CN108914939A - A kind of major diameter ultra-deep high pressure jet grouting construction method - Google Patents

A kind of major diameter ultra-deep high pressure jet grouting construction method Download PDF

Info

Publication number
CN108914939A
CN108914939A CN201810712144.8A CN201810712144A CN108914939A CN 108914939 A CN108914939 A CN 108914939A CN 201810712144 A CN201810712144 A CN 201810712144A CN 108914939 A CN108914939 A CN 108914939A
Authority
CN
China
Prior art keywords
section
drilling tool
high pressure
mud
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810712144.8A
Other languages
Chinese (zh)
Inventor
陈军
郭星宇
黄朝昱
宣霖康
朱进成
王蓉
陈相茂
冯凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yong Chuang Construction Development Co Ltd
SGIDI Engineering Consulting Group Co Ltd
Original Assignee
Shanghai Yong Chuang Construction Development Co Ltd
SGIDI Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yong Chuang Construction Development Co Ltd, SGIDI Engineering Consulting Group Co Ltd filed Critical Shanghai Yong Chuang Construction Development Co Ltd
Priority to CN201810712144.8A priority Critical patent/CN108914939A/en
Publication of CN108914939A publication Critical patent/CN108914939A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0053Production methods using suction or vacuum techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of major diameter ultra-deep high pressure jet grouting construction methods, it is characterised in that the construction method includes the following steps:Pilot hole is being carried out using pilot hole drilling machine to slip casting point;After pore-forming, the drilling tool of whirl spraying machinery is transferred to bottom hole, the lower end of the drilling tool has a water cut section and whitewashing section, and the water cut section is located at the top of the whitewashing section;It is mechanical to run the whirl spraying, while revolution above mentions the drilling tool, the water cut section sprays high pressure water flow outward to carry out cutting into mud to the soil body around the drilling tool, and the outside gunite of the whitewashing section around the drilling tool to form whirl spraying pile body.It is an advantage of the invention that:Surrounding mud density can be diluted by setting water cut section, and the anti-slurry section of synchronous setting carries out concentration plasma discharge using special sludge pipe, and the pressure in ground can be effectively controlled while efficient spoil disposal, thus guarantee the quality of whitewashing pile, it is small to surrounding environment influence.

Description

A kind of major diameter ultra-deep high pressure jet grouting construction method
Technical field
The invention belongs to foundation construction technical fields, and in particular to a kind of major diameter ultra-deep high pressure jet grouting construction party Method.
Background technique
In the construction of conventional high-tension slip casting method, mud is naturally drained on the ground by the gap on drilling rod periphery.But depths Spoil disposal it is highly difficult because pressure increases in drilling rod at ultra-deep and the ground of high pressure spray loophole surrounding, frequently can lead to spray Efficiency decline, therefore, consolidation effect and reliability reduce.In addition, in the construction process, pressure increases in ground, surrounding will lead to Surface uplift.
MJS engineering method (Metro Jet System) is also known as comprehensive high-pressure injection engineering method, and MJS engineering method is sprayed in conventional high-tension On the basis of grouting process, device (habit is referred to as Monitor) is caused using unique antipriming pipe and front end, realizes hole Pressure monitoring in interior pressure plasma discharge and ground, and by adjusting forcing plasma discharge amount to control pressure in ground, make in depths spoil disposal and ground Pressure is rationally controlled, and is stablized pressure in ground, has also just been reduced and occurred a possibility that earth's surface deformation in construction, substantially Degree reduces the influence to environment, and the reduction of pressure also further ensures expanded diameter in ground.It is compared with traditional whirl spraying technique, MJS engineering method reduces the influence constructed to surrounding enviroment.
But it is found by the actual conditions of a large amount of site operation:Spoil disposal suction inlet is easy to be blocked by biggish soil block, sometimes Also mud suction mouth is be easy to cause to block since mud density is larger, causes spoil disposal unsmooth, influence construction quality and construction speed.Therefore It is badly in need of a kind of super-large diameter superhigh pressure jetting slip casting method of efficient spoil disposal, effectively controls the stabilization of pressure in ground, reach spoil disposal Optimum efficiency.
Summary of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of major diameter ultra-deep high-pressure injections to infuse Construction method is starched, which cut and be diluted mud to ambient earth by setting water cut section, and The synchronous anti-slurry section of setting carries out concentration plasma discharge using special sludge pipe, and the pressure in ground can be effectively controlled while efficient spoil disposal Power, to guarantee the quality of whitewashing pile.
The object of the invention realization is completed by following technical scheme:
A kind of major diameter ultra-deep high pressure jet grouting construction method, it is characterised in that the construction method includes the following steps:? Pilot hole is carried out using pilot hole drilling machine to slip casting point;After pore-forming, the drilling tool of whirl spraying machinery is transferred to bottom hole, the lower end of the drilling tool Portion has a water cut section and whitewashing section, and the water cut section is located at the top of the whitewashing section;It is mechanical to run the whirl spraying, While mentioning the drilling tool in revolution, the water cut section sprays high pressure water flow outward to carry out to the soil body around the drilling tool Mud is cut into, the outside gunite of the whitewashing section around the drilling tool to form whirl spraying pile body.
During the pilot hole of the pilot hole drilling machine, steel pile casting is set at layer of sand, rubble stratum or the boulder bed encountered Carry out retaining wall.
After the pilot hole drilling machine completes pilot hole and the drilling rod of extraction thereon, thin-walled pilot hole Guan Zhishe is set in the hole Depth is counted, the thin-walled pilot hole pipe can be crashed to pieces under the high pressure water flow jet-action of the water cut section.
It is additionally provided between the water cut section and the whitewashing section and returns slurry section and ground pressure test section, returned in the drilling tool Turn during above mentioning, presses the ground pressure value size around drilling tool described in test section real-time monitoring describedly, the slurry section of returning is to institute It states water cut section and cuts the mud to be formed progress vacuum pump drainage;If test section is pressed to monitor the ground pressure around the drilling tool describedly Value is greater than ground pressure equilibrium valve, then the mud pump drainage speed of slurry section is returned described in increasing;If test section is pressed to monitor the brill describedly Ground pressure value around having is less than ground pressure equilibrium valve, then the mud pump drainage speed of slurry section is returned described in reduction.
It is using the method for returning slurry section progress vacuum pump drainage mud:It is provided with a vacuum in the drilling tool and returns to starch and leads to Road, the vacuum return the pulp returning port opened up on slurry channel and the drilling tool outer wall and are connected, and the vacuum returns slurry channel for mud Slurry is through in the pulp returning port pump drainage to the mud conditioning pond resting on the ground.
During the vacuum returns slurry channel pump drainage mud, it is set to the water spray that the vacuum is returned in slurry channel and sprays Mouth conveying direction of mud into it is sprayed water, to improve the mobility of mud.
There is horizontally disposed cutting nozzle in the water cut section, there is horizontally disposed cement slurry in the whitewashing section Nozzle, during drilling tool revolution above mentions, the cutting nozzle level sprays high pressure water flow, the cement slurry spray outward Mouth gunite horizontally outward.
There is the cutting nozzle being arranged diagonally downward in the water cut section, have in the whitewashing section and tilt upward setting Cement slurry nozzle, angle is obliquely installed by adjusting the cutting nozzle and the cement slurry nozzle respectively, to control It states the cement slurry that cement slurry nozzle sprays outward and the high pressure water flow that the cutting nozzle sprays outward is intersected in design diameter position Place is set, to form the whirl spraying pile body of design diameter around the drilling tool.
Also there is cutting nozzle of the row of horizontal to setting in the water cut section.
It is an advantage of the invention that:Surrounding mud density, and the anti-slurry Duan Li of synchronous setting can be diluted by the way that water cut section is arranged Concentration plasma discharge is carried out with special sludge pipe, the pressure in ground can be effectively controlled while efficient spoil disposal, to guarantee to whitewash The quality of pile is small to surrounding environment influence.
Detailed description of the invention
Fig. 1 is the structure composition schematic diagram of each functional section in drilling tool lower end in the present invention;
Fig. 2 is the water cut segment structure schematic diagram in the present invention with horizontal cutting nozzle;
Fig. 3 is that direct absorbing type returns slurry segment structure schematic diagram in the present invention;
Fig. 4 is that flush-type returns slurry segment structure schematic diagram in the present invention;
Fig. 5 is the whitewashing segment structure schematic diagram in the present invention with horizontal cement slurry nozzle;
Fig. 6 is the construction procedure schematic diagram for carrying out pilot hole in the present invention using pilot hole drilling machine;
Fig. 7 is the status diagram that drilling tool carries out initial gunite work using two horizontal cement slurry nozzles in the present invention;
Fig. 8 whitewash using two horizontal cement slurry nozzles for drilling tool in the present invention applies the construction to form whirl spraying pile body signal Figure;
Fig. 9 is the schematic diagram that whirl spraying pile body applies completion in the present invention;
Figure 10 is the whitewashing segment structure schematic diagram of the cement slurry nozzle in the present invention with inclination angle;
Figure 11 is the drilling tool structure schematic diagram of the cutting nozzle and cement slurry nozzle in the present invention with inclination angle;
Figure 12 is the cutting nozzle with the setting of horizontal and inclination angle in the present invention and the cement slurry nozzle with inclination angle Drilling tool structure schematic diagram;
Figure 13 be the inclination angle that nozzle and cement slurry nozzle are cut in the present invention, between the two at a distance from and whirl spraying pile body diameter Relation schematic diagram.
Specific embodiment
Feature of the invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, with Convenient for the understanding of technical staff of the same trade:
Such as Fig. 1-13, label 1-18 is respectively in figure:Water cut section 1, water cut section ontology 101, air flue 102, segment of cutting water channel 103, annular groove 104, cutting nozzle 105, gas cap 106;Slurry section 2, pulp returning port 201, vacuum is returned to return slurry channel 202, return slurry section sheet Body 203, day word baffle 204, high pressure aquaporin 205, suck-back water opening valve 206;Press test section 3 in ground;Whitewashing section 4, whitewashing section sheet Body 401, whitewashing channel 402, cement slurry nozzle 403, air flue 404, gas cap 405;Drill bit 5;Pilot hole drilling machine 6, whirl spraying mechnisiam, mud Starch case 8, drilling tool 9, thin-walled pilot hole pipe 10, sludge pipe 11, compressed air 12, cement slurry 13, cutting air 14, cutting water 15, rotation Spray pile body 16, cutting mud 17, jet face 18.
Embodiment 1:As shown in figs 1-9, the present embodiment is specifically related to a kind of major diameter ultra-deep high pressure jet grouting construction party Method, the construction method mainly pass through 1 pair of soil body of water cut section set by 9 lower end of drilling tool and carry out water cut and utilize to return slurry section 2 pairs of mud carry out vacuum pump drainage, while the periphery rotation using horizontally disposed cement slurry nozzle 403 in whitewashing section 4 to drilling tool 9 Gunite forms whirl spraying pile body 16, the pressure in ground can be effectively controlled while reaching efficient spoil disposal, to guarantee to whitewash The quality of pile.
As shown in Figure 1, 2, water cut section 1 includes the water cut section ontology 101 in cylindrical shape, in water cut section ontology Being horizontally disposed in 101 outside wall surface has at least one to cut nozzle 105, may also set up two, three or more cutting spray certainly Mouth 105, above-mentioned cutting nozzle 105 is connected with the annular groove 104 in water cut section ontology 101, and annular groove 104 is then cut with water It cuts section water channel 103 to be connected, in practical applications, high pressure water is squeezed into from A mouthfuls, and successively through water cut section water channel 103 and annular Slot 104 finally carries out water cut to the soil body from cutting 105 mesohigh of nozzle is spouting.In addition, in water cut section ontology 101 Outside wall surface on correspond to cutting nozzle 105 position be provided with gas cap 106, gas cap 106 is connected with air flue 102, in reality In, pressure-air is squeezed into from B mouthfuls, and after air flue 102 from 106 mesohigh of gas cap it is spouting with assisted machining water to soil Body is cut, and to cutting water formed ring protection be enclosed in around water column, with reduce cutting water in course of injection by Air drag, guarantee the cutting hardness of cutting water.
As described in Fig. 1,3, returning slurry section 2 includes returning slurry section ontology 203 in cylindrical shape, returns the outer wall of slurry section ontology 203 A pulp returning port 201 is offered on face, which returns slurry channel 202 with vacuum and be connected, in order to prevent the soil block of major diameter Or stone is inhaled into vacuum and returns in slurry channel 202, a day word baffle 204 is additionally provided at pulp returning port 201, naturally it is also possible to be net The structure of trellis or other limitation major diameter particles.
As shown in figure 4, returning slurry channel 202 to the transportation performance and efficiency of mud, in vacuum in order to further enhance vacuum The top portion for returning slurry channel 202 is provided with a suck-back water opening valve 206, the spray nozzle face in the suck-back water opening valve 206 Vacuum returns slurry channel 202, and the same high pressure aquaporin 205 of suck-back water opening valve 206 is connected, and passes through suck-back water opening valve 206 can spray the high pressure water in high pressure aquaporin 205 along the conveying direction that vacuum returns mud in slurry channel 202, to improve Mud returns the mobility in slurry channel 202 in vacuum and mud is discharged faster by high pressure water force.
As shown in Figure 1, ground pressure test section 3 is mainly used for testing the pressure of its surrounding soil, and the stratum that will be monitored Pressure signal is transmitted to ground by signal transmssion line.
As shown in Figure 1,5, whitewashing section 4 includes the whitewashing section ontology 401 in cylindrical shape, the water on whitewashing section ontology 401 It is flat to be provided at least one cement slurry nozzle 403, it may also set up two, three or more cement slurry nozzle 403, cement slurry certainly Nozzle 403 is connected with whitewashing channel 402 and by 402 conveying high-pressure cement slurry of channel of whitewashing;In addition, in cement slurry nozzle 403 Corresponding position is additionally provided with gas cap 405, and gas cap 405 is connected with air flue 404, and compressed air is transported to gas by air flue 404 It can be opened when at cap 405 and convey compressed air outward.
As shown in Figure 1, drill bit 5 is set to the front end of drilling tool 9, it is mainly used for during the decentralization of drilling tool 9 to pilot hole Guiding or drilling.
As shown in figs 1-9, major diameter ultra-deep high pressure jet grouting construction method includes the following steps in the present embodiment:
(1)As shown in fig. 6, determining the center of slip casting point, pilot hole is carried out using pilot hole drilling machine 6, to pilot hole to projected depth The drilling rod of pilot hole drilling machine 6 is pulled out afterwards;It may collapse during pilot hole, when if encountering layer of sand, rubble stratum or boulder bed Hole, therefore cylinder-wall protecting need to be set when carrying out pilot hole to these stratum;And these may cause with the hole section of collapse hole, it is pulling out Except thin-walled pilot hole pipe 10, e.g. Thin-Wall PVC pipe, above-mentioned thin-walled pilot hole pipe 10 is arranged in the drilling rod of pilot hole drilling machine 6 in hole later It should can be crushed under the impact of high pressure cutting water, to not influence subsequent water cut and mud injection;
(2)As shown in Figure 7,8, after pilot hole to be done, whirl spraying mechnisiam is mobile in place, decentralization drilling tool 9 to bottom hole is then run Whirl spraying mechnisiam and high speed rotation upper body drilling tool 9, during drilling tool 9 above mentions, positioned at the water of 9 multi-function head topmost of drilling tool Segment of cutting 1 is cut the high-pressure injection cutting water 15 outside first of nozzle 105, and empty by the outside high-pressure injection of gas cap 106 cutting Gas 14 carries out cutting early period by the peripheral soil body of the high pressure cutting water 15 to drilling tool 9, forms a biggish cylinder cutting region Domain reduces the loss of the spray operation cutting soil body, and cutting water 15 cuts the soil mixed diluting to get off with it and forms cutting Mud 17, certainly, the cutting diameter of cutting water 15 control within the scope of the design diameter of whirl spraying pile body 16;Wherein, high pressure Cutting water 15 is squeezed by A mouthfuls and is successively ejected outward through segment of cutting water channel 103, annular groove 104 and cutting nozzle 105;
After soil cutting is diluted to mud by water cut section 1, slurry 2 pairs of mud of section are returned positioned at 1 lower section of water cut section Carry out vacuum pump drainage, that is, under vacuum suction effect, mud returns slurry channel 202 into vacuum through pulp returning port 201, and vacuum returns slurry The suck-back water opening valve 206 of 202 top portion of channel using its spray nozzle to vacuum return slurry channel 202 in injection water it is further The upward mobility of mud is improved, after returning slurry channel 202 into vacuum, mud enters to rest on the ground through 11 pump drainage of sludge pipe Mud pit 8, to carry out further mud conditioning;
In the process, the ground pressure of ground pressure 3 real-time monitoring drilling tool surrounding soil of test section, locality pressure test section 3 monitor stratum When hypertonia, adjusts the suck-back water opening valve 206 returned in slurry section 2 and improve suck-back water pressure, increase the plasma discharge amount of mud, make ground Stressor layer reduces;Conversely, then adjusting the suck-back water returned in slurry section 2 when local pressure test section 3 monitors that strata pressure is too low and opening Valve 206 reduces suck-back water pressure, reduces the plasma discharge amount of mud, to effectively keep the pressure balance on stratum;
At the same time, during drilling tool 9 above mentions, whitewashing section 4 while outward gunite 13 and compressed air 12, in water Impingement mix is carried out to the soil for being mixed with water quality under 12 collective effect of mud 13 and compressed air, to form blended cement Slurry;And above mentioned since drilling tool 9 turns round, high-speed rotating drilling tool 9 can during outside gunite 13 shape At whirl spraying pile body 16;And so on, it until mentioning ground in the revolution of drilling tool 9, finally applies to form whirl spraying pile body as shown in Figure 9 16。
The present embodiment has the beneficial effect that:(1)It can " comprehensive " progress high pressure jet grouting construction;(2)It is effectively ensured Stake diameter is big, and pile quality is good;(3)Small on surrounding enviroment influence, ultra-deep construction is guaranteed;(4)There is special sludge pipe to be collected Middle plasma discharge decreases mud " altering " and enters soil, water body or ground so that mud contamination is few, while the regulation to strata pressure The phenomenon that lower pipeline.
Embodiment 2:As shown in Figure 10,11,13, the present embodiment is the difference from embodiment 1 is that cut spray in the present embodiment Mouth 105 tilts down setting, and cement slurry nozzle 403 is then obliquely installed upwards, and the two is on same vertical line, and the two is sprayed The cutting water 15 and cement slurry 13 shot out is intersected on jet face 18, is sprayed by adjusting cutting nozzle 105 and cement slurry respectively Mouth 403 is obliquely installed angle, can control the position of the jet face 18 of intersection, that is, is intersected at setting diametrical position, from And the whirl spraying pile body 16 of design diameter is formed around drilling tool 9.
In practical applications, it according to the design diameter of the required whirl spraying pile body 16 applied, adjusts and cuts nozzle on drilling tool 9 Spacing and respective tilt angle between 105 and cement slurry nozzle 403, to make the two in injection cutting water 15 and cement The position that crosses when starching 13 is in the design radial position of whirl spraying pile body 16, and specific calculation formula is:
Wherein, D is that 403 gunite 13 of cement slurry nozzle and cutting nozzle 105 spray cutting water 15 at the position that crosses It is formed by the diameter of whirl spraying pile body 16;L is the spacing cut between nozzle 105 and cement slurry nozzle 403;α is cutting nozzle Angle between 105 or cement slurry nozzle 403 and vertical direction, i.e. tilt angle.
The present embodiment has the beneficial effect that:(1)The diameter of whirl spraying pile body can be effectively controlled according to construction requirement;(2)It can be with " comprehensive " progress high pressure jet grouting construction;(3)It is good that pile quality is effectively ensured;(4)Small on surrounding enviroment influence, ultra-deep is applied Work is guaranteed;(5)There is special sludge pipe to carry out concentration plasma discharge, so that mud contamination is few, while the regulation of interior pressure over the ground, Reduce the phenomenon that mud " altering " enters soil, water body or underground piping.
Embodiment 3, as shown in figure 12, the present embodiment is the difference from example 2 is that in the present embodiment in water cut section 1 also Increase has horizontally disposed cutting nozzle 105, which can carry out more the soil body around drilling tool 9 It also can ensure that whirl spraying pile body 16 is straight while can effectively control whirl spraying pile body diameter according to construction requirement for strong cutting Diameter is sufficiently large.

Claims (9)

1. a kind of major diameter ultra-deep high pressure jet grouting construction method, it is characterised in that the construction method includes the following steps: Pilot hole is being carried out using pilot hole drilling machine to slip casting point;After pore-forming, the drilling tool of whirl spraying machinery is transferred to bottom hole, under the drilling tool End has a water cut section and whitewashing section, and the water cut section is located at the top of the whitewashing section;It is mechanical to run the whirl spraying, Revolution above mention the drilling tool while, the water cut section spray outward high pressure water flow with to the soil body around the drilling tool into Row cuts into mud, and the outside gunite of the whitewashing section around the drilling tool to form whirl spraying pile body.
2. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 1, it is characterised in that described During the pilot hole of pilot hole drilling machine, steel pile casting is set at layer of sand, rubble stratum or the boulder bed encountered and carries out retaining wall.
3. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 1, it is characterised in that described After pilot hole drilling machine completes pilot hole and the drilling rod of extraction thereon, setting thin-walled pilot hole pipe is described thin to projected depth in the hole Wall pilot hole pipe can be crashed to pieces under the high pressure water flow jet-action of the water cut section.
4. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 1, it is characterised in that described It is additionally provided between water cut section and the whitewashing section and returns slurry section and ground pressure test section, the process above proposed is turned round in the drilling tool In, the ground pressure value size around drilling tool described in test section real-time monitoring is pressed describedly, and the slurry section of returning cuts the water cut section It cuts the mud to be formed and carries out vacuum pump drainage;If test section is pressed to monitor that the ground pressure value around the drilling tool flattens with being greater than describedly Weighing apparatus value then returns the mud pump drainage speed of slurry section described in increasing;If test section is pressed to monitor the ground pressure around the drilling tool describedly Value is less than ground pressure equilibrium valve, then the mud pump drainage speed of slurry section is returned described in reduction.
5. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 4, it is characterised in that utilize institute Stating the method for returning slurry section progress vacuum pump drainage mud is:It is provided with a vacuum in the drilling tool and returns slurry channel, the vacuum is returned The pulp returning port opened up on slurry channel and the drilling tool outer wall is connected, and the vacuum returns slurry channel for mud through the pulp returning port In pump drainage to the mud conditioning pond resting on the ground.
6. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 5, it is characterised in that described Vacuum return slurry channel pump drainage mud during, be set to the vacuum return slurry channel in a spray nozzle into it mud Conveying direction is sprayed water, to improve the mobility of mud.
7. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 1, it is characterised in that the water There is horizontally disposed cutting nozzle on segment of cutting, there is horizontally disposed cement slurry nozzle in the whitewashing section, in the brill During tool revolution above mentions, the cutting nozzle level sprays high pressure water flow outward, and the cement slurry nozzle level sprays outward Jetting mud.
8. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 1, it is characterised in that the water There is the cutting nozzle being arranged diagonally downward on segment of cutting, there is the cement slurry nozzle for tilting upward setting in the whitewashing section, Be obliquely installed angle by adjusting the cutting nozzle and the cement slurry nozzle respectively, with control the cement slurry nozzle to The high pressure water flow that the cement slurry of outer injection and the cutting nozzle spray outward is intersected at design diameter position, in the brill The whirl spraying pile body of design diameter is formed around tool.
9. a kind of major diameter ultra-deep high pressure jet grouting construction method according to claim 8, it is characterised in that the water Also there is cutting nozzle of the row of horizontal to setting on segment of cutting.
CN201810712144.8A 2018-07-03 2018-07-03 A kind of major diameter ultra-deep high pressure jet grouting construction method Pending CN108914939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810712144.8A CN108914939A (en) 2018-07-03 2018-07-03 A kind of major diameter ultra-deep high pressure jet grouting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810712144.8A CN108914939A (en) 2018-07-03 2018-07-03 A kind of major diameter ultra-deep high pressure jet grouting construction method

Publications (1)

Publication Number Publication Date
CN108914939A true CN108914939A (en) 2018-11-30

Family

ID=64423367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810712144.8A Pending CN108914939A (en) 2018-07-03 2018-07-03 A kind of major diameter ultra-deep high pressure jet grouting construction method

Country Status (1)

Country Link
CN (1) CN108914939A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409434A (en) * 2019-06-25 2019-11-05 浙江省建工集团有限责任公司 A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN113186930A (en) * 2021-04-28 2021-07-30 建基建设集团有限公司 Improved MJS construction machine and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1109937A (en) * 1994-03-01 1995-10-11 亚斯克研究所株式会社 Excavator and a method of forming a modified ground in an earthen foundation with the use of the same
CN1944809A (en) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 Three pipe double high pressure rotary jet sprouting reinforced construction method and its equipment
CN203174588U (en) * 2013-02-17 2013-09-04 广州市吉特高喷灌浆工程有限公司 Device capable of forming high-strength jet grouting piles in silt layer
CN106761395A (en) * 2017-03-11 2017-05-31 上海久卓机电设备有限公司 Deep hole drill
CN107542084A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
CN108086296A (en) * 2017-11-20 2018-05-29 中冶建筑研究总院(深圳)有限公司 Sound joint injected foundation reinforces engineering method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1109937A (en) * 1994-03-01 1995-10-11 亚斯克研究所株式会社 Excavator and a method of forming a modified ground in an earthen foundation with the use of the same
CN1944809A (en) * 2006-10-26 2007-04-11 上海隧道工程股份有限公司 Three pipe double high pressure rotary jet sprouting reinforced construction method and its equipment
CN203174588U (en) * 2013-02-17 2013-09-04 广州市吉特高喷灌浆工程有限公司 Device capable of forming high-strength jet grouting piles in silt layer
CN107542084A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
CN106761395A (en) * 2017-03-11 2017-05-31 上海久卓机电设备有限公司 Deep hole drill
CN108086296A (en) * 2017-11-20 2018-05-29 中冶建筑研究总院(深圳)有限公司 Sound joint injected foundation reinforces engineering method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱磊: "《RJP高压旋喷法在深基坑工程中的应用》", 《施工技术》 *
梁峰: "《新疆北部某水电站围堰、基础防渗设计》", 《广东水利水电》 *
陶忠平: "《云南水利水电工程地质实践》", 28 February 2010, 云南科技出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409434A (en) * 2019-06-25 2019-11-05 浙江省建工集团有限责任公司 A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN113186930A (en) * 2021-04-28 2021-07-30 建基建设集团有限公司 Improved MJS construction machine and construction method

Similar Documents

Publication Publication Date Title
CN110424385A (en) The construction of major diameter high verticality jet grouting stake in ovum rubble stratum
CN110953013B (en) Controllable jet flow punching pressure relief and permeability increase device and method for soft coal seam
CN104533513B (en) High-pressure abrasive material gas jet coal-breaking pressure relief and permeability improvement equipment and method
CN109778835A (en) A kind of displaced type rotary jet grouting stratum consolidation method
CN108775012A (en) A kind of major diameter ultra-deep high pressure jet grouting device and its grouting process
CN108914939A (en) A kind of major diameter ultra-deep high pressure jet grouting construction method
CN108914938A (en) A kind of controlled diameter high pressure jet grouting construction method
CN112281826B (en) Construction method for forming pile by rotary spraying in ovoid gravel stratum
JP5717148B2 (en) Underground consolidated body construction method
CN107313420B (en) The construction method of strong rammer densification block pier is replaced using high pressure water
CN108775011A (en) A kind of controlled diameter high pressure jet grouting device and its grouting process
CN208033274U (en) A kind of triple churning equipment of soil remediation
CN110924385B (en) High-pressure jet grouting pile construction process
KR20240073779A (en) Independent multi-channel full-hole reverse circulation cluster down-the-hole hammer
CN204920977U (en) Spray tube canopy construction equipment is revolved in advance to percussion drilling formula
CN208563316U (en) A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit
JP5305573B2 (en) Underground solid body forming device and underground solid body forming method
CN106592514A (en) Construction method of old city riverway piling wall integrated vertical type retaining wall
CN108914940A (en) A kind of multiple superhigh pressure jetting grouting construction method of super-large diameter
CN204098791U (en) A kind of self-drilling hollow anchor bars drill bit
CN208633116U (en) A kind of MJS stake machine for preventing spoil disposal suction inlet from blocking
CN216194693U (en) Multi-nozzle multi-angle combined high-pressure jet grouting construction equipment
CN108797563A (en) A kind of multiple superhigh pressure jetting grouting device of super-large diameter and its grouting process
CN207278235U (en) Drilling machine, shield machine churning breast wall apparatus
CN214883784U (en) Sinking-assisting structure of open caisson

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication