CN209636720U - A kind of Gravity Type Casisson Berth - Google Patents

A kind of Gravity Type Casisson Berth Download PDF

Info

Publication number
CN209636720U
CN209636720U CN201822191700.XU CN201822191700U CN209636720U CN 209636720 U CN209636720 U CN 209636720U CN 201822191700 U CN201822191700 U CN 201822191700U CN 209636720 U CN209636720 U CN 209636720U
Authority
CN
China
Prior art keywords
caisson
positioning
bedding
gravity type
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822191700.XU
Other languages
Chinese (zh)
Inventor
李小明
何兴华
陈悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yue Ke Engineering Technology Co Ltd
Original Assignee
Guangzhou Yue Ke Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yue Ke Engineering Technology Co Ltd filed Critical Guangzhou Yue Ke Engineering Technology Co Ltd
Priority to CN201822191700.XU priority Critical patent/CN209636720U/en
Application granted granted Critical
Publication of CN209636720U publication Critical patent/CN209636720U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of Gravity Type Casisson Berth, which includes the bedding being laid on riverbed;The caisson being installed on the bedding;Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;Harbour superstructure is set to the top of the caisson and the backfill material;Several positioning bored concrete piles being fixed on riverbed;Wherein, the bottom of the caisson is equipped with positioning stake holes, and the positioning bored concrete pile passes through the bedding and is connected in the positioning stake holes, to position to the caisson.Caisson offset can be greatly reduced in the Gravity Type Casisson Berth of the utility model, and harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforce the structure safety of Gravity Type Casisson Berth.

Description

A kind of Gravity Type Casisson Berth
Technical field
The utility model relates to a kind of Gravity Type Casisson Berth manufacturing technology field more particularly to a kind of gravity caisson codes Head.
Background technique
As China's port construction develops, large-scale gravity type quay is built to obtain express delivery development, and Caisson type Structure is existing More generally existing one of form in modern China Entry Points for Ocean Shipping/Ocean Cargo.
Due to being in the biggish harbour water area of long-term stormy waves, harbour caisson can shift under the influence of stormy waves or unevenness Situations such as even sedimentation;And when harbour caisson generates and is significantly displaced and settles, the master of Gravity Type Casisson Berth can be seriously affected Body structure is using function and using safe.
Therefore, a kind of caisset and arrangement and method for construction that caisson offset and differential settlement can be greatly reduced is researched and developed, Harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforces the structure safety of Gravity Type Casisson Berth, becomes One of those skilled in the art's urgent problem to be solved.
Utility model content
The purpose of the utility model is to provide a kind of Gravity Type Casisson Berth, which can significantly subtract Few caisson offset, harbour maintenance input cost increases caused by reducing because of caisson displacement, reinforces the structure of Gravity Type Casisson Berth Safety.
To achieve the goals above, the technical solution of the utility model is:
A kind of Gravity Type Casisson Berth comprising: the bedding being laid on riverbed;The caisson being installed on the bedding; Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;Harbour superstructure, setting In the top of the caisson and the backfill material;Several positioning bored concrete piles being fixed on riverbed.
Wherein, the bottom of the caisson is equipped with positioning stake holes, and the positioning bored concrete pile is connected to described across the bedding It positions in stake holes, to be positioned to the caisson.
As a kind of specific embodiment, the bedding includes the foundation trench being arranged on riverbed, and is filled in the base Jackstone in slot.
As a kind of specific embodiment, the positioning bored concrete pile is made of steel reinforcement cage and concrete.
Further, the junction of the positioning bored concrete pile and the positioning stake holes, the bedding is consolidated by underwater grouting Fixed connection.
Compared with prior art, the utility model has following technical effect that
The Gravity Type Casisson Berth of the utility model, if being formed by constructing on the position that riverbed needs to install caisson Dry item positions bored concrete pile, and then again by excavating foundation trench, backfilling jackstone in foundation trench to form bedding, and in preset caisson Positioning stake holes is formed in the bottom of caisson, then when being placed on caisson on bedding, by making positioning stake holes be connected to positioning perfusion In stake, then carry out inside caisson backfill construction and subsequent operation that harbour is built;It is fixed to be positioned such that bored concrete pile can play Position caisson and the effect for reinforcing caisson, avoid caisson from shifting under the impact of water flow.
In order to better understand and implement, according to the present invention will be described in detail below with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the Gravity Type Casisson Berth of the utility model;
Fig. 2 is the enlarged drawing in Fig. 1 at A.
Specific embodiment
Embodiment 1
Referring to Fig. 1, a kind of Gravity Type Casisson Berth comprising the bedding 3 that is laid on riverbed 1 is installed on the base The backfill material 5 of caisson 4, the position being filled between the inner cavity and the caisson 4 and river levee 2 of the caisson 4 on bed 3, with And it is set to the harbour superstructure 6 of the top of the caisson 4 and the backfill material 5;Several positioning are further fixed on riverbed 1 to fill Infuse stake 7.
Wherein, the bottom of the caisson 4 is equipped with positioning stake holes 401, and the positioning bored concrete pile 7 is connected across the bedding 3 In in the positioning stake holes 401, to be positioned to the caisson 4.
Specifically, the bedding 3 includes the foundation trench 301 being arranged on riverbed, and the throwing being filled in the foundation trench 301 Stone 302.
Specifically, the positioning bored concrete pile 7 is made of steel reinforcement cage and concrete.
Preferably, the junction of the positioning bored concrete pile 7 and the positioning stake holes 401, the bedding 3 passes through underwater grouting Reinforce connection.
The Gravity Type Casisson Berth of the utility model, if being formed by constructing on the position that riverbed needs to install caisson Dry item positions bored concrete pile, and then again by excavating foundation trench, backfilling jackstone in foundation trench to form bedding, and in preset caisson Positioning stake holes is formed in the bottom of caisson, then when being placed on caisson on bedding, by making positioning stake holes be connected to positioning perfusion In stake, then carry out inside caisson backfill construction and subsequent operation that harbour is built;It is fixed to be positioned such that bored concrete pile can play Position caisson and the effect for reinforcing caisson, avoid caisson from shifting under the impact of water flow.
Further, the utility model is after the completion of the positioning stake holes of caisson bottom is connect with positioning bored concrete pile, to described The gap positioned between the gap between bored concrete pile and the bedding, the positioning bored concrete pile and the positioning stake holes carries out under water Consolidation by grouting makes caisson, bedding and positioning bored concrete pile form an entirety, it is ensured that caisson, positioning bored concrete pile and bedding connection are tight It is close.
The utility model is not limited to above embodiment, if the various changes or deformation to the utility model do not take off Spirit and scope from the utility model, if these changes and deformation belong to the claims and equivalents of the utility model Within the scope of, then the utility model is also intended to encompass these changes and deformation.

Claims (4)

1. a kind of Gravity Type Casisson Berth characterized by comprising
The bedding being laid on riverbed;
The caisson being installed on the bedding;
Backfill material, is filled in the position between the inner cavity and the caisson and river levee of the caisson;
Harbour superstructure is set to the top of the caisson and the backfill material;
Several positioning bored concrete piles being fixed on riverbed;Wherein, the bottom of the caisson is equipped with positioning stake holes, the positioning perfusion Stake passes through the bedding and is connected in the positioning stake holes, to position to the caisson.
2. Gravity Type Casisson Berth according to claim 1, it is characterised in that:
The bedding includes the foundation trench being arranged on riverbed, and the jackstone being filled in the foundation trench.
3. Gravity Type Casisson Berth according to claim 1, it is characterised in that:
The positioning bored concrete pile is made of steel reinforcement cage and concrete.
4. Gravity Type Casisson Berth according to claim 1-3, it is characterised in that:
The positioning bored concrete pile is fixedly connected with the junction of the positioning stake holes, the bedding by underwater grouting.
CN201822191700.XU 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth Active CN209636720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822191700.XU CN209636720U (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822191700.XU CN209636720U (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth

Publications (1)

Publication Number Publication Date
CN209636720U true CN209636720U (en) 2019-11-15

Family

ID=68475308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822191700.XU Active CN209636720U (en) 2018-12-25 2018-12-25 A kind of Gravity Type Casisson Berth

Country Status (1)

Country Link
CN (1) CN209636720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555078A (en) * 2018-12-25 2019-04-02 广州粤科工程技术有限公司 A kind of Gravity Type Casisson Berth and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555078A (en) * 2018-12-25 2019-04-02 广州粤科工程技术有限公司 A kind of Gravity Type Casisson Berth and its construction method

Similar Documents

Publication Publication Date Title
CN205000355U (en) Box gravity type marine wind power foundation structure
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN105220703B (en) Enclosing type deepwater platform construction method based on condition of sand backfilling balance method
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN1952273A (en) Digging foundation with baffle and its construction method
CN103374900B (en) Build the gravity type quay on muddy foundation and construction method thereof
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN209636720U (en) A kind of Gravity Type Casisson Berth
CN109555078A (en) A kind of Gravity Type Casisson Berth and its construction method
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN103343534A (en) Closed precipitation method for foundation pit construction
CN202626934U (en) Gravity wharf built on silty foundation
CN101705668B (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN104499489A (en) Foundation pit construction method
CN101285302A (en) Method for reinforcing caisson of concrete dam
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
CN202359565U (en) Steel sheet pile cofferdam structure
CN102535457B (en) Method for treating slurry leakage of perforated holes of offshore pile foundation in process of utilizing steel casing to carry out pile foundation construction
CN110644511B (en) Treatment method for massive water burst and sand gushing of karst foundation underwater bearing platform foundation pit
CN206512748U (en) Immersed tube sinking and locking backfill integrated ship
CN204435321U (en) A kind of steam power station water intaking open channel
CN210827422U (en) Peripheral shallow structure foundation reinforced structure that buries of deep basal pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant