CN109555078A - A kind of Gravity Type Casisson Berth and its construction method - Google Patents

A kind of Gravity Type Casisson Berth and its construction method Download PDF

Info

Publication number
CN109555078A
CN109555078A CN201811592729.7A CN201811592729A CN109555078A CN 109555078 A CN109555078 A CN 109555078A CN 201811592729 A CN201811592729 A CN 201811592729A CN 109555078 A CN109555078 A CN 109555078A
Authority
CN
China
Prior art keywords
positioning
caisson
concrete pile
bedding
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811592729.7A
Other languages
Chinese (zh)
Inventor
庄剑
欧阳武
林镇汀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yue Ke Engineering Technology Co Ltd
Original Assignee
Guangzhou Yue Ke Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yue Ke Engineering Technology Co Ltd filed Critical Guangzhou Yue Ke Engineering Technology Co Ltd
Priority to CN201811592729.7A priority Critical patent/CN109555078A/en
Publication of CN109555078A publication Critical patent/CN109555078A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of Gravity Type Casisson Berth and its construction method, which includes the bedding being laid on riverbed;The caisson being installed on the bedding;Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;Harbour superstructure is set to the top of the caisson and the backfill material;Several positioning bored concrete piles being fixed on riverbed;Wherein, the bottom of the caisson is equipped with positioning stake holes, and the positioning bored concrete pile passes through the bedding and is connected in the positioning stake holes, to position to the caisson.Caisson offset can be greatly reduced in Gravity Type Casisson Berth and its construction method of the invention, and harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforce the structure safety of Gravity Type Casisson Berth.

Description

A kind of Gravity Type Casisson Berth and its construction method
Technical field
The present invention relates to a kind of Gravity Type Casisson Berth manufacturing technology field more particularly to a kind of Gravity Type Casisson Berth and Its construction method.
Background technique
As China's port construction develops, large-scale gravity type quay is built to obtain express delivery development, and Caisson type Structure is existing More generally existing one of form in modern China Entry Points for Ocean Shipping/Ocean Cargo.
Due to being in the biggish harbour water area of long-term stormy waves, harbour caisson can shift under the influence of stormy waves or unevenness Situations such as even sedimentation;And when harbour caisson generates and is significantly displaced and settles, the master of Gravity Type Casisson Berth can be seriously affected Body structure is using function and using safe.
Therefore, a kind of caisset and arrangement and method for construction that caisson offset and differential settlement can be greatly reduced is researched and developed, Harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforces the structure safety of Gravity Type Casisson Berth, becomes One of those skilled in the art's urgent problem to be solved.
Summary of the invention
The object of the present invention is to provide a kind of Gravity Type Casisson Berths, and it is heavy which can be greatly reduced Case offset, harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforces the structure safety of Gravity Type Casisson Berth.
To achieve the goals above, the technical scheme is that
A kind of Gravity Type Casisson Berth comprising: the bedding being laid on riverbed;The caisson being installed on the bedding; Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;Harbour superstructure, setting In the top of the caisson and the backfill material;Several positioning bored concrete piles being fixed on riverbed.
Wherein, the bottom of the caisson is equipped with positioning stake holes, and the positioning bored concrete pile is connected to described across the bedding It positions in stake holes, to be positioned to the caisson.
As a kind of specific embodiment, the bedding includes the foundation trench being arranged on riverbed, and is filled in the base Jackstone in slot.
Further, the junction of the positioning bored concrete pile and the positioning stake holes, the bedding is consolidated by underwater grouting Fixed connection.
As a kind of specific embodiment, the positioning bored concrete pile is made of steel reinforcement cage and concrete.
It is a further object of the invention to provide a kind of construction method of Gravity Type Casisson Berth, the construction method packets Include following steps:
Step S1: construction forms several positioning bored concrete piles on riverbed.
Step S2: excavating foundation trench on riverbed, and then jackstone backfill construction is carried out in the foundation trench, to form bedding, And then leveling construction is carried out to the top surface of the bedding.
Step S3: pre-production caisson, and positioning stake holes, the positioning stake holes and institute are formed in the bottom of the caisson Positioning bored concrete pile is stated to be adapted.
Step S4: by the caisson placing in the top surface of the bedding, and the positioning stake holes is made to be connected to the positioning On bored concrete pile.
Step S5: to gap, the positioning bored concrete pile and the positioning between the positioning bored concrete pile and the bedding Gap between stake holes carries out underwater grouting reinforcing.
Step S6: the position between the inside and the caisson and river levee of the caisson carries out backfill material construction.
Step S7: concrete construction of binding is carried out in the top of the caisson and the backfill material.
Step S8: harbour Superstructure Construction is carried out in the top of the caisson and the backfill material.
As a kind of specific embodiment, height locating for the top surface of the positioning bored concrete pile, compared to default caisson The locating height in bottom surface wants high 1-2m.
As a kind of specific embodiment, the construction method that bored concrete pile is positioned described in the step S1 includes following step It is rapid:
Step S1.1: determining the position of the positioning bored concrete pile on riverbed, and then bury steel pile casting in corresponding position, And then drilling construction is carried out, to form priming concrete pile hole.
Step S1.2: prefabricated steel reinforcement cage, and then the steel reinforcement cage is put into the steel pile casting, and then the steel reinforcement cage is put Enter in the priming concrete pile hole.
Concrete grout: being cast in the priming concrete pile hole by step S1.3 using conduit, is filled with forming the positioning Infuse stake.
Jackstone backfill construction is carried out in the foundation trench as a kind of specific embodiment, described in step S2 specifically: In the foundation trench, jackstone backfill is carried out centered on the positioning bored concrete pile.
Compared with prior art, the present invention has following technical effect that
Gravity Type Casisson Berth and its construction method of the invention, by being applied on the position that riverbed needs to install caisson Work forms several positioning bored concrete piles, and then again by excavating foundation trench, backfilling jackstone in foundation trench to form bedding, and pre- Positioning stake holes is formed in the bottom of caisson when setting caisson, then when being placed on caisson on bedding, by being connected to positioning stake holes It positions on bored concrete pile, then carries out the subsequent operation of backfill construction and harbour construction inside caisson;It is positioned such that bored concrete pile just It can play the role of positioning caisson and reinforce caisson, caisson is avoided to shift under the impact of water flow.
In order to better understand and implement, the invention will now be described in detail with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Gravity Type Casisson Berth of the invention;
Fig. 2 is the enlarged drawing in Fig. 1 at A.
Specific embodiment
Embodiment 1
Referring to Fig. 1, a kind of Gravity Type Casisson Berth comprising the bedding 3 that is laid on riverbed 1 is installed on the base The backfill material 5 of caisson 4, the position being filled between the inner cavity and the caisson 4 and river levee 2 of the caisson 4 on bed 3, with And it is set to the harbour superstructure 6 of the top of the caisson 4 and the backfill material 5;Several positioning are further fixed on riverbed 1 to fill Infuse stake 7.
Wherein, the bottom of the caisson 4 is equipped with positioning stake holes 401, and the positioning bored concrete pile 7 is connected across the bedding 3 In in the positioning stake holes 401, to be positioned to the caisson 4.
Specifically, the bedding 3 includes the foundation trench 301 being arranged on riverbed, and the throwing being filled in the foundation trench 301 Stone 302.
Specifically, the positioning bored concrete pile 7 is made of steel reinforcement cage and concrete.
Preferably, the junction of the positioning bored concrete pile 7 and the positioning stake holes 401, the bedding 3 passes through underwater grouting Reinforce connection.
Embodiment 2
A kind of construction method of Gravity Type Casisson Berth comprising following steps:
Step S1: construction forms several positioning bored concrete piles on riverbed.
Step S2: excavating foundation trench on riverbed, and then jackstone backfill construction is carried out in the foundation trench, to form bedding, And then leveling construction is carried out to the top surface of the bedding.
Step S3: pre-production caisson, and positioning stake holes, the positioning stake holes and institute are formed in the bottom of the caisson Positioning bored concrete pile is stated to be adapted.
Step S4: by the caisson placing in the top surface of the bedding, and the positioning stake holes is made to be connected to the positioning On bored concrete pile.
Step S5: to gap, the positioning bored concrete pile and the positioning between the positioning bored concrete pile and the bedding Gap between stake holes carries out underwater grouting reinforcing.
Step S6: the position between the inside and the caisson and river levee of the caisson carries out backfill material construction.
Step S7: concrete construction of binding is carried out in the top of the caisson and the backfill material.
Step S8: harbour Superstructure Construction is carried out in the top of the caisson and the backfill material.
Specifically, height locating for the top surface of the positioning bored concrete pile, is highly wanted locating for the bottom surface compared to default caisson High 1-2m.
Specifically, described in step S1 position bored concrete pile construction method the following steps are included:
Step S1.1: determining the position of the positioning bored concrete pile on riverbed, and then bury steel pile casting in corresponding position, And then drilling construction is carried out, to form priming concrete pile hole.
Step S1.2: prefabricated steel reinforcement cage, and then the steel reinforcement cage is put into the steel pile casting, and then the steel reinforcement cage is put Enter in the priming concrete pile hole.
Concrete grout: being cast in the priming concrete pile hole by step S1.3 using conduit, is filled with forming the positioning Infuse stake.
Preferably, jackstone backfill construction is carried out described in the step S2 in the foundation trench specifically: in the foundation trench, Jackstone backfill is carried out centered on the positioning bored concrete pile.
Gravity Type Casisson Berth and its construction method of the invention, by being applied on the position that riverbed needs to install caisson Work forms several positioning bored concrete piles, and then again by excavating foundation trench, backfilling jackstone in foundation trench to form bedding, and pre- Positioning stake holes is formed in the bottom of caisson when setting caisson, then when being placed on caisson on bedding, by being connected to positioning stake holes It positions on bored concrete pile, then carries out the subsequent operation of backfill construction and harbour construction inside caisson;It is positioned such that bored concrete pile just It can play the role of positioning caisson and reinforce caisson, caisson is avoided to shift under the impact of water flow.
Further, construction method of the invention, after the completion of the positioning stake holes of caisson bottom is connect with positioning bored concrete pile, To it is described positioning bored concrete pile and the bedding between gap, it is described positioning bored concrete pile and it is described positioning stake holes between gap into Row underwater grouting is reinforced, and so that caisson, bedding and positioning bored concrete pile is formed an entirety, it is ensured that caisson, positioning bored concrete pile and bedding It is completely embedded.
Further, construction method of the invention is after excavating foundation trench, is to position when carrying out jackstone backfill in foundation trench Jackstone backfill is carried out centered on bored concrete pile, is avoided that in this way when carrying out jackstone backfill, and jackstone is deposited in the one of positioning bored concrete pile Side, causes that positioning steel tube bored concrete pile unilateral side lateral pressure is excessive, leads to the problem of pile body breaking.
The invention is not limited to above embodiment, if not departing from the present invention to various changes or deformation of the invention Spirit and scope, if these changes and deformation belong within the scope of claim and equivalent technologies of the invention, then this hair It is bright to be also intended to encompass these changes and deformation.

Claims (8)

1. a kind of Gravity Type Casisson Berth characterized by comprising
The bedding being laid on riverbed;
The caisson being installed on the bedding;
Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;
Harbour superstructure is set to the top of the caisson and the backfill material;
Several positioning bored concrete piles being fixed on riverbed;Wherein, the bottom of the caisson is equipped with positioning stake holes, the positioning perfusion Stake passes through the bedding and is connected in the positioning stake holes, to position to the caisson.
2. Gravity Type Casisson Berth according to claim 1, it is characterised in that:
The bedding includes the foundation trench being arranged on riverbed, and the jackstone being filled in the foundation trench.
3. Gravity Type Casisson Berth according to claim 1, it is characterised in that:
The positioning bored concrete pile is made of steel reinforcement cage and concrete.
4. Gravity Type Casisson Berth according to claim 1-3, it is characterised in that:
The positioning bored concrete pile is fixedly connected with the junction of the positioning stake holes, the bedding by underwater grouting.
5. a kind of construction method of Gravity Type Casisson Berth, it is characterised in that:
Step S1: construction forms several positioning bored concrete piles on riverbed;
Step S2: excavating foundation trench on riverbed, and then jackstone backfill construction is carried out in the foundation trench, to form bedding, in turn Leveling construction is carried out to the top surface of the bedding;
Step S3: pre-production caisson, and the bottom of the caisson formed positioning stake holes, the positioning stake holes with it is described fixed Position bored concrete pile is adapted;
Step S4: by the caisson placing in the top surface of the bedding, and the positioning stake holes is made to be connected to the positioning perfusion In stake;
Step S5: to gap, the positioning bored concrete pile and the positioning stake holes between the positioning bored concrete pile and the bedding Between gap carry out underwater grouting reinforcing;
Step S6: the position between the inside and the caisson and river levee of the caisson carries out backfill material construction;
Step S7: concrete construction of binding is carried out in the top of the caisson and the backfill material;
Step S8: harbour Superstructure Construction is carried out in the top of the caisson and the backfill material.
6. the construction method of Gravity Type Casisson Berth according to claim 5, it is characterised in that:
Height locating for the top surface of the positioning bored concrete pile, highly wants high 1-2m locating for the bottom surface compared to default caisson.
7. the construction method of Gravity Type Casisson Berth according to claim 5, which is characterized in that positioning described in step S1 The construction method of bored concrete pile the following steps are included:
Step S1.1: the position of the positioning bored concrete pile is determined on riverbed, and then buries steel pile casting in corresponding position, in turn Drilling construction is carried out, to form priming concrete pile hole;
Step S1.2: prefabricated steel reinforcement cage, and then the steel reinforcement cage is put into the steel pile casting, and then the steel reinforcement cage is put into institute It states in priming concrete pile hole;
Step S1.3: concrete grout is cast in the priming concrete pile hole using conduit, to form the positioning bored concrete pile.
8. according to the construction method of the described in any item Gravity Type Casisson Berths of claim 5-7, which is characterized in that
Jackstone backfill construction is carried out described in the step S2 in the foundation trench specifically:
In the foundation trench, jackstone backfill is carried out centered on the positioning bored concrete pile.
CN201811592729.7A 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth and its construction method Pending CN109555078A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811592729.7A CN109555078A (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811592729.7A CN109555078A (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth and its construction method

Publications (1)

Publication Number Publication Date
CN109555078A true CN109555078A (en) 2019-04-02

Family

ID=65871022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811592729.7A Pending CN109555078A (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth and its construction method

Country Status (1)

Country Link
CN (1) CN109555078A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023020356A1 (en) * 2021-08-20 2023-02-23 中交四航局第二工程有限公司 Caisson quay and construction method therefor
CN116084421A (en) * 2023-03-07 2023-05-09 中交第一航务工程局有限公司 Construction method of permeable anti-collision pier

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0213605A (en) * 1988-06-30 1990-01-18 Kokudo Sogo Kensetsu Kk Construction method for caisson and quay wall made utilizing it
KR20060023036A (en) * 2004-09-08 2006-03-13 송병무 Marine structure and construction method thereof
WO2007045173A1 (en) * 2005-10-19 2007-04-26 Zhenxin Chen An assembly type open caisson and a marine engineering structure
CN101260664A (en) * 2008-04-22 2008-09-10 中船第九设计研究院工程有限公司 Soft soil foundation large scale steel float lock head construction method
CN101294394A (en) * 2008-05-28 2008-10-29 中交公路规划设计院有限公司 Steel cavity stranded caisson-pile inverse-way composite base and construction method
CN101487252A (en) * 2009-02-13 2009-07-22 中建八局第一建设有限公司 Construction process of cast-in-situ bored pile
CN101899824A (en) * 2009-06-01 2010-12-01 王锦文 Method for building harbor wharf based on soft soil
WO2011023745A1 (en) * 2009-08-27 2011-03-03 Geosea Nv Method of installation of large diameter piles
CN102080364A (en) * 2010-12-17 2011-06-01 浙江海桐高新工程技术有限公司 Pile bearing caisson seawall and construction method thereof
KR20120012504A (en) * 2010-08-02 2012-02-10 김상훈 Cast in place concrete pile With precast type Caisson
CN202989857U (en) * 2012-12-19 2013-06-12 中交第三航务工程勘察设计院有限公司 Reinforced gravity type caisson wharf structure
CN206486871U (en) * 2017-02-24 2017-09-12 交通运输部水运科学研究所 A kind of soft base Gravity harf structure
CN108867547A (en) * 2018-08-19 2018-11-23 天津大学 The construction method of semi-circular caisson and pile foundation combined type breakwater
CN209636720U (en) * 2018-12-25 2019-11-15 广州粤科工程技术有限公司 A kind of Gravity Type Casisson Berth

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0213605A (en) * 1988-06-30 1990-01-18 Kokudo Sogo Kensetsu Kk Construction method for caisson and quay wall made utilizing it
KR20060023036A (en) * 2004-09-08 2006-03-13 송병무 Marine structure and construction method thereof
WO2007045173A1 (en) * 2005-10-19 2007-04-26 Zhenxin Chen An assembly type open caisson and a marine engineering structure
CN101260664A (en) * 2008-04-22 2008-09-10 中船第九设计研究院工程有限公司 Soft soil foundation large scale steel float lock head construction method
CN101294394A (en) * 2008-05-28 2008-10-29 中交公路规划设计院有限公司 Steel cavity stranded caisson-pile inverse-way composite base and construction method
CN101487252A (en) * 2009-02-13 2009-07-22 中建八局第一建设有限公司 Construction process of cast-in-situ bored pile
CN101899824A (en) * 2009-06-01 2010-12-01 王锦文 Method for building harbor wharf based on soft soil
WO2011023745A1 (en) * 2009-08-27 2011-03-03 Geosea Nv Method of installation of large diameter piles
KR20120012504A (en) * 2010-08-02 2012-02-10 김상훈 Cast in place concrete pile With precast type Caisson
CN102080364A (en) * 2010-12-17 2011-06-01 浙江海桐高新工程技术有限公司 Pile bearing caisson seawall and construction method thereof
CN202989857U (en) * 2012-12-19 2013-06-12 中交第三航务工程勘察设计院有限公司 Reinforced gravity type caisson wharf structure
CN206486871U (en) * 2017-02-24 2017-09-12 交通运输部水运科学研究所 A kind of soft base Gravity harf structure
CN108867547A (en) * 2018-08-19 2018-11-23 天津大学 The construction method of semi-circular caisson and pile foundation combined type breakwater
CN209636720U (en) * 2018-12-25 2019-11-15 广州粤科工程技术有限公司 A kind of Gravity Type Casisson Berth

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023020356A1 (en) * 2021-08-20 2023-02-23 中交四航局第二工程有限公司 Caisson quay and construction method therefor
CN116084421A (en) * 2023-03-07 2023-05-09 中交第一航务工程局有限公司 Construction method of permeable anti-collision pier

Similar Documents

Publication Publication Date Title
CN103510531B (en) A kind of split type open caisson staking Compound Anchorage basis and construction method thereof
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN102363961A (en) Deepwater single-wall steel plate pile cofferdam structure with low buried depth and construction method thereof
CN101457526A (en) Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method
CN108457282A (en) Deep water hard rock is without back cover steel sheet pile cofferdam construction method
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN103374900B (en) Build the gravity type quay on muddy foundation and construction method thereof
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN101949226B (en) Cross construction method for large pool body
CN105350526A (en) Method for setting up steel platform
KR20120012504A (en) Cast in place concrete pile With precast type Caisson
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN202401462U (en) Deep-water single-wall steel sheet pile cofferdam structure with small soil penetration depth
CN109555078A (en) A kind of Gravity Type Casisson Berth and its construction method
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
KR20120012503A (en) Reverse Circulation Drill Method With precast type Caisson and Jacket
CN202626934U (en) Gravity wharf built on silty foundation
CN104480945B (en) A kind of foundation ditch reversed construction method
CN104499489B (en) Foundation pit construction method
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN209636720U (en) A kind of Gravity Type Casisson Berth
CN106120853B (en) A kind of inverted construction method of frame bridge
CN201351279Y (en) Circular deep foundation pit support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination