CN109812045A - After a kind of tool-type plus structural slab fast joint structure and method - Google Patents

After a kind of tool-type plus structural slab fast joint structure and method Download PDF

Info

Publication number
CN109812045A
CN109812045A CN201910208984.5A CN201910208984A CN109812045A CN 109812045 A CN109812045 A CN 109812045A CN 201910208984 A CN201910208984 A CN 201910208984A CN 109812045 A CN109812045 A CN 109812045A
Authority
CN
China
Prior art keywords
tool
structural slab
light floor
plate
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910208984.5A
Other languages
Chinese (zh)
Inventor
李永胜
李红梅
罗盈洲
刘丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201910208984.5A priority Critical patent/CN109812045A/en
Publication of CN109812045A publication Critical patent/CN109812045A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides after a kind of tool-type plus structural slab fast joint structure and method, including precast light floor, the both ends of precast light floor are reserved with reinforcing bar, afterwards plus the old structure plate at structural slab position both ends to be installed and the reserved steel bar at precast light floor both ends are welded and fixed, the junction of old structure plate and precast light floor has poured cast-in-place concrete, and the place of pouring is die-filling by tool-type aluminum alloy pattern plate.By solve tradition after plus structural slab in a manner of long construction period, difficulty of construction is big, can not have enough to meet the need the problems such as.Belong to structural engineering technical field.

Description

After a kind of tool-type plus structural slab fast joint structure and method
Technical field
The present invention relates to structural slab fast joint structure and method is added after a kind of tool-type, belong to structural engineering technology Field.
Background technique
In fast development process, increase back strengthening plate in some improvement projects can be found everywhere China's building.After tradition plus tie Structure plate mode long construction period, difficulty of construction is big, can not have enough to meet the need, and needs very big construction site and many manpowers, and aggravate The weight bearing of old plate has certain influence to old structure plate, beam stress.
Summary of the invention
It is an object of the invention to: it provides after a kind of tool-type plus structural slab fast joint structure and method, to solve to pass After system plus structural slab mode long construction period, difficulty of construction is big, the problems such as can not having enough to meet the need.
To solve the above problems, adding structural slab fast joint structure after such a tool-type of proposed adoption, including prefabricated light The both ends of matter floor, precast light floor are reserved with reinforcing bar, rear plus structural slab position both ends to be installed old structure plates with it is prefabricated The reserved steel bar at light floor both ends is welded and fixed, and the junction of old structure plate and precast light floor has poured cast-in-place coagulation Soil, and the place of pouring is die-filling by tool-type aluminum alloy pattern plate.
In aforementioned quick-connect machanism, exposing is chiselled at rear plus structural slab position both ends to be installed old structure plates and is had been friends in the past knot Structure slab muscle, the old structure plate carry out single welding by the reinforcing bar that old structure slab muscle and precast light floor both ends are reserved It connects.
The specific method is as follows for it:
First in processing factory's precast light floor, the reinforcing bar for meeting welding requirements length is reserved on precast light floor both sides, Precast light floor is hung to designated position using lifting mode, this crosses Cheng Qian and needs to wait pacifying to rear plus structural slab using impact drill The old structure plate at holding position both ends is chiselled, and the reinforcing bar length of exposing meets welding requirements;Then by precast light floor with Reinforcing bar at old structure plate docking carries out single-sided welding, and subsequently use can have enough to meet the need Quick Release tool-type aluminum alloy pattern plate and carry out to docking area It is die-filling, die-filling high 8% slightly expanded concrete of a grade of completion after-pouring.
Compared with prior art, the present invention can in the construction process prefabricated light floor lift etc. modes with Old structure plate carries out rapid abutting joint, and the tool-type aluminum alloy pattern plate added can effectively improve the flatness requirement of floor, reduces faulting of slab ends, Construction quality is improved, and is constructed quickly, the period is short, and difficulty of construction is small, and tool-type aluminum alloy pattern plate quick release is used in turn, can It admirably solves the problems, such as described of the existing technology.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention will be made below further detailed Explanation.
Embodiment:
Referring to attached drawing 1, the present embodiment provides add structural slab fast joint structure, including precast light building after a kind of tool-type The both ends of plate 2, precast light floor 2 are reserved with reinforcing bar, rear plus structural slab position both ends to be installed old structure plates 3 and prefabricated light The reserved steel bar at 2 both ends of matter floor is welded and fixed, and the junction of old structure plate 3 and precast light floor 2 has poured cast-in-place coagulation Soil 4, and the place of pouring is die-filling by tool-type aluminum alloy pattern plate 1.
The specific method is as follows for it:
First in processing factory's precast light floor 2, the reserved steel for meeting welding requirements length in 2 both sides of precast light floor Muscle is hung precast light floor 2 to designated position using lifting mode, this crosses Cheng Qian and needs using impact drill to rear plus structural slab The old structure plate 3 at position both ends to be installed is chiselled, and the reinforcing bar length of exposing meets welding requirements;Then by precast light building Plate 2 carries out 8d (d is bar diameter) single-sided welding with the reinforcing bar at 3 place of docking of old structure plate, and subsequently use can have enough to meet the need Quick Release work Tool formula aluminum alloy pattern plate 1 carries out die-filling, die-filling high 8% slightly expanded concrete of a grade of completion after-pouring to docking area.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (3)

1. adding structural slab fast joint structure after a kind of tool-type, it is characterised in that: prefabricated light including precast light floor (2) The both ends of matter floor (2) are reserved with reinforcing bar, rear plus structural slab position both ends to be installed old structure plates (3) and precast light floor (2) reserved steel bar at both ends is welded and fixed, and the junction of old structure plate (3) and precast light floor (2) has poured cast-in-place coagulation Native (4), and the place of pouring is die-filling by tool-type aluminum alloy pattern plate (1).
2. according to claim 1 after a kind of tool-type plus structural slab fast joint structure, it is characterised in that: afterwards plus structural slab It chisels exposing at the old structure plate (3) at position both ends to be installed to have been friends in the past structural slab reinforcing bar, the old structure plate (3) passes through old structure The reinforcing bar that slab muscle and precast light floor (2) both ends are reserved carries out single-sided welding.
3. adding structural slab quick connecting method after a kind of tool-type, which is characterized in that the specific method is as follows:
First in processing factory's precast light floor (2), the reserved steel for meeting welding requirements length in precast light floor (2) both sides Muscle is hung precast light floor (2) to designated position using lifting mode, this crosses Cheng Qian and needs using impact drill to rear plus structure The old structure plate (3) at plate position both ends to be installed is chiselled, and the reinforcing bar length of exposing meets welding requirements;It then will be prefabricated light The reinforcing bar that matter floor (2) docks place with old structure plate (3) carries out single-sided welding, and subsequently use can have enough to meet the need Quick Release tool-type aluminum dipping form Plate (1) carries out die-filling, die-filling high 8% slightly expanded concrete of a grade of completion after-pouring to docking area.
CN201910208984.5A 2019-03-19 2019-03-19 After a kind of tool-type plus structural slab fast joint structure and method Pending CN109812045A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910208984.5A CN109812045A (en) 2019-03-19 2019-03-19 After a kind of tool-type plus structural slab fast joint structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910208984.5A CN109812045A (en) 2019-03-19 2019-03-19 After a kind of tool-type plus structural slab fast joint structure and method

Publications (1)

Publication Number Publication Date
CN109812045A true CN109812045A (en) 2019-05-28

Family

ID=66609552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910208984.5A Pending CN109812045A (en) 2019-03-19 2019-03-19 After a kind of tool-type plus structural slab fast joint structure and method

Country Status (1)

Country Link
CN (1) CN109812045A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860777A (en) * 1994-08-23 1996-03-05 Kajima Corp Floor slab of pc board and execution method thereof
US20080313993A1 (en) * 2007-06-20 2008-12-25 Reen Michael J Floor hole repair fixture and method
CN102966050A (en) * 2012-12-07 2013-03-13 清华大学 Longitudinal connection method for steel-concrete combined beam and existing reinforced concrete T beam
CN204139644U (en) * 2014-10-08 2015-02-04 苏州中固建筑科技有限公司 A kind of newly-increased beam of SRC member
CN205777642U (en) * 2016-05-23 2016-12-07 清华大学 Anti-seismic strengthening device for reinforced concrete frame structure
CN106555453A (en) * 2017-02-04 2017-04-05 赤峰市建筑科学研究院有限公司 A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN107217865A (en) * 2017-06-20 2017-09-29 中冶建工集团有限公司 A kind of increasing reinforced construction method of the flat beam section of main body frame
CN107268852A (en) * 2017-07-21 2017-10-20 清华大学建筑设计研究院有限公司 Floor construction and construction method that a kind of prefabricated frid is constituted
CN206667546U (en) * 2017-03-15 2017-11-24 苏州中固建筑科技股份有限公司 Add floor construction after a kind of steel reinforced concrete
CN207672766U (en) * 2017-11-29 2018-07-31 珠海华发建筑设计咨询有限公司 Newly-increased floor and original beam connection structure
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN208441314U (en) * 2018-07-11 2019-01-29 郑立国 A kind of prefabricated superimposed sheet and the superimposed sheet and Cast-in-situ Beam quick assembling connection structure
CN210264015U (en) * 2019-03-19 2020-04-07 中建四局第一建筑工程有限公司 Tool type rear-added structural plate quick connecting structure

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860777A (en) * 1994-08-23 1996-03-05 Kajima Corp Floor slab of pc board and execution method thereof
US20080313993A1 (en) * 2007-06-20 2008-12-25 Reen Michael J Floor hole repair fixture and method
CN102966050A (en) * 2012-12-07 2013-03-13 清华大学 Longitudinal connection method for steel-concrete combined beam and existing reinforced concrete T beam
CN204139644U (en) * 2014-10-08 2015-02-04 苏州中固建筑科技有限公司 A kind of newly-increased beam of SRC member
CN205777642U (en) * 2016-05-23 2016-12-07 清华大学 Anti-seismic strengthening device for reinforced concrete frame structure
CN106555453A (en) * 2017-02-04 2017-04-05 赤峰市建筑科学研究院有限公司 A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN206667546U (en) * 2017-03-15 2017-11-24 苏州中固建筑科技股份有限公司 Add floor construction after a kind of steel reinforced concrete
CN107217865A (en) * 2017-06-20 2017-09-29 中冶建工集团有限公司 A kind of increasing reinforced construction method of the flat beam section of main body frame
CN107268852A (en) * 2017-07-21 2017-10-20 清华大学建筑设计研究院有限公司 Floor construction and construction method that a kind of prefabricated frid is constituted
CN207672766U (en) * 2017-11-29 2018-07-31 珠海华发建筑设计咨询有限公司 Newly-increased floor and original beam connection structure
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
CN208441314U (en) * 2018-07-11 2019-01-29 郑立国 A kind of prefabricated superimposed sheet and the superimposed sheet and Cast-in-situ Beam quick assembling connection structure
CN210264015U (en) * 2019-03-19 2020-04-07 中建四局第一建筑工程有限公司 Tool type rear-added structural plate quick connecting structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
侯晓萌;郑文忠;谷锋;徐国洲;: "某多层砖砌体房屋增层改造设计分析" *

Similar Documents

Publication Publication Date Title
CN108331158A (en) A kind of joint connection in site method of precast reinforced concrete beam column
CN104234079B (en) A kind of subway station Y type cast steel combines steel pipe column construction method
CN109653233A (en) Cushion cap single wall steel jacket box recoverable construction of bottom plates method
CN206279631U (en) A kind of built-in fitting connected for girder steel and Core Walls Structure
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN109403201A (en) A kind of new and old bridge jointing seam new structural systen and implementation method
CN204804057U (en) Beam column connecting device of prefabricated frame
CN103806593B (en) A kind of precast concrete
CN106978909A (en) A kind of method that beams of concrete is connected with profile steel concrete column joint reinforcing bar
CN206109960U (en) Steel that can be under construction fast concrete integrated configuration bridge
CN103966956A (en) Hooped concrete-filled steel tube reinforced single-pole bridge pier constructing device and construction method
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN106760060A (en) A kind of assembled exempts from support beam wall integral type shear wall and its construction method
CN109812045A (en) After a kind of tool-type plus structural slab fast joint structure and method
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN210264015U (en) Tool type rear-added structural plate quick connecting structure
CN206477476U (en) A kind of assembled exempts from support beam wall integral type shear wall
CN207314523U (en) A kind of Novel steel-mixed bean column node constructing structure
CN109779226A (en) A kind of opposite sex chimney construction security platform structure and its construction method
CN206418861U (en) A kind of switch base for facing skirt shield and multiduty skirt of facing are protected
CN206503348U (en) The support system of one discharge plate buckle type scaffold door opening position bracket
CN106522531A (en) Ring lock scaffold opening portion bracket supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528