CN107700503B - A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam - Google Patents

A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam Download PDF

Info

Publication number
CN107700503B
CN107700503B CN201710639810.5A CN201710639810A CN107700503B CN 107700503 B CN107700503 B CN 107700503B CN 201710639810 A CN201710639810 A CN 201710639810A CN 107700503 B CN107700503 B CN 107700503B
Authority
CN
China
Prior art keywords
sandbag
dry packet
sand
construction
cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710639810.5A
Other languages
Chinese (zh)
Other versions
CN107700503A (en
Inventor
殷立中
孙德中
吴永彬
岳吉双
宋俊强
冯晨
刘�文
赵子鉴
冷文厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201710639810.5A priority Critical patent/CN107700503B/en
Publication of CN107700503A publication Critical patent/CN107700503A/en
Application granted granted Critical
Publication of CN107700503B publication Critical patent/CN107700503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

, construction survey and setting-out, the processing of geotextile bag body the present invention relates to a kind of dry packet sandbag construction methods based on hydraulic reclamation reef sand cofferdam, characterized by the following steps: (1);(2), foundation trench excavates;(3), geotextile is laid with bag body;(4), cofferdam bag body is constructed, the dry packet sandbag filling of bottom, the dry packet sandbag filling in middle layer, the dry packet sandbag filling in upper layer;(5), after the completion of the body of weir, protection geotextiles is laid with and is laid with sun-proof geotextiles in time after the completion of the bath of top layer sand pocket is closely knit, wraps up entire sand pocket cofferdam.The present invention solves the problems, such as to gather materials on the spot in material shortage, the transportation cost regional hydraulic reclamation cofferdam construction such as higher, easy for construction, it is loose to packing material Particle size requirements, cofferdam can be quickly formed, the advantages that greatly reducing construction cost, accelerate construction speed.The method sufficiently demonstrates its exploitativeness and economical by engineering construction example.

Description

A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam
Technical field
The invention belongs to dredging and reclamation cofferdam construction technical fields, more particularly to a kind of dry based on hydraulic reclamation reef sand cofferdam Packet sandbag construction method.
Background technique
In some special regions, engineering material extremely lacks, and transportation cost is higher.Using well-known technique and traditional construction Technique, not only construction cost is higher, and material supply is also difficult to ensure construction needs.The present invention takes full advantage of the hydraulic reclamation of dredger Main material of the material as engineering, had both met the needs of construction, ensure that construction speed, and engineering cost is greatly saved.
Summary of the invention
The present invention provides one kind to solve technical problem present in well-known technique, and cost is relatively low, simple process, construction Fast, strong operability, solve the problems, such as the regional hydraulic reclamation cofferdam construction such as poor, transport difficult of material based on hydraulic reclamation The dry packet sandbag construction method in reef sand cofferdam.
The technical scheme adopted by the present invention to solve the technical problems existing in the known art is that
A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam, characterized by the following steps: (1), apply Work measurement and setting-out, the processing of geotextile bag body, go out axis and set steel on the face Yuan Jiao 1 before constructing using measuring instrument measuring Pipe is identified, and is suitably encrypted in arc section and dog-ear section;Geotextiles are cut by geotextile bag body computational length Several, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, it sews up into needed for cloth bag Width;
(2), foundation trench excavates: hydraulic reclamation was taken at the land stage and first blew back wall early period, was directly filled out backfill reef sand blast by dredger To cofferdam construction region, foundation trench is dug on the spot with excavator, foundation trench width determines that grooving length is bigger by the dry packet sandbag width of bottom In cofferdam construction length, foundation trench excavates the nearest other side of reef sand in foundation trench two sides, use when backfilling;
It after land-based area takes on a certain scale, takes and first encloses after-blow, soil construction is first returned with dump truck by hydraulic reclamation region It fills out to form work surface, backfill section width is determined according to builder's road and weir bottom width degree;
(3), geotextile is laid with bag body, and the bottom of the dry packet sandbag body of bottom is fixed using the steel pipe set in advance;
(4), cofferdam bag body is constructed, the dry packet sandbag filling of bottom: surveying and locating first, using steel pipe the dry packet sandbag of bottom The bottom of body is fixed, and then in excavator back-up sand to the dry packet sandbag body of bottom, bottom is done with portable sewing machine after sand is full Packet sandbag body is sewed it up, and is finally washed by water closely knit;When thickness is insufficient or local eminence, artificial stop-off high-pressure water pipe should be flattened or used in time Water-filling leveling;
The dry packet sandbag filling in middle layer: the dry packet sandbag in middle layer is laid with above the dry packet sandbag body of bottom;Equally, excavator is utilized In back-up sand to the dry packet sandbag body in middle layer, the dry packet sandbag body in middle layer is sewed it up with portable sewing machine after sand is full, is finally washed by water close It is real;It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when thickness is insufficient or local eminence;
The dry packet sandbag filling in upper layer: the dry packet sandbag in upper layer is laid with above the dry packet sandbag body in middle layer;Equally, it is filled out using excavator In sand to the dry packet sandbag body in upper layer, the dry packet sandbag body in upper layer is sewed it up with portable sewing machine after sand is full, is finally washed by water closely knit; It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when thickness is insufficient or local eminence;
(5), after the completion of the body of weir, protection geotextiles is laid with and are laid with sun-proof geotechnique in time after the completion of the bath of top layer sand pocket is closely knit Cloth wraps up entire sand pocket cofferdam.
The advantages and positive effects of the present invention are: the present invention efficiently solve it is higher in material shortage, transportation cost Deng the problem of regional hydraulic reclamation cofferdam construction, can gather materials on the spot, it is easy for construction, it is loose to packing material Particle size requirements, it can quick shape At cofferdam, the advantages that greatly reducing construction cost, accelerate construction speed.The method is sufficiently demonstrated by engineering construction example Its exploitativeness and economical.
Detailed description of the invention
Fig. 1, backfill work surface schematic diagram;
Fig. 2, foundation trench excavated section schematic diagram;
Fig. 3, dry packet sandbag cofferdam schematic diagram;
In figure: 1, the face Yuan Jiao;2, reef sand is backfilled;3, foundation trench excavates reef sand;4, foundation trench;5, the dry packet sandbag of bottom;6, middle layer Dry packet sandbag;7, the dry packet sandbag in upper layer;8, geotextiles are protected.
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and cooperate attached drawing Detailed description are as follows:
It please refers to Fig.1 to Fig.3, a kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam includes the following steps: (1), construction survey and setting-out, the processing of geotextile bag body, go out axis and on the face Yuan Jiao 1 using measuring instrument measuring before constructing It sets steel pipe to be identified, suitably be encrypted in arc section and dog-ear section;Geotextiles are pressed into geotextile bag body computational length Several are cut into, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, sews up into cloth bag Required width;
(2), foundation trench excavates: hydraulic reclamation was taken at the land stage and first blew back wall early period, was directly blown backfill reef sand 2 by dredger It is filled to cofferdam construction region, digs foundation trench 4 on the spot with excavator, foundation trench width is determined by the dry packet sandbag width of bottom, grooving length Slightly larger than cofferdam construction length, foundation trench excavates the nearest other side of reef sand 3 in foundation trench two sides, use when backfilling;
It after land-based area takes on a certain scale, takes and first encloses after-blow, soil construction is first returned with dump truck by hydraulic reclamation region It fills out to form work surface, backfill section width is determined according to builder's road and weir bottom width degree;
(3), geotextile is laid with bag body, and the bottom of the dry packet sandbag body of bottom is fixed using the steel pipe set in advance;
(4), cofferdam bag body is constructed: the dry packet sandbag filling of bottom: surveying and locating first, using steel pipe the dry packet sandbag of bottom The bottom of body 6 is fixed, and then in excavator back-up sand to the dry packet sandbag body of bottom, bottom is done with portable sewing machine after sand is full Packet sandbag body is sewed it up, and is finally washed by water closely knit;When thickness is insufficient or local eminence, artificial stop-off high-pressure water pipe should be flattened or used in time Water-filling leveling;
The dry packet sandbag filling in middle layer: the dry packet sandbag in middle layer is laid with above the dry packet sandbag body of bottom;Equally, excavator is utilized In back-up sand to the dry packet sandbag body 7 in middle layer, the dry packet sandbag body in middle layer is sewed it up with portable sewing machine after sand is full, is finally washed by water close It is real;It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when thickness is insufficient or local eminence;
The dry packet sandbag filling in upper layer: the dry packet sandbag in upper layer is laid with above the dry packet sandbag body in middle layer;Equally, it is filled out using excavator In sand to the dry packet sandbag body 8 in upper layer, the dry packet sandbag body in upper layer is sewed it up with portable sewing machine after sand is full, is finally washed by water close It is real;It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when thickness is insufficient or local eminence;
(5), after the completion of the body of weir, protection geotextiles is laid with and are laid with sun-proof geotechnique in time after the completion of the bath of top layer sand pocket is closely knit Cloth wraps up entire sand pocket cofferdam.
In conclusion this construction method simple process, easy for construction, efficiently solve material shortage, transportation cost compared with The problem of high area hydraulic reclamation cofferdam construction, can gather materials on the spot, loose to packing material Particle size requirements, can quickly form cofferdam, The advantages that greatly reducing construction cost, accelerating construction speed.The method is sufficiently demonstrated implementable by engineering construction example Property and economical.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to In the range of technical solution of the present invention.

Claims (1)

1. a kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam, characterized by the following steps:
(1), construction survey and setting-out, the processing of geotextile bag body, go out axis and in Yuan Jiao using measuring instrument measuring before constructing Steel pipe is set on face (1) to be identified, and is suitably encrypted in arc section and dog-ear section;By geotextiles based on geotextile bag body It calculates length and is cut into several, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, sew up At width needed for cloth bag;
(2), foundation trench excavates: hydraulic reclamation was taken at the land stage and first blew back wall early period, is directly filled to backfill reef sand blast by dredger and encloses Weir construction area digs foundation trench with excavator on the spot, and foundation trench width is determined by the dry packet sandbag width of bottom, and grooving length, which is slightly larger than, encloses Weir construction length, foundation trench excavate the nearest other side of reef sand in foundation trench two sides, use when backfilling;
It after land-based area takes on a certain scale, takes and first encloses after-blow, soil construction first backfills shape with dump truck by hydraulic reclamation region At work surface, backfills section width and determined according to builder's road and weir bottom width degree;
(3), geotextile is laid with bag body, and the bottom of the dry packet sandbag body of bottom is fixed using the steel pipe set in advance;
(4), cofferdam bag body is constructed, the dry packet sandbag filling of bottom: surveying and locating first, using steel pipe the dry packet sandbag body of bottom Bottom is fixed, and then in excavator back-up sand to the dry packet sandbag body of bottom, bottom is done Bao Sha with portable sewing machine after sand is full Bag body is sewed it up, and is finally washed by water closely knit;It, should artificial stop-off leveling in time or with high-pressure water pipe water-filling when thickness is insufficient or local eminence Leveling;
The dry packet sandbag filling in middle layer: the dry packet sandbag in middle layer is laid with above the dry packet sandbag body of bottom;Equally, excavator back-up sand is utilized To the dry packet sandbag body in middle layer, the dry packet sandbag body in middle layer is sewed it up with portable sewing machine after sand is full, is finally washed by water closely knit;It is thick It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when degree is insufficient or local eminence;
The dry packet sandbag filling in upper layer: the dry packet sandbag in upper layer is laid with above the dry packet sandbag body in middle layer;Equally, extremely using excavator back-up sand In the dry packet sandbag body in upper layer, the dry packet sandbag body in upper layer is sewed it up with portable sewing machine after sand is full, is finally washed by water closely knit;Thickness It, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling when insufficient or local eminence;
(5), after the completion of the body of weir, protection geotextiles is laid with and are laid with sun-proof geotextiles in time after the completion of the bath of top layer sand pocket is closely knit, Wrap up entire sand pocket cofferdam.
CN201710639810.5A 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam Active CN107700503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710639810.5A CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710639810.5A CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Publications (2)

Publication Number Publication Date
CN107700503A CN107700503A (en) 2018-02-16
CN107700503B true CN107700503B (en) 2019-07-09

Family

ID=61170794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710639810.5A Active CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Country Status (1)

Country Link
CN (1) CN107700503B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625417A (en) * 2018-05-22 2018-10-09 四川城凯特建设工程有限公司 A kind of channel cleanout method and its device
CN110284393A (en) * 2019-06-28 2019-09-27 中国二十冶集团有限公司 The method of peat soil soft base build sidewalk
CN110924364A (en) * 2019-12-10 2020-03-27 安庆市水利水电规划设计院 River-blocking weir gate anti-impact deep tooth wall and construction method thereof
CN112900357A (en) * 2021-03-03 2021-06-04 中交上海航道勘察设计研究院有限公司 Degradable geotextile filling bag

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256588A (en) * 1998-03-12 1999-09-21 Kajima Corp Underwater strut constructing method
CN201891104U (en) * 2010-11-11 2011-07-06 上海勘测设计研究院 Combination bag outer prism structure for tidal flat reclamation
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256588A (en) * 1998-03-12 1999-09-21 Kajima Corp Underwater strut constructing method
CN201891104U (en) * 2010-11-11 2011-07-06 上海勘测设计研究院 Combination bag outer prism structure for tidal flat reclamation
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel

Also Published As

Publication number Publication date
CN107700503A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN107700503B (en) A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
CN103225267B (en) Construction method of deep and thick soft soil foundation bed bridge abutment
CN2911010Y (en) Fast reinforcing apparatus for blowing-filling sludge ground
CN107254878B (en) A kind of excavation method of hydroelectric project dam abutment high gradient slope control dust
CN203668885U (en) Novel hydraulic reclamation mould bag
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN105781556A (en) Construction method for shield to penetrate through shallow-covered urban landscape lake downwards
CN103255762B (en) Method of leading Yellow River silt to fill reclamation coal mining subsidence land
CN107859062A (en) The earth-filling method of underground pipe gallery
CN104652409B (en) A kind of forced-ventilated water continuously combines the close soft foundation processing technology method of rammer
CN107816050A (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam and its construction method
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
US2757514A (en) Method of forming an impermeable wall in the terrain
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN106884427A (en) Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN107190709B (en) Method for building river channel in newly dredged soil reclamation land-enclosed area
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN106761914B (en) A kind of routed water water damage prevention and controls of shallow buried coal seam mine raceway groove flood
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN103422467B (en) Mucky soil filling bag embankment method
CN106120827A (en) Freeze to make end water-bound and method inside a kind of sensitizing range, city tunneling foundation ditch
CN107859040A (en) A kind of excavation method of foundation ditch large area soft soil horizon
CN111197300B (en) Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN102182867B (en) Method for laying ore pulp pipelines in quicksand bed section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant