CN107217865A CN201710469339.XA CN201710469339A CN107217865A CN 107217865 A CN107217865 A CN 107217865A CN 201710469339 A CN201710469339 A CN 201710469339A CN 107217865 A CN107217865 A CN 107217865A
Authority
CN
China
Prior art keywords
flat beam
concrete
body frame
main body
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710469339.XA
Other languages
Chinese (zh)
Other versions
CN107217865B (en
Inventor
张志彬
肖作昊
朱广涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Construction Engineering Group (Tianjin) Construction Engineering Co., Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710469339.XA priority Critical patent/CN107217865B/en
Publication of CN107217865A publication Critical patent/CN107217865A/en
Application granted granted Critical
Publication of CN107217865B publication Critical patent/CN107217865B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/22Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members built-up by elements jointed in line

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of increasing reinforced construction method of the flat beam section of main body frame, including first treat the step of flat beam progress base treatment of reinforcing, unwrapping wire and bar planting, it is characterised in that after bar planting, also comprise the following steps:Waiting that the bottom for reinforcing flat beam picks out multiple be placed equidistant along its length and the translot of insertion in the width direction according to unwrapping wire position, the depth of translot is untill picking out beam main tendon, according to the beam main tendon position picked out, the position that cage bar is avoided in selection drills through vertically communicated pouring hole;Then the reinforcing for carrying out template is installed;From pouring hole into template casting concrete, in casting process, vibrating spear is inserted concrete vibrated in template, cement mortar of being emerged above concreting to the template for waiting to reinforce flat beam both sides, and when concrete no longer sinks at pouring hole, complete pouring for concrete.There is the present invention operation more to facilitate, and advantageously reduce the difficulty of construction of concreting;The waste of concrete is reduced, construction cost is saved;The advantages of being conducive to improving the intensity of crossbeam reinforcing.

Description

A kind of increasing reinforced construction method of the flat beam section of main body frame
Technical field
The present invention relates to technical field of building construction, the increasing reinforcing in particular to a kind of flat beam section of main body frame is applied Work method.
Background technology
In the engineered neutralization New Buildings major project construction of concrete structure old building, portion occasionally there are The phenomenon for dividing concrete members intensity not enough, so that causing component to produce substantial amounts of structural cracks because bearing capacity is reduced, influences Normal use and durability to building;When the concrete strength wretched insufficiency of a large amount of components, it will cause building structure because Lose bearing capacity and collapse.To make each concrete component in building structure to meet bearing capacity and serviceability limit state Design requirement and overall Seismic Design Requirements, it is necessary to carry out reinforcement and strengthening to these components.
Being presently used for the reinforcement and strengthening method of concrete structure member has section-increased method, Covered with Angles method, sticking carbon fiber Method, external prestressing method, suspension method and increase supporting methods etc.;Wherein, when being reinforced using section-increased method to crossbeam, pass The construction method of system is:First after the bottom bar planting of crossbeam, installation form, and the template of beam width direction side is leaned outward It is oblique into horn mouth(As shown in Figure 1), then from casting concrete at the horn mouth, after after concrete initial set, by prominent crossbeam side Reject at the cast gate position of wall.But, when the crossbeam needed reinforcement is flat beam, due to original flat beam bottom and upper strata floor bottom The distance between portion is smaller(As shown in Figure 2), it is tubaeform to pour the distance between mouth and upper strata floor slab bottoms after model sheetinstallat Also it is smaller, it is impossible to carry out concreting work, bring great difficulty to construction.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problems to be solved by the invention are:How to provide it is a kind of using with Flat beam is reinforced, easy to operate, advantageously reduces difficulty of construction, and the increasing for improving the flat beam section of main body frame of construction quality is reinforced Construction method.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of increasing reinforced construction method of the flat beam section of main body frame, including first treat the flat beam progress base treatment of reinforcing, put The step of line and bar planting, it is characterised in that after bar planting, also comprise the following steps:
Waiting that the bottom for reinforcing flat beam picks out multiple be placed equidistant along its length and insertion in the width direction according to unwrapping wire position Translot, the depth of translot is untill picking out beam main tendon, according to the beam main tendon position picked out, and chooses and avoids the position of cage bar and drill through Vertically communicated pouring hole;Then the reinforcing for carrying out template is installed;
From pouring hole into template in casting concrete, casting process, vibrating spear is inserted concrete vibrated in template, Concreting to concrete at emerge above the template for waiting to reinforce flat beam both sides cement mortar, and pouring hole no longer sink when, it is complete Into pouring for concrete.
Using above-mentioned construction method, multiple vertically communicated pouring holes are drilled through on flat beam waiting to reinforce, because pouring hole is passed through Through upper strata floor so that whole upper strata floor turns into the scope of operation of concreting, operation more facilitates, and reduces coagulation The difficulty of construction that soil is poured.In addition, concreting is carried out using this method, without the both sides of template are arranged into horn mouth, The follow-up work for rejecting protruding parts concrete is reduced, the waste of concrete is decreased, is conducive to saving construction cost.By In pouring hole through waiting to reinforce after the concrete setting in flat beam, pouring hole, the combination between former flat beam is even closer, favorably Beam strength after further raising is poured.Due to being provided with pouring hole, facilitate vibrating spear to insert and concrete is entered in template Row vibrates, and is conducive to increasing the compactness of concrete, eliminates concrete because depression is cracked in new and old joint part and is carefully stitched, Be conducive to improving the intensity that crossbeam is reinforced.
Further, when being vibrated using vibrating spear to concrete, the template use for treating the both sides for reinforcing flat beam is flat Slab vibrator and the mode manually hammered are vibrated.
So, concrete can be vibrated to greatest extent, it is ensured that the compactness of coagulation body, improves what crossbeam was reinforced Intensity.
Further, the step of obtaining before concreting in funnelform chute is additionally included in, will during concreting In the chute insertion pouring hole.
So, using funnelform chute, pouring down or forth for concrete can be avoided, facilitates concreting, improves what is poured Efficiency.
Further, before concreting, the slump to concrete is detected, it is ensured that the slump of concrete is 180±20mm。
So, be conducive to improving the mobility of concrete, be easy to concrete to be quickly filled in template, be easy to apply Work.
Further, after the completion of concreting, in pre-hardening previous hour, secondary vibration is carried out to concrete.
So, be conducive to the compactness of further increase concrete, eliminate concrete because depression is produced in new and old joint part Raw crackle and thin seam.
Further, the width of the translot is 50~150mm;The central moment of the two neighboring translot be 1000~ 1500mm, and close to end translot apart from end distance be more than 500mm.
Further, the pouring hole is up-small and down-big horn-like, and the aperture of upper end is 100mm, the aperture of lower end For 300mm.
So, the effective area of vibrating spear vibrated concrete can be increased.
Further, the step of base treatment is:Before construction, it will wait to reinforce the substrate surface aging of flat beam, open Split, the with serious pollution structure of loose and surface and oil contaminant thoroughly cut to firm basic unit is cleaned, to ensure that body structure surface is hard Gu it is intact.
Further, before bar planting, in addition to the step of flat beam of reinforcing carries out dabbing is treated:Waiting to reinforce according to unwrapping wire position The bottom of flat beam carries out artificial chiseling processing, picks laitance and exposes stone, forms concavo-convex pitted skin.
So, be conducive to beam concrete and existing concrete that the later stage pours organically to be combined into an entirety, improve Concrete construction Forming Quality.
Further, the step of bar planting is:Drilled according to unwrapping wire position in the bottom for waiting to reinforce flat beam, aperture Than the big 4mm of diameter for being implanted into reinforcing bar, then surface dust is blown off untill hole inwall is water stain without floating dust with inflator;Use professional injecting glue Rifle injecting glue since opposite side gos deep into bottom hole, irrigator is slowly transferred on marginal not side, untill filling the 2/3 of pore volume;By steel Muscle is slowly rotated in reeve hole for injecting glue, so that bubble is discharged, it is ensured that reinforcing bar is in hole center;Treat that anchoring adhesive curing period terminates The welding such as laggard cross girders cage bar and stirrup, colligation work.
In summary, there is the present invention operation more to facilitate, and advantageously reduce the difficulty of construction of concreting;Reduce The waste of concrete, saves construction cost;The advantages of being conducive to improving the intensity of crossbeam reinforcing.
Brief description of the drawings
Fig. 1 is the structural representation that traditional beam section is reinforced.
Fig. 2 is structural representation of the flat beam when conventional cross-section is reinforced.
Fig. 3 is that the flat beam section in the inventive method reinforces schematic diagram.
Embodiment
With reference to embodiment, the present invention is described in further detail.
During specific implementation:Flat beam section reinforced construction method is as follows:A base treatments:Before construction, by substrate surface Ying Jian In fact, clean, without greasy dirt and other pollutants, aging, cracking, the with serious pollution structure of loose and surface and oil contaminant will thoroughly be dug Except to firm basic unit is cleaned, to ensure that body structure surface is firm intact.
B unwrapping wire:The size indicated according to drawing is released on frame column and needed reinforcement on beam section size positions line and beam Need the line of rabbet joint picked out.
C dabbings:According to the beam section position line of releasing and former beam bottom, artificial chiseling processing is carried out, laitance is picked and exposes stone Son, forms concavo-convex pitted skin, is so conducive to beam concrete and existing concrete that the later stage pours organically to be combined into one It is overall, improve concrete construction Forming Quality.
D drillings, borehole cleaning, injecting glue, bar planting:Drilled, aperture should be greater than being implanted into bar diameter 4mm, then will with inflator Surface dust is blown off untill hole inwall is water stain without floating dust.With professional colloid-injecting gun since opposite side gos deep into bottom hole injecting glue, marginal not side Irrigator is slowly transferred to, untill filling the 2/3 of pore volume.Reinforcing bar is slowly rotated in reeve hole for injecting glue, so that bubble is arranged Go out, it is ensured that reinforcing bar is in hole center.
E reinforcing bar colligations:Bar planting completes to treat that anchoring adhesive curing period terminates the welding such as laggard cross girders cage bar and stirrup, colligation work Make.
F tick slots:Beam section is reinforced according to unwrapping wire position edge(Back portion)The wide elongated grooves of 100mm are picked out, until picking out Untill beam main tendon, groove center is away from for 1000mm, and slot pitch beam-ends distance is 500mm.So it is effectively prevented in follow-up drilling, Hurt beam main tendon.According to the situation for picking out beam main tendon, the suitable position of selection carries out brill circular hole.Boring aperture is that top is 100mm, bottom is 300mm, can so increase the effective area of vibrating spear vibrated concrete.
G installation forms:After the completion of drilling, formwork reinforcement installation is carried out.
H casting concretes:As shown in figure 3, using making by oneself in funneling chute patchhole, surrounding is fixed using support body, The slump of casting concrete typically requires to be 180 ± 20mm, mobility when so being conducive to pouring, the side of bringing during to construction Just.During casting concrete, top is vibrated using vibrating spear, and beam sides is manually hammered using vibration board Beam side, which coordinates, to vibrate, and so concrete is vibrated to greatest extent, it is ensured that its compactness.Casting concrete is until reinforcing Emerge above side template cement mortar, concrete no longer sinks at hole on beam, stops pouring.
After the completion of concreting, or so pre-hardening previous hour, secondary vibration is carried out to it, be so conducive to increase mixed The compactness of soil is coagulated, concrete is eliminated because depression is cracked in new and old joint part and is carefully stitched.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation, all essences in the present invention with the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of increasing reinforced construction method of the flat beam section of main body frame, including first treat the flat beam of reinforcing carry out base treatment, The step of unwrapping wire and bar planting, it is characterised in that after bar planting, also comprise the following steps:
Waiting that the bottom for reinforcing flat beam picks out multiple be placed equidistant along its length and insertion in the width direction according to unwrapping wire position Translot, the depth of translot is untill picking out beam main tendon, according to the beam main tendon position picked out, and chooses and avoids the position of cage bar and drill through Vertically communicated pouring hole;Then the reinforcing for carrying out template is installed;
From pouring hole into template in casting concrete, casting process, vibrating spear is inserted concrete vibrated in template, Concreting to concrete at emerge above the template for waiting to reinforce flat beam both sides cement mortar, and pouring hole no longer sink when, it is complete Into pouring for concrete.
2. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that use and vibrate When rod vibrates to concrete, the mode that the template for the both sides for reinforcing flat beam is hammered using vibration board and manually is treated Vibrated.
3. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that be additionally included in The step of obtaining before concreting in funnelform chute, during concreting, the chute is inserted in pouring hole.
4. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that concrete is poured Before building, the slump to concrete is detected, it is ensured that the slump of concrete is 180 ± 20mm.
5. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that concrete is poured After the completion of building, in pre-hardening previous hour, secondary vibration is carried out to concrete.
6. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that the translot Width be 50~150mm;The central moment of the two neighboring translot is 1000~1500mm, and close to the translot distance of end The distance of end is more than 500mm.
7. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that described to pour Hole is up-small and down-big horn-like, and the aperture of upper end is 100mm, and the aperture of lower end is 300mm.
8. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that the basic unit The step of processing is:Before construction, it will wait to reinforce the substrate surface aging of flat beam, cracking, loose and surface and oil contaminant seriously polluted Structure thoroughly cut to firm basic unit is cleaned, to ensure that body structure surface is firm intact.
9. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that before bar planting, Also include treating the step of flat beam of reinforcing carries out dabbing:Waiting to reinforce at the bottom progress artificial chiseling of flat beam according to unwrapping wire position Reason, picks laitance and exposes stone, forms concavo-convex pitted skin.
10. the increasing reinforced construction method of the flat beam section of main body frame as claimed in claim 1, it is characterised in that the plant The step of muscle is:Drilled according to unwrapping wire position in the bottom for waiting to reinforce flat beam, aperture ratio is implanted into the big 4mm of diameter of reinforcing bar, Then surface dust is blown off untill hole inwall is water stain without floating dust with inflator;With professional colloid-injecting gun since opposite side gos deep into bottom hole Irrigator is slowly transferred on injecting glue, marginal not side, untill filling the 2/3 of pore volume;Reinforcing bar is slowly rotated in reeve hole for injecting glue, So that bubble is discharged, it is ensured that reinforcing bar is in hole center;Treat that anchoring adhesive curing period terminates the weldering such as laggard cross girders cage bar and stirrup Connect, colligation works.
CN201710469339.XA 2017-06-20 2017-06-20 A kind of increasing reinforced construction method of the flat beam section of main body frame Active CN107217865B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710469339.XA CN107217865B (en) 2017-06-20 2017-06-20 A kind of increasing reinforced construction method of the flat beam section of main body frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710469339.XA CN107217865B (en) 2017-06-20 2017-06-20 A kind of increasing reinforced construction method of the flat beam section of main body frame

Publications (2)

Publication Number Publication Date
CN107217865A true CN107217865A (en) 2017-09-29
CN107217865B CN107217865B (en) 2019-08-30

Family

ID=59949913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710469339.XA Active CN107217865B (en) 2017-06-20 2017-06-20 A kind of increasing reinforced construction method of the flat beam section of main body frame

Country Status (1)

Country Link
CN (1) CN107217865B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method
CN115234025A (en) * 2022-07-20 2022-10-25 中建八局西南建设工程有限公司 Concrete floor thickening construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556820A (en) * 2013-10-25 2014-02-05 杭州固力建筑工程有限公司 Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN104746892A (en) * 2015-03-30 2015-07-01 山东双得利建设科技有限公司 Supporting beam wall demolition device and supporting beam wall demolition construction method
CN104847130A (en) * 2015-05-19 2015-08-19 江苏南通三建集团有限公司 Reinforcing structure of existing structural beam and construction method thereof
CN205314604U (en) * 2016-01-15 2016-06-15 镇江中谊抗震科技股份有限公司 A template for reinforced concrete roof beam increase cross -section
CN205637578U (en) * 2016-04-26 2016-10-12 湖北建科结构加固有限责任公司 Roof beam increase cross -section combination steel form

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556820A (en) * 2013-10-25 2014-02-05 杭州固力建筑工程有限公司 Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN104746892A (en) * 2015-03-30 2015-07-01 山东双得利建设科技有限公司 Supporting beam wall demolition device and supporting beam wall demolition construction method
CN104847130A (en) * 2015-05-19 2015-08-19 江苏南通三建集团有限公司 Reinforcing structure of existing structural beam and construction method thereof
CN205314604U (en) * 2016-01-15 2016-06-15 镇江中谊抗震科技股份有限公司 A template for reinforced concrete roof beam increase cross -section
CN205637578U (en) * 2016-04-26 2016-10-12 湖北建科结构加固有限责任公司 Roof beam increase cross -section combination steel form

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
戴隆沂: "双氧水仓库框架屋面梁的加固处理方法", 《江西化工》 *
赵凤敏: "楼板加固施工", 《黑龙江科技信息》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method
CN115234025A (en) * 2022-07-20 2022-10-25 中建八局西南建设工程有限公司 Concrete floor thickening construction method

Also Published As

Publication number Publication date
CN107217865B (en) 2019-08-30

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN1162595C (en) Hollow floor slab with hidden and dense ribs
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN1210472C (en) Concrete building construction form unit and manufacturing device therefor, and concrete building constructed by using concrete building construction form
CN209482591U (en) Prefabricated molds shell structure column construction structure
JP6437150B2 (en) Concrete construction method
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN206015861U (en) The cast-in-place core body of light block wall
CN204983669U (en) Constructional column be connected with collar tie beam pour device
CN101487293A (en) Concrete pouring method for beam-column joints with different strength grades
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN107217865A (en) A kind of increasing reinforced construction method of the flat beam section of main body frame
CN107083804B (en) A kind of wall structure column joint bar construction method
CN110905113A (en) Construction method of large-span concrete dome structure
CN108798053A (en) A kind of method that ECC reinforces damaged frame Structure Beam-column node
CN109898698B (en) Construction method of antique building wire seam wall
CN108457190A (en) Anchor ceiling board construction method before anchorage
CN105649235A (en) Construction technique for MS dense thin-wall building block filling
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN106049665B (en) The construction method of the cast-in-place core of light block wall
CN110067401A (en) A kind of existing masonry structure is reinforced using prefabricated board wall and its construction method
CN106917469A (en) Steel plate concrete composite reinforcement reinforced beam anti-fatigue performance structure and method
CN106545008A (en) A kind of cast-in-situ bored pile pile making method
CN206319620U (en) A kind of floor concrete casting controls scale
CN104763158B (en) Tenon joint type light-weight aggregate chained block construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200628

Address after: No.1 Tengfei Road, Junliang City, Dongli District, Tianjin

Patentee after: MCC Construction Engineering Group (Tianjin) Construction Engineering Co., Ltd

Address before: No. 1 West Road 400084 Dadukou District of Chongqing

Patentee before: CHINA METALLURGICAL CONSTRUCTION ENGINEERING GROUP Co.,Ltd.