CN205531410U - A simply can dismantle construction canopy for steel construction job site - Google Patents
A simply can dismantle construction canopy for steel construction job site Download PDFInfo
- Publication number
- CN205531410U CN205531410U CN201620106934.8U CN201620106934U CN205531410U CN 205531410 U CN205531410 U CN 205531410U CN 201620106934 U CN201620106934 U CN 201620106934U CN 205531410 U CN205531410 U CN 205531410U
- Authority
- CN
- China
- Prior art keywords
- construction
- shed
- spot
- connector
- steel structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a simply can dismantle construction canopy for steel construction job site, including the construction canopy support frame that is provided with four piece at least stands, the stand top is provided with the transverse truss through the connecting piece between being horizontal, the stand top is provided with the longitudinal truss through the connecting piece between being vertical, evenly be provided with an at least purlin through the connecting piece between the longitudinal truss, the roof boarding has been laid to construction canopy support frame top surface. The utility model discloses easy dismounting, transportation facility can adapt to the steel construction job site of frequently changing construction site, and solved traditional construction canopy and do not prevent wind, and the problem that can not gather materials on the spot in the steel construction job site.
Description
Technical field
This utility model relates to construction shed, executes particularly to a kind of Simple detachable on-the-spot for Construction of Steel Structure
Builder's temporary shed.
Background technology
Along with expanding economy, structural steelwork is because it is higher than concrete works intensity, low in the pollution of the environment, carrying
The advantages such as power is big, have obtained increasingly being widely applied, thus the application of Construction of Steel Structure canopy have also got more and more.
The way that traditional construction canopy many employings steel pipe scaffold is set up, because not having anti-wind action, affects steel construction
Welding, and can not gather materials on the spot at Construction of Steel Structure scene, it is less well-suited to Construction of Steel Structure on-the-spot.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, it is provided that it is on-the-spot that one is available for Construction of Steel Structure
With, gather materials on the spot, simple and dismountable Construction of Steel Structure canopy be installed.
In order to solve above-mentioned technical problem, this utility model provides a kind of for on-the-spot simply may be used of Construction of Steel Structure
Dismounting construction shed, including being provided with the construction shed bracing frame of at least four root posts, described column top laterally between
Connector is provided with transverse truss, between described column top is longitudinal, connector is provided with longitudinal truss;Institute
State and be evenly arranged with at least purlin by connector between longitudinal truss;Described construction shed bracing frame end face is laid
There is roof boarding.
Described construction shed bracing frame transverse side is equipped with wind shutter.
Described column bottom is provided with base plate.
Described connector is that square plate, the one of which of L-type angle steel or a combination thereof are constituted.
The ceiling gradient of described roof boarding is 3%-7%.
The beneficial effects of the utility model are:
1, construction shed bracing frame of the present utility model is connected with each other by each connector, and all has spiral shell in connector
Tether and connect so that the advantage that construction shed has detachably, can have enough to meet the need;
2, the roof boarding ceiling of this utility model construction shed is provided with the gradient, can be with rain and snow and timely by rain
Snow descends along slope current, is not stored on roof boarding;This utility model construction shed side is provided with wind shutter, permissible
The wind impact on welding when reducing welding to greatest extent;
3, all of component of this utility model is the component can gathered materials on the spot in Construction of Steel Structure scene, processing letter
Easily;
4, this utility model construction shed, easy accessibility, transport facility, adapt to frequently change job location
Construction of Steel Structure is on-the-spot, has the effect of Stability Analysis of Structures, stress more reasonable benefit/risk.
Accompanying drawing explanation
Fig. 1: this utility model builder's temporary shed bracing frame main TV structure schematic diagram;
Fig. 2: this utility model builder's temporary shed bracing frame side-looking structural representation;
Fig. 3: this utility model construction shed main TV structure schematic diagram;
Fig. 4: this utility model column and longitudinal truss connector schematic diagram;
Fig. 5: this utility model column and transverse truss connector schematic diagram;
Fig. 6: this utility model longitudinal truss and purlin connector schematic diagram.
Accompanying drawing marks: 1, column;2, longitudinal truss;3, transverse truss;4, purlin;5, roof boarding;6, anti-
Aerofoil;7, base plate;8, foundation bolt;9, connector;10, connector;11, connector.
Detailed description of the invention
The utility model will be further described below in conjunction with the accompanying drawings.
As shown in figures 1-6, a kind of Simple detachable construction shed on-the-spot for Construction of Steel Structure, including construction
Canopy bracing frame, described construction shed bracing frame is provided with at least four columns 1 supported, in the present embodiment, institute
State column 1 and be set to eight;Described column 1 bottom is provided with base plate 7, by foundation bolt 8 by column 1
Effectively couple together with construction shed foundation.
Between described column 1 top is horizontal, connector 10 is provided with transverse truss 3, in the present embodiment, institute
Stating connector 10 is L-type angle steel (as shown in Figure 5), and its panel is welded on column 1, and web passes through spiral shell
Bolt is effectively connected with transverse truss 3;Between described column 1 top is longitudinal, connector 9 is provided with longitudinal truss 2,
In the present embodiment, described connector 9 is that the combination of a square plate and two L-type angle steel is (such as Fig. 4 institute
Show), wherein, square plate is welded on the end of longitudinal truss 2, and the web of two L-type angle steel is respectively welded at
The both sides of column 1, and make its panel relative with the two ends of square plate outwardly, effectively connected by bolt;Institute
State and be evenly arranged with at least purlin 4 by connector 11 between longitudinal truss 2, in the present embodiment, described
Purlin 4 is set to five, and described connector 11 is L-type angle steel (as shown in Figure 6), and its panel is welded on vertical
On truss 2, web is effectively connected with transverse truss 3 by bolt.
Additionally, described construction shed bracing frame end face is equipped with roof boarding 5, the ceiling gradient of described roof boarding 5 is
3%-7%, in the present embodiment, the ceiling head fall of described roof boarding 5 was set to for 3% (as shown in Figure 2),
With rain and snow, and in time sleet can be stayed along the gradient, be not stored on roof boarding 5;Described construction shed supports
Frame transverse side is equipped with wind shutter 6, the wind impact on welding when can reduce welding to greatest extent.
This utility model construction shed is installed, first, during pouring construction canopy foundation, by foundation bolt 8 and the end
Plate 7 is placed in position in advance, then casting concrete, completes foundation basic construction;Secondly, by column 1 with vertical
The connector 9 of truss 2, column 1 are welded on ground with the L-type angle steel in the connector 10 of transverse truss 3
Column 1 top, and column 1 is placed on base plate 7 welds;Then, welded longitudinal truss 2 on ground,
Two ends welding column 1 and the square plate in the connector 9 of longitudinal truss 2, lift longitudinal truss 2, with column 1
Bolt connects, and meanwhile, has welded transverse truss 3 on ground, has lifted transverse truss 3, be connected with column 1 bolt;
Again, longitudinal truss 2 is laid purlin 4, is connected with connector 11 bolt of purlin 4 by longitudinal truss 2;
Finally, lay roof boarding 5 and side wind shutter 6, complete to install.
Claims (5)
1., for the Simple detachable construction shed that Construction of Steel Structure is on-the-spot, stand including being provided with at least four
The construction shed bracing frame of post, it is characterised in that between described column top is horizontal, connector is provided with crossyard
Frame, is provided with longitudinal truss by connector between described column top is longitudinal;By connecting between described longitudinal truss
Part is evenly arranged with at least purlin;Described construction shed bracing frame end face is equipped with roof boarding.
2. require the Simple detachable construction shed on-the-spot for Construction of Steel Structure described in 1 according to claim,
It is characterized in that, described construction shed bracing frame transverse side is equipped with wind shutter.
3. require the Simple detachable construction shed on-the-spot for Construction of Steel Structure described in 1 according to claim,
It is characterized in that, described column bottom is provided with base plate.
4. require the Simple detachable construction shed on-the-spot for Construction of Steel Structure described in 1 according to claim,
It is characterized in that, described connector is that square plate, the one of which of L-type angle steel or a combination thereof are constituted.
5. require the Simple detachable construction shed on-the-spot for Construction of Steel Structure described in 1 according to claim,
It is characterized in that, the ceiling gradient of described roof boarding is 3%-7%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620106934.8U CN205531410U (en) | 2016-02-02 | 2016-02-02 | A simply can dismantle construction canopy for steel construction job site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620106934.8U CN205531410U (en) | 2016-02-02 | 2016-02-02 | A simply can dismantle construction canopy for steel construction job site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205531410U true CN205531410U (en) | 2016-08-31 |
Family
ID=56775587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620106934.8U Expired - Fee Related CN205531410U (en) | 2016-02-02 | 2016-02-02 | A simply can dismantle construction canopy for steel construction job site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205531410U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442525A (en) * | 2018-04-13 | 2018-08-24 | 上海绿地建设设计研究院有限公司 | A kind of construction awning mobile system |
CN110158988A (en) * | 2019-06-28 | 2019-08-23 | 中冶建工集团有限公司 | A kind of building protection steel structure support and its quick method for dismounting |
-
2016
- 2016-02-02 CN CN201620106934.8U patent/CN205531410U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442525A (en) * | 2018-04-13 | 2018-08-24 | 上海绿地建设设计研究院有限公司 | A kind of construction awning mobile system |
CN108442525B (en) * | 2018-04-13 | 2024-05-24 | 上海绿地建设设计研究院有限公司 | Construction awning moving system |
CN110158988A (en) * | 2019-06-28 | 2019-08-23 | 中冶建工集团有限公司 | A kind of building protection steel structure support and its quick method for dismounting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11332929B2 (en) | Large-angle sloping roof steel structure and construction method thereof | |
CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN201546435U (en) | Bolted stayed cantilever scaffold | |
CN107355037A (en) | Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method | |
CN104675143A (en) | Heavy lattice type support system and using method thereof | |
CN207974601U (en) | A kind of large size earthing concrete tank dome steel support structure | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
CN103572834A (en) | Large-span arch structure and construction method thereof | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN202706508U (en) | Overhanging strength bearing steel beam construction member of scaffold | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN216512520U (en) | Lifting system suitable for small space | |
CN217232907U (en) | Folding fan-shaped classical landscape corridor frame | |
CN106988520B (en) | Construction method and support system for high-rise suspension structure | |
CN205116776U (en) | Support access structure | |
CN202152442U (en) | Assembling type steel tube-vertical post system | |
CN204850068U (en) | Connection structure of side column and crane beam tip in steel construction | |
CN210439163U (en) | Diagonal joist supporting structure applicable to assembly and disassembly of continuous beam | |
CN207003765U (en) | Assembling type steel structure builds self-bearing type steel truss form bracing system | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN202913716U (en) | Temporary support structure for truss integral lifting | |
CN202227482U (en) | Connection structure for roof truss and concrete column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20210202 |