CN203741996U - Beam column node for foundation pit project adopting top-down excavation method - Google Patents

Beam column node for foundation pit project adopting top-down excavation method Download PDF

Info

Publication number
CN203741996U
CN203741996U CN201320833165.8U CN201320833165U CN203741996U CN 203741996 U CN203741996 U CN 203741996U CN 201320833165 U CN201320833165 U CN 201320833165U CN 203741996 U CN203741996 U CN 203741996U
Authority
CN
China
Prior art keywords
column node
plate
beam main
foundation pit
main tendon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320833165.8U
Other languages
Chinese (zh)
Inventor
刘若彪
翁其平
王卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201320833165.8U priority Critical patent/CN203741996U/en
Application granted granted Critical
Publication of CN203741996U publication Critical patent/CN203741996U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a beam column node for a foundation pit project adopting a top-down excavation method, and belongs to the field of construction projects. The beam column node adopts a technical scheme as follows: after a foundation pit is dig below a structural beam bottom elevation, a steel ring board is welded outside a steel tube concrete column at an elevation position corresponding to a structural beam main rib; the width of the steel ring board meets the welding requirement of the structural beam main rib; the thickness of the steel ring board meets the force transmission requirement of the structural beam main rib. The structural beam main rib transmits the force to the adjacent crossed structural beam main rib via the steel ring board. According to the beam column node, the connection and force transmission of a structural beam reinforcing steel bar at the position of a beam column node in the foundation pit project adopting the top-down excavation method are successfully realized, and the difficulty of the crossing of the beam column node reinforcing steel bar, which puzzles technical personnel in the field for a long term, is solved.

Description

A kind of for base pit engineering of topdown construction method beam-column node
Technical field
The utility model belongs to fixed buildings bean column node structure, can be widely used in adopting in the base pit engineering of contrary sequence method enforcement.
Background technology
A kind of construction that contrary sequence method combines with supporting and protection structure as agent structure comprehensively, outer wall of basement combines with retaining wall, and horizontal structure member combines with horizontal struts system, and vertical structure member combines with interim column system.Contrary sequence method has synchronous construction saving major project duration, support stiffness up and down by means of it and can strictly control greatly foundation pit deformation protection of the environment, utilize agent structure can save the advantages such as construction costs as supporting; become a large hot technology of base pit engineering circle, and require to get a lot of applications in high narrow city in inner city, particularly environment sensitive, protection.
In base pit engineering of topdown construction method, vertical support system all adopts the form of steel post in conjunction with stand column pile.According to the technological requirement of contrary sequence method foundation ditch, vertical support system need be complete at ground construction before excavation of foundation pit.Therefore, basement horizontal structure is contrary does the stage, the problem that inevitably exists structural beams reinforcing bar to pass through steel post, and this problem is also a general character difficult problem in top-down method construction process.Along with accumulation and the summary of a large amount of contrary working method engineering designs and construction experience, the contrary processing method of making stage bean column node is also enriched gradually and is ripe.
The connection structure of steel post and structural beams depends on the form of column.In conventional contrary working method engineering, the most common steel post is mainly angle steel lattice column and steel core concrete column.For angle steel lattice column, common beam-column connection has boring reinforcing bar connection method, power transmission steel plate method and beam side haunch method etc.For steel core concrete column, because its cross section is real abdomen formula, the beam main tendon within its planar range all cannot pass through, and compares angle steel lattice column, and its bean column node intractability is larger.At present, common steel core concrete column bean column node processing method has twin beams node, ring beam joint etc., but two kinds of methods all have certain drawback and limitation.For example, twin beams node is only applicable to twin-spar construction system, if basement horizontal structure adopts the beam and slab structure system of single-beam, needs to readjust structure stress system, and structure design work significantly increases; Ring beam joint complex forms, difficulty of construction is higher, higher for the construction technical requirement of unit in charge of construction.
Utility model content
Technical problem to be solved in the utility model has been to provide a kind of for base pit engineering of topdown construction method beam-column node.Adopt this node, solved bean column node position reinforcing bar completely and connected the large problem of difficulty, widened the thinking of beam-column node structure beam steel connected mode, and this node has, and power transmission is clear and definite, the superiority easily of constructing.
For solving the contrary problem that stage structures beam is connected with steel core concrete column of doing, basic scheme of the present utility model is: be connected with steel core concrete column against making stage structures beam, after the extremely described structure bottom elevation of excavation of foundation pit below, in described steel core concrete column outside, the absolute altitude position weldable steel ring flat-plate corresponding with structure beam main tendon, described steel loop plate width meets the welding requirements of described structure beam main tendon, and described steel loop plate thickness need meet described structure beam main tendon power transmission requirement.
Excavation of foundation pit is to structure bottom elevation below, in steel core concrete column outside, the absolute altitude position weldable steel ring flat-plate corresponding with structure beam main tendon, steel loop plate width meets the welding requirements of described structure beam main tendon, and steel loop plate thickness need meet structure beam main tendon power transmission requirement.Structure beam main tendon by described steel loop plate by power pass to adjacent across structure beam main tendon.
?as optimization, in such scheme, if steel loop plate restricted width, can be in structural beams wide region local widening, to meet the welding requirements of structure beam main tendon.In addition, can be according to structure stress needs, between upper and lower steel loop plate, vertical interval arranges stiffening rib.
Based on above-mentioned feature, if main muscle row is greater than a row at the bottom of bean column node positional structure back, can be on the plate face of steel loop plate vertical welding reinforcing bar junction plate, structure beam main tendon is welded on the vertical side of reinforcing bar junction plate.
Based on above-mentioned feature, if bean column node position root beam is the side bar that soil outlet or structure punch, for meeting horizontal force requirement, need be according to calculating and setting lateral longitudinal muscle, now can between upper and lower steel loop plate, weld lateral longitudinal muscle junction plate, lateral longitudinal muscle is welded in the side of lateral longitudinal muscle junction plate.
Above-mentioned node has successfully been realized contrary connection and the power transmission of making base pit engineering beam-column node location structural beams reinforcing bar, has solved the difficult problem that long-term puzzlement those skilled in the art's bean column node reinforcing bar passes through.
Brief description of the drawings
Below in conjunction with accompanying drawing and example and application construction method, the utility model will be further described.
Fig. 1 is longitudinal plan of the present utility model.
Fig. 2 is drawing in side sectional elevation of the present utility model.
Fig. 3 is the longitudinal plan that reinforcing bar junction plate is set on the utility model steel loop plate.
Fig. 4 is the drawing in side sectional elevation that reinforcing bar junction plate is set on the utility model steel loop plate.
Fig. 5 is the longitudinal plan that lateral longitudinal muscle junction plate is set between the utility model steel loop plate.
Fig. 6 is the drawing in side sectional elevation that lateral longitudinal muscle junction plate is set between the utility model steel loop plate.
Detailed description of the invention
Taking circular steel tube concrete post as example, other forms of steel post all can be implemented with reference to this node.
As depicted in figs. 1 and 2, excavation of foundation pit to contrary make horizontal structure bottom elevation after, at the corresponding absolute altitude weldable steel of steel core concrete column 1 outboard structure beam main tendon 2 ring flat-plate 3, and at vertical interval, stiffening rib 4 is set, described steel loop plate 3 width meet the welding requirements of structure beam main tendon, if described steel loop plate 1 restricted width, can be in structural beams 5 width ranges local widening, described steel loop plate 3 thickness need meet the power transmission requirement of structure beam main tendon 2.After described steel loop plate 3 and stiffening rib 4 have welded, structure beam main tendon 2 is welded on steel loop plate 3, structure beam main tendon 2 can by steel loop plate 3 by power pass to adjacent across structure beam main tendon 2, efficiently solve the difficult problem that bean column node reinforcing bar passes through.Diagram is only signal, and stiffening rib 4 can be selected arrange or do not arrange according to actual loading situation.
In above-mentioned nodal basis, as shown in Figure 3 and Figure 4, structure beam main tendon 2 rows are during more than a row, can be on described steel loop plate 3 welded reinforcement junction plate 6, up-down structure beam main tendon 2 and the described reinforcing bar junction plate 6 of structural beams weld.
In above-mentioned nodal basis, as shown in Figure 5 and Figure 6, while being provided with lateral longitudinal muscle 7 within the scope of structural beams 5 deck-moldings, can between steel loop plate 3, weld lateral longitudinal muscle junction plates 8 by structural beams lateral longitudinal muscle 7 correspondence positions, lateral longitudinal muscle 7 can be welded in the side of lateral longitudinal muscle junction plate 8.
The scheme above the utility model example being provided is introduced in detail, for one of ordinary skill in the art, according to the thought of the utility model embodiment, all will change in specific embodiments and applications.In sum, this description should not be construed as restriction of the present utility model, and all any changes of making according to the utility model design philosophy are all within protection domain of the present utility model.

Claims (3)

1. one kind for base pit engineering of topdown construction method beam-column node, be connected with steel core concrete column (1) against making stage structures beam (5), it is characterized in that: excavation of foundation pit is to after described structural beams (5) end absolute altitude below, in described steel core concrete column (1) outside, the absolute altitude position weldable steel ring flat-plate (3) corresponding with structure beam main tendon (2), described steel loop plate (3) width meets described structure beam main tendon (2) welding requirements, and described steel loop plate (3) thickness need meet described structure beam main tendon (2) power transmission requirement.
2. one according to claim 1 is for base pit engineering of topdown construction method beam-column node, it is characterized in that: described structure beam main tendon (2) row is during more than a row, vertical welding reinforcing bar junction plate (6) on the plate face of described steel loop plate (3), described structure beam main tendon (2) is in the vertical side welding of described reinforcing bar junction plate (6).
3. one according to claim 1 is for base pit engineering of topdown construction method beam-column node, it is characterized in that: within the scope of described structural beams (5) deck-molding, be provided with lateral longitudinal muscle (7), lateral longitudinal muscle junction plate (8) is welded between upper and lower described steel loop plate (3), and described lateral longitudinal muscle (7) is welded in the side of described lateral longitudinal muscle junction plate (8).
CN201320833165.8U 2013-12-18 2013-12-18 Beam column node for foundation pit project adopting top-down excavation method Expired - Lifetime CN203741996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320833165.8U CN203741996U (en) 2013-12-18 2013-12-18 Beam column node for foundation pit project adopting top-down excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320833165.8U CN203741996U (en) 2013-12-18 2013-12-18 Beam column node for foundation pit project adopting top-down excavation method

Publications (1)

Publication Number Publication Date
CN203741996U true CN203741996U (en) 2014-07-30

Family

ID=51341815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320833165.8U Expired - Lifetime CN203741996U (en) 2013-12-18 2013-12-18 Beam column node for foundation pit project adopting top-down excavation method

Country Status (1)

Country Link
CN (1) CN203741996U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628572A (en) * 2013-12-18 2014-03-12 华东建筑设计研究院有限公司 Project beam-column joint for reverse building method
CN105649217A (en) * 2015-12-31 2016-06-08 上海建工建集团有限公司 Profiled steel structure beam column joint for reverse construction of stiffened structure and construction method
CN105908755A (en) * 2016-05-31 2016-08-31 中铁第四勘察设计院集团有限公司 Deep foundation pit supporting structure adopting steel pipe temporary strut
CN107829434A (en) * 2017-12-05 2018-03-23 华东建筑设计研究院有限公司 It is a kind of to be used for steel lattice column and the inverse shearing resistance construction made concrete structural beams and be connected
CN111305221A (en) * 2019-12-09 2020-06-19 中建四局土木工程有限公司 Method for replacing inner support of foundation pit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628572A (en) * 2013-12-18 2014-03-12 华东建筑设计研究院有限公司 Project beam-column joint for reverse building method
CN105649217A (en) * 2015-12-31 2016-06-08 上海建工建集团有限公司 Profiled steel structure beam column joint for reverse construction of stiffened structure and construction method
CN105908755A (en) * 2016-05-31 2016-08-31 中铁第四勘察设计院集团有限公司 Deep foundation pit supporting structure adopting steel pipe temporary strut
CN107829434A (en) * 2017-12-05 2018-03-23 华东建筑设计研究院有限公司 It is a kind of to be used for steel lattice column and the inverse shearing resistance construction made concrete structural beams and be connected
CN111305221A (en) * 2019-12-09 2020-06-19 中建四局土木工程有限公司 Method for replacing inner support of foundation pit
CN111305221B (en) * 2019-12-09 2022-05-17 中建四局土木工程有限公司 Method for replacing inner support of foundation pit

Similar Documents

Publication Publication Date Title
CN103628572A (en) Project beam-column joint for reverse building method
CN203741996U (en) Beam column node for foundation pit project adopting top-down excavation method
KR101329440B1 (en) Steel pipe strut having an enclosure connector
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN109723085B (en) Deep foundation pit division construction rib wall support replacing structure and construction method thereof
KR101179770B1 (en) Soil protection against build structure and the method
CN109505609B (en) Bracket-free construction method for underground comprehensive pipe rack of shallow-buried underground excavation city and comprehensive pipe rack
CN105155549A (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
CN204738302U (en) Multi -storey frame formula double row pile supporting construction
CN205205833U (en) Soil nail and stock combined type double row pile underground structure
CN105113514B (en) Foundation pit enclosure system with underground continuous wall as vertical cantilever fulcrum and construction method
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN202627000U (en) Anchor-pulling type foundation pit supporting structure with double rows of piles
CN103397704B (en) A kind of concrete filled steel tube coupled column-reinforced beam connects node
CN108979663B (en) Subway station main body structure construction method adopting temporary middle column support
CN104631469A (en) Astylar reinforced concrete supporting framework for deep and big foundation pit and building method thereof
CN107476810B (en) Back wall structure of pushing device
CN203654470U (en) Top-down method top plate beam column joint structure
CN105002930A (en) Beam column joint structure constructed through steel annular plate and method of beam column joint structure
CN112281861A (en) Support system for transfer node of urban rail transit transfer station and construction method
CN204825945U (en) A fixture for fixing buried bolt in advance
CN204825919U (en) Strut foundation ditch and enclose purlin structure of shearing
CN103924981A (en) Single-arch large-span shallow-buried excavation tunnel reinforcing system and construction method thereof
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140730

CX01 Expiry of patent term