CN107527155A - Construction project supervisory systems - Google Patents
Construction project supervisory systems Download PDFInfo
- Publication number
- CN107527155A CN107527155A CN201710795575.0A CN201710795575A CN107527155A CN 107527155 A CN107527155 A CN 107527155A CN 201710795575 A CN201710795575 A CN 201710795575A CN 107527155 A CN107527155 A CN 107527155A
- Authority
- CN
- China
- Prior art keywords
- information
- construction
- subsystem
- project
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 403
- 238000007726 management method Methods 0.000 claims abstract description 136
- 238000013500 data storage Methods 0.000 claims abstract description 67
- 238000012544 monitoring process Methods 0.000 claims description 57
- 238000000034 method Methods 0.000 claims description 38
- 239000004035 construction material Substances 0.000 claims description 31
- 238000007689 inspection Methods 0.000 claims description 30
- 230000007613 environmental effect Effects 0.000 claims description 26
- 238000005516 engineering process Methods 0.000 claims description 21
- 230000008569 process Effects 0.000 claims description 19
- 239000000463 material Substances 0.000 claims description 18
- 210000000352 storage cell Anatomy 0.000 claims description 12
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 7
- 238000004458 analytical method Methods 0.000 claims description 6
- 238000013523 data management Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 5
- 238000013439 planning Methods 0.000 claims description 5
- 230000002159 abnormal effect Effects 0.000 claims description 4
- 238000007405 data analysis Methods 0.000 claims description 4
- 238000013461 design Methods 0.000 claims description 3
- 210000004027 cell Anatomy 0.000 claims 2
- 238000000151 deposition Methods 0.000 claims 1
- 230000008901 benefit Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 235000019504 cigarettes Nutrition 0.000 description 1
- 230000003749 cleanliness Effects 0.000 description 1
- 238000002716 delivery method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 210000004209 hair Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 231100000331 toxic Toxicity 0.000 description 1
- 230000002588 toxic effect Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of construction project supervisory systems, construction project supervisory systems provided by the invention includes data acquisition subsystem, basic information management subsystem, construction project information subsystem, project management subsystem, quality safety management subsystem and data storage subsystem;Data acquisition subsystem, basic information management subsystem, construction project information subsystem, project management subsystem, quality safety management subsystem are connected with data storage subsystem, project management subsystem is also connected with construction project information subsystem, and project management subsystem and construction project information subsystem are connected with quality safety management subsystem.Construction project supervisory systems provided by the invention, which realizes each construction data in construction project, quickly, efficiently, accurately link up to improve the efficiency of construction of construction project.
Description
Technical field
The present invention relates to construction project technology, more particularly to a kind of construction project supervisory systems.
Background technology
With the fast development of social economy, China's construction business enters the high-speed developing period.But construction quality is simultaneously
Unstable, quality accident still happens occasionally, and the badly damaged public rights and interests of the people, project delivery method need further
Improve.In order to improve the quality level of construction project, it is necessary to the implementation of strict supervision construction project.
In the prior art, unit in charge of construction, project management unit, Party A etc. are each using oneself in engineering construction project
System is operated, and is not in contact between each system and interface, it is impossible to effectively using the association between the construction data of each system
Relation, it have impact on the completion efficiency of engineering construction project.
The content of the invention
The present invention provides a kind of construction project supervisory systems, realize construction data in construction project can quickly, height
Effect, accurately link up.
The present invention provides a kind of construction project supervisory systems, including:
Data acquisition subsystem, basic information management subsystem, construction project information subsystem, project management subsystem,
Quality safety management subsystem and data storage subsystem;The data acquisition subsystem, basic information management subsystem, build
Project information subsystem, project management subsystem, quality safety management subsystem are connected with the data storage subsystem;Institute
State project management subsystem to be also connected with the construction project information subsystem, project management subsystem and the construction project letter
Breath subsystem connection is connected with the quality safety management subsystem;
The data acquisition subsystem includes a variety of different types of sensors, for obtaining each monitoring number of job site
According to, and each Monitoring Data is sent to the data storage subsystem;
The basic information management subsystem, for obtaining each Back ground Information related to constructing, and by each basis
Information is sent to the data storage subsystem;
The construction project information subsystem, for obtaining each first construction information on construction project, and by each first
Construction information is sent to quality safety management subsystem and data storage subsystem;
The project management subsystem, constructed for obtaining each second construction information on construction project, and by each second
Information is sent to quality safety management subsystem and data storage subsystem;
Quality safety management subsystem is used for according to the Back ground Information, the first construction information and the second construction information, obtains
Sent to supervision information, and by the supervision information to construction project information subsystem and data storage subsystem.
Supervisory systems as described above, the supervisory systems also include data process subsystem, multiple warning devices;It is described
Data process subsystem is connected with the data acquisition subsystem, data storage subsystem and warning device respectively;
The Monitoring Data includes:The running state data of each construction equipment, the environmental data of construction project, with construct phase
The operation of data, the monitor video data and construction equipment of construction project, job site personnel and vehicle corresponding to the personnel of pass
Status data;
The data process subsystem is used for the running state data for analyzing each construction equipment, and in the operation of construction equipment
When status data occurs abnormal, alarm command is sent to the first warning device, so that the first warning device is alarmed;
The data process subsystem is used for the environmental data for analyzing construction project, obtains environmental data analysis curve, and
After the environmental data of construction project exceeds corresponding early warning value, alarm command is sent to the second warning device, so that second
Warning device is alarmed;
The data process subsystem is additionally operable to analysis and the corresponding data of related personnel of constructing, after being handled with applying
Data corresponding to work related personnel.
Supervisory systems as described above, the supervisory systems also include display subsystem, the display subsystem with it is described
Data storage subsystem, the data process subsystem connect with project management subsystem;
The display subsystem is yet to be built for being shown by building model BIM technology and Distribution GIS technology
The neighboring area information of the threedimensional model of building and building yet to be built;
The display subsystem is additionally operable to show the running state data of each construction equipment, the basic letter of target construction equipment
Breath, alarm times related to target construction equipment in preset duration, the environmental data of construction project, environmental data curve, respectively
Data corresponding with construction related personnel, construction project after the early warning value of each comfortable current slot of environmental data, processing
Monitor video, current construction days.
Supervisory systems as described above, the supervisory systems also include machine vision subsystem, the machine vision subsystem
System is connected with the data storage subsystem;
The machine vision subsystem is used to, according to the picture shot at the construction field (site), detect the violation of job site personnel
The unlawful practice of the vehicle of behavior, the unsafe condition of building materials and job site.
Supervisory systems as described above, the basic information management subsystem include:Connect with the first data storage cell
Construction material information acquisition unit, construction equipment information acquisition unit, construction related personnel information acquisition unit, the template connect obtains
Take unit, construction formality acquiring unit, unit in charge of construction's information acquisition unit, construction essential information acquiring unit and construction quality
Information acquisition unit;
The construction material information acquisition unit, for obtaining the pricing information of construction material, the deposit of construction material is believed
Breath, the buying status information of construction material, the binning state information of construction material;
Construction equipment information acquisition unit, for obtaining the essential information, buying status information, binning state of construction equipment
Information, align mode information, use state information, service mode information, limitation use state information and dead status information;
Construction related personnel's information acquisition unit, for obtaining essential information, record information, the position of construction related personnel
Information, contact information;
Template acquiring unit, for obtaining the template used in construction project;
Construction formality acquiring unit, for obtaining the various formalities needed for the legal progress of whole construction project;
Unit in charge of construction's information acquisition unit, for obtaining the history information on services of multiple units in charge of construction, so that supervision user
The selection target unit in charge of construction from multiple units in charge of construction;
Construct essential information acquiring unit, for obtaining default duration of project, capital budgeting, personnel's budget, emphasis work
The account information of journey, the as-built information of building yet to be built, job specfication information, construction norm information.
Construction quality information acquisition unit, for obtaining the acceptable quality level of building yet to be built.
Supervisory systems as described above, construction project information subsystem include:It is connected with the second data storage cell
First construction plan acquiring unit, the first work progress information acquisition unit, the first procurement information acquiring unit, rectification information obtain
Take unit, the first completion information acquisition unit and dangerous operation information acquisition unit;
The first construction plan acquiring unit, for obtaining arrangement and method for construction, construction schedule, cost planning, quality
Inspection program and safety inspection plan;
The first work progress information acquisition unit, for obtain quality examination result, safety inspection result, construct into
Spend information;
The first procurement information acquiring unit, for obtaining the MRP in work progress, goods and materials monthly plan
And purchasing plan of materials and equipment;
The rectification information acquisition unit, for obtaining the rectification of the quality in work progress information, safety rectification information, applying
Work progress rectifies and improves information.
The first completion information acquisition unit, for obtaining completed project register information, technical data management information, completing
Work data management information and completion information handover information;
The dangerous operation information acquisition unit, for obtaining personal information corresponding to dangerous operation, activity duration information.
Supervisory systems as described above, project management subsystem include:Second be connected with the 3rd data storage cell
Construction plan acquiring unit, the second work progress information acquisition unit, the second procurement information acquiring unit, the second completion information obtain
Take unit;
The second construction plan acquiring unit, for obtaining Quality Examination Program and safety inspection plan;
The second work progress information acquisition unit, for obtain quality examination result, safety inspection result, construct into
Spend information;
The second procurement information acquiring unit, for obtaining the materiel acquisition management information in work progress;
The second completion information acquisition unit, for obtaining completed project account information and engineering achievement management information;
The project management subsystem is additionally operable to send current construction speed and current safety inspection result to display
System;
The display subsystem is additionally operable to use BIM technology, according to current construction speed and the three-dimensional mould of building yet to be built
The component of type, corresponding three-dimensional building model under current construction speed is obtained, and show corresponding three-dimensional under current construction speed
BUILDINGS MODELS;
The display subsystem is additionally operable to use BIM technology, and the corresponding safety in current safety inspection result is asked
Topic, safety problem is integrated into the threedimensional model of building yet to be built and the display interface of building neighboring area yet to be built information
Shown.
Supervisory systems as described above, quality safety management subsystem include applying with what the 4th data storage cell was connected
Work scheme monitoring unit, Schedule monitoring unit, security monitoring unit, quality monitoring unit, buying monitoring unit, cost monitoring list
Member, dangerous operation monitoring unit;
The arrangement and method for construction monitoring unit is used to obtain arrangement and method for construction, and obtains through supervising the amended arrangement and method for construction of user
Information, amended arrangement and method for construction is sent to the construction project information subsystem, so that unit in charge of construction's applying according to modification
Work scheme is constructed;
The Schedule monitoring unit, for obtaining construction speed information, if construction speed lags, it is defeated to obtain supervision user
The construction speed rectification information entered, construction speed rectification information is sent to the construction project information subsystem;
The security monitoring unit, for obtaining safety inspection result, and supervision user is obtained according to safety inspection result
The factor information and safety rectification information of obtained influence safety, the factor information for influenceing safety and safety rectification information are sent
To the construction project information subsystem;
The quality monitoring unit, for obtaining quality examination result, if quality examination result is unqualified, obtains supervision and use
The quality rectification information of family input, quality rectification information is sent to the construction project information subsystem;
The buying monitoring unit, the procurement plan sent for obtaining the construction project information subsystem, and obtain
Procurement plan with supervision user's approval results, the procurement plan with supervision user's approval results is sent to the construction
Project information subsystem;
The cost monitoring unit, MRP is sent for obtaining the construction project information subsystem, according to
MRP obtains goods and materials total price, if goods and materials total price exceedes cost, obtains amended MRP, will change
MRP afterwards is sent to the construction project information subsystem;
The dangerous operation monitoring unit, for obtaining dangerous operation information, if existing in dangerous operation information unqualified
Data, then obtain dangerous operation rectification information, by dangerous operation rectification information send to construction project information subsystem.
Supervisory systems as described above, the supervisory systems also include examination & approval subsystem, the examination & approval subsystem and data
Storage subsystem connection, the connection of construction project information subsystem, project information subsystem, quality safety management subsystem;
The examination & approval subsystem is used to obtain file corresponding to first construction information, text corresponding to the second construction information
Part and Building Design map file yet to be built are sent to user equipment corresponding to multiple examination & approval users, so that each examination & approval user couple
Each file is examined, and obtains each file with approval results, and will examine each file transmission passed through
To data storage subsystem and quality safety management subsystem.
Supervisory systems as described above, the system also include inquiry being connected respectively with the data storage subsystem
System, video conference subsystem;
The Query Subsystem is used for the data storage subsystem that multiple users inquire about the supervisory systems according to default access
The information of system storage.
The construction project supervisory systems of the present invention includes data acquisition subsystem, basic information management subsystem, builds item
Mesh information subsystem, project management subsystem, quality safety management subsystem and data storage subsystem;Data acquisition subsystem
System, basic information management subsystem, construction project information subsystem, project management subsystem, quality safety management subsystem are equal
It is connected with data storage subsystem, project management subsystem is also connected with construction project information subsystem, project management subsystem
It is connected with construction project information subsystem with quality safety management subsystem.The construction project supervisory systems of the present invention realizes
Each construction data in construction project quickly, efficiently, accurately link up can improve the efficiency of construction of construction project.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs
Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation one of construction project supervisory systems provided by the invention;
Fig. 2 is the structural representation of basic information management subsystem provided by the invention;
Fig. 3 is the structural representation two of construction project supervisory systems provided by the invention;
Fig. 4 is the structural representation three of construction project supervisory systems provided by the invention;
Fig. 5 is the structural representation of construction project information subsystem provided by the invention;
Fig. 6 is the structural representation of project management subsystem provided by the invention;
Fig. 7 is the structural representation of quality safety management subsystem provided by the invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is the structural representation one of construction project supervisory systems provided by the invention, and the construction project of the present embodiment is supervised
Guard system can include:
Data acquisition subsystem 101, basic information management subsystem 102, construction project information subsystem 103, project pipe
Manage subsystem 104, quality safety management subsystem 105 and data storage subsystem 106;Data acquisition subsystem 101, basic letter
Breath management subsystem 102, construction project information subsystem 103, project management subsystem 104, quality safety management subsystem 105
It is connected with data storage subsystem 106, project management subsystem 104 is also connected with construction project information subsystem 103, project
Management subsystem 104 and construction project information subsystem 103 are connected and are connected with quality safety management subsystem 105.
Data acquisition subsystem 101 includes a variety of different types of sensors, for obtaining each monitoring number of job site
According to, and each Monitoring Data is sent to data storage subsystem 106 and stored.
Basic information management subsystem 102, sent out for obtaining each Back ground Information related to constructing, and by each Back ground Information
Deliver to data storage subsystem 106 to be stored, so that construction project information subsystem 103, project management subsystem 104 and matter
Measure security management subsystem 105 and call Back ground Information;
Construction project information subsystem 103, applied for obtaining each first construction information on construction project, and by each first
Work information is sent to quality safety management subsystem 105 and data storage subsystem 106;
Project management subsystem 104, for obtaining each second construction information on construction project, and by each second construction information
Send to quality safety management subsystem 105 and data storage subsystem 106;
Quality safety management subsystem 105 is used for according to Back ground Information, the first construction information and the second construction information, obtains
Information is supervised, and supervision information is sent to construction project information subsystem 103 and data storage subsystem 106.
Specifically, the basic information management subsystem 102 in the present embodiment, for obtaining each basis letter related to constructing
Breath, and each Back ground Information is sent to data storage subsystem 106, so that construction project information subsystem 103, project management
System 104 and quality safety management subsystem 105 call Back ground Information.
Fig. 2 is the structural representation of basic information management subsystem provided by the invention.Referring to Fig. 2, basic information management
Subsystem includes:Construction material information acquisition unit 21, the construction equipment information being connected with the first data storage cell 29 obtain
Take unit 22, construction related personnel information acquisition unit 23, template acquiring unit 24, construction formality acquiring unit 25, work order
Position information acquisition unit 26, construction essential information acquiring unit 27 and Construction quality and safety information acquisition unit 28.Each information
The information that acquiring unit obtains, which is sent to data storage cell 29, to be stored.
Construction material information acquisition unit 21, for obtain the pricing information of construction material, construction material reserve message,
The buying status information of construction material, the binning state information of construction material.Construction material information supplies quality safety management subsystem
The procurement plan and MRP that system examination & verification construction project information subsystem is sent, and construction project information subsystem system
Determine the foundation of procurement plan and MRP.
Specifically, the acquisition methods of various information can be manually entered, can also by scan material Quick Response Code or
The mode of radio frequency identification obtains.
The pricing information of construction material may include the unit price of construction material, may include multiple confessions for same construction material
The unit price of business is answered, associated user can be made to determine supplier according to the unit price of each supplier.The reserve message of construction material may include
The currently stored total amount of each construction material.The buying status information of construction material may include the current of the construction material purchased
State, for example just place an order, deliver, in states such as way, examinations.The binning state information of construction material may include that construction material is
It is no to be placed into storage repository storage, entry time etc..
Construction equipment information acquisition unit 22, for obtaining the essential information, buying status information, storage shape of construction equipment
State information, align mode information, use state information, service mode information, limitation use state information and dead status information.
Construction equipment information selects the foundation of construction equipment for construction project information subsystem.
Specifically, the essential information of construction equipment is the information such as the model of construction equipment, performance parameter.Construction equipment is adopted
Purchase status information may include the current state for the construction equipment purchased, for example just places an order, delivers, in shapes such as way, examinations
State.The binning state information of construction material may include whether construction equipment has been placed into storage repository storage, entry time etc..Apply
The align mode information of construction equipment may include:Whether calibrated, prover time etc..The use state information of construction equipment may include
Whether construction equipment be used, using the time started, using end time etc..The use state information of construction equipment may include
Whether construction equipment repairs, maintenance time etc..
Construction related personnel information acquisition unit 23, for the essential information of acquisition construction related personnel, record information, duty
Position information, contact information;Wherein, if construction related personnel is site operation personnel, job information includes work post information.
Specifically, essential information may include sex, native place, identification card number, political affiliation, age, photo etc.;Record information
It can be the work that the workmen can be competent at for work experience information (length of service, being worked where, the property of work), work post information
Kind.
Template acquiring unit 24, for obtaining the template used in whole construction project.Wherein, construction project may be used
Template include:The template related to labour contract, the template related with work progress record information, arrangement and method for construction template, apply
Work plan template, cost planning template, procurement plan template, template etc. of asking for leave.
The means for being stored as work in every in whole construction project and providing unified record information of each template, just
In final-period management.
Construction formality acquiring unit 25, for obtaining the various formalities needed for the legal progress of project.Such as:Soil formality,
Plan formality, property right formality, go into operation formality.
Unit in charge of construction's information acquisition unit 26, for obtaining the history information on services of multiple units in charge of construction, so that supervision is used
Family selection target unit in charge of construction from multiple units in charge of construction.
The essential information acquiring unit of constructing 27, for obtaining default duration of project, capital budgeting, personnel's budget, emphasis
The account information of engineering, the as-built information of building yet to be built, job specfication information, construction norm information.
Specifically, presetting the duration includes the duration of the estimated experience of whole construction project, and construction project each stage is expected
The duration of experience.The account information of key project includes:Each information of dangerous heavy construction, such as risk class, suitable operation
Time etc..Capital budgeting includes construction project master budget, material cost budget, personnel's cost budget, different building technology pair
The cost budgeting answered.The as-built information of building yet to be built includes:The internal structure of the unitary construction and building of construction project;
Construction norm information is the corresponding relation standard of construction scale and cost, workmen's quantity used etc., can refer to the standard and enters
Row capital budgeting and personnel's budget.
Construction quality information acquisition unit 28, for obtaining the acceptable quality level of building.User can be according to building
Acceptable quality level detect building yet to be built quality it is whether qualified.
Each information that basic information management subsystem 102 obtains, which is sent to data storage subsystem 106, to be stored, with
Called for construction project information subsystem 103, project management subsystem 104, quality safety management subsystem 105.
Sensor in the present embodiment in data acquisition subsystem 101 may include:(such as humiture passes environmental parameter sensor
Sensor, air cleanliness sensor, speed wind sensor, integrated temperature, humidity, PM10, noise, toxic combustible gas concentration
Comprehensive sensor etc.), video monitoring sensor (such as camera), labor service system sensor (construction area gate control system and labor
Business personnel IC card system), construction equipment sensor (height sensor of tower crane, angular transducer, obliquity sensor etc.).
Each sensor of data acquisition subsystem 101 obtains the Monitoring Data in work progress in real time, and by each monitoring
Data send to data storage subsystem 106 and stored, for construction project information subsystem, quality safety management subsystem,
Project management subsystem calls.
Monitoring Data includes:The running state data of each construction equipment, the environmental data of construction project and construction relevant people
Data, the monitor video data and construction equipment of construction project, the running status of job site personnel and vehicle corresponding to member
Data.
The running state data of each construction equipment, included with the citing of large scale equipment tower crane:The anglec of rotation, the rotation speed of tower crane
Degree, height, load-carrying data etc..
The environmental data of construction project includes temperature, humidity, wind-force, wind speed, noise, PM10 concentration etc..
Data corresponding to construction related personnel:Personnel enter the time in place, the time for leaving place, personnel's is each in field
Whether personnel are information of competent person etc. in information, and the field judged according to face identification system.
The monitor video data of construction project are the video of each monitoring camera shooting.
The running state data of job site personnel, construction equipment and vehicle includes;Each job site personnel construction equipment
The data such as geographical position, movement locus with vehicle.
Fig. 3 is construction project supervisory systems structural representation two provided by the invention.
In order that user easily obtains the Monitoring Data that each sensor of data acquisition subsystem gathers in real time, referring to figure
3, the construction project supervisory systems of the present embodiment also includes data process subsystem 107, display subsystem 108 and multiple alarms and set
Standby 109.Data process subsystem 107 respectively with data acquisition subsystem 101, data storage subsystem 106, display subsystem
108th, warning device 109 connects;
Specifically, data process subsystem 107 is used for the running state data for analyzing each construction equipment, and in construction equipment
Running state data occur it is abnormal when, alarm command is sent to the first warning device, so that the first warning device is alarmed.
Data process subsystem 107 be additionally operable to count construction project in each construction site on target construction equipment sometime
The alarm times of section.The target construction equipment of the present embodiment is heavy construction equipment, such as tower crane, lift.
Data process subsystem 107 is additionally operable to analyze the environmental data of construction project, obtains environmental data analysis curve simultaneously
After the environmental data of construction project exceeds corresponding early warning value, alarm command is sent to the second warning device, so that second
Warning device is alarmed.Environmental data analysis curve, i.e. environment relative to the time curve.
Data process subsystem 107 is additionally operable to analysis and the corresponding data of related personnel of constructing, after being handled with applying
Data corresponding to work related personnel.For example believed according to the data of the classification such as age of workmen, native place, the personnel on the scene of statistics
Breath, each work post demographic data on the scene etc..
Data process subsystem 107 is additionally operable to influence of each side to construction project security in work progress and is distributed and applies
Influence distribution of each side to construction speed during work;Wherein, each side includes in work progress:General contracting unit, subpackage unit, labor
Be engaged in unit, material supplier etc..
Display subsystem 108 shows the threedimensional model of building yet to be built and building yet to be built using BIM technology and GIS technology
Thing neighboring area information.Namely stereoscopic display building model yet to be built, construction site and construction site peripheral information, wherein,
Building neighboring area yet to be built information includes the area information and construction site periphery between each building yet to be built in construction site
Area information.
The threedimensional model and building neighboring area yet to be built letter of building yet to be built are shown using BIM technology and GIS technology
The advantages of breath can make full use of BIM technology and GIS technology so that user fully understands yet to be built build according to the threedimensional model of display
The inside and outside construction of thing and building peripheral information yet to be built are built, so as to which user can be according to the three of the building yet to be built of display
The arrangement on construction ground of dimension module and each construction equipment of building neighboring area yet to be built information analysis, the stacking of material, point
The travel route of the related vehicle of each construction of analysis planning, the collision of wagon flow and the stream of people, analysis neighboring area fire prevention measure is avoided to be
The no safety problem such as in place.
Display subsystem 108 is additionally operable to show the running state data of each construction equipment, the basic letter of target construction equipment
Breath, alarm times related to target construction equipment in preset duration, the environmental data of construction project, environmental data curve,
Data corresponding with construction related personnel after the early warning value of each each comfortable current slot of environmental data, processing, construction project
Monitor video.
Wherein, each environmental data is stored in data process subsystem 107 in the early warning value of different time sections, data processing
Each environmental data can be sent to display subsystem 108 and be shown by subsystem in the early warning value of different time sections.
Display subsystem 108 can also obtain construction project total number of persons from data storage subsystem, and be shown.
Display subsystem 108, can be with the history of display target equipment except can be with the real-time running state data of display target equipment
Running state data.Display subsystem can also receive the modification instruction of the essential information to target device of user's input, root
Instructed according to modification, update the essential information of the large scale equipment of display.
Display subsystem 108 be additionally operable to show in work progress influence distribution map of each side to construction project security and
Influence distribution map of each side to construction speed in work progress.
Above-mentioned display subsystem 108 show to the data of construction project environmental correclation, the data related with construction equipment,
Data corresponding with construction related personnel after processing, each monitor video each can be shown in the form of single figure layer.
Fig. 4 is the structural representation three of construction project supervisory systems provided by the invention.
In order to ensure the safety of construction project, also regarded referring to the construction project supervisory systems of Fig. 4 the present embodiment including machine
Feel subsystem 110, machine vision subsystem 110 is connected with data storage subsystem;
Machine vision subsystem 110 is used to, according to the picture shot at the construction field (site), detect the violation of job site personnel
The unlawful practice of the vehicle of behavior, the unsafe condition of construction material and job site.
The unlawful practice of job site personnel, including cross the border, abnormal aggregation etc.;The unlawful practice of the vehicle of job site,
Stop separated road occupying, not by defined area reverse driving etc. including disobeying;The unsafe condition of construction material includes:Warehouse stuff piles up area
Bright cigarette, naked light etc..
It will be alarmed after machine vision subsystem 110 detects above-mentioned unlawful practice, so that associated user is timely
Processing.
After being illustrated to above-mentioned subsystem, the subsystem related to Specific construction in construction project is said below
It is bright.
Construction project information subsystem is illustrated first.
Fig. 5 is the structural representation of construction project information subsystem provided by the invention.Referring to Fig. 5 construction projects information
System 103 includes:The first construction plan acquiring unit 31 for being connected with the second data storage cell 37, the first work progress letter
Cease acquiring unit 32, the first procurement information acquiring unit 33, rectification information acquisition unit 34, the first completion information acquisition unit
35th, dangerous operation information acquisition unit 36;Construction project information subsystem is to be directed to general contracting unit subsystem.Construction project information
The data that each unit of subsystem 103 obtains, which are first sent to the second data storage cell 37, to be stored.
First construction plan acquiring unit 31, for obtaining arrangement and method for construction, construction schedule, cost planning, quality inspection
The plan of looking into and safety inspection plan.
First work progress information acquisition unit 32, for obtaining quality examination result, safety inspection result, construction speed
Information.Such as scrutineer, the review time, whether the information such as qualified.Wherein, safety inspection result can be remembered by mobile terminal
Record, send in real time to quality safety management subsystem.Associated user can obtain acceptable quality level, pre- from data storage subsystem
If the information such as duration obtain quality examination result and construction speed, by quality examination result, construction speed information is inputted to first
Work progress information acquisition unit 32, obtained by the first work progress information acquisition unit 32.
First procurement information acquiring unit 33, for obtain the MRP in work progress, goods and materials monthly plan and
Purchasing plan of materials and equipment.Such as material requirements species, quantity, unit price, total price, buying species, quantity, unit price, total price etc..
Information acquisition unit 34 is rectified and improved, for obtaining the rectification of the quality in work progress information, safety rectification information, construction
Progress rectifies and improves information.Such as rectification time, rectification director, rectification implementation people, rectification state etc..
First completion information acquisition unit 35, for obtaining completed project register information, technical data management information, being completed
Data management information and completion information handover information.
Dangerous operation information acquisition unit 36, it is real for obtaining personal information corresponding to dangerous operation, activity duration information
Existing dangerous operation superintends and directs pipe.
The information that each unit of construction project information subsystem 103 obtains can be described as the first construction information, construction project letter
Breath subsystem 103 sends first construction information to data storage subsystem 106, quality safety management subsystem 105 and item
Mesh manages subsystem 104.Wherein, each information that the first work progress information acquisition unit 32 obtains can be every predetermined period to number
Sent once according to storage subsystem 106 and quality safety management subsystem 105.
Secondly, project management subsystem is illustrated.
Fig. 6 is the structural representation of project management subsystem provided by the invention.Referring to Fig. 6, project management subsystem 104
Including:The second construction plan acquiring unit 41 for being connected with the 3rd data storage cell 45, the second work progress acquisition of information
Unit 42, the second procurement information acquiring unit 43, the second completion information acquisition unit 44;Second item management subsystem is to be directed to
The subsystem of Project Unit.The data that each unit that project management subsystem 104 includes obtains first are sent to the 3rd data storage
Unit 45 is stored.
Second construction plan acquiring unit 41, for obtaining Quality Examination Program and safety inspection plan;
Second work progress information acquisition unit 42, for obtaining quality examination result, safety inspection result, construction speed
Information;Such as scrutineer, the review time, whether the information such as qualified.Wherein, safety inspection result can be remembered by mobile terminal
Record, send in real time to quality safety management subsystem.Associated user can obtain acceptable quality level, pre- from data storage subsystem
If the information such as duration obtain quality examination result and construction speed, by quality examination result, construction speed information is inputted to second
Work progress information acquisition unit 42, obtained by the second work progress information acquisition unit 42.
Second procurement information acquiring unit 43, for obtaining the centralized procurement management information in work progress.
Second completion information acquisition unit 44, for obtaining completed project account information, engineering achievement management information and item
Mesh data information.
Project management subsystem 104 is additionally operable to send construction speed and safety inspection result to display subsystem 108;Its
In, construction speed relevant information and safety inspection result relevant information can be sent to display subsystem by mobile terminal in real time
108。
Display subsystem 108 is additionally operable to use BIM technology, according to construction speed and the threedimensional model structure of building yet to be built
Part, corresponding three-dimensional building model under current construction speed is obtained, and show corresponding three-dimensional building mould under current construction speed
Type.Such as if the relevant information of current construction speed to have built up 5 layers, corresponding three-dimensional building mould under current construction speed
Type is:Only include 5 layers of three-dimensional building model.Meanwhile display subsystem can also obtain default work from data storage subsystem
Phase, more current construction speed is advanced, normal or fallen behind, and is assigned three corresponding under the current construction speed under different conditions
Tie up the different color of BUILDINGS MODELS;Such as if current construction speed is advanced, corresponding three-dimensional building under current construction speed
Model is shown in green.Associated user is allowd to get information about current construction speed.
In addition, display subsystem 108 may also display construction days corresponding to current construction speed, such as when the day before yesterday is construction
234th day.
Display subsystem 108 with BIM technology is used, the corresponding safety problem in safety inspection result, will also pacify
Full problem, which is integrated into the threedimensional model of building yet to be built and the display interface of building neighboring area yet to be built information, to be shown
Show.
The information that each unit of project management subsystem 104 obtains can be described as the second construction information, project management subsystem
104 send second construction information to data storage subsystem 106 and quality safety management subsystem 105.Wherein, second apply
Each information that work procedural information acquiring unit 42 obtains can be every predetermined period to data storage subsystem 106 and quality safety pipe
Reason subsystem 105 is sent once.
Secondly, quality security management subsystem is described in detail.
Fig. 7 is the structural representation of quality safety management subsystem provided by the invention.
Quality safety management subsystem include be connected with the 4th data storage cell 78 arrangement and method for construction monitoring unit 71,
Schedule monitoring unit 72, security monitoring unit 73, quality monitoring unit 74, buying monitoring unit 75, the and of cost monitoring unit 76
Dangerous operation monitoring unit 77;
Arrangement and method for construction monitoring unit 71 is used to obtain arrangement and method for construction information, and obtains through supervising the amended construction party of user
Case information, amended arrangement and method for construction information is sent to construction project information subsystem, so that unit in charge of construction is according to modification
Arrangement and method for construction is constructed.
Schedule monitoring unit 72, for obtaining construction speed information, if construction speed lags, obtain supervision user's input
Construction speed rectification information, by construction speed rectification information send to construction project information subsystem.Quality safety management
System can obtain construction speed information from construction project information subsystem and project management subsystem.
Security monitoring unit 73 is used to obtain safety inspection result, and obtains supervision user and obtained according to safety inspection result
Influence safety factor information and safety rectification information, the factor information and safety rectification information that will influence safety sent to building
If project information subsystem.Quality safety management subsystem can obtain from construction project information subsystem and project management subsystem
Safety inspection result.
Quality monitoring unit 74, for obtaining quality examination result, if quality examination result is unqualified, obtain supervision user
The quality rectification information of input, quality rectification information is sent to construction project information subsystem;Quality safety management subsystem
Quality safety inspection result can be obtained from construction project information subsystem and project management subsystem.
Monitoring unit 75 is purchased, for obtaining procurement plan, and obtains the procurement plan with supervision user's approval results,
Procurement plan with supervision user's approval results is sent to construction project information subsystem;
Cost monitoring unit 76, plan of needs is provided for obtaining, goods and materials total price is obtained according to MRP, if goods and materials
Total price exceedes cost, then obtains MRP after modification, amended MRP is sent to construction project and believed
Cease subsystem.
Dangerous operation monitoring unit 77, for obtaining dangerous operation information, if existing in dangerous operation information underproof
Data, then dangerous operation rectification information is obtained, dangerous operation rectification information is sent to construction project information subsystem.
Quality safety management subsystem is for center headquarter, construction project information subsystem and project management subsystem
System needs the examination & approval of users at different levels before sending the first construction information and the second construction information to quality safety management subsystem,
Therefore, the construction project supervisory systems of this implementation also include examination & approval subsystem, examination & approval subsystem be connected with data storage subsystem,
Construction project information subsystem, the connection of project information subsystem, quality safety management subsystem.
Examine subsystem and be used to obtain file corresponding to the first construction information, file corresponding to the second construction information and yet to be built
Building Design map file is sent to user equipment corresponding to multiple examination & approval users, so that respectively examination & approval user is examined each file
Batch, each file with approval results is obtained, and each file that examination & approval pass through is sent to data storage subsystem and quality
Security management subsystem.
Wherein, examining user includes unit in charge of construction correlation director, Project Management Company correlation director.Management, center
Headquarter correlation director.
Further, what the construction project supervisory systems of the present embodiment also included being connected with data storage subsystem respectively looks into
Ask subsystem, video conference subsystem;
Query Subsystem is used for the number that multiple users inquire about the construction project supervisory systems of the present embodiment according to default access
The information stored according to storage subsystem.
Each participant of construction project can carry out video conference by video conference subsystem.
The construction project supervisory systems of the present embodiment by it is above-mentioned including each subsystem realize it is each in construction project
Construction data can quickly, efficiently, accurately link up.
The construction project supervisory systems of the present embodiment includes data acquisition subsystem, basic information management subsystem, built
Project information subsystem, project management subsystem, quality safety management subsystem and data storage subsystem;Data acquisition subsystem
System, basic information management subsystem, construction project information subsystem, project management subsystem, quality safety management subsystem are equal
It is connected with data storage subsystem, project management subsystem is also connected with construction project information subsystem, project management subsystem
It is connected with construction project information subsystem with quality safety management subsystem.The construction project supervisory systems of the present embodiment is realized
Each construction data in construction project quickly, efficiently, accurately link up can improve the construction effect of construction project
Rate.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.
Claims (10)
- A kind of 1. construction project supervisory systems, it is characterised in that including:Data acquisition subsystem, basic information management subsystem, construction project information subsystem, project management subsystem, quality Security management subsystem and data storage subsystem;The data acquisition subsystem, basic information management subsystem, construction project Information subsystem, project management subsystem, quality safety management subsystem are connected with the data storage subsystem;The item Mesh management subsystem is also connected with the construction project information subsystem, the project management subsystem and construction project information System is connected with the quality safety management subsystem;The data acquisition subsystem includes a variety of different types of sensors, for obtaining each Monitoring Data of job site, And each Monitoring Data is sent to the data storage subsystem;The basic information management subsystem, for obtaining each Back ground Information related to constructing, and by each Back ground Information Send to the data storage subsystem;The construction project information subsystem, constructed for obtaining each first construction information on construction project, and by each first Information is sent to quality safety management subsystem and data storage subsystem;The project management subsystem, for obtaining each second construction information on construction project, and by each second construction information Send to quality safety management subsystem and data storage subsystem;Quality safety management subsystem is used for according to the Back ground Information, the first construction information and the second construction information, is supervised Pipe information, and the supervision information is sent to construction project information subsystem and data storage subsystem.
- 2. supervisory systems according to claim 1, it is characterised in that the supervisory systems also includes data processing subsystem System, multiple warning devices;The data process subsystem is connected with the data acquisition subsystem respectively, data storage subsystem Connected with warning device;The Monitoring Data includes:The running state data of each construction equipment, the environmental data of construction project and construction relevant people Data, the monitor video data and construction equipment of construction project, the running status of job site personnel and vehicle corresponding to member Data;The data process subsystem is used for the running state data for analyzing each construction equipment, and in the running status of construction equipment When data occur abnormal, alarm command is sent to the first warning device, so that the first warning device is alarmed;The data process subsystem is used for the environmental data for analyzing construction project, obtains environmental data analysis curve, and building If the environmental data of project exceeds after corresponding early warning value, alarm command is sent to the second warning device, so that the second alarm Equipment is alarmed;The data process subsystem is additionally operable to analysis and the corresponding data of construction related personnel, after being handled with construction phase Data corresponding to the personnel of pass.
- 3. supervisory systems according to claim 2, it is characterised in that the supervisory systems also includes display subsystem, institute Display subsystem is stated to be connected with the data storage subsystem, the data process subsystem and project management subsystem;The display subsystem is used to show building yet to be built by building model BIM technology and Distribution GIS technology The neighboring area information of the threedimensional model of thing and building yet to be built;The display subsystem be additionally operable to show the running state data of each construction equipment, the essential information of target construction equipment, The alarm times related to target construction equipment, environmental data, environmental data curve, each environment of construction project in preset duration The monitoring of corresponding with construction related personnel data, construction project after the early warning value of each comfortable current slot of data, processing Video, current construction days.
- 4. supervisory systems according to claim 2, it is characterised in that the supervisory systems also includes machine vision subsystem System, the machine vision subsystem are connected with the data storage subsystem;The machine vision subsystem is used for the violation row for according to the picture shot at the construction field (site), detecting job site personnel For the unlawful practice of the, unsafe condition of construction material and the vehicle of job site.
- 5. supervisory systems according to claim 1, it is characterised in that the basic information management subsystem includes:With The construction material information acquisition unit of first data storage cell connection, construction equipment information acquisition unit, construction related personnel Information acquisition unit, template acquiring unit, construction formality acquiring unit, unit in charge of construction's information acquisition unit, construction essential information Acquiring unit and construction quality information acquisition unit;The construction material information acquisition unit, for obtain the pricing information of construction material, construction material reserve message, apply The buying status information of work material, the binning state information of construction material;Construction equipment information acquisition unit, for obtaining the essential information, buying status information, binning state letter of construction equipment Breath, align mode information, use state information, service mode information, limitation use state information and dead status information;Construction related personnel's information acquisition unit, essential information, record information, position for obtaining construction related personnel are believed Breath, contact information;Template acquiring unit, for obtaining the template used in construction project;Construction formality acquiring unit, for obtaining the various formalities needed for the legal progress of whole construction project;Unit in charge of construction's information acquisition unit, for obtaining the history information on services of multiple units in charge of construction, so that supervision user is from more Selection target unit in charge of construction in individual unit in charge of construction;Construct essential information acquiring unit, for obtaining default duration of project, capital budgeting, personnel's budget, key project Account information, the as-built information of building yet to be built, job specfication information, construction norm information;Construction quality information acquisition unit, for obtaining the acceptable quality level of building yet to be built.
- 6. supervisory systems according to claim 5, it is characterised in that construction project information subsystem includes:With second First construction plan acquiring unit of data storage cell connection, the first work progress information acquisition unit, the first procurement information Acquiring unit, rectification information acquisition unit, the first completion information acquisition unit and dangerous operation information acquisition unit;The first construction plan acquiring unit, for obtaining arrangement and method for construction, construction schedule, cost planning, quality examination Plan and safety inspection plan;The first work progress information acquisition unit, for obtaining quality examination result, safety inspection result, construction speed letter Breath;The first procurement information acquiring unit, for obtaining the MRP in work progress, goods and materials monthly plan and thing Provide procurement plan;The rectification information acquisition unit, for obtain the quality in work progress rectification information, safety rectification information, construct into Degree rectification information.The first completion information acquisition unit, for obtaining completed project register information, technical data management information, money of being completed Expect management information and completion information handover information;The dangerous operation information acquisition unit, for obtaining personal information corresponding to dangerous operation, activity duration information.
- 7. supervisory systems according to claim 6, it is characterised in that project management subsystem includes:With the 3rd data Second construction plan acquiring unit of memory cell connection, the second work progress information acquisition unit, the second procurement information obtain Unit, the second completion information acquisition unit;The second construction plan acquiring unit, for obtaining Quality Examination Program and safety inspection plan;The second work progress information acquisition unit, for obtaining quality examination result, safety inspection result, construction speed letter Breath;The second procurement information acquiring unit, for obtaining the materiel acquisition management information in work progress;The second completion information acquisition unit, for obtaining completed project account information and engineering achievement management information;The project management subsystem is additionally operable to send current construction speed and current safety inspection result to display subsystem;The display subsystem is additionally operable to use BIM technology, according to the threedimensional model of current construction speed and building yet to be built Component, show corresponding three-dimensional building model under current construction speed;The display subsystem is additionally operable to use BIM technology, the corresponding safety problem in current safety inspection result, will Safety problem, which is integrated into the threedimensional model of building yet to be built and the display interface of building neighboring area yet to be built information, to be shown Show.
- 8. supervisory systems according to claim 7, it is characterised in that quality safety management subsystem includes counting with the 4th According to the arrangement and method for construction monitoring unit of memory cell connection, Schedule monitoring unit, security monitoring unit, quality monitoring unit, buying Monitoring unit, cost monitoring unit, dangerous operation monitoring unit;The arrangement and method for construction monitoring unit is used to obtain arrangement and method for construction, and obtains and believe through supervising the amended arrangement and method for construction of user Breath, amended arrangement and method for construction is sent to the construction project information subsystem, so that construction of the unit in charge of construction according to modification Scheme is constructed;The Schedule monitoring unit, for obtaining construction speed information, if construction speed lags, obtain supervision user's input Construction speed rectifies and improves information, and construction speed rectification information is sent to the construction project information subsystem;The security monitoring unit, for obtaining safety inspection result, and obtain supervision user and obtained according to safety inspection result Influence safety factor information and safety rectification information, by influence safety factor information and safety rectification information send to institute State construction project information subsystem;The quality monitoring unit, for obtaining quality examination result, if quality examination result is unqualified, it is defeated to obtain supervision user The quality rectification information entered, quality rectification information is sent to the construction project information subsystem;The buying monitoring unit, the procurement plan sent for obtaining the construction project information subsystem, and obtain and carry The procurement plan of user's approval results is supervised, the procurement plan with supervision user's approval results is sent to the construction project Information subsystem;The cost monitoring unit, MRP is sent for obtaining the construction project information subsystem, according to goods and materials Plan of needs obtains goods and materials total price, if goods and materials total price exceedes cost, obtains amended MRP, will be amended MRP is sent to the construction project information subsystem;The dangerous operation monitoring unit, for obtaining dangerous operation information, if underproof number in dangerous operation information be present According to then acquisition dangerous operation rectification information, dangerous operation rectification information is sent to construction project information subsystem.
- 9. supervisory systems according to claim 8, it is characterised in that the supervisory systems also includes examination & approval subsystem, institute State examination & approval subsystem and data storage subsystem, construction project information subsystem, project information subsystem, quality safety management System connects;It is described examination & approval subsystem be used for obtain file corresponding to first construction information, file corresponding to the second construction information and Building Design map file yet to be built is sent to user equipment corresponding to multiple examination & approval users, so that each examination & approval user is to each institute State file to be examined, obtain each file with approval results, and each file that examination & approval pass through is sent to number According to storage subsystem and quality safety management subsystem.
- 10. supervisory systems according to claim 8, it is characterised in that the system also includes depositing with the data respectively Store up Query Subsystem, the video conference subsystem of subsystem connection;The Query Subsystem is used for multiple users and deposited according to the data storage subsystem of the default access inquiry supervisory systems The information of storage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710795575.0A CN107527155A (en) | 2017-09-06 | 2017-09-06 | Construction project supervisory systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710795575.0A CN107527155A (en) | 2017-09-06 | 2017-09-06 | Construction project supervisory systems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107527155A true CN107527155A (en) | 2017-12-29 |
Family
ID=60683644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710795575.0A Pending CN107527155A (en) | 2017-09-06 | 2017-09-06 | Construction project supervisory systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107527155A (en) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108470105A (en) * | 2018-03-27 | 2018-08-31 | 湖南大学 | A method of Dynamic Construction programming is carried out based on BIM+3S+VR technologies and underground engineering case base system |
CN108510248A (en) * | 2018-04-08 | 2018-09-07 | 广东新康博思信息技术有限公司 | A kind of construction project environment approval system of overall monitor |
CN108549963A (en) * | 2018-02-22 | 2018-09-18 | 北京中建建筑设计院有限公司 | Novel construction management method based on BIM information flow standardization |
CN108663979A (en) * | 2018-05-08 | 2018-10-16 | 江南大学 | The high tower comprehensive monitoring system that technology of Internet of things is integrated with 3D |
CN109191081A (en) * | 2018-09-18 | 2019-01-11 | 温州市勘察测绘研究院 | A kind of wisdom site supervision examination & approval platform |
CN109272282A (en) * | 2018-07-27 | 2019-01-25 | 深圳市中电数通智慧安全科技股份有限公司 | Job that requires special skills management system |
CN109461290A (en) * | 2018-11-13 | 2019-03-12 | 机械工业第六设计研究院有限公司 | A kind of monitoring management system and equipment of civil construction |
CN109462736A (en) * | 2018-10-31 | 2019-03-12 | 广西路桥工程集团有限公司 | A kind of road and bridge engineering construction video conference management method and system based on BIM+GIS modeling |
CN109492035A (en) * | 2018-10-17 | 2019-03-19 | 眉山德鑫航空设备股份有限公司 | Equipment that airport is unpowered supervises data processing system and method |
CN109636408A (en) * | 2018-11-02 | 2019-04-16 | 成都四平软件有限公司 | Build things system |
CN110378674A (en) * | 2019-07-20 | 2019-10-25 | 深圳市实瑞建筑技术有限公司 | A kind of project delivery method information management system |
CN110414922A (en) * | 2019-06-28 | 2019-11-05 | 万翼科技有限公司 | A kind of construction data management method and device based on Building Information Model |
CN111045372A (en) * | 2019-12-30 | 2020-04-21 | 重庆能工科技发展有限公司 | Intelligent construction site management system |
CN111562042A (en) * | 2020-05-28 | 2020-08-21 | 关蕙 | Safety information monitoring method and system in underground garage construction |
CN112204589A (en) * | 2018-06-12 | 2021-01-08 | 神钢建机株式会社 | Construction management system and construction management method |
CN113139783A (en) * | 2021-03-31 | 2021-07-20 | 北京北排水环境发展有限公司 | Construction project management system for underground regeneration water plant |
CN113205269A (en) * | 2021-05-12 | 2021-08-03 | 湖北新悦成智能科技有限公司 | Engineering supervision method based on artificial intelligence, intelligent terminal and storage medium |
CN113626914A (en) * | 2021-08-04 | 2021-11-09 | 苏州思萃融合基建技术研究所有限公司 | Engineering project management method, device and system based on digital twins |
CN114528314A (en) * | 2022-04-20 | 2022-05-24 | 四川省大数据中心 | Engineering construction project supervision system and method |
CN115809756A (en) * | 2023-01-20 | 2023-03-17 | 南方电网数字电网研究院有限公司 | Engineering project management method and system |
CN116109283A (en) * | 2023-04-12 | 2023-05-12 | 中川建投集团有限公司 | Digital project management collaboration platform |
CN116109080A (en) * | 2022-12-29 | 2023-05-12 | 无锡泰禾宏科技有限公司 | Building integrated management platform based on BIM and AR |
CN116342072A (en) * | 2023-05-22 | 2023-06-27 | 四川华恒升科技发展有限公司 | High-standard farmland construction project design system and method based on artificial intelligence |
WO2024082649A1 (en) * | 2022-10-18 | 2024-04-25 | 星际空间(天津)科技发展有限公司 | Key project collaboration and dynamic management service process monitoring method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104408559A (en) * | 2014-11-19 | 2015-03-11 | 湖北福泰建筑装饰工程有限公司 | Engineering information management system |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
CN205050191U (en) * | 2015-09-30 | 2016-02-24 | 天津辰达科技发展有限公司 | A information system for supervising engineering job site |
CN106022649A (en) * | 2016-06-13 | 2016-10-12 | 四川省兴华工程项目管理有限公司 | Comprehensive management system for engineering project supervision, cost, bidding, and consultation |
CN107103078A (en) * | 2017-04-25 | 2017-08-29 | 国网上海市电力公司 | Transformer substation construction complete period digitlization managing and control system based on BIM |
-
2017
- 2017-09-06 CN CN201710795575.0A patent/CN107527155A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104408559A (en) * | 2014-11-19 | 2015-03-11 | 湖北福泰建筑装饰工程有限公司 | Engineering information management system |
CN205050191U (en) * | 2015-09-30 | 2016-02-24 | 天津辰达科技发展有限公司 | A information system for supervising engineering job site |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
CN106022649A (en) * | 2016-06-13 | 2016-10-12 | 四川省兴华工程项目管理有限公司 | Comprehensive management system for engineering project supervision, cost, bidding, and consultation |
CN107103078A (en) * | 2017-04-25 | 2017-08-29 | 国网上海市电力公司 | Transformer substation construction complete period digitlization managing and control system based on BIM |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108549963A (en) * | 2018-02-22 | 2018-09-18 | 北京中建建筑设计院有限公司 | Novel construction management method based on BIM information flow standardization |
CN108470105A (en) * | 2018-03-27 | 2018-08-31 | 湖南大学 | A method of Dynamic Construction programming is carried out based on BIM+3S+VR technologies and underground engineering case base system |
CN108510248A (en) * | 2018-04-08 | 2018-09-07 | 广东新康博思信息技术有限公司 | A kind of construction project environment approval system of overall monitor |
CN108510248B (en) * | 2018-04-08 | 2022-04-29 | 广东盈智通科技有限公司 | Construction project environment approval system capable of achieving comprehensive monitoring |
CN108663979A (en) * | 2018-05-08 | 2018-10-16 | 江南大学 | The high tower comprehensive monitoring system that technology of Internet of things is integrated with 3D |
CN112204589A (en) * | 2018-06-12 | 2021-01-08 | 神钢建机株式会社 | Construction management system and construction management method |
CN109272282A (en) * | 2018-07-27 | 2019-01-25 | 深圳市中电数通智慧安全科技股份有限公司 | Job that requires special skills management system |
CN109191081A (en) * | 2018-09-18 | 2019-01-11 | 温州市勘察测绘研究院 | A kind of wisdom site supervision examination & approval platform |
CN109492035A (en) * | 2018-10-17 | 2019-03-19 | 眉山德鑫航空设备股份有限公司 | Equipment that airport is unpowered supervises data processing system and method |
CN109462736A (en) * | 2018-10-31 | 2019-03-12 | 广西路桥工程集团有限公司 | A kind of road and bridge engineering construction video conference management method and system based on BIM+GIS modeling |
CN109462736B (en) * | 2018-10-31 | 2020-10-02 | 广西路桥工程集团有限公司 | Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling |
CN109636408A (en) * | 2018-11-02 | 2019-04-16 | 成都四平软件有限公司 | Build things system |
CN109461290A (en) * | 2018-11-13 | 2019-03-12 | 机械工业第六设计研究院有限公司 | A kind of monitoring management system and equipment of civil construction |
CN110414922A (en) * | 2019-06-28 | 2019-11-05 | 万翼科技有限公司 | A kind of construction data management method and device based on Building Information Model |
CN110378674A (en) * | 2019-07-20 | 2019-10-25 | 深圳市实瑞建筑技术有限公司 | A kind of project delivery method information management system |
CN111045372B (en) * | 2019-12-30 | 2021-11-23 | 重庆能工科技发展有限公司 | Intelligent construction site management system |
CN111045372A (en) * | 2019-12-30 | 2020-04-21 | 重庆能工科技发展有限公司 | Intelligent construction site management system |
CN111562042A (en) * | 2020-05-28 | 2020-08-21 | 关蕙 | Safety information monitoring method and system in underground garage construction |
CN113139783A (en) * | 2021-03-31 | 2021-07-20 | 北京北排水环境发展有限公司 | Construction project management system for underground regeneration water plant |
CN113205269B (en) * | 2021-05-12 | 2022-04-05 | 广东重工建设监理有限公司 | Engineering supervision method based on artificial intelligence, intelligent terminal and storage medium |
CN113205269A (en) * | 2021-05-12 | 2021-08-03 | 湖北新悦成智能科技有限公司 | Engineering supervision method based on artificial intelligence, intelligent terminal and storage medium |
CN113626914A (en) * | 2021-08-04 | 2021-11-09 | 苏州思萃融合基建技术研究所有限公司 | Engineering project management method, device and system based on digital twins |
CN114528314A (en) * | 2022-04-20 | 2022-05-24 | 四川省大数据中心 | Engineering construction project supervision system and method |
WO2024082649A1 (en) * | 2022-10-18 | 2024-04-25 | 星际空间(天津)科技发展有限公司 | Key project collaboration and dynamic management service process monitoring method |
CN116109080A (en) * | 2022-12-29 | 2023-05-12 | 无锡泰禾宏科技有限公司 | Building integrated management platform based on BIM and AR |
CN116109080B (en) * | 2022-12-29 | 2023-09-12 | 无锡泰禾宏科技有限公司 | Building integrated management platform based on BIM and AR |
CN115809756A (en) * | 2023-01-20 | 2023-03-17 | 南方电网数字电网研究院有限公司 | Engineering project management method and system |
CN116109283A (en) * | 2023-04-12 | 2023-05-12 | 中川建投集团有限公司 | Digital project management collaboration platform |
CN116342072A (en) * | 2023-05-22 | 2023-06-27 | 四川华恒升科技发展有限公司 | High-standard farmland construction project design system and method based on artificial intelligence |
CN116342072B (en) * | 2023-05-22 | 2023-08-08 | 四川华恒升科技发展有限公司 | High-standard farmland construction project design system and method based on artificial intelligence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107527155A (en) | Construction project supervisory systems | |
Xu et al. | Collaborative information integration for construction safety monitoring | |
CN108898360A (en) | A kind of power engineering wisdom building site integrated control information system | |
CN110428135A (en) | A kind of pipe gallery equipment condition monitoring management system | |
WO2021256699A1 (en) | System for providing integrated apartment management platform | |
CN106485298A (en) | A kind of equipment routing inspection maintaining method based on Quick Response Code | |
CN107657677A (en) | Substation inspection monitoring method, device and electronic equipment | |
CN116823191B (en) | Intelligent construction engineering management platform based on EMPC mode | |
CN102521685A (en) | Electronic monitoring system | |
CN113034311A (en) | Building construction supervision system and method based on BIM | |
KR102122588B1 (en) | Integrated facility management system based on ict | |
CN108038674A (en) | A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function | |
CN111767329A (en) | Key field food safety supervision informatization system | |
CN113361880A (en) | Building engineering cost evaluation management system | |
CN112866647A (en) | Intelligent property management system based on smart community | |
CN107679827A (en) | Towards the management platform of ordinarily resident | |
CN106185520A (en) | Maintenance work auxiliary device, system and the method for elevator | |
CN111738672A (en) | Intelligent coordination system for bid evaluation work | |
CN103530693A (en) | Risk control system and control method for movable-property pledge financing service | |
KR20200031246A (en) | Mobile terminal for integrated facility management system based on ict and method thereof | |
KR20200027686A (en) | Method for processing integrated facility management system based on ict | |
CN110599368A (en) | DBM intelligent building management tool | |
CN107610261B (en) | System capable of managing entrance and exit of construction site | |
CN113379370A (en) | Segment production informatization management system | |
CN113837533A (en) | Multi-dimensional examination and evaluation system for real estate engineering project management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171229 |