CN107542084A - Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment - Google Patents

Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment Download PDF

Info

Publication number
CN107542084A
CN107542084A CN201610467477.XA CN201610467477A CN107542084A CN 107542084 A CN107542084 A CN 107542084A CN 201610467477 A CN201610467477 A CN 201610467477A CN 107542084 A CN107542084 A CN 107542084A
Authority
CN
China
Prior art keywords
hole
rubble
churning
drawn
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610467477.XA
Other languages
Chinese (zh)
Inventor
王洋
王良俊
何祖勇
蔡凯
范捷
呼群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610467477.XA priority Critical patent/CN107542084A/en
Publication of CN107542084A publication Critical patent/CN107542084A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to pile foundation construction.Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment, and it includes:Step 1, hole machinery is drawn using specialty and carries out drawing hole, rubble stratum or pebble layer is met and very likely suspends at collapse hole;Step 2, steel pile casting is transferred, draws hole again, only carried out local steel pile casting retaining wall on rubble stratum or pebble layer, make drilling not collapse hole;Step 3, draw hole to hole depth is designed, remove drilling rod, transfer common thin wall type pvc pipe, be allowed to pass through metalling or boulder bed;Step 4, extract steel bushing, backward shift draw hole machinery;Step 5, churning machinery is in place, and after completing preparation, churning bar is transferred to bottom hole;Step 6, start water, the pipe churning of gas and water mud three, to churning bar lifting speed is reduced when rubble or pebble layer, under the high water pressure impact force effect more than 30MPa, thin wall type pvc pipe will be crashed to pieces.The present invention can the smooth pore-forming under such a geological environment.

Description

Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
Technical field
The present invention relates to pile foundation construction, more particularly to triple-pipe high pressure jet grouting stake to draw hole pile making method.
Background technology
For triple-pipe high pressure jet grouting stake, due to its own process characteristic, need to draw hole by boring machine progress rotary churning pile in advance.And for compactness is smaller or grain composition is poor metalling, pebble layer, due to construction disturbance, draw and be easy to cause collapse hole during hole, cause follow-up churning bar can not reach predetermined design depth, in the process, if taking steel bushing used for geological prospecting to carry out collapse hole retaining wall, it is easy to cause follow-up churning pressure can not effectively be transferred to periphery Rock And Soil, further result in rotary churning pile undergauge or can not the quality problems such as pile, so as to influence pile body bearing capacity or water-stagnating effect.
The content of the invention
Present invention seek to address that drawbacks described above, there is provided hole pile making method is drawn in triple-pipe high pressure jet grouting stake under a kind of rubble, cobble geological environment.The present invention can the smooth pore-forming under such a geological environment.
To solve the above problems, hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble of the present invention, cobble geological environment, it includes:
Step 1, according to Normal practice, hole machinery is drawn using specialty and carries out drawing hole, rubble stratum or pebble layer is met and very likely suspends at collapse hole;.
Step 2, steel pile casting is transferred, draws hole again, only carried out local steel pile casting retaining wall on rubble stratum or pebble layer, make drilling not collapse hole;
Step 3, draw hole to hole depth is designed, remove drilling rod, transfer common thin wall type pvc pipe, be allowed to pass through metalling or boulder bed;
Step 4, extract steel bushing, even if now collapse hole, thin wall type pvc pipe play retaining wall perforating action again, backward shift draw hole machinery;
Step 5, churning machinery is in place, and after slurry, mud jacking preparation are mixed in completion, churning bar is transferred to bottom hole;
Step 6, start water, the pipe churning of gas and water mud three, speed is lifted to churning bar is reduced when rubble or pebble layer, under the high water pressure impact force effect more than 30MPa; thin wall type pvc pipe will be crashed to pieces; so as to realize that cement slurry mixes with the effective of Rock And Soil in certain limit around drilling, form churning pile body.
Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under described rubble, cobble geological environment, and the thin wall type pvc pipe diameter is less than steel bushing;And before formal implementation, need to testing determination in advance, it can be by 30MPa high hydraulic pressure impact comminution.
The present invention can the smooth pore-forming under rubble, cobble geological environment, be particularly suitable for triple-pipe high pressure jet grouting stake and intercepted water in basement process, improvement of soil nature, sealing etc., is widely used.The method of the present invention is simple and practical, and cost increase is humble.
Embodiment
Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble of the present invention, cobble geological environment, and it includes:
Step 1, according to Normal practice, hole machinery is drawn using specialty and carries out drawing hole, rubble stratum or pebble layer is met and very likely suspends at collapse hole;.
Step 2, steel pile casting is transferred, draws hole again, only can carried out local steel pile casting retaining wall on rubble stratum or pebble layer, make drilling not collapse hole;
Step 3, draw hole to hole depth is designed, remove drilling rod, transfer common thin wall type pvc pipe, be allowed to pass through metalling or boulder bed;
Step 4, extract steel bushing, even if now collapse hole, thin wall type pvc pipe play retaining wall perforating action again, backward shift draw hole machinery;
Step 5, churning machinery is in place, and after slurry, mud jacking preparation are mixed in completion, churning bar is transferred to bottom hole;
Step 6, start water, the pipe churning of gas and water mud three, speed is lifted to churning bar is reduced when rubble or pebble layer, under the high water pressure impact force effect more than 30MPa; thin wall type pvc pipe will be crashed to pieces; so as to realize that cement slurry mixes with the effective of Rock And Soil in certain limit around drilling, form churning pile body.
Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under described rubble, cobble geological environment, and the thin wall type pvc pipe diameter is less than steel bushing;And before formal implementation, need to testing determination in advance, it can be by 30MPa high hydraulic pressure impact comminution.

Claims (2)

1. hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment, it is characterised in that it includes:
Step 1, according to Normal practice, hole machinery is drawn using specialty and carries out drawing hole, rubble stratum or pebble layer is met and very likely suspends at collapse hole;
Step 2, steel pile casting is transferred, draws hole again, only carried out local steel pile casting retaining wall on rubble stratum or pebble layer, make drilling not collapse hole;
Step 3, draw hole to hole depth is designed, remove drilling rod, transfer common thin wall type pvc pipe, be allowed to pass through metalling or boulder bed;
Step 4, extract steel bushing, even if now collapse hole, thin wall type pvc pipe play retaining wall perforating action again, backward shift draw hole machinery;
Step 5, churning machinery is in place, and after slurry, mud jacking preparation are mixed in completion, churning bar is transferred to bottom hole;
Step 6, start water, the pipe churning of gas and water mud three, speed is lifted to churning bar is reduced when rubble or pebble layer, under the high water pressure impact force effect more than 30MPa; thin wall type pvc pipe will be crashed to pieces; so as to realize that cement slurry mixes with the effective of Rock And Soil in certain limit around drilling, form churning pile body.
2. hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble according to claim 1, cobble geological environment, it is characterised in that the thin wall type pvc pipe diameter is less than steel bushing;And before formal implementation, need to testing determination in advance, it can be by 30MPa high hydraulic pressure impact comminution.
CN201610467477.XA 2016-06-24 2016-06-24 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment Pending CN107542084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610467477.XA CN107542084A (en) 2016-06-24 2016-06-24 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610467477.XA CN107542084A (en) 2016-06-24 2016-06-24 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment

Publications (1)

Publication Number Publication Date
CN107542084A true CN107542084A (en) 2018-01-05

Family

ID=60960941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610467477.XA Pending CN107542084A (en) 2016-06-24 2016-06-24 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment

Country Status (1)

Country Link
CN (1) CN107542084A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142931A (en) * 2017-06-19 2017-09-08 中冶成都勘察研究总院有限公司 A kind of jet grouting pile construction preexisting hole wall protecting method
CN108914940A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of multiple superhigh pressure jetting grouting construction method of super-large diameter
CN108914938A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of controlled diameter high pressure jet grouting construction method
CN108914939A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of major diameter ultra-deep high pressure jet grouting construction method
CN110080214A (en) * 2019-05-13 2019-08-02 上海智平基础工程有限公司 A kind of construction method of oblique high-pressure rotary jet grouting pile
CN110409434A (en) * 2019-06-25 2019-11-05 浙江省建工集团有限责任公司 A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN110453678A (en) * 2019-07-30 2019-11-15 甘肃恒捷路桥养护科技有限公司 A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation
CN110904957A (en) * 2019-07-25 2020-03-24 北京中润宝成工程技术有限公司 Construction method of large-diameter high-verticality jet grouting pile in gravel stratum
CN111733851A (en) * 2020-07-02 2020-10-02 中国建筑第八工程局有限公司 Construction method for jet grouting waterproof curtain under water-rich sandy gravel geological condition
CN111851479A (en) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer
CN112281826A (en) * 2020-10-23 2021-01-29 北京中润宝成工程技术有限公司 Construction method for forming pile by rotary spraying in ovoid gravel stratum

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5037242A (en) * 1990-09-06 1991-08-06 Nill A Joseph Dock fender and shock absorber
CN204418184U (en) * 2014-12-15 2015-06-24 青岛城建集团有限公司 High-pressure rotary jet grouting pile double-jacket tube drilling construction device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5037242A (en) * 1990-09-06 1991-08-06 Nill A Joseph Dock fender and shock absorber
CN204418184U (en) * 2014-12-15 2015-06-24 青岛城建集团有限公司 High-pressure rotary jet grouting pile double-jacket tube drilling construction device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142931A (en) * 2017-06-19 2017-09-08 中冶成都勘察研究总院有限公司 A kind of jet grouting pile construction preexisting hole wall protecting method
CN108914940A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of multiple superhigh pressure jetting grouting construction method of super-large diameter
CN108914938A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of controlled diameter high pressure jet grouting construction method
CN108914939A (en) * 2018-07-03 2018-11-30 上海勇创建设发展有限公司 A kind of major diameter ultra-deep high pressure jet grouting construction method
CN110080214A (en) * 2019-05-13 2019-08-02 上海智平基础工程有限公司 A kind of construction method of oblique high-pressure rotary jet grouting pile
CN110409434A (en) * 2019-06-25 2019-11-05 浙江省建工集团有限责任公司 A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN110904957A (en) * 2019-07-25 2020-03-24 北京中润宝成工程技术有限公司 Construction method of large-diameter high-verticality jet grouting pile in gravel stratum
CN110453678A (en) * 2019-07-30 2019-11-15 甘肃恒捷路桥养护科技有限公司 A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation
CN111733851A (en) * 2020-07-02 2020-10-02 中国建筑第八工程局有限公司 Construction method for jet grouting waterproof curtain under water-rich sandy gravel geological condition
CN111851479A (en) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer
CN112281826A (en) * 2020-10-23 2021-01-29 北京中润宝成工程技术有限公司 Construction method for forming pile by rotary spraying in ovoid gravel stratum
CN112281826B (en) * 2020-10-23 2021-11-09 北京中润宝成工程技术有限公司 Construction method for forming pile by rotary spraying in ovoid gravel stratum

Similar Documents

Publication Publication Date Title
CN107542084A (en) Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN102286985A (en) Method for constructing dual high-pressure jet grouting pile waterproof curtain
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102286984A (en) Water-stop curtain and construction method thereof
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN101173516A (en) Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method
CN104196044A (en) Cofferdam construction method with grooves milled through limited hole forming of percussion drill combined with steel sheet piles
CN204530730U (en) The novel closed cutting off water system of a kind of water rich strata foundation ditch
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN105804107A (en) High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall
CN105178285A (en) Method for widening grouting reinforcement and seepage and blockage prevention range of rock and soil
CN107339122B (en) Construction method for treating goaf by steel pipe column
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN107227740A (en) The construction method that limestone cave cell wall is closed in construction of diaphragm wall
CN104762970B (en) A kind of deep hole Karst grouting auxiliary pipe drawing device and construction method
CN104695457A (en) Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer
CN108396759B (en) Deviation rectifying construction method for inclined open caisson under different soil conditions
CN101158159A (en) Whole-course hole-preguiding hammering entering-rock PHC pile tube construction process
CN103195063B (en) Fresh water splitting post grouting construction method
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN106120829A (en) A kind of deep hole grout curtain overfall thickens construction method
CN104863126B (en) Use the method that Grouting Technology processes large diameter bored pile collapse hole
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105

RJ01 Rejection of invention patent application after publication