CN110453678A - A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation - Google Patents

A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation Download PDF

Info

Publication number
CN110453678A
CN110453678A CN201910694810.4A CN201910694810A CN110453678A CN 110453678 A CN110453678 A CN 110453678A CN 201910694810 A CN201910694810 A CN 201910694810A CN 110453678 A CN110453678 A CN 110453678A
Authority
CN
China
Prior art keywords
pile
stake
jet grouting
drilling
rotary jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910694810.4A
Other languages
Chinese (zh)
Other versions
CN110453678B (en
Inventor
唐士润
黄永飞
赵鹏栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Heng Jie Luqiao Maintenance Technology Co Ltd
Original Assignee
Gansu Heng Jie Luqiao Maintenance Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Heng Jie Luqiao Maintenance Technology Co Ltd filed Critical Gansu Heng Jie Luqiao Maintenance Technology Co Ltd
Priority to CN201910694810.4A priority Critical patent/CN110453678B/en
Publication of CN110453678A publication Critical patent/CN110453678A/en
Application granted granted Critical
Publication of CN110453678B publication Critical patent/CN110453678B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Architecture (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to subgrade settlement Treatment process fields, a kind of method for ruling reason highway in loess area sedimentation by law more particularly to high-pressure rotary jet grouting pile double pipe, including preparation of construction, specific construction parameter is determined by test pile and the setting-out of stake position, aperture operation is carried out to the point of stake position setting-out, then slurrying, intubation and whitewashing, and pile crown is handled, the present invention can make the soil body and cement slurry sufficiently mix solidification, later period pile is the soil cement cylinder pile of diameter 60-150cm, pile is good, meet weak subgrade, mutual compacted occlusion between cement earth pile, weak subgrade can be made to be consolidated into an entirety, the differential subsidence that this method is mainly used in Highway in Loess Area roadbed is administered, embankment and subjacent bed can be administered, subgrade settlement caused by roadbed weakness can thoroughly be administered.

Description

A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation
Technical field
The invention belongs to subgrade settlement Treatment process fields, and in particular to a kind of high-pressure rotary jet grouting pile double pipe ruling by law reason loess The method of highway subgrade sedimentation.
Background technique
The presence of collapsibility of loess, the consolidation settlement of loess, the mutation of different section geological condition or different sections of highway The method for processing foundation to differ greatly is taken, so that the section sedimentation of features as poor geologic condition is big, and the sedimentation of other sections is small, generates Differential subsidence especially builds the highways at different levels in Canal in Loess Area after the several years that is open to traffic, and this differential subsidence gradually accumulates Tired, often there is irregular depression in road surface, serious jump vehicle phenomenon occurs, and the jump vehicle as caused by Uneven road generates Impact force the irregularity degree on road surface can be made to be further exacerbated by, formed vicious circle.Highway protect it is smooth due to, for This ground subsidence management often only overlays base and surface layer, can not eradicate to the most fundamental reason is settled.
In recent years, high-pressure rotary jet grouting pile administers the biggish subgrade defect of highway subgrade differential subsidence.In northwest China loess For area, high-pressure rotary jet grouting pile substance tube method expanded diameter is smaller, generally less than 50cm, when pilespacing is certain, Ge Geshui Occlusion can not be formed between soil stake, weak roadbed can not be connected into an entirety, regulation effect is undesirable.When diminution stake Away from when, stake digit is near to reduce and doubles above, and construction period and project cost will substantially increase.Since Canal in Loess Area loess is anti- Shear ability is weak, when using the construction of high-pressure rotary jet grouting pile tri-tube method, since tri-tube method pressure is larger, administers tight on the outside of roadbed When the roadbed of adjacent side slope part, high pressure water mud is easy to break through side slope, causes secondary disease to roadbed.
Summary of the invention
For above-mentioned problems of the prior art and deficiency, the present invention provides a kind of high-pressure rotary jet grouting pile double pipe ruling by law The method for managing highway in loess area sedimentation.
To achieve the above object, the invention provides the following technical scheme:
A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation, this method carry out as steps described below:
Step 1: after Area Of Safe Operation laying is finished, the roadbed side slope for treating improvement is reconnoitred, and discovery side slope, which exists, to be fallen into When cave or longer through crack, simultaneously consolidation process is recorded in time, can carry out high-pressure rotary jet grouting pile work after consolidation process Industry;
Step 2: treating the initial measurement of higher degree of road surface laying elevation observation point progress for administering roadbed, lay the side of elevation observation point Formula is along the longitudinal 3 × 3m rectangular arrangement of route, work progress, and per half a day carries out a measurement of higher degree, according to road hump feelings Condition adjusts grouting pressure in time, and to prevent, design requirement is not achieved in road surface raising height deficiency or raising height is excessively high causes road Face cracking;
Step 3: the setting-out of stake position is carried out by construction drawing, when administering Bridgehead by Blastig sedimentation, the position of the first campshed position cross central line For the position of abutment parados 1/2 diameter backward, when setting-out, should be according to expansion joint center line in bridge original design drawing and abutment parados The distance between, the first campshed position cross central line is calculated at a distance from expansion joint, and stake position cross central line is vertical with route always To vertical, after determining the first campshed position center line, the setting-out of stake position is carried out by design pilespacing, pile layout form and stake digit;
When administering general subgrade sedimentation, found out first according to the sedimentation combination design drawing of median strip corrugated guardrail or kerbstone The maximum position of settling amount, then carries out precise measurement with level, determines its position center line, then settles feelings according to two sides Condition carries out the setting-out of stake position;
Step 4: after setting-out, carrying out aperture operation with drilling machine, slurrying and bore operation are carried out after aperture;
Step 5: preparing cement slurry according to the determining ratio of mud of design, when carrying out slurrying operation, water is added according to the ratio of mud first The dosage of mud and water, Xian Jiashui stir 5min with pulper afterwards plus cement, and qualified to every disk cement slurry specific gravity self-test is laggard Enter drilling and intubation process;
Step 6: when double tube method Construction of High Pressure Jet Grouting Pile, drilling and intubation two procedures be combined into one, before drilling, drilling machine by Horizontal ruler is strictly leveled from both direction in length and breadth, and verticality must not exceed 1.5%;
Step 7: shotcrete pipe sinks after arrival projected depth, stops drilling, and rotation does not stop, and the increasing of high-pressure slurry pump pressure is set to construction Evaluation, air compressor machine pressure remain unchanged, side whitewashing, Bian Xuanzhuan, while being promoted and being bored according to the promotion speed that design and test pile determine Bar, after whirl spraying is completed in whole stake, after confirming that slip casting machine and air compressor machine are closed, ability dismounting drilling rod carries out next pile body construction;
Step 8: after entire work surface whitewashing terminates, for drilling machine according to former stake position aperture again, aperture depth is road surface structare layer Depth uses C20 concrete backfill after aperture;
Step 9: after construction, by strong to high-pressure rotary jet grouting pile pile body drilling core examination high-pressure rotary jet grouting pile pile body uniaxial compressive Degree and Bearing Capacity of Composite Foundation, high-pressure rotary jet grouting pile pile body uniaxial compressive strength and Bearing Capacity of Composite Foundation should meet design requirement.
Further, the calculation method that the amount of cement slurry is prepared in the step 5 is volumetric method, wherein volumetric method are as follows:
(1)
In (1) formula, Q is the whitewashing amount (m needed3);
DeFor whirl spraying induration diameter (m);
D0For slip casting pipe diameter (m);
K1For filling rate, 0.75~0.9;
h1For whirl spraying length (m);
K2For the filling rate of non-whirl spraying range soil, 0.5~0.75;
h2For non-whirl spraying length (m);
β is loss coefficient, 0.1~0.2;
By statistical analysis, discovery is long when stake, and cement slurry dosage is smaller, on the basis of volumetric method, utilizes Excel table Data fitting is carried out, fits and is suitable for the calculation formula of Canal in Loess Area high-pressure rotary jet grouting pile cement slurry dosage
(2)
(2) in formula, Q is the whitewashing amount (m needed3);
D is whirl spraying induration diameter (m);
K is filling rate, 0.75~0.9;
H is that stake is long (m);
β is loss coefficient, 0.1~0.2;
X is the long influence coefficient of stake;
It can be obtained by above formula (2), cement slurry dosage continues to use the formula of original soft clay area construction, it is clear that does not meet practical feelings Condition, formula (2) show that being conducive to the finer controlled investment of owner's unit and unit in charge of construction carries out cost control and construction The control of quality.
Compared with prior art, the beneficial effects of the present invention are:
Cement grout is passed through drilling rod end using high-pressure grout injector using high-pressure rotary jet grouting pile double tube method construction system by the present invention Less than 0.2mm spray head, the soil body is sprayed into not less than 25MPa pressure so that high speed is horizontal, by the impact force cross cutting of cement grout Soil layer, while drilling rod is promoted slowly with the speed low speed of 15-20cm/min on one side, is made with the speed low speed rotation of 16-20rpm The soil body and cement slurry sufficiently mix solidification, and later period pile is the soil cement cylinder pile of diameter 60-150cm, and pile is good, meet weak Roadbed, mutually compacted occlusion, can make weak subgrade be consolidated into an entirety, this method is mainly used in loess between cement earth pile The differential subsidence of local highway roadbed can administer embankment and subjacent bed, can thoroughly administer roadbed weakness and cause on administering Subgrade settlement.
Detailed description of the invention
Fig. 1 is process flow diagram of the invention;
Fig. 2 is the long influence coefficient of stake and the long relational graph of stake.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
As shown in figure 1 and 2, a kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation, the party Method carries out as steps described below:
Step 1: after Area Of Safe Operation laying is finished, the roadbed side slope for treating improvement is reconnoitred, and discovery side slope, which exists, to be fallen into When cave or longer through crack, simultaneously consolidation process is recorded in time, can carry out high-pressure rotary jet grouting pile work after consolidation process Industry;
Step 2: treating the initial measurement of higher degree of road surface laying elevation observation point progress for administering roadbed, lay the side of elevation observation point Formula is along the longitudinal 3 × 3m rectangular arrangement of route, work progress, and per half a day carries out a measurement of higher degree, according to road hump feelings Condition adjusts grouting pressure in time, and to prevent, design requirement is not achieved in road surface raising height deficiency or raising height is excessively high causes road Face cracking;
Step 3: the setting-out of stake position is carried out by construction drawing, when administering Bridgehead by Blastig sedimentation, the position of the first campshed position cross central line For the position of abutment parados 1/2 diameter backward, when setting-out, should be according to expansion joint center line in bridge original design drawing and abutment parados The distance between, the first campshed position cross central line is calculated at a distance from expansion joint, and stake position cross central line is vertical with route always To vertical, after determining the first campshed position center line, the setting-out of stake position is carried out by design pilespacing, pile layout form and stake digit;
When administering general subgrade sedimentation, found out first according to the sedimentation combination design drawing of median strip corrugated guardrail or kerbstone The maximum position of settling amount, then carries out precise measurement with level, determines its position center line, then settles feelings according to two sides Condition carries out the setting-out of stake position;
Step 4: according to the point of the stake position setting-out in step 3, carrying out aperture operation with drilling machine, after drill bit centering, drilling machine is tight Style is flat, and perforation of boring machine depth is pavement structure layer depth, carries out water-proofing treatment to all pilot holes after aperture, packed using working out Aperture material blocks aperture, to spray operation after drilling;
Step 5: preparing cement slurry according to the determining ratio of mud of design, when carrying out slurrying operation, water is added according to the ratio of mud first The dosage of mud and water, Xian Jiashui stir 5min with pulper afterwards plus cement, and qualified to every disk cement slurry specific gravity self-test is laggard Enter drilling and intubation process;
Step 6: when double tube method Construction of High Pressure Jet Grouting Pile, drilling and intubation two procedures be combined into one, before drilling, drilling machine by Horizontal ruler is strictly leveled from both direction in length and breadth, and verticality is no more than 1.5%, can be by injection since roadbed soil compaction is higher Manage itself injection or vibration injection, injection or vibration penetration process are as follows: starting drilling machine, while opening high pressure cement stock pump low pressure Cement grout is conveyed, air compressor machine is opened, its pressure is made to be maintained at 0.5-0.7Mpa, drilling rod is vibrated along leading truck, under jet stream pore-forming Heavy, until stake bottom designed elevation, observing operating current should not exceed rated value, when extension drill rod, it is necessary to first close cement slurrypump And air compressor machine, since loess has collapsibility, in jet stream sinking watching, jetting is forbidden to sink, in drilling rod sinking watching, slip casting machine Pressure is maintained at 2-5Mpa, and slip casting machine pressure crosses macaroni sinking difficulty, and slip casting machine pressure is excessive to be easy to cause cement slurry to waste, To prevent adjacent studs during whitewashing from influencing each other, slotting mode must be jumped using interlacing when intubation and constructed;
Step 7: first test pile obtains parameters of construction technology by test pile, carries out spray operation, when shotcrete pipe sinks to reaching design deeply After degree, stop drilling, rotation does not stop, and high-pressure slurry pump pressure increasing to detail design value, air compressor machine pressure remains unchanged, side spray Slurry, Bian Xuanzhuan, while drilling rod is promoted according to the promotion speed that design and test pile determine, after whirl spraying is completed in whole stake, confirm slip casting machine It, could dismounting drilling rod after being closed with air compressor machine;
Step 8: after entire work surface whitewashing terminates, for drilling machine according to former stake position aperture again, aperture depth is road surface structare layer Depth uses C20 concrete backfill after aperture;
Step 9: by high-pressure rotary jet grouting pile pile body drilling core examination high-pressure rotary jet grouting pile pile body uniaxial compressive strength and compound Base bearing capacity, high-pressure rotary jet grouting pile pile body uniaxial compressive strength and Bearing Capacity of Composite Foundation should meet design requirement.
Embodiment 1
The present invention when specifically used, in highway Lanzhou, the capital G6 hiding, administer by section (second phase) maintenance engineering high-pressure rotary jet grouting pile Construct 5024m, calms down section (silver section) damaged or destroyed by flood recovery project (second phase) project SK1693-SK1741 in G22 Lan-qin expressway Section has 21 settlement points with XK1693-XK1741 sections, amounts to 4636 stake positions, and high-pressure rotary jet grouting pile administers construction 59587m.
In the construction of two above Highway Maintenance, Construction of High Pressure Jet Grouting Pile amounts to 64611m, in the construction process sternly It is 25Mpa that lattice, which control grouting pressure, and ratio of mud 1:1, it is 0.15-0.25 (m/min) that drilling rod, which promotes speed, right after construction Pile strength, Bearing Capacity of Composite Foundation are detected, and are all satisfied design requirement, and carried out data to practical cement slurry dosage Statistics is as a result following such as table 1:
For 12m, the theoretical amount of every linear meter(lin.m.) cement slurry is carried out with volumetric method and discharge rate method respectively.
Volumetric method:
The equivalent every linear meter(lin.m.) of cement consumption is 189L.
Discharge rate method:
The equivalent every linear meter(lin.m.) of cement consumption is 575L.
In above formula:
Q-needs whitewashing amount (m3);
De- whirl spraying induration diameter (m);
D0- slip casting pipe diameter (m);
K1- filling rate, 0.75~0.9;
h1- whirl spraying length (m);
K2The filling rate of-non-whirl spraying range soil, 0.5~0.75;
h2- non-whirl spraying length (m);
β-loss coefficient, 0.1~0.2;
V-promotion speed (m/min);
H-spray penetration (m);
Q-unit whitewashing amount (m3/min)。
By calculating above, the every linear meter(lin.m.) cement slurry dosage theoretical value of volumetric method is the 69.65% of actual count value;Discharge rate method Every linear meter(lin.m.) cement slurry dosage theoretical value is the 211.90% of actual count value.The calculated result of obvious volumetric method is more nearly reality Statistical value.By statistical analysis, discovery is long when stake, and cement slurry dosage is smaller.
On the basis of volumetric method, data fitting is carried out using Excel table, fits and is revolved suitable for Canal in Loess Area high pressure Spray the calculation formula of stake cement slurry dosage.
Double tube method high-pressure rotary jet grouting pile punishment Canal in Loess Area subgrade settlement influences many because being known as of cement slurry dosage, and stake is long Influence be mainly reflected in and return slurry and high roadbed soil does not consolidate two aspects, since construction parameter is constant in the long range of stake, in order to Simplify and calculate, this engineering method is on the basis of original volumetric method calculation formula, it is assumed that has carried out the water of whirl spraying in the long range of entire stake Mud is calculated using original formula and the every linear meter(lin.m.) cement slurry dosage result such as the following table 2 of engineering statistics:
The long influence coefficient of stake as shown in Fig. 1 and the long relational graph of stake are obtained according to table 2.
It is assumed that considering the long influence of stake, it can be deduced that following formula on the basis of carrying out whirl spraying in the long range of entire stake:
In formula:
Q-needs whitewashing amount (m3);
D-whirl spraying induration diameter (m);
K-filling rate, 0.75~0.9;
H-stake is long (m);
β-loss coefficient, 0.1~0.2;
The long influence coefficient of x-stake.
Cement slurry dosage continues to use the formula of original soft clay area construction, it is clear that does not meet actual conditions, above formula pushes away Out, be conducive to the finer controlled investment of owner's unit and unit in charge of construction carries out the control of cost control and construction quality.

Claims (2)

1. a kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation, which is characterized in that this method according to Following step carries out:
Step 1: after Area Of Safe Operation laying is finished, the roadbed side slope for treating improvement is reconnoitred, and discovery side slope, which exists, to be fallen into When cave or longer through crack, simultaneously consolidation process is recorded in time, can carry out high-pressure rotary jet grouting pile work after consolidation process Industry;
Step 2: treating the initial measurement of higher degree of road surface laying elevation observation point progress for administering roadbed, lay the side of elevation observation point Formula is along the longitudinal 3 × 3m rectangular arrangement of route, work progress, and per half a day carries out a measurement of higher degree, according to road hump feelings Condition adjusts grouting pressure in time, and to prevent, design requirement is not achieved in road surface raising height deficiency or raising height is excessively high causes road Face cracking;
Step 3: the setting-out of stake position is carried out by construction drawing, when administering Bridgehead by Blastig sedimentation, the position of the first campshed position cross central line For the position of abutment parados 1/2 diameter backward, when setting-out, should be according to expansion joint center line in bridge original design drawing and abutment parados The distance between, the first campshed position cross central line is calculated at a distance from expansion joint, and stake position cross central line is vertical with route always To vertical, after determining the first campshed position center line, the setting-out of stake position is carried out by design pilespacing, pile layout form and stake digit;
When administering general subgrade sedimentation, found out first according to the sedimentation combination design drawing of median strip corrugated guardrail or kerbstone The maximum position of settling amount, then carries out precise measurement with level, determines its position center line, then settles feelings according to two sides Condition carries out the setting-out of stake position;
Step 4: after setting-out, carrying out aperture operation with drilling machine, aperture protection is carried out after drilling and prepares cement slurry;
Step 5: preparing cement slurry according to the determining ratio of mud of design, when carrying out slurrying operation, water is added according to the ratio of mud first The dosage of mud and water, Xian Jiashui stir 5min with pulper afterwards plus cement, and qualified to every disk cement slurry specific gravity self-test is laggard Enter drilling and intubation process;
Step 6: when double tube method Construction of High Pressure Jet Grouting Pile, drilling and intubation two procedures be combined into one, before drilling, drilling machine by Horizontal ruler is strictly leveled from both direction in length and breadth, and verticality must not exceed 1.5%;
Step 7: after shotcrete pipe reaches projected depth, stopping drilling, rotation does not stop, and high-pressure slurry pump pressure increases to detail design Value, air compressor machine pressure remain unchanged, side whitewashing, Bian Xuanzhuan, while promoting drilling rod according to the promotion speed that design and test pile determine, After whirl spraying is completed in whole stake, after confirming that slip casting machine and air compressor machine are closed, ability dismounting drilling rod carries out the construction of next pile body;
Step 8: after entire work surface whitewashing terminates, for drilling machine according to former stake position aperture again, aperture depth is road surface structare layer Depth uses C20 concrete backfill after aperture;
Step 9: after construction, by strong to high-pressure rotary jet grouting pile pile body drilling core examination high-pressure rotary jet grouting pile pile body uniaxial compressive Degree and Bearing Capacity of Composite Foundation, high-pressure rotary jet grouting pile pile body uniaxial compressive strength and Bearing Capacity of Composite Foundation should meet design requirement.
2. a kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation as described in claim 1, special Sign is that the calculation method that the amount of cement slurry is prepared in the step 5 is volumetric method, wherein volumetric method are as follows:
(1)
In (1) formula, Q is the whitewashing amount (m needed3);
DeFor whirl spraying induration diameter (m);
D0For slip casting pipe diameter (m);
K1For filling rate, 0.75~0.9;
h1For whirl spraying length (m);
K2For the filling rate of non-whirl spraying range soil, 0.5~0.75;
h2For non-whirl spraying length (m);
β is loss coefficient, 0.1~0.2;
By statistical analysis, discovery is long when stake, and cement slurry dosage is smaller, on the basis of volumetric method, utilizes Excel table Data fitting is carried out, the calculation formula suitable for Canal in Loess Area high-pressure rotary jet grouting pile cement slurry dosage is fitted are as follows:
(2)
(2) in formula, Q is the whitewashing amount (m needed3);
D is whirl spraying induration diameter (m);
K is filling rate, 0.75~0.9;
H is that stake is long (m);
β is loss coefficient, 0.1~0.2;
X is the long influence coefficient of stake;
It can be obtained by above formula (2), cement slurry dosage continues to use the formula of original soft clay area construction, it is clear that does not meet practical feelings Condition, formula (2) show that being conducive to the finer controlled investment of owner's unit and unit in charge of construction carries out cost control and construction The control of quality.
CN201910694810.4A 2019-07-30 2019-07-30 Method for treating loess highway subgrade settlement by high-pressure jet grouting pile double-pipe method Expired - Fee Related CN110453678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910694810.4A CN110453678B (en) 2019-07-30 2019-07-30 Method for treating loess highway subgrade settlement by high-pressure jet grouting pile double-pipe method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910694810.4A CN110453678B (en) 2019-07-30 2019-07-30 Method for treating loess highway subgrade settlement by high-pressure jet grouting pile double-pipe method

Publications (2)

Publication Number Publication Date
CN110453678A true CN110453678A (en) 2019-11-15
CN110453678B CN110453678B (en) 2021-01-12

Family

ID=68483988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910694810.4A Expired - Fee Related CN110453678B (en) 2019-07-30 2019-07-30 Method for treating loess highway subgrade settlement by high-pressure jet grouting pile double-pipe method

Country Status (1)

Country Link
CN (1) CN110453678B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111235993A (en) * 2020-01-19 2020-06-05 吴桥县交通运输局 Improvement device and improvement method for collapsible loess subgrade
CN111636450A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Construction method of high-pressure rotary-spraying impervious wall on gravel layer
CN112281933A (en) * 2020-10-19 2021-01-29 中铁六局集团有限公司 Construction method of high-pressure jet grouting pile test
CN117782824A (en) * 2024-02-26 2024-03-29 陇东学院 Highway subgrade fixed-point pressure measurement equipment and measurement method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429766A (en) * 2008-11-27 2009-05-13 吴哲慧 Ground strengthened high pressure rotary spraying pile construction technique
CN105421328A (en) * 2015-11-18 2016-03-23 中铁西北科学研究院有限公司 Collapsible loess area roadbed foundation treatment structure and construction method
CN106223329A (en) * 2016-08-08 2016-12-14 福建永强岩土股份有限公司 A kind of construction method of full-sleeve rotary churning pile
CN107542084A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
CN108797598A (en) * 2018-07-09 2018-11-13 江苏地基工程有限公司 The construction technology of pre-loaded support struts in a kind of deep basal pit
CN109098175A (en) * 2018-08-21 2018-12-28 江苏兴厦建设工程集团有限公司 A kind of tri-axes deep mixing pile construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429766A (en) * 2008-11-27 2009-05-13 吴哲慧 Ground strengthened high pressure rotary spraying pile construction technique
CN105421328A (en) * 2015-11-18 2016-03-23 中铁西北科学研究院有限公司 Collapsible loess area roadbed foundation treatment structure and construction method
CN107542084A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Hole pile making method is drawn in triple-pipe high pressure jet grouting stake under rubble, cobble geological environment
CN106223329A (en) * 2016-08-08 2016-12-14 福建永强岩土股份有限公司 A kind of construction method of full-sleeve rotary churning pile
CN108797598A (en) * 2018-07-09 2018-11-13 江苏地基工程有限公司 The construction technology of pre-loaded support struts in a kind of deep basal pit
CN109098175A (en) * 2018-08-21 2018-12-28 江苏兴厦建设工程集团有限公司 A kind of tri-axes deep mixing pile construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111235993A (en) * 2020-01-19 2020-06-05 吴桥县交通运输局 Improvement device and improvement method for collapsible loess subgrade
CN111636450A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Construction method of high-pressure rotary-spraying impervious wall on gravel layer
CN112281933A (en) * 2020-10-19 2021-01-29 中铁六局集团有限公司 Construction method of high-pressure jet grouting pile test
CN117782824A (en) * 2024-02-26 2024-03-29 陇东学院 Highway subgrade fixed-point pressure measurement equipment and measurement method

Also Published As

Publication number Publication date
CN110453678B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
CN110453678A (en) A kind of method of high-pressure rotary jet grouting pile double pipe ruling by law reason highway in loess area sedimentation
CN101886382B (en) Soft foundation reinforcing method of existing railway or highway subgrade construction
CN208605184U (en) The ruggedized construction of loose highfill embankment is worn under a kind of large cross-section tunnel
CN106192650B (en) Coordinate the operation highway bridgehead vehicle jump disposal structure and method of control based on malformation
CN203383119U (en) Novel widening structure of highway embankment
CN104278608A (en) Novel highway embankment widened structure and construction method
CN206902479U (en) Ballastless track roadbed Deformation control is worn under a kind of aqueduct with repairing structure
CN109736346A (en) Steel anchor tube reinforces weathered rock formation reinforcement balance weight retaining wall structure and construction method
CN107130475A (en) Ballastless track roadbed Deformation control is worn under a kind of aqueduct with repairing structure and method
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN108506015A (en) Excavate the construction method of artificial push pipe and application Pipe Jacking in a kind of Large Diameter Pipeline point storehouse
CN105569071B (en) A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction
CN103276649B (en) Side is had to limit layering many thickness Stone Filled Embankment construction method
CN110965416B (en) Bamboo reinforcement system for reinforcing mountain area high-fill roadbed and construction method
CN107740434B (en) Construction method for waterproof curtain of foundation pit with dam for broken sand pebbles and dolomite
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN109914240B (en) Construction method for treating bump at bridge head by polyurethane high polymer grouting under traffic conditions
CN104404838A (en) Collapsed loess subgrade base treatment method for railway with speed more than 200km
CN111350104A (en) Construction method of high-speed railway excavation roadbed in deep artificial spoil area
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN109704656A (en) A kind of bridge joint hillside fields polymer grouting strengthening method
CN103276716B (en) A kind of changeover portion CFG stake and mattress layer composite foundation stabilization construction method
CN102392402A (en) Road and bridge transition section grouting construction method used during jacking construction
CN107142902A (en) High head and large flow tunneling boring damming method
CN113622238B (en) Widened roadbed structure of expressway and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210112

Termination date: 20210730