CN107700503A - A kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam - Google Patents

A kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam Download PDF

Info

Publication number
CN107700503A
CN107700503A CN201710639810.5A CN201710639810A CN107700503A CN 107700503 A CN107700503 A CN 107700503A CN 201710639810 A CN201710639810 A CN 201710639810A CN 107700503 A CN107700503 A CN 107700503A
Authority
CN
China
Prior art keywords
sand
dry
bag
construction
bag body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710639810.5A
Other languages
Chinese (zh)
Other versions
CN107700503B (en
Inventor
殷立中
孙德中
吴永彬
岳吉双
宋俊强
冯晨
刘�文
赵子鉴
冷文厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201710639810.5A priority Critical patent/CN107700503B/en
Publication of CN107700503A publication Critical patent/CN107700503A/en
Application granted granted Critical
Publication of CN107700503B publication Critical patent/CN107700503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam, it is characterised in that:Comprise the following steps:(1), construction survey and setting-out, the processing of geotextile bag body;(2), foundation trench excavates;(3), geotextile laying bag body;(4), cofferdam bag body construction, the dry bag sandbag filling of bottom, the dry bag sandbag filling in middle level, the dry bag sandbag filling in upper strata;(5), after the completion of the body of weir, laying protection geotextiles, after the completion of the bath of top layer sand pocket is closely knit, sun-proof geotextiles are laid in time, wrap up whole sand pocket cofferdam.The present invention efficiently solves the problem in the regional hydraulic reclamation cofferdam construction such as material shortage, cost of transportation be higher, can gather materials on the spot, easy for construction, it is loose to packing material Particle size requirements, cofferdam can be quickly formed, greatly reduces construction cost, the advantages that accelerating construction speed.The method fully demonstrates its exploitativeness and economical by engineering construction example.

Description

A kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam
Technical field
The invention belongs to dredging and reclamation cofferdam construction technical field, more particularly to a kind of dry based on hydraulic reclamation reef sand cofferdam Bag sandbag construction method.
Background technology
In some special regions, engineering material extremely lacks, and cost of transportation is higher.Using known technology and traditional construction Technique, not only construction cost is higher, and material supply is also difficult to ensure construction needs.The present invention takes full advantage of the hydraulic reclamation of dredger Main material of the material as engineering, had both met the needs of construction, ensure that construction speed, greatlys save engineering cost again.
The content of the invention
The present invention constructs to solve a kind of relatively low, the simple process that provides cost of technical problem present in known technology Fast, it is workable, efficiently solve the hydraulic reclamation cofferdam construction in the area such as poor, transport difficult of material problem based on blowing Fill out the dry bag sandbag construction method in reef sand cofferdam.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
A kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam, it is characterised in that:Comprise the following steps:(1), apply Work measures and setting-out, the processing of geotextile bag body, goes out axis using measuring instrument measuring before constructing and sets steel on Yuan Jiao faces 1 Pipe is identified, and is suitably encrypted in arc section and knuckle section;Geotextiles are cut into by geotextile bag body computational length Several, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, sew up into needed for cloth bag Width;
(2), foundation trench excavates:Hydraulic reclamation was taken into the land stage and first blew back wall, directly filled out backfill reef sand blast by dredger early stage To cofferdam construction region, foundation trench is dug on the spot with excavator, foundation trench width determines that grooving length is bigger by the dry burnt-in sand bag width of bottom In cofferdam construction length, foundation trench excavates reef sand, and other side in foundation trench both sides, uses when backfilling nearby;
After land-based area takes on a certain scale, take and first enclose after-blow, first returned with the dump truck work of falling soil application by hydraulic reclamation region Fill out to form the scope of operation, backfill section width determines according to builder's road and weir bottom width degree;
(3), geotextile laying bag body, fixes the bottom of the dry burnt-in sand bag body of bottom using the steel pipe set in advance;
(4), cofferdam bag body construction, the dry bag sandbag filling of bottom:Surveying and locating first, using steel pipe the dry burnt-in sand bag of bottom The bottom of body is fixed, and then excavator back-up sand is internal to the dry burnt-in sand bag of bottom, and bottom is done with portable sewing machine after sand is full Burnt-in sand bag body is sewed it up, and is finally washed by water closely knit;When thickness deficiency or local eminence, artificial stop-off high-pressure water pipe should be flattened or used in time Water-filling flattens;
The dry bag sandbag filling in middle level:The dry bag sandbag in middle level is laid above the dry burnt-in sand bag body of bottom;Equally, excavator is utilized Back-up sand is internal to the dry burnt-in sand bag in middle level, and the dry burnt-in sand bag body in middle level is sewed it up with portable sewing machine after sand is full, finally washed by water close It is real;Thickness deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
The dry bag sandbag filling in upper strata:The laying dry bag sandbag in upper strata above the dry burnt-in sand bag body in middle level;Equally, filled out using excavator Sand is internal to the dry burnt-in sand bag in upper strata, and the dry burnt-in sand bag body in upper strata is sewed it up with portable sewing machine after sand is full, finally washed by water closely knit; Thickness deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
(5), after the completion of the body of weir, laying protection geotextiles, after the completion of the bath of top layer sand pocket is closely knit, sun-proof geotechnique is laid in time Cloth, wrap up whole sand pocket cofferdam.
The present invention has the advantages and positive effects of:The present invention efficiently solves higher in material shortage, cost of transportation Etc. the problem of regional hydraulic reclamation cofferdam construction, can gather materials on the spot, it is easy for construction, it is loose to packing material Particle size requirements, can quick shape Into cofferdam, construction cost is greatly reduced, the advantages that accelerating construction speed.The method is fully demonstrated by engineering construction example Its exploitativeness and economical.
Brief description of the drawings
Fig. 1, backfill scope of operation schematic diagram;
Fig. 2, foundation trench excavated section schematic diagram;
Fig. 3, dry burnt-in sand sack cofferdam schematic diagram;
In figure:1st, Yuan Jiao faces;2nd, reef sand is backfilled;3rd, foundation trench excavates reef sand;4th, foundation trench;5th, the dry burnt-in sand bag of bottom;6th, middle level Dry burnt-in sand bag;7th, the dry burnt-in sand bag in upper strata;8th, geotextiles are protected.
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing Describe in detail as follows:
Fig. 1 to Fig. 3 is referred to, a kind of dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam, is comprised the following steps: (1), construction survey and setting-out, the processing of geotextile bag body, go out axis and on Yuan Jiao faces 1 before constructing using measuring instrument measuring Set steel pipe to be identified, suitably encrypted in arc section and knuckle section;Geotextiles are pressed into geotextile bag body computational length Several are cut into, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, sews up into cloth bag Required width;
(2), foundation trench excavates:Hydraulic reclamation was taken into the land stage and first blew back wall, directly blown backfill reef sand 2 by dredger early stage Cofferdam construction region is filled to, digs foundation trench 4 on the spot with excavator, foundation trench width is determined by the dry burnt-in sand bag width of bottom, grooving length Slightly larger than cofferdam construction length, foundation trench excavates reef sand 3, and other side in foundation trench both sides, uses when backfilling nearby;
After land-based area takes on a certain scale, take and first enclose after-blow, first returned with the dump truck work of falling soil application by hydraulic reclamation region Fill out to form the scope of operation, backfill section width determines according to builder's road and weir bottom width degree;
(3), geotextile laying bag body, fixes the bottom of the dry burnt-in sand bag body of bottom using the steel pipe set in advance;
(4), cofferdam bag body construction:The dry bag sandbag filling of bottom:Surveying and locating first, using steel pipe the dry burnt-in sand bag of bottom The bottom of body 6 is fixed, and then excavator back-up sand is internal to the dry burnt-in sand bag of bottom, and bottom is done with portable sewing machine after sand is full Burnt-in sand bag body is sewed it up, and is finally washed by water closely knit;When thickness deficiency or local eminence, artificial stop-off high-pressure water pipe should be flattened or used in time Water-filling flattens;
The dry bag sandbag filling in middle level:The dry bag sandbag in middle level is laid above the dry burnt-in sand bag body of bottom;Equally, excavator is utilized In back-up sand to the dry burnt-in sand bag body 7 in middle level, the dry burnt-in sand bag body in middle level is sewed it up with portable sewing machine after sand is full, finally washed by water close It is real;Thickness deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
The dry bag sandbag filling in upper strata:The laying dry bag sandbag in upper strata above the dry burnt-in sand bag body in middle level;Equally, filled out using excavator In sand to the dry burnt-in sand bag body 8 in upper strata, the dry burnt-in sand bag body in upper strata is sewed it up with portable sewing machine after sand is full, finally washed by water close It is real;Thickness deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
(5), after the completion of the body of weir, laying protection geotextiles, after the completion of the bath of top layer sand pocket is closely knit, sun-proof geotechnique is laid in time Cloth, wrap up whole sand pocket cofferdam.
In summary, this construction method technique is simple, easy for construction, efficiently solve material shortage, cost of transportation compared with The problem of high regional hydraulic reclamation cofferdam construction, can gather materials on the spot, loose to packing material Particle size requirements, can quickly form cofferdam, Construction cost is greatly reduced, the advantages that accelerating construction speed.The method is fully demonstrated by engineering construction example to be implemented Property and economical.
It is described above to be only the preferred embodiments of the present invention, any formal limitation not is made to the present invention, Every technical spirit according to the present invention belongs to any simple modification made for any of the above embodiments, equivalent variations and modification In the range of technical solution of the present invention.

Claims (1)

  1. A kind of 1. dry bag sandbag construction method based on hydraulic reclamation reef sand cofferdam, it is characterised in that:Comprise the following steps:
    (1), construction survey and setting-out, the processing of geotextile bag body, go out axis and in Yuan Jiao before constructing using measuring instrument measuring Steel pipe is set on face 1 to be identified, and is suitably encrypted in arc section and knuckle section;Geotextiles are calculated by geotextile bag body Length is cut into several, then the protection geotextiles cut are sewed into code requirement according to geotextiles along its length, sews up into Width needed for cloth bag;
    (2), foundation trench excavates:Hydraulic reclamation was taken into the land stage and first blew back wall, be directly filled to backfill reef sand blast by dredger and enclose early stage Weir construction area, foundation trench is dug on the spot with excavator, foundation trench width is determined by the dry burnt-in sand bag width of bottom, and grooving length, which is slightly larger than, encloses Weir is constructed length, and foundation trench excavates reef sand, and other side in foundation trench both sides, uses when backfilling nearby;
    After land-based area takes on a certain scale, take and first enclose after-blow, shape is first backfilled with the dump truck work of falling soil application by hydraulic reclamation region Into the scope of operation, backfill section width determines according to builder's road and weir bottom width degree;
    (3), geotextile laying bag body, fixes the bottom of the dry burnt-in sand bag body of bottom using the steel pipe set in advance;
    (4), cofferdam bag body construction, the dry bag sandbag filling of bottom:Surveying and locating first, using steel pipe the dry burnt-in sand bag body of bottom Bottom is fixed, and then excavator back-up sand is internal to the dry burnt-in sand bag of bottom, with portable sewing machine the dry burnt-in sand of bottom after sand is full Bag body is sewed it up, and is finally washed by water closely knit;Thickness deficiency or during local eminence, should artificial stop-off leveling in time or with high-pressure water pipe water-filling Leveling;
    The dry bag sandbag filling in middle level:The dry bag sandbag in middle level is laid above the dry burnt-in sand bag body of bottom;Equally, excavator back-up sand is utilized It is internal to the dry burnt-in sand bag in middle level, the dry burnt-in sand bag body in middle level is sewed it up with portable sewing machine after sand is full, finally washed by water closely knit;It is thick Degree deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
    The dry bag sandbag filling in upper strata:The laying dry bag sandbag in upper strata above the dry burnt-in sand bag body in middle level;Equally, using excavator back-up sand extremely The dry burnt-in sand bag in upper strata is internal, and the dry burnt-in sand bag body in upper strata is sewed it up with portable sewing machine after sand is full, finally washed by water closely knit;Thickness Deficiency or during local eminence, should artificial stop-off leveling in time or with the leveling of high-pressure water pipe water-filling;
    (5), after the completion of the body of weir, laying protection geotextiles, after the completion of the bath of top layer sand pocket is closely knit, sun-proof geotextiles are laid in time, Wrap up whole sand pocket cofferdam.
CN201710639810.5A 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam Active CN107700503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710639810.5A CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710639810.5A CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Publications (2)

Publication Number Publication Date
CN107700503A true CN107700503A (en) 2018-02-16
CN107700503B CN107700503B (en) 2019-07-09

Family

ID=61170794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710639810.5A Active CN107700503B (en) 2017-07-31 2017-07-31 A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam

Country Status (1)

Country Link
CN (1) CN107700503B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625417A (en) * 2018-05-22 2018-10-09 四川城凯特建设工程有限公司 A kind of channel cleanout method and its device
CN110284393A (en) * 2019-06-28 2019-09-27 中国二十冶集团有限公司 The method of peat soil soft base build sidewalk
CN110924364A (en) * 2019-12-10 2020-03-27 安庆市水利水电规划设计院 River-blocking weir gate anti-impact deep tooth wall and construction method thereof
CN112900357A (en) * 2021-03-03 2021-06-04 中交上海航道勘察设计研究院有限公司 Degradable geotextile filling bag

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256588A (en) * 1998-03-12 1999-09-21 Kajima Corp Underwater strut constructing method
CN201891104U (en) * 2010-11-11 2011-07-06 上海勘测设计研究院 Combination bag outer prism structure for tidal flat reclamation
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256588A (en) * 1998-03-12 1999-09-21 Kajima Corp Underwater strut constructing method
CN201891104U (en) * 2010-11-11 2011-07-06 上海勘测设计研究院 Combination bag outer prism structure for tidal flat reclamation
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625417A (en) * 2018-05-22 2018-10-09 四川城凯特建设工程有限公司 A kind of channel cleanout method and its device
CN110284393A (en) * 2019-06-28 2019-09-27 中国二十冶集团有限公司 The method of peat soil soft base build sidewalk
CN110924364A (en) * 2019-12-10 2020-03-27 安庆市水利水电规划设计院 River-blocking weir gate anti-impact deep tooth wall and construction method thereof
CN112900357A (en) * 2021-03-03 2021-06-04 中交上海航道勘察设计研究院有限公司 Degradable geotextile filling bag

Also Published As

Publication number Publication date
CN107700503B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
CN107700503B (en) A kind of dry packet sandbag construction method based on hydraulic reclamation reef sand cofferdam
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
CN103225267B (en) Construction method of deep and thick soft soil foundation bed bridge abutment
CN103526766A (en) Method for plugging relief well of deep foundation pit
CN203668885U (en) Novel hydraulic reclamation mould bag
WO2019109602A1 (en) Short-face coal-pillar-free mining method having zero gangue discharge
CN107254878A (en) A kind of hydroelectric project dam abutment high gradient slope controls the excavation method of dust
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN108756893B (en) A kind of city shallow tunnel vault soil stabilization method
CN105781556A (en) Construction method for shield to penetrate through shallow-covered urban landscape lake downwards
CN104652409B (en) A kind of forced-ventilated water continuously combines the close soft foundation processing technology method of rammer
CN108086308A (en) Reclaimation area locally secretly buries the construction method that mud wraps Punching Borehole Cast-in-place Concrete Pile
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
US2757514A (en) Method of forming an impermeable wall in the terrain
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN105951667A (en) Riverway structure reserved in reclamation district through mud filling pipe bags and construction method of riverway structure
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN209194555U (en) A kind of earth cofferdam for deep-water bare basement rock close pile supporting construction cushion cap
CN103422467B (en) Mucky soil filling bag embankment method
CN106120827A (en) Freeze to make end water-bound and method inside a kind of sensitizing range, city tunneling foundation ditch
CN213013736U (en) Reinforced riprap silt squeezing expansion roadbed
CN107859040A (en) A kind of excavation method of foundation ditch large area soft soil horizon
CN212388474U (en) A concrete gravity dam for precipitous river valley topography
CN111197300B (en) Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN106869107A (en) The novel solid drainage system and its dewatering construction method of a kind of reinforcing soft ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant