CN105586978A - Construction method of soil replacement stir waterproof curtain based on gravels - Google Patents

Construction method of soil replacement stir waterproof curtain based on gravels Download PDF

Info

Publication number
CN105586978A
CN105586978A CN201610103716.3A CN201610103716A CN105586978A CN 105586978 A CN105586978 A CN 105586978A CN 201610103716 A CN201610103716 A CN 201610103716A CN 105586978 A CN105586978 A CN 105586978A
Authority
CN
China
Prior art keywords
hole
pile
stake
construction
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610103716.3A
Other languages
Chinese (zh)
Other versions
CN105586978B (en
Inventor
张生雨
白汉民
王冬生
邱太刚
温支生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201610103716.3A priority Critical patent/CN105586978B/en
Publication of CN105586978A publication Critical patent/CN105586978A/en
Application granted granted Critical
Publication of CN105586978B publication Critical patent/CN105586978B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a construction method of a soil replacement stir waterproof curtain based on gravels. The construction method comprises the following steps: (1) a leading hole pile position is cast according to the axis of a cement mixing pile; (2) a steel protection cylinder is embedded; a hole wall is stabilized by mud; soil to be dig in a hole is taken out by a rotary drilling machine through a wet method; (3) the hole wall of the drilled hole is stabilized by the mud until the hole leading and backfill operation space satisfies the requirements; (4) the mud in the pile hole is removed by gas lift mud removing machinery; and pile soil is filled back; (5) the backfill completion distance satisfies the continuous operation requirements of the cement mixing pile; and a mud removing ditch is dig; (6) a cement mixing machine is in place; and the cement mixing pile constructs; and (7) the remained un-treated interlayer part of two adjacent leading hole pile positions is forcedly stirred by stirring machinery to finish construction of the soil replacement stir waterproof curtain. The construction method is scientific and reasonable in design, used for a deep foundation pit waterproof curtain, simple in process and low in construction cost, fully uses common construction machinery, is excellent in waterproof effect of the finished waterproof curtain, and is safe and reliable in construction.

Description

Soil removal and replacement stirring water-stop curtain construction method based on gravel
The application is that number of patent application is 201410813752.X, and patent name is stopping of soil removal and replacement stirringThe construction method of water curtain, the divisional application that the original bill applying date is 2014.12.23.
Technical field
The invention belongs to water-stop curtain field, especially a kind of soil removal and replacement stirring water-stop curtain based on gravelCurtain construction method.
Background technology
When the underground engineering Construction of Deep Excavation Engineering that particularly level of ground water is higher, often need to prop upThe arranged outside water-stop curtain of fender pile, water-stop curtain generally adopts continuous cement mixing method to form.When water-stop curtain design depth bounds in run into the geological stratification that is difficult to pass through, as gravel layer,When hard skerry and erratic boulder etc., use conventional cement-soil mixing pile machine tool, as two axle waterEarth mixing pile machine, triaxial cement mixing pile machine etc. are difficult to construct.
For the skerry that is difficult to pass through, can adopt single tube high-pressure rotary-spray equipment in advance its pointwise to be stirredMoving loose, and then construction cement mixing method, but the method for deep gravel layer withAnd erratic boulder still cannot be implemented.
Can adopt interlocking pile or ground-connecting-wall for deep gravel layer and erratic boulder, play simultaneouslyThe effect of supporting and sealing. But when interlocking pile construction, to the quality stability of super retarded concreteRequire high, and between the A stake of interlocking pile and B stake very easily owing to sending out in the direction perpendicular to wallGive birth to deflection and seepage. Ground-connecting-wall seam crossing is an easily position that produces seepage, adopts two-wheel flute milling machineCan effectively avoid joint seepage, but this process costs is higher, and the cost of ground-connecting-wall ownHeight, is not suitable for all engineerings.
TRD engineering method can easily be tackled hardpan, as cobblestone, viscosity mud, sandstone, oil motherShale, limestone, granite etc., stir, and do not have malocclusion, guarantees that body of wall is continuously highProperty and high sealing, but TRD engineering method cost is high.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of soil removal and replacement based on gravel is providedStirring water-stop curtain construction method, the method design science is reasonable, for water seal for deep foundation pit curtain, workSkill is simple, construction cost is low, makes full use of common construction machinery, the water-stop curtain sealing effect completingFruit is good, and construction safety is reliable.
The present invention solves its technical problem and is achieved through the following technical solutions:
A soil removal and replacement stirring water-stop curtain construction method based on gravel, the step of its method is:
(1), discharge and draw stake position, hole by cement mixing pile axis;
, bury steel casing underground, adopt mud to stablize hole wall, Spiral digging machine wet work is dug waiting in holeSoil property is taken out;
, observe drilling bucket and take out matter situation to be cut the earth, determine and draw hole depth, boring reaches draws hole depthAfter degree, remove rotary drilling rig, continue adopt mud stablize hole wall until draw hole and backfilling operation space expireFoot requirement;
(4), adopt mud in gaslift plasma discharge machinery eliminating stake hole, backfill pile earth material, control plasma dischargeMeasure corresponding with backfill amount;
(5) backfill completes distance and meets the cement mixing pile requirement of working continuously, at cement mixing pile axisPlasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system process pump slurry starts stake machine and carries out cementMixing pile construction;
(7) adjacent two draw position, stake hole, hole and remain untreated sandwich portion, by Mixing Machine action of forced stirring,Complete the water-stop curtain construction that soil removal and replacement is stirred.
And the described stake position, hole of drawing is discharged and is drawn stake position, hole φ by three axle mixing pile axis10001200。
And, the described high 2m of steel casing, steel casing diameter is than the design stake large 20cm in footpath, steel casingEnd face exceeds operation platform 30cm.
And described Spiral digging machine wet work is jumped manual labour skill and drawn a hole, drawing a hole is φ 1000mm.
And described matter to be cut the earth is gravel, cobble or erratic boulder.
And it is that φ 8,501,200 3 axles stir that described startup stake machine carries out cement mixing pile driving constructionPile driving construction.
Advantage of the present invention and beneficial effect are:
1, the water-stop curtain that this soil removal and replacement is stirred is to take out containing in the stratum such as dust, cobble, erratic boulderBe unfavorable for the soil property of pile, backfill is simultaneously beneficial to the material of pile (one-tenth wall), proceeds to stirThe construction of stake. This method construction quality is guaranteed, and construction machinery tissue is subject to market restriction less.
Technology maturation, the technique of the water-stop curtain that 2, this soil removal and replacement is stirred are simple, with low cost, fullyUtilize common construction machinery, the water-stop curtain stagnant water effect completing is good.
Brief description of the drawings
Fig. 1 is that the present invention is revolved and dug the schematic diagram that draws hole;
Fig. 2 is the schematic diagram that the present invention completes construction cement mixing pile.
Wherein 1 is cement mixing pile, and 2 for drawing hole, and 3 is original ground, 4 for dust, cobble, floatThe unfavorable interlayer such as stone, 5 is the earth material of backfill, and 6 is level of ground water, and H1 is water-stop curtain supporting column lengthDegree, H2 is the unfavorable interlayer geology such as dust in water-stop curtain support post depth bounds, cobble, erratic boulderBuried depth, H3 is unfavorable interlayer geology thickness.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following examples are just describedProperty, not determinate, can not limit protection scope of the present invention with this.
A soil removal and replacement stirring water-stop curtain construction method based on gravel, the step of its method is:
(1), discharge and draw stake position, hole by cement mixing pile axis; Draw stake position, hole by three axle mixing pile axisDischarge and draw stake position, hole φ 10001200.
, bury steel casing underground, adopt mud stablize hole wall, mud employing tonerde and water mixForm and mix a certain proportion of bentonite, prepare mud. Spiral digging machine wet work is dug waiting in holeSoil property is taken out; The high 2m of steel casing, steel casing diameter is than the design stake large 20cm in footpath, and steel casing end face is highGo out operation platform 30cm. Spiral digging machine wet work is jumped manual labour skill and is drawn a hole, and drawing a hole is φ 1000mm.Matter to be cut the earth is gravel, cobble or erratic boulder.
, observe drilling bucket and take out matter situation to be cut the earth, determine and draw hole depth, boring reaches draws hole depthAfter degree, remove rotary drilling rig, continue adopt mud stablize hole wall until draw hole and backfilling operation space expireFoot requirement;
(4), adopt mud in gaslift plasma discharge machinery eliminating stake hole, backfill pile earth material, control plasma dischargeMeasure corresponding with backfill amount;
(5) backfill completes distance and meets the cement mixing pile requirement of working continuously, at cement mixing pile axisPlasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system process pump slurry starts stake machine and carries out cementMixing pile construction; It is that φ 8,501,200 3 axle mixing piles are executed that a startup stake machine carries out cement mixing pile driving constructionWork.
(7) adjacent two draw position, stake hole, hole and remain untreated sandwich portion, by Mixing Machine action of forced stirring,Complete the water-stop curtain construction that soil removal and replacement is stirred.

Claims (4)

1. the soil removal and replacement stirring water-stop curtain construction method based on gravel, is characterized in that: the partyThe step of method is:
(1), discharge and draw stake position, hole by cement mixing pile axis; Draw stake position, hole by three axle mixing pile axisDischarge and draw stake position, hole φ 10001200;
, bury steel casing underground, adopt mud to stablize hole wall, Spiral digging machine wet work is by gravel in holeTake out;
, observe drilling bucket and take out gravel situation, determine and draw hole depth, boring reaches draws after hole depthRemove rotary drilling rig, continue adopt mud stablize hole wall until draw hole and backfilling operation space meet willAsk;
(4), adopt mud in gaslift plasma discharge machinery eliminating stake hole, backfill pile earth material, control plasma dischargeMeasure corresponding with backfill amount;
(5), backfill completes distance and meets the cement mixing pile requirement of working continuously, at cement mixing pile axlePlasma discharge guide channel is dug on line both sides;
, cement mixer is in place, cement mortar stirring system process pump slurry, starts a stake machine and carries out waterMud mixing pile construction;
, adjacent two draw position, stake hole, hole and remain untreated sandwich portion, forced to stir by Mixing MachineMix, complete the water-stop curtain construction that soil removal and replacement is stirred.
2. the soil removal and replacement stirring water-stop curtain construction method based on gravel according to claim 1,It is characterized in that: the described high 2m of steel casing, steel casing diameter is than the design stake large 20cm in footpath, and steel protectsCylinder end face exceeds operation platform 30cm.
3. the soil removal and replacement stirring water-stop curtain construction method based on gravel according to claim 1,It is characterized in that: described Spiral digging machine wet work is jumped manual labour skill and drawn a hole, and drawing a hole is φ1000mm。
4. the soil removal and replacement stirring water-stop curtain construction method based on gravel according to claim 1,It is characterized in that: it is that φ 8,501,200 3 axles stir that described startup stake machine carries out cement mixing pile driving constructionMix pile driving construction.
CN201610103716.3A 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel Active CN105586978B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610103716.3A CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610103716.3A CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel
CN201410813752.XA CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410813752.XA Division CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring

Publications (2)

Publication Number Publication Date
CN105586978A true CN105586978A (en) 2016-05-18
CN105586978B CN105586978B (en) 2019-01-18

Family

ID=53210677

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410813752.XA Active CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring
CN201610103716.3A Active CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410813752.XA Active CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring

Country Status (1)

Country Link
CN (2) CN104631479B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241836A (en) * 2019-07-04 2019-09-17 嘉盛建设集团有限公司 A kind of construction method of embedding rock water-stop curtain
CN111042061A (en) * 2019-12-30 2020-04-21 中国水电基础局有限公司 Construction method of ultra-deep impervious wall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631479B (en) * 2014-12-23 2016-08-31 中冶天工集团有限公司 The construction method of the water-stop curtain of soil removal and replacement stirring

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631479B (en) * 2014-12-23 2016-08-31 中冶天工集团有限公司 The construction method of the water-stop curtain of soil removal and replacement stirring

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19832935C1 (en) * 1997-11-19 1999-12-16 Bauer Spezialtiefbau Method of production high pressure injected building foundation
CN1635223A (en) * 2003-12-26 2005-07-06 上海市基础工程公司 Bridge cofferdam waterstop construction process
CN101255689A (en) * 2008-03-12 2008-09-03 何世鸣 Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof
CN102286981A (en) * 2011-07-15 2011-12-21 深圳市鸿荣轩建设工程有限公司 Waterproof curtain and construction method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631479B (en) * 2014-12-23 2016-08-31 中冶天工集团有限公司 The construction method of the water-stop curtain of soil removal and replacement stirring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241836A (en) * 2019-07-04 2019-09-17 嘉盛建设集团有限公司 A kind of construction method of embedding rock water-stop curtain
CN111042061A (en) * 2019-12-30 2020-04-21 中国水电基础局有限公司 Construction method of ultra-deep impervious wall

Also Published As

Publication number Publication date
CN104631479B (en) 2016-08-31
CN105586978B (en) 2019-01-18
CN104631479A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN102286984A (en) Water-stop curtain and construction method thereof
CN106759473A (en) The constructing structure and its construction method of underground pipe gallery and road
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN111042249A (en) Construction method of ultra-deep equal-thickness cement-soil mixing wall under complex geological condition
CN104963346A (en) Support construction method for deep foundation pit in complex geological condition
CN103114599A (en) Deep foundation pit sealed precipitation device and construction method thereof
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN110952528A (en) Construction method of cement-soil underground continuous wall under complex geological conditions
CN202194149U (en) Water-proof curtain
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN110241836A (en) A kind of construction method of embedding rock water-stop curtain
CN104631479B (en) The construction method of the water-stop curtain of soil removal and replacement stirring
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN206800431U (en) A kind of sealing bottom type caisson wall
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN103821140B (en) A kind of construction method of reinforcing soft foundation
CN103015435A (en) Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant