CN1951707B - Scene-making process in gangue ground emission - Google Patents

Scene-making process in gangue ground emission Download PDF

Info

Publication number
CN1951707B
CN1951707B CN200610097018A CN200610097018A CN1951707B CN 1951707 B CN1951707 B CN 1951707B CN 200610097018 A CN200610097018 A CN 200610097018A CN 200610097018 A CN200610097018 A CN 200610097018A CN 1951707 B CN1951707 B CN 1951707B
Authority
CN
China
Prior art keywords
spoil
making
layer
side slope
scape technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200610097018A
Other languages
Chinese (zh)
Other versions
CN1951707A (en
Inventor
卞正富
李钢
张连贵
张国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN200610097018A priority Critical patent/CN1951707B/en
Publication of CN1951707A publication Critical patent/CN1951707A/en
Application granted granted Critical
Publication of CN1951707B publication Critical patent/CN1951707B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a method for arranging bone coals on the ground to form views. Wherein, it comprises that: transmitting the bone coals to the field; stacking the bone coals; classifying the bone coal of each layer, and laying road or man way, whose two sides have water grooves; when compressing two layers of bone coals, transmitting soil to the slope of bone coals, or mixing the bone coal with lake soil to cover the slope; when the height of each layer is 4-6m, keeping 1-2m wide platform around the bone coal accumulation; covering soil on the platform, and digging tree concave; arranging the water discharge groove at each platform to connect the water groove of road; plating trees. The invention has low cost.

Description

A kind of scape technology of making in the gangue ground emission process
Technical field
The present invention relates to a kind of scape technology of making in a kind of the scape technology of making, especially the gangue ground emission process.
Background technology
The discharging of China gangue is discharged in the mode of piling up for a long time, not only land occupation, but also pollute visual environment, also have dust pollution, landslide hazard simultaneously; In recent years, the spoil discharging comprises with the processing major progress: 1) spoil directly is disposed to mining collapse area, the subsidence area of both having reclaimed has been reduced the spoil occupation of land again; 2) spoil is disposed to the down-hole as bashing, had both handled spoil, reduced land subsidence again; 3) hillock of having piled up is taked the shaping measure, afforest again.
Though above-mentioned several method result of use is better, all has certain limitation.Require the preceding subsidence area of discharge refuse to form as first method, build the ore deposit initial stage and just cannot use the method.Even the subsidence area forms, can also need to obtain land owner, user's agreement toward subsidence area discharging spoil; Second method need be done certain change to existing mine hoisting transportation system, thereby mine production is produced certain influence, enters the mine of decline phase so this method often is applicable to mine capacity; The third method is a kind of behavior of afterwards handling again, if obviously can just require to stack spoil according to greening in advance, will reduce spoil discharging and the cost of greening and the difficulty of construction greatly.Make the scape design and construction in the gangue ground release process and need solve following problem: the 1) expression of construction plan; 2) restricted clearance spoil stacking amount, stack highly and design with the harmony of environment; 3) Slope Treatment not only meets greening and aesthetic requirement, also will prevent harm such as landslide.
Summary of the invention
It is simple to the purpose of this invention is to provide a kind of technology, is easy to discharging, is convenient to construction, afforests a kind of scape technology of making in the low gangue ground emission process of cost.
For achieving the above object, a kind of scape technology of making in the gangue ground emission process of the present invention:
A. spoil is transported to the selected spoil place of stacking;
B. press design shape and highl stratification and pile up spoil;
C. push enforcement worker operation every layer of spoil tamped, and lay traffic route or pavement, traffic route or both sides, pavement are provided with the charge for remittance ditch, and the charge for remittance ditch is narrowed down by wide to going up down;
D. behind the two-layer spoil of every compacting, muck haulage to the spoil side slope face earthing and afforest, side slope is covered with thickness and is advisable to be not more than 20cm, or covers hillock side slope surface after adopting spoil and lake mud mixing by a certain percentage, and the thickness of covering is 40~60cm;
When e. the every piling height of spoil is 4~6m, reserve the platform of 1~2m width around piling up spoil massif periphery, this flat surface and horizontal plane slanted angle are 2 °, and flat surface incline direction and hillock are domatic oppositely;
F. earthing on each platform that is stayed, and dig the hole that plants trees, stopping and planting trees with soil, be equipped with the gutter in each inboard, platform border, all gutters communicate with traffic route or pavement charge for remittance ditch;
G. the greening of spoil limit is piled up on the limit, until finishing the design view.
Described spoil compaction in layers design height is 60~80cm; The working procedure of every lamination reality is that earlier to be that the spoil of 60~80cm pushes away flat with height of release, and watering is carried out static pressure with bull-dozer then, uses the vibrated roller compacting at last; The traffic route of transporting spoil twist, its gradient is less than 5 °; The spoil that adopts mixes the mass percent that covers hillock side slope surface with lake mud be 7: 3~5: 5; Described hillock side slope to the ratio of following domatic and massif up is 1: 3~1: 2.
The invention has the beneficial effects as follows:
(1) administers while discharging, reduced after the spoil discharging cost of shaping greening again;
(2) maximally utilise spoil discharging place, saved the soil;
(3) in greening spoil side slope, prevented the spoil landslide.
(4) visual pollution and dust pollution in the spoil discharge process have been reduced.
The specific embodiment
The present invention adopts the moulding of imitative natural landscape design hillock, the view and coordination mutually such as industrial building, natural landscape on every side that require hillock to produce; Consider stability of slope and greening requirement during design, the geometric parameter of main view is considered humanity and aesthetic values, satisfy the function division in the surface plant scope, accomplish to administer while discharging.The delineation spoil is stacked scope at first earlier; Side slope is determined side slope maximum and thickness of earth covering do stability analysis, determine maximum height and the stacking shape of stacking of spoil; Drawing, affiliated facility and the construction technology of being correlated with design; Spoil is transported to the selected spoil place of stacking; Press design height 60~80cm layer spoil, the compacting of every accumulation one deck spoil once, the working procedure of compacting is: the spoil of 60~80cm height is pushed away the watering of flat back with bull-dozer, after making the spoil moisture content reach 15%, carry out static pressure, press the road compacting with vibration again, make the thickness of compacting reach 50~70cm.Lay the spirality traffic route by the gradient less than 5 ° when the spoil layering is stacked, the traffic route both sides are provided with the charge for remittance ditch, and the charge for remittance ditch is narrowed down by wide to going up down, can lay the pavement as required simultaneously, and the both sides on pavement are provided with the charge for remittance ditch.Behind the two-layer spoil of every compacting, muck haulage is with side slope earthing around the spoil and greening, thickness of earth covering is advisable to be not more than 20cm, or cover hillock side slope surface after adopting spoil and lake mud mixing in 7: 3~5: 5 ratios, the thickness that covers is 40~60cm, can play bonding preferably, anti-bursting and certain impermeable role.When the spoil piling height is 4~6m, reserve the platform of 2m width around piling up the spoil periphery, earthing on staying platform after each step construction is intact, carries out earthing to 2 meters wide platforms, and dig to plant trees and cheat, stopping and planting trees with soil, platform slopes inwardly (flat surface is opposite with the domatic aspect of massif), with the horizontal plane slanted angle be 2 °, each platform inboard is equipped with the gutter, and the platform gutter communicates with the charge for remittance ditch on runway or pavement.Every compacting is two-layer, muck haulage to around begin domatic earthing, if native source abundance, 20 centimetres of earthing and compactings between per two steps, hillock side slope to up the ratio of domatic and massif down is 1: 3~1: 2, forms the anxious massif in slow earlier back.So greening while discharging is until finishing the design view.

Claims (6)

1. a kind of scape technology of making in the gangue ground emission process is characterized in that:
A. spoil is transported to the selected spoil place of stacking;
B. press design shape and highl stratification and pile up spoil;
C. push enforcement worker operation every layer of spoil tamped, and lay traffic route or pavement, traffic route or both sides, pavement are provided with the charge for remittance ditch, and the charge for remittance ditch is narrowed down by wide to going up down;
D. behind the two-layer spoil of every compacting, muck haulage to the spoil side slope face earthing and afforest, the side slope thickness of earth covering is not more than 20cm, or adopts spoil and cover hillock side slope surface after lake mud mixes by a certain percentage, the thickness of covering is 40~60cm;
When e. the every piling height of spoil is 4~6m, reserve the platform of 1~2m width around piling up spoil massif periphery, this flat surface and horizontal plane slanted angle are 2 °, and flat surface incline direction and hillock are domatic oppositely;
F. earthing on each platform that is stayed, and dig the hole that plants trees, stopping and planting trees with soil, be equipped with the gutter in each inboard, platform border, all gutters communicate with traffic route or pavement charge for remittance ditch;
G. the greening of spoil limit is piled up on the limit, until finishing the design view.
2. a kind of scape technology of making in the gangue ground emission process according to claim 1, it is characterized in that: the height of described layer spoil is 60~80cm.
3. a kind of scape technology of making in the gangue ground emission process according to claim 1, it is characterized in that: describedly push that to implement operation that worker's operation tamps every layer of spoil be to push away the spoil of layer flat earlier, watering then, keeping the spoil moisture content is 15%, carry out static pressure with bull-dozer, use the vibrated roller compacting at last.
4. a kind of scape technology of making in the gangue ground emission process according to claim 1 is characterized in that: the traffic route of described laying twist, the gradient of traffic route is less than 5 °.
5. a kind of scape technology of making in the gangue ground emission process according to claim 1, it is characterized in that: the spoil of described employing mixes the mass percent that covers hillock side slope surface with lake mud be 7: 3~5: 5.
6. a kind of scape technology of making in the gangue ground emission process according to claim 1 is characterized in that: described hillock side slope to the ratio of following domatic and massif up is 1: 3~1: 2.
CN200610097018A 2006-10-24 2006-10-24 Scene-making process in gangue ground emission Expired - Fee Related CN1951707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610097018A CN1951707B (en) 2006-10-24 2006-10-24 Scene-making process in gangue ground emission

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610097018A CN1951707B (en) 2006-10-24 2006-10-24 Scene-making process in gangue ground emission

Publications (2)

Publication Number Publication Date
CN1951707A CN1951707A (en) 2007-04-25
CN1951707B true CN1951707B (en) 2010-05-12

Family

ID=38058339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610097018A Expired - Fee Related CN1951707B (en) 2006-10-24 2006-10-24 Scene-making process in gangue ground emission

Country Status (1)

Country Link
CN (1) CN1951707B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109005722B (en) * 2018-07-30 2021-09-03 玉溪大红山矿业有限公司 Comprehensive reclamation method for land reclamation of iron ore waste stone yard
CN109763499A (en) * 2019-01-07 2019-05-17 四川川煤华荣能源股份有限公司 For big height difference, the comprehensive processing method of abrupt slope drop coal gangue hill
CN110402738A (en) * 2019-07-10 2019-11-05 合肥虚实文化发展股份有限公司 A kind of greening of novel plant and landscaping method and its mating lighting fixture
CN113617826A (en) * 2021-06-30 2021-11-09 中冶成都勘察研究总院有限公司 Step earthing method for repairing mine
CN114197503A (en) * 2021-12-30 2022-03-18 中煤科工生态环境科技有限公司 Method for renovating and utilizing coal mine waste rock

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994028705A1 (en) * 1993-06-04 1994-12-22 Biokat Corporation Method of cultivation of coal and lignite infields formed by uncovering (open cast mining)

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994028705A1 (en) * 1993-06-04 1994-12-22 Biokat Corporation Method of cultivation of coal and lignite infields formed by uncovering (open cast mining)
CN1113072A (en) * 1993-06-04 1995-12-06 伯克特公司 Method of cultivation of coal and lignite infields formed by uncovering (open cast mining)

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
胡振琪.《半干旱地区煤矸石山绿化技术研究》.煤炭学报第20卷 第3期.1995,第20卷(第3期),322-324.
胡振琪.《半干旱地区煤矸石山绿化技术研究》.煤炭学报第20卷 第3期.1995,第20卷(第3期),322-324. *
钱玉山.《煤炭清洁生产中的矸石处置》.煤矿环境保护第15卷 第5期.2001,第15卷(第5期),22-25.
钱玉山.《煤炭清洁生产中的矸石处置》.煤矿环境保护第15卷 第5期.2001,第15卷(第5期),22-25. *

Also Published As

Publication number Publication date
CN1951707A (en) 2007-04-25

Similar Documents

Publication Publication Date Title
CN104480963B (en) The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade
CN1951707B (en) Scene-making process in gangue ground emission
CN102278115A (en) High-efficiency safe environment-friendly mining method for rare shallow-buried ore layer in irregular strip-shaped distribution
CN108222026B (en) Method for repairing small gangue dump of coal mine
CN104328766A (en) Ecological stone cage net box retaining wall and construction method
CN109057799A (en) It is a kind of the north open coal mine water resource storage and concocting method
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN101725102A (en) Construction method for filling roadbed with coal gangues
CN104047210B (en) Rail track roadbed
CN112709233A (en) Mine waste rock and concentrated tailing cooperative disposal system and construction method
CN114592484A (en) Waste rock dam and waste rock dam building method
CN101660412A (en) Reconstruction method of soil in surface layer of open-pit mining waste dump
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN111206559A (en) Desert area surface solidification method and structure
CN102888849A (en) Transformation method for waste dump micro-landform of large opencast coal mine in loess area
CN208235579U (en) A kind of variable slope wave mutually-embedded ecological building block retaining wall system
CN111185456A (en) Stabilization landfill method for fly ash chelate
CN207944429U (en) Prefabricated interlock block for slope protection
CN103147378B (en) Road lime soil foundation stone bucket determines ridge code side road mix construction method
CN114606819A (en) High-fill structure adopting lime soil to half wrap expansive soil and construction method thereof
CN108396774A (en) A kind of variable slope wave mutually-embedded ecological building block retaining wall system and its construction method
CN109083442A (en) The construction method of dynamic load bearing structure when existing building is docked with newly-built basis
CN113818924A (en) Layered backfill compacting method for dolomite tailing pit
CN102864760A (en) Gravel masonry dam material filling construction method in cold region
CN113605416A (en) Slope protection supporting structure for ecological management of side slope water and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20131024