode, and the spacing between drainpipe 2 is 2~3M;Row Water pipe 2 uses caliber to drain floral tube for 100MMPVC.
Embodiment
8 height of side slope of this example is not more than 12M;It is located building 9 at the top of side slope, 9 outer abutment wall of building is apart from side slope 8 Design excavation line 7 be not less than 2M;Side slope is excavated by design requirement slope slope ratio from top to bottom, is often excavated 1.5M high and is carried out 1 supporting of anchor pole and its slopes internal drainage are administered, and next layer of 1.5M excavation is carried out again after completing this layer of processing;Anchor pole 1 is by interim Protective treatment, using the full Grouted bolt of system, determinant arrangement is anyhow 1.5M to spacing, and anchor pole inclination angle is 15 degree, anchor pole 1 exposed parts enter in 3 range of concrete cavity;Side slope body internal drainage is administered:Built-in 100MMPVC drains floral tube 2, spacing Using 2~3M, plum blossom-shaped arrangement, end in depth descends water enrichment positions, outside to extend out to outside concrete cavity 3 as possible;It waits for whole After the completion of a slope surface provisional protection, foundation trench is excavated, outer wall uses concreting, the mud stone backfill that inner utilization is excavated to carry out Filling forms ecological supporting architecture basics part and is carried out at the same time filling and the pressure of mud stone backfill using masonry wall body is divided into It is real, the concrete cavity 3 of a completion is eventually formed, the mud stone backfill that inner utilization is excavated is tamped;Outside concrete cavity 3 Multistage planting groove 4 is set in side, is put into plough and plants soil 5, draining floral tube 2 gos deep into 4 top of planting groove, plants vine plant 6, and rattan class is planted The preferred mucuna of object.
The specific application example of the above only present invention, it is also possible to there are other embodiments, all use equally to replace Change or equivalent transformation formed technical solution, be within protection domain of the presently claimed invention.

Claims (8)

1. a kind of method for protecting support for preventing mud stone from coming down, it is characterised in that:Design excavation line is located at and is built apart from top of the slope by this method It builds and locates other than outer abutment wall 2m;It is from top to bottom excavated by design requirement slope slope ratio when construction, is suspended per 1.5m is excavated downwards It excavates, interim suspension roof support is carried out to the layer, and squeeze into drainpipe in slopes and carry out drainage sunk well;To when excavating under successively Supporting and draining are until reach bottom of slope;Then foundation trench is excavated in bottom of slope, foundation trench outer wall is concreting body, and excavation is utilized in foundation trench The mud stone material to get off is filled compacting;Later on foundation trench by the way of placement layer by layer constructing concrete cavity, be used in combination Mud stone material is filled in compacting in cavity, until top of the slope;Finally anchor pole and drainpipe are fixed on the outside of concrete cavity.
2. method according to claim 1, it is characterised in that:The anchor pole tilts down 15 degree or so and squeezes into slopes, adopts With determinant arrangement mode, anchor pole is anyhow 1.5m to spacing;Anchor pole is anchored using full bonding mode in slope;It carries out interim When suspension roof support, anchor pole protruded length is it is ensured that anchor pole can run through concrete cavity, and ensure that anchor pole is reliably fixed.
3. method according to claim 1, it is characterised in that:The drainpipe tilts squeeze into slopes upwards, drains pipe end Portion in depth descends water enrichment positions as possible, and drainpipe uses plum blossom-shaped arrangement mode, and spacing is 2~3m between drainpipe;Row Water pipe uses caliber to drain floral tube for 100mmPVC, and drainpipe protruded length is it is ensured that can run through concrete cavity, and stretch out Outside concrete cavity.
4. method according to claim 1, it is characterised in that:The lower section on the outside of concrete cavity at the drainpipe stretching Equipped with planting groove, filled with plant soil is ploughed in planting groove, ploughs to plant in soil and plant vine plant.
5. a kind of suspension device for preventing mud stone from coming down, including side slope(8)And the building at the top of side slope(9);It is characterized in that: Apart from building(9)2 meters of exterior wall is to be externally provided with design excavation line(7), it is close to design excavation line(7)Equipped with concrete cavity(3), Concrete cavity(3)Outside, which is equipped with, runs through concrete cavity(3)Stretch into side slope(8)Interior shale layer(10)Anchor pole(1)And draining Pipe(2), anchor pole(1)It tilts down 15 degree and stretches into shale layer(10), drainpipe(2)It tilts upwards and stretches into shale layer(10)Underground Water enrichment positions;Concrete cavity(3)Bottom is equipped with foundation trench, foundation trench and concrete cavity(3)It is interior to be filled with mud stone backfill;It is mixed Solidifying soil cavity(3)Outside drainpipe(2)Planting groove is equipped with below exit(4), planting groove(4)It is interior native filled with plant is ploughed(5), plough Plant soil(5)Interior kind is implanted with vine plant(6).
6. the suspension device for preventing mud stone from coming down according to claim 5, it is characterised in that:The side slope(8)Distance from top Terrace absolute altitude is not more than 12m;The concrete cavity(3)Bottom and foundation trench are located at terrace absolute altitude or less.
7. the suspension device for preventing mud stone from coming down according to claim 5, it is characterised in that:The anchor pole(1)Using ranks Formula arrangement mode, anchor pole(1)Anyhow it is 1.5m to spacing;Anchor pole(1)With the shale layer in side slope(10)Between be perfused with it is viscous Tie agent.
8. the suspension device for preventing mud stone from coming down according to claim 5, it is characterised in that:The drainpipe(2)Using plum Flower-shaped arrangement mode, drainpipe(2)Between spacing be 2~3m;Drainpipe(2)It uses caliber to drain for 100mmPVC to spend Pipe.
CN201610699637.3A 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down Active CN106120822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610699637.3A CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610699637.3A CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Publications (2)

Publication Number Publication Date
CN106120822A CN106120822A (en) 2016-11-16
CN106120822B true CN106120822B (en) 2018-08-14

Family

ID=57279436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610699637.3A Active CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Country Status (1)

Country Link
CN (1) CN106120822B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106818413A (en) * 2016-12-23 2017-06-13 西北农林科技大学 A kind of method of utilization slope underground water irrigated crop
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe
CN107386310B (en) * 2017-08-15 2023-07-25 广东工业大学 Building supporting structure applied to hillside topography and construction method thereof
CN115142442B (en) * 2022-07-20 2024-04-30 万宝矿产有限公司 Large-scale landslide control method for side solution ditch side slope of large-diameter pipeline

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100996848B1 (en) * 2008-03-14 2010-11-26 이상덕 Soil nailing method and the ground reinforcement structure used soil nailing
CN201746843U (en) * 2010-08-02 2011-02-16 中国水电顾问集团华东勘测设计研究院 High slope supporting and road retaining wall integrated structure
JP2015094169A (en) * 2013-11-13 2015-05-18 共和ハーモテック株式会社 Earth retaining structure and formation method thereof
CN104762978B (en) * 2014-12-26 2016-08-24 浙江省电力设计院 A kind of anchor pole Gravity Retaining Wall for high slope rockmass and manufacture method
CN206143783U (en) * 2016-08-23 2017-05-03 中国电建集团贵阳勘测设计研究院有限公司 Prevent supporting device on mud stone landslide

Also Published As

Publication number Publication date
CN106120822A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN104480974B (en) Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond
CN203403426U (en) Supporting structure of expensive earth road cutting side slope
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN102605793B (en) Moisture transfer and ecological management method for loess slope
CN102817366A (en) Prevention and treatment method for full-mechanized caving mining collapse trap area water disaster for shallow-buried ultra-thick coal seam
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN106703044A (en) Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN108798684A (en) A kind of method of completely decomposed fine sand stratum tunnel excavation
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104878719A (en) Mutually-embedded reinforced ecological retaining wall construction method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN205444395U (en) Be equipped with drain pipe in hole of permeating water on pipe wall
CN206143783U (en) Prevent supporting device on mud stone landslide
CN103243721A (en) Raft foundation and core tube excavation construction method of high-rise building under weak geological conditions
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ou Yangzhangzhi

Inventor after: Zhang Kenan

Inventor after: Hu Yun

Inventor after: Duan Hao

Inventor after: Guo Ruchun

Inventor after: Li Xuan

Inventor after: Li Hui

Inventor before: Ou Yangzhangzhi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180511

Address after: 550002 No. 128 North Section of Huaxi orchard, flower orchard, Nanming District, Guiyang, Guizhou

Applicant after: Guizhou Construction Engineering Group eighth Construction Engineering Co., Ltd.

Address before: 550025 Xingshan Lake District, Guiyang, Guizhou Province, No. 16

Applicant before: China Kweiyang survey and design research institute company limited of electricity Jian group

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 550000 No. 1, floor 11, unit 1, building B, Taisheng international, No. 9, Airport Road, Shuanglong Airport Economic Zone, Guiyang City, Guizhou Province

Patentee after: Guizhou construction engineering eighth Construction Group Co.,Ltd.

Address before: 550002 No. 128 North Section of Huaxi orchard, flower orchard, Nanming District, Guiyang, Guizhou

Patentee before: NO.8 CONSTRUCTION ENGINEERING GROUP CO., LTD. OF GUIZHOU CONSTRUCTION AND ENGINEERING Group