CN107237262A - A kind of concrete arch rib construction method - Google Patents

A kind of concrete arch rib construction method Download PDF

Info

Publication number
CN107237262A
CN107237262A CN201710432229.6A CN201710432229A CN107237262A CN 107237262 A CN107237262 A CN 107237262A CN 201710432229 A CN201710432229 A CN 201710432229A CN 107237262 A CN107237262 A CN 107237262A
Authority
CN
China
Prior art keywords
section
arch rib
arch
concrete
vault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710432229.6A
Other languages
Chinese (zh)
Inventor
李辉
王旭
杨清印
尹华博
刘宁波
卢佩
王路
赵磊
陈丹
邓艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710432229.6A priority Critical patent/CN107237262A/en
Publication of CN107237262A publication Critical patent/CN107237262A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to technical field of bridge construction, in particular to a kind of concrete arch rib construction method.Arch rib to be onstructed is divided into multiple spaced apart sections, template is built in bridge floor, relies on template to pour the separation trough between section and reserved adjacent segment successively, after the completion for the treatment of that all sections are poured, concrete is filled in separation trough all sections are connected as entirety, form arch rib.The present invention passes through section construction, by the stress reduction produced during arch rib pouring construction to minimum, avoid because the generation for the change of arch costal shape problem that stress release is caused, it ensure that the requirement of arch rib line style, arch rib equitable subsection improves construction effect simultaneously, the duration has been saved, arch springing concrete problem easy to crack is solved.

Description

A kind of concrete arch rib construction method
Technical field
The present invention relates to technical field of bridge construction, in particular to a kind of concrete arch rib construction method.
Background technology
In Concrete Tied Arch, arch rib is the main forced position of the bridge type, and routinely the mode of closing up is:Armored concrete Cast-in-place poured successively from arch springing to vault to arch rib of arch rib is closed up, and requires high to concrete Slow setting time and poring rate, it is necessary to Formerly pour completion arch rib before concrete initial set to close up, concrete placings process control difficulties are higher, lateral stability is poor, risk is larger, take It is long;Poured with arch rib concrete, elastic deformation occurs for support system, arch rib Root Stress is constantly accumulated, easily causes arch springing and open Split;Simultaneously coagulation soil property is influenceed because support is settled the factors such as uneven and arch springing concrete shrinkage and creep produce local stress Amount.
The content of the invention
Present invention aim to the deficiency for solving above-mentioned background technology, there is provided a kind of concrete arch rib construction method.
The technical scheme is that:A kind of concrete arch rib construction method, it is characterised in that:By arch rib to be onstructed point Multiple spaced apart sections are segmented into, template is built in bridge floor, rely on template to pour successively between section and reserved adjacent segment Separation trough, after the completion for the treatment of that all sections are poured, concrete is filled in separation trough all sections is connected as entirety, form arch Rib.
It is further arch rib is divided into section method be:Arch rib to be onstructed is divided into the odd number no less than three sections Section section.
Vault section at the top of further described arch rib is independent section, positioned at vault section along section from bridge to both sides Section is arranged symmetrically centered on vault.
It is further pour section successively method be:Symmetrically poured from the bottom to top to both sides along bridge since arch rib, first Arch springing section is poured, vault section is finally poured.
It is further pour arch springing section method be:Arch springing section is poured together with bridge floor when pouring bridge floor.
Further comprise the following steps:
1) when, pouring bridge floor, arch springing section is poured together with bridge floor;
2) full framing, is built on bridge floor, template is built on full framing;
3), rely on template symmetrically to pour rib-lifting section from the bottom to top since the arch springing of both sides, arranged between adjacent segment Separation trough;
4) vault section symmetrically finally, is poured from the bottom to top, is closed up at vault;
5), after after all segmental stabilizations, the separation trough between all adjacent segments has been filled at temperature stable night Into;
6), after after the concrete setting in separation trough, form removal and full framing complete the pouring construction of arch rib.
The present invention is by section construction, by the stress reduction produced during arch rib pouring construction to minimum, it is to avoid because The generation of the change of arch costal shape problem caused for stress release, it is ensured that the requirement of arch rib line style, while arch rib equitable subsection is improved Construction effect, has saved the duration, solves arch springing concrete problem easy to crack.
Brief description of the drawings
Fig. 1:The segmented construction schematic diagram of arch rib of the present invention;
Wherein:1-arch rib;1.1-arch springing section;1.2-first segment;1.3-second section;1.4-the three section; 1.5-vault section;2-bridge floor;3-separation trough.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1, the present embodiment passes through segmented independent construction by the way that arch rib 1 is divided into multiple sections, it is to avoid arch rib Line style change and the problem of cracking in arch foot caused by stress dissipates in 1 work progress.
Arch rib 1 is divided into arch springing section 1.1 and vault section 1.5, wherein arch springing section 1.1 and vault section by the present embodiment A rib-lifting section is comprised at least between section 1.5, as shown in figure 1, first being illustrated by taking three rib-lifting sections as an example.Under at least Respectively first segment 1.2, the section 1.4 of second section 1.3 and the 3rd, opposite side have been arranged symmetrically the other three section.
Separation trough 3 is provided between adjacent rib-lifting section, wherein, between arch springing section 1.1 and adjacent first segment 1.2 There is no separation trough 3, be the arch springing section 1.1 when pouring first segment 1.2 because arch springing section 1.1 pours shaping together with bridge floor 2 It has been molded firm, in the absence of the release and dissipation of stress, and when pouring first segment 1.2, the upper end of first segment 1.2 has point Separate slot, the stress of first segment 1.2 can be dissipated by the separation trough 1.2 of upper end.In addition, the angle of inclination of arch springing part It is larger, if staying separation trough 3 between arch springing section 1.1 and first segment 1.2, it is unfavorable for the constructing operation of first segment 1.2.
During practice of construction, 1) when, pouring bridge floor 2, arch springing section 1.1 is poured together with bridge floor 2, bridge floor 2 is being built During formwork for placing, the formwork for placing of arch springing section 1.1 is reserved, then arch springing section 1.1 is poured out together with bridge floor 2;
2) full framing, is built on bridge floor, template is built on full framing;
3), rely on template symmetrically to pour rib-lifting section from the bottom to top since the arch springing of both sides, rely on arch springing section 1.1 symmetrical The first segment 1.2 of both sides is poured, second section 1.3 is then symmetrically poured, is stayed between first segment 1.2 and second section 1.3 There is separation trough 3, then reserve symmetrical the 3rd section 1.4 for pouring both sides of separation trough 3;
4) after the completion of, the 3rd section 1.4 is poured, finally it is left vault section 1.5, the arch rib center line of vault section 1.5 1 It is arranged symmetrically, therefore can symmetrically pours out vault section 1.5 from the bottom to top, finally converges at the vault of vault section 1.5, it is complete Arching epimerite section 1.5 is poured, and wherein vault section 1.5 is arranged symmetrically along bridge to the separation trough 3 of both sides with the center line of arch rib;
5), after after all segmental stabilizations, all separation troughs 3 are filled into completion, all points at temperature stable night Separate slot 3 is disposably completed, and avoids excessive temperature differentials from causing the concrete in separation trough 3 easily to be opened during the night for being selected in temperature stabilization Split;
6), after after the concrete setting in separation trough 3, form removal and full framing complete the pouring construction of arch rib.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent is defined.

Claims (6)

1. a kind of concrete arch rib construction method, it is characterised in that:Arch rib (1) to be onstructed is divided into multiple spaced apart Section, template is built in bridge floor (2), is relied on template to pour the separation trough (3) between section and reserved adjacent segment successively, is treated institute Have after the completion of section pours, concrete is filled in separation trough (3) all sections are connected as entirety, form arch rib (1).
2. a kind of concrete arch rib construction method as claimed in claim 1, it is characterised in that:Arch rib (1) is divided into section Method be:Arch rib (1) to be onstructed is divided into the odd number section section no less than three sections.
3. a kind of concrete arch rib construction method as claimed in claim 2, it is characterised in that:At the top of described arch rib (1) Vault section (1.5) be independent section, positioned at vault section (1.5) along bridge to the section of both sides the symmetrical cloth centered on vault Put.
4. a kind of concrete arch rib construction method as claimed in claim 1, it is characterised in that:The method for pouring section successively For:Symmetrically poured from the bottom to top to both sides along bridge since arch rib (1), first pour arch springing section (1.1), finally pour vault section Section (1.5).
5. a kind of concrete arch rib construction method as claimed in claim 4, it is characterised in that:Pour arch springing section (1.1) Method is:Arch springing section (1.1) is poured together with bridge floor (2) when pouring bridge floor (2).
6. a kind of concrete arch rib construction method as claimed in claim 1, it is characterised in that:Comprise the following steps:
1) when, pouring bridge floor (2), arch springing section (1.1) is poured together with bridge floor (2);
2) full framing, is built on bridge floor (2), template is built on full framing;
3) arch rib (1) section is symmetrically poured from the bottom to top, relying on template at the arch springing of both sides, is arranged between adjacent segment Separation trough (3);
4) vault section (1.5) symmetrically finally, is poured from the bottom to top, is closed up at vault;
5), after after all segmental stabilizations, the separation trough (3) between all adjacent segments has been filled at temperature stable night Into;
6), after after the concrete setting in separation trough (3), form removal and full framing complete the pouring construction of arch rib (1).
CN201710432229.6A 2017-06-09 2017-06-09 A kind of concrete arch rib construction method Pending CN107237262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432229.6A CN107237262A (en) 2017-06-09 2017-06-09 A kind of concrete arch rib construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432229.6A CN107237262A (en) 2017-06-09 2017-06-09 A kind of concrete arch rib construction method

Publications (1)

Publication Number Publication Date
CN107237262A true CN107237262A (en) 2017-10-10

Family

ID=59987100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432229.6A Pending CN107237262A (en) 2017-06-09 2017-06-09 A kind of concrete arch rib construction method

Country Status (1)

Country Link
CN (1) CN107237262A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193601A (en) * 2018-01-08 2018-06-22 王涛 A kind of method for bridge construction
CN108286223A (en) * 2018-04-17 2018-07-17 中铁二十局集团第四工程有限公司 A kind of box arch ring segmentation disposal molding construction forming panel and construction method
CN110700071A (en) * 2019-11-16 2020-01-17 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110886237A (en) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 Arch bridge construction method
CN113089498A (en) * 2021-05-10 2021-07-09 中国电建集团贵阳勘测设计研究院有限公司 Concrete ring-dividing and sectional cast-in-place method for main arch ring of large-span arch bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201609A (en) * 2000-12-28 2002-07-19 Ps Corp Construction method for concrete arch bridge
JP2004011196A (en) * 2002-06-05 2004-01-15 Sumitomo Mitsui Construction Co Ltd Erection method for arch rib of concrete arch bridge
CN101024977A (en) * 2007-03-17 2007-08-29 中铁六局集团太原铁路建设有限公司 Prepressing-free construction process for large-span steel-reinforced concrete arch structure
CN105200925A (en) * 2015-10-21 2015-12-30 杭州江润科技有限公司 Construction method of ultra-wide main arch ring of large span open-spandrel type arch bridge in extremely-cold regions
CN106592406A (en) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 Through tied arch bridge and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201609A (en) * 2000-12-28 2002-07-19 Ps Corp Construction method for concrete arch bridge
JP2004011196A (en) * 2002-06-05 2004-01-15 Sumitomo Mitsui Construction Co Ltd Erection method for arch rib of concrete arch bridge
CN101024977A (en) * 2007-03-17 2007-08-29 中铁六局集团太原铁路建设有限公司 Prepressing-free construction process for large-span steel-reinforced concrete arch structure
CN105200925A (en) * 2015-10-21 2015-12-30 杭州江润科技有限公司 Construction method of ultra-wide main arch ring of large span open-spandrel type arch bridge in extremely-cold regions
CN106592406A (en) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 Through tied arch bridge and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙全胜,苗建伟: "梁拱组合体系桥受力性能研究", 《中外公路》 *
申哲会: "斜靠式拱桥施工控制研究", 《工程科技II辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193601A (en) * 2018-01-08 2018-06-22 王涛 A kind of method for bridge construction
CN108286223A (en) * 2018-04-17 2018-07-17 中铁二十局集团第四工程有限公司 A kind of box arch ring segmentation disposal molding construction forming panel and construction method
CN108286223B (en) * 2018-04-17 2023-08-25 中铁二十一局集团第四工程有限公司 Forming template for sectional one-time forming construction of box-type arch ring and construction method
CN110700071A (en) * 2019-11-16 2020-01-17 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110700071B (en) * 2019-11-16 2024-06-04 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110886237A (en) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 Arch bridge construction method
CN110886237B (en) * 2019-12-25 2021-02-12 中交路桥华南工程有限公司 Arch bridge construction method
CN113089498A (en) * 2021-05-10 2021-07-09 中国电建集团贵阳勘测设计研究院有限公司 Concrete ring-dividing and sectional cast-in-place method for main arch ring of large-span arch bridge

Similar Documents

Publication Publication Date Title
CN107237262A (en) A kind of concrete arch rib construction method
CN106988436B (en) A kind of method that reserving hole blocks
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN104480867A (en) Replacement and maintenance method of bridge foundation support padstone
CN105463993B (en) Movable formwork suitable for multiple beams and construction method
CN105799046B (en) A kind of prestressed thin slab integration with ribbing pours mold and casting method
CN106111911A (en) Complicated core tears core coring method open
US2753711A (en) Method of constructing furnace arches
US1206150A (en) Method and apparatus for stripping ingots.
CN206241188U (en) For the casting compencation system of model casting
CN206829400U (en) A kind of 3D printing wall and its connecting node construction
CN102877416B (en) Herring-bone wall body construction method of large-span concrete herring-bone continuous girder bridge and structure thereof
CN106392008B (en) Multichannel casting runner mould
CN105221160B (en) Vertical bifurcation arrangement structure of staggered floor tunnel
US587728A (en) Metal-mold
CN203066264U (en) Water stopping piece for concrete post-cast strip
US1431803A (en) And ernest j
CN204492153U (en) A kind of vapor-permeable type concrete cast template
CN206997716U (en) A kind of wooden model plays mode structure
CN202595617U (en) Concrete capping beam counterforce platform system for jacking bridge
CN106351131B (en) A kind of method without the support reformation rigid framed arch bridge floorings
US1710247A (en) Furnace-arch construction
US666671A (en) Flask for making seamless sash-weights.
CN204079800U (en) A kind of founding high-temperature material insulation can being easy to replacing thermal insulation layer
US2184469A (en) Paving brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171010

RJ01 Rejection of invention patent application after publication