CN110565948A - Template device of inverted four-shuttle platform column cap and construction method - Google Patents

Template device of inverted four-shuttle platform column cap and construction method Download PDF

Info

Publication number
CN110565948A
CN110565948A CN201910878938.6A CN201910878938A CN110565948A CN 110565948 A CN110565948 A CN 110565948A CN 201910878938 A CN201910878938 A CN 201910878938A CN 110565948 A CN110565948 A CN 110565948A
Authority
CN
China
Prior art keywords
template
shuttle
cap
inverted
units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910878938.6A
Other languages
Chinese (zh)
Inventor
宋震
张明辉
李厚伟
张明明
蒋萦牧
倪锋
倪小龙
池敏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201910878938.6A priority Critical patent/CN110565948A/en
Publication of CN110565948A publication Critical patent/CN110565948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/028Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for columns' capital
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a template device of an inverted four-shuttle platform column cap and a construction method, and relates to the technical field of building construction. The template that pours to current four shuttle platform cap splices inconveniently, but also need set up with trapezoidal inclined plane vertically diagonal bracing, the great problem of the formwork degree of difficulty. The template support structure comprises four template units, a plurality of split bolts and a plurality of supporting rods, wherein the trapezoidal inclined planes of the template units are matched with the trapezoidal inclined planes of the four-shuttle table cap, the trapezoidal inclined planes of the four template units are arranged towards the axis of the four-shuttle table cap and are connected end to form a template of the four-shuttle table cap to be poured, the four-shuttle table outer contour template is converted into a cube outer contour template through the vertical planes and the transverse planes of the template units, and supports are erected vertically and horizontally from the surrounding templates according to the template supporting mode of a common square cap, so that the template support structure of the four-shuttle table cap is simplified, and the installation is convenient and rapid.

Description

Template device of inverted four-shuttle platform column cap and construction method
Technical Field
The invention relates to the technical field of building construction, in particular to a template device of an inverted four-shuttle table cap and a construction method.
Background
When the floor slab load is larger, in order to improve the bearing capacity, rigidity and impact resistance of the floor slab, a column cap is often arranged at the top of a column to increase the supporting area of the column, the column cap generally adopts the shape of an inverted four-shuttle table, and different from a regular-shaped component, the inverted four-shuttle table column cap is provided with four trapezoidal inclined planes, so that a pouring template is inconvenient to splice, an inclined support perpendicular to the trapezoidal inclined planes needs to be erected, and the difficulty in supporting the template is larger.
Disclosure of Invention
the template that pours to current four shuttle platform cap splices inconveniently, but also need set up with trapezoidal inclined plane vertically diagonal bracing, the great problem of the formwork degree of difficulty. The invention aims to provide a template device and a construction method of an inverted four-shuttle table column cap.
the technical scheme adopted by the invention for solving the technical problems is as follows: a template device of a reverse four-shuttle table cap comprises four template units, a plurality of split bolts and a plurality of support rods, the template unit is a wedge with a right-angled triangle-shaped longitudinal section, a trapezoidal inclined plane where a right-angled triangle inclined edge is located is matched with a trapezoidal inclined plane of the four-shuttle table cap, a vertical plane where a straight edge of the right-angled triangle is located is parallel to the axis of the four-shuttle table cap, a transverse plane where another straight edge of the right-angled triangle is located is perpendicular to the axis of the four-shuttle table cap, the trapezoidal inclined planes of the four template units face the axis of the four-shuttle table cap and are connected end to form a template of the four-shuttle table cap to be poured, a plurality of counter bolts horizontally penetrate through the template unit and are locked and fixed by nuts, a plurality of support rods are vertically arranged at the bottom of the template unit, and the bottom ends of the support rods are supported on the ground or a floor slab.
The template device of the inverted four-shuttle column cap comprises four template units, a plurality of split bolts and a plurality of support rods, wherein the trapezoidal inclined planes of the template units are matched with the trapezoidal inclined planes of the inverted four-shuttle column cap, the trapezoidal inclined planes of the four template units are arranged towards the axis of the inverted four-shuttle column cap and are connected end to enclose a template of the inverted four-shuttle column cap to be poured, the vertical planes and the transverse planes of the template units enable the inverted four-shuttle outline template to be converted into a square outline template, and supports are erected from the periphery and in a vertical and horizontal mode according to a mode of supporting a common square column cap, so that a template supporting structure of the inverted four-shuttle column cap is simplified, the installation is convenient and rapid, the template units can be repeatedly utilized, and the utilization rate of materials is improved.
Preferably, the formwork structure further comprises a plurality of groups of column hoops enclosing the outer sides of the four formwork units, and each group of column hoops is formed by movably connecting four cross rods which are arranged on the outer sides of the formwork units in a criss-cross mode.
preferably, the two adjacent crossbars of the column hoop are connected by fasteners or bolts.
Preferably, the column hoop is made of steel pipe or square timber.
Preferably, triangular end plates are further arranged at two ends of the template unit.
Preferably, stiffening ribs which are respectively vertical to the trapezoidal inclined plane and the vertical plane are further arranged in the template unit.
In addition, the invention also provides a construction method of the inverted four-shuttle-stand column cap, which comprises the following steps:
S1: prefabricating four template units of the template device of the inverted four-shuttle-table cap, wherein the longitudinal section of each template unit is in a wedge shape of a right-angled triangle, a trapezoidal inclined plane where a bevel edge of the right-angled triangle is located is matched with a trapezoidal inclined plane of the inverted four-shuttle-table cap, a vertical plane where one straight edge of the right-angled triangle is located is parallel to the axis of the inverted four-shuttle-table cap, and a transverse plane where the other straight edge of the right-angled triangle is located is perpendicular to the axis of the inverted four-shuttle-table cap;
S2: the four trapezoidal inclined planes of the template unit are arranged inwards and are connected end to form a template of the inverted four-shuttle cap to be poured, the split bolts horizontally penetrate through the template unit and are locked by nuts, the plurality of supporting rods are vertically arranged at the bottom of the template unit, the bottom ends of the supporting rods are supported on the ground or a floor, concrete of the inverted four-shuttle cap is poured, and after the concrete reaches the strength required by design, the template is removed to complete the construction of the inverted four-shuttle cap.
The construction method of the inverted four-shuttle column cap comprises the steps of prefabricating four template units, arranging the trapezoid inclined planes of the four template units inwards, connecting the trapezoid inclined planes end to form a template of the inverted four-shuttle column cap to be poured in an enclosing mode, enabling the inverted four-shuttle outer contour template to be a square outer contour template, namely, converting the template with an irregular shape into the template with a regular shape, splicing the four template units together during template supporting, and supporting the template from the periphery and vertically and horizontally according to the template supporting mode of a common square column cap.
Preferably, in step S2, the outer side of the seam between two adjacent template units is sealed by an adhesive tape.
Drawings
FIG. 1 is a schematic structural view of an installed embodiment of a formwork apparatus for an inverted four-shuttle cap of the present invention;
Fig. 2 is a schematic structural diagram of a template unit in an embodiment of the template device of the inverted four-shuttle cap according to the present invention.
The numbers in the figures are as follows:
A four-shuttle-table cap 1 is inverted; a template unit 10; a trapezoidal slope 11; a vertical plane 12; a transverse plane 14; an end plate 15; a split bolt 16; a strut 17; a collar 18.
Detailed Description
The invention is described in further detail below with reference to the figures and specific examples. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention. For convenience of description, the directions of "up" and "down" described below are the same as the directions of "up" and "down" in the drawings, but this is not a limitation of the technical solution of the present invention.
The template device of the inverted four-shuttle-table cap of the invention is described by combining the figure 1 and the figure 2, and comprises four template units 10, a plurality of counter bolts 16 and a plurality of support rods 17, wherein the template units 10 are wedge-shaped with right-angled triangle-shaped longitudinal sections, a trapezoidal inclined plane 11 on which a right-angled triangle inclined edge is positioned is matched with a trapezoidal inclined plane of the inverted four-shuttle-table cap 1, a vertical plane 12 on which one straight edge of the right-angled triangle is positioned is parallel to the axis of the inverted four-shuttle-table cap 1, a transverse plane 14 on which the other straight edge of the right-angled triangle is positioned is vertical to the axis of the inverted four-shuttle-table cap 1, the trapezoidal inclined planes 11 of the four template units 10 are arranged towards the axis of the inverted four-shuttle-table cap 1 and are connected end to enclose a template of the inverted four-shuttle-table cap 1 to be poured, the plurality of counter bolts 16 horizontally penetrate through the template units, the lower ends of the struts 17 are supported on the ground or floor.
The template device of the inverted four-shuttle table column cap comprises four template units 10, a plurality of split bolts 16 and a plurality of support rods 17, wherein the trapezoidal inclined planes 11 of the template units 10 are matched with the trapezoidal inclined planes of the inverted four-shuttle table column cap 1, the trapezoidal inclined planes 11 of the four template units 10 are arranged towards the axis of the inverted four-shuttle table column cap 1 and are connected end to enclose the template of the inverted four-shuttle table column cap 1 to be poured, the vertical planes 12 and the transverse planes 14 of the template units 10 enable the inverted four-shuttle table outer contour template to be converted into a square outer contour template, and supports are erected vertically and horizontally from the periphery according to the mode of supporting the common square column cap, so that the template supporting structure of the inverted four-shuttle table column cap 1 is simplified, the installation is convenient and rapid, the template units 10 can be repeatedly utilized, and the utilization rate of materials is improved.
As shown in fig. 1, the formwork device further includes a plurality of groups of column hoops 18 enclosing the outer sides of the four formwork units 10, each group of column hoops 18 is formed by movably connecting four cross bars arranged on the outer sides of the formwork units 10 in a criss-cross manner, and the arrangement of the column hoops 18 improves the formwork strength of the formwork in the horizontal direction of the formwork, thereby avoiding the slurry leakage phenomenon during concrete pouring. The adjacent two cross bars of the column hoop 18 are connected by fasteners or bolts, so that the column hoop is convenient to disassemble and assemble, and each component can be recycled.
The column hoop 18 is made of steel pipes or square timbers, and the materials are convenient to obtain.
As shown in fig. 2, the two ends of the formwork unit 10 are further provided with triangular end plates 15, so that the overall structural strength of the formwork unit 10 can be enhanced, the formwork unit 10 is prevented from being bent under the action of external force, and preferably, stiffening ribs perpendicular to the trapezoidal inclined plane 11 and the vertical plane 12 are further arranged in the formwork unit 10, so that the structural strength of the formwork unit 10 is further improved.
The construction method of the inverted four-shuttle table cap of the invention is described by combining the figure 1 and the figure 2, and the concrete steps are as follows:
S1: prefabricating four template units 10, wherein the longitudinal sections of the template units 10 are in the shape of a wedge of a right-angled triangle, a trapezoidal inclined plane 11 where the inclined edge of the right-angled triangle is located is matched with a trapezoidal inclined plane of the inverted four-shuttle-table cap 1, a vertical plane 12 where one straight edge of the right-angled triangle is located is parallel to the axis of the inverted four-shuttle-table cap 1, and a transverse plane 14 where the other straight edge of the right-angled triangle is located is perpendicular to the axis of the inverted four-shuttle-table cap 1;
S2: the trapezoidal inclined planes 11 of the four template units 10 are arranged inwards and are connected end to form a template of the four-shuttle column cap 1 to be poured, the split bolts 16 horizontally penetrate through the template units 10 and are locked by nuts, the plurality of supporting rods 17 are vertically arranged at the bottom of the template units 10, the bottom ends of the supporting rods 17 are supported on the ground or a floor, the concrete of the four-shuttle column cap 1 is poured, and after the concrete reaches the strength required by design, the template is removed to complete the construction of the four-shuttle column cap 1.
The construction method of the inverted four-shuttle cap column cap of the invention comprises the steps of firstly prefabricating four template units 10, arranging the trapezoidal inclined planes 11 of the four template units 10 inwards and enclosing the trapezoidal inclined planes end to form a template of the inverted four-shuttle cap column cap 1 to be poured, converting the outer contour template of the inverted four-shuttle cap into a square outer contour template by the vertical plane 12 and the transverse plane 14 of the template units 10, namely converting the irregular template into a regular template, splicing the four template units 10 together when supporting the template, and the formwork is supported from the periphery and supports are erected vertically and horizontally according to the formwork supporting mode of the common square column cap, the formwork supporting construction process is simple and convenient, the construction speed is accelerated, and, the template device stability is good, has improved the construction quality of four shuttle platform cap 1, has promoted the efficiency of construction, and in addition, the template can reuse, has reduced construction cost.
In the step S2, the outer side of the joint between two adjacent formwork units 10 is sealed by the adhesive tape, so that slurry leakage during concrete pouring is avoided, and the construction quality of the inverted four-shuttle cap 1 is ensured.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, and any variations and modifications made by those skilled in the art based on the above disclosure are within the scope of the appended claims.

Claims (8)

1. the utility model provides a template device of four shuttle platform cap, its characterized in that fall: the template unit is a wedge with a right-angled triangle-shaped longitudinal section, a trapezoidal inclined plane where a hypotenuse of the right-angled triangle is matched with a trapezoidal inclined plane of the four-shuttle-table cap, a vertical plane where a straight edge of the right-angled triangle is parallel to the axis of the four-shuttle-table cap, a transverse plane where another straight edge of the right-angled triangle is perpendicular to the axis of the four-shuttle-table cap, the trapezoidal inclined planes of the four template units face the axis of the four-shuttle-table cap and are connected end to enclose a template of the four-shuttle-table cap to be poured, the pull bolts horizontally penetrate through the template unit and are locked and fixed by nuts, the support rods are vertically arranged at the bottom of the template unit, and the bottom ends of the support rods are supported on the ground or a floor slab.
2. The template assembly according to claim 1, wherein: the template unit is characterized by further comprising a plurality of groups of column hoops enclosing the outer sides of the four template units, wherein each group of column hoops is formed by movably connecting four cross rods which are arranged on the outer sides of the template units in a criss-cross mode.
3. The template assembly according to claim 2, wherein: and two adjacent cross rods of the column hoop are connected through fasteners or bolts.
4. the template assembly according to claim 2, wherein: the column hoop is made of steel pipes or square timbers.
5. The template assembly according to claim 1, wherein: and triangular end plates are arranged at two ends of the template unit.
6. the template assembly according to claim 1, wherein: stiffening ribs which are respectively vertical to the trapezoidal inclined plane and the vertical plane are also arranged in the template unit.
7. A construction method of an inverted four-shuttle-table cap is characterized by comprising the following steps:
S1: four template units of a template device for prefabricating the inverted four-shuttle-table cap according to any one of claims 1 to 6, wherein the template units are wedge-shaped with a vertical section in a right-angled triangle, a trapezoidal inclined plane where a bevel edge of the right-angled triangle is positioned is matched with a trapezoidal inclined plane of the inverted four-shuttle-table cap, a vertical plane where one straight edge of the right-angled triangle is positioned is parallel to the axis of the inverted four-shuttle-table cap, and a transverse plane where the other straight edge of the right-angled triangle is positioned is vertical to the axis of the inverted four-shuttle-table cap;
s2: the four trapezoidal inclined planes of the template unit are arranged inwards and are connected end to form a template of the inverted four-shuttle cap to be poured, the split bolts horizontally penetrate through the template unit and are locked by nuts, the plurality of supporting rods are vertically arranged at the bottom of the template unit, the bottom ends of the supporting rods are supported on the ground or a floor, concrete of the inverted four-shuttle cap is poured, and after the concrete reaches the strength required by design, the template is removed to complete the construction of the inverted four-shuttle cap.
8. the construction method according to claim 7, wherein in step S2, the outer side of the joint between two adjacent form units is sealed by tape.
CN201910878938.6A 2019-09-18 2019-09-18 Template device of inverted four-shuttle platform column cap and construction method Pending CN110565948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910878938.6A CN110565948A (en) 2019-09-18 2019-09-18 Template device of inverted four-shuttle platform column cap and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910878938.6A CN110565948A (en) 2019-09-18 2019-09-18 Template device of inverted four-shuttle platform column cap and construction method

Publications (1)

Publication Number Publication Date
CN110565948A true CN110565948A (en) 2019-12-13

Family

ID=68780679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910878938.6A Pending CN110565948A (en) 2019-09-18 2019-09-18 Template device of inverted four-shuttle platform column cap and construction method

Country Status (1)

Country Link
CN (1) CN110565948A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338614A (en) * 2021-06-07 2021-09-03 湖北全洲扬子江建设工程有限公司 Adjustable template structure for column caps of beamless floor
CN114922420A (en) * 2022-07-20 2022-08-19 徐州志正装饰材料有限公司 Assembly type template for cone-shaped column head

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924703U (en) * 2014-07-08 2014-11-05 南通市达欣工程股份有限公司 Chamfered edge important actor hat cone plate
CN205840315U (en) * 2016-06-29 2016-12-28 泰宏建设发展有限公司 Inclination angle connection supporting plate cap form bracing system structure
CN206591819U (en) * 2017-03-28 2017-10-27 重庆建工第二建设有限公司 cap template assembly
CN109537892A (en) * 2017-09-22 2019-03-29 上海宝冶集团有限公司 The fixed construction method of trapezoidal column hat cone plate
CN109750833A (en) * 2019-03-07 2019-05-14 中建八局第三建设有限公司 A kind of variable cross-section sets up structure without beam column cap
CN211286619U (en) * 2019-09-18 2020-08-18 上海建工七建集团有限公司 Template device of four-shuttle-table column cap

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924703U (en) * 2014-07-08 2014-11-05 南通市达欣工程股份有限公司 Chamfered edge important actor hat cone plate
CN205840315U (en) * 2016-06-29 2016-12-28 泰宏建设发展有限公司 Inclination angle connection supporting plate cap form bracing system structure
CN206591819U (en) * 2017-03-28 2017-10-27 重庆建工第二建设有限公司 cap template assembly
CN109537892A (en) * 2017-09-22 2019-03-29 上海宝冶集团有限公司 The fixed construction method of trapezoidal column hat cone plate
CN109750833A (en) * 2019-03-07 2019-05-14 中建八局第三建设有限公司 A kind of variable cross-section sets up structure without beam column cap
CN211286619U (en) * 2019-09-18 2020-08-18 上海建工七建集团有限公司 Template device of four-shuttle-table column cap

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338614A (en) * 2021-06-07 2021-09-03 湖北全洲扬子江建设工程有限公司 Adjustable template structure for column caps of beamless floor
CN114922420A (en) * 2022-07-20 2022-08-19 徐州志正装饰材料有限公司 Assembly type template for cone-shaped column head

Similar Documents

Publication Publication Date Title
US11332929B2 (en) Large-angle sloping roof steel structure and construction method thereof
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN102839678A (en) Structure for improving rigidity and stability of foundation pit steel support
CN110565948A (en) Template device of inverted four-shuttle platform column cap and construction method
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN207974601U (en) A kind of large size earthing concrete tank dome steel support structure
CN212002170U (en) Adjustable support for elevator shaft operating platform
CN211286619U (en) Template device of four-shuttle-table column cap
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN212866793U (en) Assembled construction elevator stops layer platform
CN212129218U (en) Basement outer wall single face formwork system
CN106351429A (en) Heavy support system and construction method thereof
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN204212272U (en) A kind of concrete column and stiffened steel structure post steel split heads connected node
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN210827113U (en) Truss structure for pier construction
CN210857512U (en) Steel pipe combined type large-span protective shed
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN209837675U (en) Bearing platform template reinforcing apparatus
CN112962427A (en) Off-standard span cast-in-place beam support across valley and construction method
CN107476200B (en) Full-hall support staggered overlapping structure and method
CN219753986U (en) Template system for beamless floor cap construction
CN107419740B (en) Steel bearing platform of beam-holding tower crane foundation and construction method thereof
CN213674651U (en) Assembled building mould for stake

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination