CN201486133U - Reinforced concrete double-shear wall template - Google Patents

Reinforced concrete double-shear wall template Download PDF

Info

Publication number
CN201486133U
CN201486133U CN200920165734XU CN200920165734U CN201486133U CN 201486133 U CN201486133 U CN 201486133U CN 200920165734X U CN200920165734X U CN 200920165734XU CN 200920165734 U CN200920165734 U CN 200920165734U CN 201486133 U CN201486133 U CN 201486133U
Authority
CN
China
Prior art keywords
shear wall
keel
clamping plate
vertical keel
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920165734XU
Other languages
Chinese (zh)
Inventor
陈晓敏
陈禹
史志远
苗培博
黄斌华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGDA CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHONGDA CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGDA CONSTRUCTION GROUP CO Ltd filed Critical ZHONGDA CONSTRUCTION GROUP CO Ltd
Priority to CN200920165734XU priority Critical patent/CN201486133U/en
Application granted granted Critical
Publication of CN201486133U publication Critical patent/CN201486133U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a reinforced concrete double-shear wall template. The double-shear wall comprises a first shear wall and a second shear wall; two sides of the first shear wall are symmetrically provided with a plurality of limit cushion blocks; a first nine-plywood and a second nine-plywood are arranged at two sides of the first shear wall respectively and are supported against the outer side of the limit cushion blocks; the outer sides of the first nine-plywood and the second nine-plywood are provided with a first vertical keel and a second vertical keel respectively; the outer sides of the first vertical keel and the second vertical keel are provided with a first horizontal keel and a second horizontal keel respectively; a plurality of through bolts run through the limit cushion blocks of the first shear wall, the first nine-plywood and the second nine-plywood; and a plurality of first anchors are arranged at two ends of the through bolts to anchor the first vertical keel, the second vertical keel, the first horizontal keel and the second horizontal keel.

Description

The Reinforced Concrete Double shear wall formwork
Technical field
The utility model relates to place, building shrinkage joint Reinforced Concrete Double shear wall formwork, is the double shear wall form that is used for reinforcing bar binding, formwork and the casting and compacting of concrete of place, building shrinkage joint Reinforced Concrete Double shear wall.
Background technology
Conventional place, shrinkage joint, during the construction of double shear wall, often two walls water simultaneously smashes concrete, its template system design internal mold is a wooden model, at the place, shrinkage joint, fill out with seam with wide plastic foamboard, fix with spacing cushion block, again two walls while disturbing concrete.
The method requires two wall concrete to water simultaneously to smash difficulty bigger, if a side wall concrete is higher than opposite side, then because concrete lateral pressure will be stitched the inner foam plastics and is extruded into opposite side, causes mass defects such as walls concrete positioning, spillage.
Summary of the invention
In order to overcome shortcomings such as the easy positioning of walls concrete, spillage in the above-mentioned background technology, the utility model provides place, a kind of building shrinkage joint Reinforced Concrete Double shear wall formwork.Adopting this template, then is earlier that a side concrete wall body construction is good, puts plastic foamboard again, puts the inner formword of other side again, and then Screw arbor with nut at both-ends is fixed, and pouring concrete has more so just guaranteed the quality of double shear wall.
A kind of Reinforced Concrete Double shear wall formwork, this double shear wall comprises first shear wall and second shear wall, wherein, this first shear wall bilateral symmetry is provided with a plurality of spacing cushion blocks, the one or nine clamping plate and the two or nine clamping plate are located at this first shear wall both sides respectively, be butted on the described spacing cushion block outside, the one or nine clamping plate and the two or the nine clamping plate outside are respectively equipped with the first vertical keel and the second vertical keel, these the first vertical keel and the second vertical keel outside are respectively equipped with the first horizontal keel and the second horizontal keel, many to wearing spacing cushion block and described the one the second nine clamping plate that bolt passes this first shear wall, a plurality of first ground tackles are arranged in described to wearing the two ends of bolt, with the described the one the second vertical keel and the one the second horizontal keel anchorings.
Also comprise plastic foamboard, be located between this first shear wall and second shear wall.
This second shear wall bilateral symmetry is provided with a plurality of spacing cushion blocks, this double shear wall form also comprises three nine-day periods after the winter solstice clamping plate, these three nine-day periods after the winter solstice clamping plate are butted on the described spacing cushion block in this second shear wall outside, this three nine-day periods after the winter solstice clamping plate outside is provided with the 3rd vertical keel, the 3rd vertical keel outside is provided with the 3rd horizontal keel, describedly also pass the described spacing cushion block of this second shear wall and these three nine-day periods after the winter solstice clamping plate to wearing bolt, by a plurality of second ground tackles with the described the 3rd vertical keel and the 3rd horizontal keel anchoring.
Described vertical keel and horizontal keel all adopt steel pipe.
Describedly be arranged with pvc pipe on the bolt to wearing.
A kind of Reinforced Concrete Double shear wall formwork of the present utility model adopts technique scheme, makes not positioning of walls concrete, spillage not, has reached the useful technique effect that has guaranteed double shear wall quality.
Description of drawings
Fig. 1 is the vertical view of double shear wall form first shear wall part;
Fig. 2 is the sectional drawing of double shear wall form first shear wall part;
Fig. 3 is the partial enlarged drawing of Fig. 2;
Fig. 4 is the sectional drawing of double shear wall form second shear wall part;
Fig. 5 is the partial enlarged drawing of Fig. 4.
The specific embodiment
For shape of the present utility model, structure and characteristics can be understood better, below will enumerate preferred embodiment and also be elaborated in conjunction with the accompanying drawings.
Fig. 1,2,3 is the schematic diagram of the utility model double shear wall form first shear wall part, and as shown in the figure, first shear wall 14 comprises parallel steel bar stress 17 and is arranged in distributing bar 18 between the steel bar stress 17.A plurality of spacing cushion block 5 is symmetrical to be arranged on the steel bar stress 17 of first shear wall, 14 both sides.
The one or nine clamping plate 1 and the two or nine clamping plate 2 are divided into first shear wall, 14 both sides, push against spacing cushion block 5 outsides.The outside of the one the second nine clamping plate is respectively equipped with the first vertical keel 3 and the second vertical keel 4.The one the second vertical keel outsides are respectively equipped with the first horizontal keel 8 and the second horizontal keel 9.Many to wearing spacing cushion block 5 and two nine clamping plate that bolt 16 passes first shear wall, by to wearing the first vertical keel 3 and second vertical keel 4 anchorings with both sides of first ground tackle 6 that bolt 16 two ends wear.The one the second horizontal keel are also by being strained and fixed to wearing bolt 16.
Also leave longer part to wearing bolt 16 after passing first shear wall 14, can wait until in the next step 15 constructions of second shear wall and use.Be arranged with pvc pipe 7 to wearing bolt 16 on the part between two nine clamping plate, the concrete grout when avoiding constructing directly contact guarantees that to wearing bolt 16 construction finishes the back and can be easy to extract to wearing bolt 16 in shear wall.
After the template of first shear wall, 14 parts is finished, can carry out the casting and compacting of concrete of first shear wall 14.14 constructions of first shear wall are promptly removed horizontal keel, vertical keel and nine clamping plate after finishing and reaching the form removal requirement.Then plastic foamboard 10 is passed and insert, be close to first shear wall 14 wearing bolt 16.The width of plastic foamboard 10 promptly is equivalent to the width at the shrinkage joint of desire formation, to form certain shrinkage joint between two shear walls.Carrying out the reinforcing bar binding and the spacing cushion block of second shear wall 15 afterwards installs.
Fig. 4,5 is the template schematic diagram of second shear wall 15, and second shear wall 15 is identical with first shear wall 14, also is to be made of steel bar stress 17 and distributing bar 18, and bilateral symmetry is provided with a plurality of spacing cushion blocks 5 on the steel bar stress 17.Three nine-day periods after the winter solstice clamping plate 11 are butted on outside the spacing cushion block 5 that is positioned at second shear wall, 15 outsides.Three nine-day periods after the winter solstice clamping plate 11 outsides are provided with the 3rd vertical keel 12, the three vertical keel 12 and are provided with the 3rd horizontal keel.Pass first shear wall 14 to wearing bolt 16, pass the spacing cushion block 5 and three nine-day periods after the winter solstice clamping plate 11 of second shear wall 15 after, by second ground tackle 19 with the 3rd vertical keel 12 and the 3rd horizontal keel anchoring.Be arranged with pvc pipe equally to wearing the part that bolt 16 is located in second shear wall, 15 templates.Horizontal keel in the present embodiment all adopt steel pipe to make with vertical keel.
After the template assembling of second shear wall, 15 parts is finished, second shear wall 15 is carried out casting and compacting of concrete.After treating that 15 constructions of second shear wall are finished, can remove the template of second shear wall, 15 parts, and will from shear wall, extract out, finish the construction of double shear wall wearing bolt 16.
More than be illustrative to description of the present utility model; and it is nonrestrictive; those skilled in the art is understood, and can carry out many modifications, variation or equivalence to it within spirit that claim limits and scope, but they will fall in the protection domain of the present utility model all.

Claims (5)

1. Reinforced Concrete Double shear wall formwork, this double shear wall comprises first shear wall and second shear wall, it is characterized in that, this first shear wall bilateral symmetry is provided with a plurality of spacing cushion blocks, the one or nine clamping plate and the two or nine clamping plate are located at this first shear wall both sides respectively, be butted on the described spacing cushion block outside, the one or nine clamping plate and the two or the nine clamping plate outside are respectively equipped with the first vertical keel and the second vertical keel, these the first vertical keel and the second vertical keel outside are respectively equipped with the first horizontal keel and the second horizontal keel, many to wearing spacing cushion block and described the one the second nine clamping plate that bolt passes this first shear wall, a plurality of first ground tackles are arranged in described to wearing the two ends of bolt, with the described the one the second vertical keel and the one the second horizontal keel anchorings.
2. double shear wall form as claimed in claim 1 is characterized in that, also comprises plastic foamboard, is located between this first shear wall and second shear wall.
3. double shear wall form as claimed in claim 2, it is characterized in that, this second shear wall bilateral symmetry is provided with a plurality of spacing cushion blocks, this double shear wall form also comprises three nine-day periods after the winter solstice clamping plate, these three nine-day periods after the winter solstice clamping plate are butted on the described spacing cushion block in this second shear wall outside, this three nine-day periods after the winter solstice clamping plate outside is provided with the 3rd vertical keel, the 3rd vertical keel outside is provided with the 3rd horizontal keel, describedly also pass the described spacing cushion block of this second shear wall and these three nine-day periods after the winter solstice clamping plate to wearing bolt, by a plurality of second ground tackles with the described the 3rd vertical keel and the 3rd horizontal keel anchoring.
4. double shear wall form as claimed in claim 3 is characterized in that, described vertical keel and horizontal keel all adopt steel pipe.
5. as claim 1 or 3 described double shear wall forms, it is characterized in that, describedly be arranged with pvc pipe on the bolt wearing.
CN200920165734XU 2009-07-17 2009-07-17 Reinforced concrete double-shear wall template Expired - Lifetime CN201486133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920165734XU CN201486133U (en) 2009-07-17 2009-07-17 Reinforced concrete double-shear wall template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920165734XU CN201486133U (en) 2009-07-17 2009-07-17 Reinforced concrete double-shear wall template

Publications (1)

Publication Number Publication Date
CN201486133U true CN201486133U (en) 2010-05-26

Family

ID=42425018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920165734XU Expired - Lifetime CN201486133U (en) 2009-07-17 2009-07-17 Reinforced concrete double-shear wall template

Country Status (1)

Country Link
CN (1) CN201486133U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720353A (en) * 2012-05-17 2012-10-10 中建三局第二建设工程有限责任公司 Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN103114717A (en) * 2013-03-14 2013-05-22 青岛博海建设集团有限公司 Formwork system of shear walls at two sides of extensible seam
CN104695708A (en) * 2015-02-17 2015-06-10 天津二十冶建设有限公司 Construction method for expansion joint formwork erection in narrow space of high-rise building external wall
CN105201082A (en) * 2015-10-10 2015-12-30 中建二局第二建筑工程有限公司 Construction method of expansion joint shape setting formwork
CN108612316A (en) * 2018-05-24 2018-10-02 中国二十冶集团有限公司 A method of control template installs straight degree
CN109989506A (en) * 2019-05-20 2019-07-09 中信国安建工集团有限公司 A kind of reinforced concrete shear wall and its construction method
CN114458006A (en) * 2022-01-25 2022-05-10 中国一冶集团有限公司 Cast in situ concrete wallboard steel bar formwork fixed knot constructs

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720353A (en) * 2012-05-17 2012-10-10 中建三局第二建设工程有限责任公司 Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN103114717A (en) * 2013-03-14 2013-05-22 青岛博海建设集团有限公司 Formwork system of shear walls at two sides of extensible seam
CN103114717B (en) * 2013-03-14 2015-12-02 青岛博海建设集团有限公司 A kind of both sides, shrinkage joint shear wall formwork system
CN104695708A (en) * 2015-02-17 2015-06-10 天津二十冶建设有限公司 Construction method for expansion joint formwork erection in narrow space of high-rise building external wall
CN105201082A (en) * 2015-10-10 2015-12-30 中建二局第二建筑工程有限公司 Construction method of expansion joint shape setting formwork
CN108612316A (en) * 2018-05-24 2018-10-02 中国二十冶集团有限公司 A method of control template installs straight degree
CN109989506A (en) * 2019-05-20 2019-07-09 中信国安建工集团有限公司 A kind of reinforced concrete shear wall and its construction method
CN109989506B (en) * 2019-05-20 2020-06-02 中信国安建工集团有限公司 Construction equipment and construction method for reinforced concrete shear wall
CN114458006A (en) * 2022-01-25 2022-05-10 中国一冶集团有限公司 Cast in situ concrete wallboard steel bar formwork fixed knot constructs

Similar Documents

Publication Publication Date Title
CN201486133U (en) Reinforced concrete double-shear wall template
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN102587554B (en) Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method
CN106437031B (en) The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method
CN101298781B (en) Basement bottom plate rear pouring tape construction method
CN103046465B (en) Reinforcing construction method for foam core die precast hollow plate beam
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN105298020A (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN102251540A (en) Construction installation method for fast-easy setback grid of bottom plate construction joint
CN102995572B (en) The method of attachment of Thin-wall Hollow Pier and former pier stud and device thereof after bridge jacking
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN104831932A (en) Construction technology for high-grade concrete column base
CN203129203U (en) Rubble retaining wall reinforcing single-face formwork supporting system
CN102677624A (en) U-shaped aqueduct simulation testing device and method
CN210737843U (en) Prefabricated assembled concrete shear force wall
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN202148608U (en) Fast-easy closing-up net construction installation structure of bottom board construction seam
CN104847111B (en) Construction method for coupling beam between shear wall limbs
CN202031328U (en) Fixing device of outer formwork for casting outer concrete wall on floor slab of building
CN207092546U (en) A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed
CN109629696B (en) Connection node and bamboo building structure of former bamboo combination wallboard of assembled and floor
CN202559291U (en) U-typed aqueduct simulated test device
CN203200623U (en) Metro monolithic roadbed expansion joint pouring auxiliary device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100526