CN107237262A - 一种混凝土拱肋施工方法 - Google Patents

一种混凝土拱肋施工方法 Download PDF

Info

Publication number
CN107237262A
CN107237262A CN201710432229.6A CN201710432229A CN107237262A CN 107237262 A CN107237262 A CN 107237262A CN 201710432229 A CN201710432229 A CN 201710432229A CN 107237262 A CN107237262 A CN 107237262A
Authority
CN
China
Prior art keywords
section
arch rib
arch
concrete
vault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710432229.6A
Other languages
English (en)
Inventor
李辉
王旭
杨清印
尹华博
刘宁波
卢佩
王路
赵磊
陈丹
邓艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710432229.6A priority Critical patent/CN107237262A/zh
Publication of CN107237262A publication Critical patent/CN107237262A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及桥梁施工技术领域,具体地指一种混凝土拱肋施工方法。将待施工的拱肋分割为多个间隔布置的节段,在桥面搭建模板,依托模板依次浇筑节段并预留相邻节段之间的分隔槽,待所有节段浇筑完成后,在分隔槽内填筑混凝土将所有节段连接为整体,形成拱肋。本发明通过分段施工,将拱肋浇筑施工过程中产生的应力消减到最小,避免了因为应力释放造成的拱肋变形问题的发生,保证了拱肋线型的要求,同时拱肋合理分段提高了施工功效,节约了工期,解决了拱脚混凝土易开裂的难题。

Description

一种混凝土拱肋施工方法
技术领域
本发明涉及桥梁施工技术领域,具体地指一种混凝土拱肋施工方法。
背景技术
在混凝土系杆拱桥中,拱肋是该桥型主要受力位置,常规合拢方式为:钢筋混凝土拱肋现浇从拱脚向拱顶依次浇筑至拱肋顶部合拢,对砼缓凝时间和浇注速度要求高,必须在先浇砼初凝前完成拱肋合拢,砼浇筑过程控制难度较高、横向稳定性差、风险较大,耗时长;伴随拱肋混凝土浇筑,支撑体系发生弹性变形,拱肋根部应力不断累积,易造成拱脚开裂;同时因支架沉降不均匀和拱脚混凝土收缩徐变等因素产生局部应力而影响混凝土质量。
发明内容
本发明的目的就是要解决上述背景技术的不足,提供一种混凝土拱肋施工方法。
本发明的技术方案为:一种混凝土拱肋施工方法,其特征在于:将待施工的拱肋分割为多个间隔布置的节段,在桥面搭建模板,依托模板依次浇筑节段并预留相邻节段之间的分隔槽,待所有节段浇筑完成后,在分隔槽内填筑混凝土将所有节段连接为整体,形成拱肋。
进一步的将拱肋分割为节段的方法为:将待施工的拱肋分割为不少于三段的奇数段节段。
进一步的所述的拱肋顶部的拱顶节段为单独节段,位于拱顶节段顺桥向两侧的节段以拱顶为中心对称布置。
进一步的依次浇筑节段的方法为:从拱肋顺桥向两侧由下至上开始对称浇筑,先浇筑拱脚节段,最后浇筑拱顶节段。
进一步的浇筑拱脚节段的方法为:在浇筑桥梁桥面时与桥面一起浇筑拱脚节段。
进一步的包括以下步骤:
1)、浇筑桥梁桥面时,与桥面一起浇筑拱脚节段;
2)、在桥面上搭建满堂支架,在满堂支架上搭建模板;
3)、依托模板从两侧拱脚开始由下至上对称浇筑拱肋节段,在相邻节段之间布置分隔槽;
4)、最后由下至上对称浇筑拱顶节段,在拱顶处合拢;
5)、待所有节段稳定后,在气温稳定的夜晚将所有相邻节段之间的分隔槽填筑完成;
6)、待分隔槽内的混凝土凝固后,拆除模板和满堂支架,完成拱肋的浇筑施工。
本发明通过分段施工,将拱肋浇筑施工过程中产生的应力消减到最小,避免了因为应力释放造成的拱肋变形问题的发生,保证了拱肋线型的要求,同时拱肋合理分段提高了施工功效,节约了工期,解决了拱脚混凝土易开裂的难题。
附图说明
图1:本发明的拱肋分节段施工示意图;
其中:1—拱肋;1.1—拱脚节段;1.2—第一节段;1.3—第二节段;1.4—第三节段;1.5—拱顶节段;2—桥面;3—分隔槽。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明。
如图1,本实施例通过将拱肋1分割为多个节段,通过分节段单独施工,避免了拱肋1施工过程中应力消散导致的线型变化和拱脚开裂的问题。
本实施例将拱肋1分割为拱脚节段1.1和拱顶节段1.5,其中拱脚节段1.1和拱顶节段1.5之间至少包含一个拱肋节段,如图1所示,先以三个拱肋节段为例进行说明。从下至少分别为第一节段1.2、第二节段1.3和第三节段1.4,另一侧对称布置有另外三个节段。
相邻拱肋节段之间设置有分隔槽3,其中,拱脚节段1.1与相邻的第一节段1.2之间没有分隔槽3,是因为拱脚节段1.1与桥面2一起浇筑成型,浇筑第一节段1.2时拱脚节段1.1已经成型稳固,不存在应力的释放和消散,而浇筑第一节段1.2时,第一节段1.2的上端有分隔槽,第一节段1.2的应力可以通过上端的分隔槽1.2进行消散。另外,拱脚部分的倾斜角度较大,如果在拱脚节段1.1和第一节段1.2之间留分隔槽3,不利于第一节段1.2的施工操作。
实际施工时,1)、浇筑桥梁桥面2时,与桥面2一起浇筑拱脚节段1.1,在搭建桥面2浇筑模板时,预留拱脚节段1.1的浇筑模板,然后同桥面2一起浇筑出拱脚节段1.1;
2)、在桥面上搭建满堂支架,在满堂支架上搭建模板;
3)、依托模板从两侧拱脚开始由下至上对称浇筑拱肋节段,依托拱脚节段1.1对称浇筑两侧的第一节段1.2,然后对称浇筑第二节段1.3,第一节段1.2和第二节段1.3之间留有分隔槽3,然后预留分隔槽3对称浇筑两侧的第三节段1.4;
4)、第三节段1.4浇筑完成后,最后剩下拱顶节段1.5,拱顶节段1.5一拱肋中心线对称布置,因此可由下至上对称浇筑出拱顶节段1.5,最后在拱顶节段1.5的拱顶处汇合,完成拱顶节段1.5的浇筑,其中拱顶节段1.5顺桥向两侧的分隔槽3以拱肋的中心线对称布置;
5)、待所有节段稳定后,在气温稳定的夜晚将所有的分隔槽3填筑完成,所有的分隔槽3一次性完成,选在气温稳定的夜晚时避免温差过大导致分隔槽3内的混凝土容易开裂;
6)、待分隔槽3内的混凝土凝固后,拆除模板和满堂支架,完成拱肋的浇筑施工。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等同物界定。

Claims (6)

1.一种混凝土拱肋施工方法,其特征在于:将待施工的拱肋(1)分割为多个间隔布置的节段,在桥面(2)搭建模板,依托模板依次浇筑节段并预留相邻节段之间的分隔槽(3),待所有节段浇筑完成后,在分隔槽(3)内填筑混凝土将所有节段连接为整体,形成拱肋(1)。
2.如权利要求1所述的一种混凝土拱肋施工方法,其特征在于:将拱肋(1)分割为节段的方法为:将待施工的拱肋(1)分割为不少于三段的奇数段节段。
3.如权利要求2所述的一种混凝土拱肋施工方法,其特征在于:所述的拱肋(1)顶部的拱顶节段(1.5)为单独节段,位于拱顶节段(1.5)顺桥向两侧的节段以拱顶为中心对称布置。
4.如权利要求1所述的一种混凝土拱肋施工方法,其特征在于:依次浇筑节段的方法为:从拱肋(1)顺桥向两侧由下至上开始对称浇筑,先浇筑拱脚节段(1.1),最后浇筑拱顶节段(1.5)。
5.如权利要求4所述的一种混凝土拱肋施工方法,其特征在于:浇筑拱脚节段(1.1)的方法为:在浇筑桥梁桥面(2)时与桥面(2)一起浇筑拱脚节段(1.1)。
6.如权利要求1所述的一种混凝土拱肋施工方法,其特征在于:包括以下步骤:
1)、浇筑桥梁桥面(2)时,与桥面(2)一起浇筑拱脚节段(1.1);
2)、在桥面(2)上搭建满堂支架,在满堂支架上搭建模板;
3)、依托模板从两侧拱脚处开始由下至上对称浇筑拱肋(1)节段,在相邻节段之间布置分隔槽(3);
4)、最后由下至上对称浇筑拱顶节段(1.5),在拱顶处合拢;
5)、待所有节段稳定后,在气温稳定的夜晚将所有相邻节段之间的分隔槽(3)填筑完成;
6)、待分隔槽(3)内的混凝土凝固后,拆除模板和满堂支架,完成拱肋(1)的浇筑施工。
CN201710432229.6A 2017-06-09 2017-06-09 一种混凝土拱肋施工方法 Pending CN107237262A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432229.6A CN107237262A (zh) 2017-06-09 2017-06-09 一种混凝土拱肋施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432229.6A CN107237262A (zh) 2017-06-09 2017-06-09 一种混凝土拱肋施工方法

Publications (1)

Publication Number Publication Date
CN107237262A true CN107237262A (zh) 2017-10-10

Family

ID=59987100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432229.6A Pending CN107237262A (zh) 2017-06-09 2017-06-09 一种混凝土拱肋施工方法

Country Status (1)

Country Link
CN (1) CN107237262A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193601A (zh) * 2018-01-08 2018-06-22 王涛 一种桥梁施工方法
CN108286223A (zh) * 2018-04-17 2018-07-17 中铁二十局集团第四工程有限公司 一种箱型拱圈分段一次性成型施工用成型模板及施工方法
CN110700071A (zh) * 2019-11-16 2020-01-17 福州大学 一种预制拼装uhpc板式拱桥及其施工方法
CN110886237A (zh) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 拱桥施工方法
CN113089498A (zh) * 2021-05-10 2021-07-09 中国电建集团贵阳勘测设计研究院有限公司 一种大跨度拱桥主拱圈混凝土分环分段现浇方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201609A (ja) * 2000-12-28 2002-07-19 Ps Corp コンクリートアーチ橋の構築方法
JP2004011196A (ja) * 2002-06-05 2004-01-15 Sumitomo Mitsui Construction Co Ltd コンクリートアーチ橋のアーチリブ架設方法
CN101024977A (zh) * 2007-03-17 2007-08-29 中铁六局集团太原铁路建设有限公司 大跨度钢筋混凝土拱形结构免预压施工工艺
CN105200925A (zh) * 2015-10-21 2015-12-30 杭州江润科技有限公司 高寒区大跨度空腹式拱桥超宽主拱圈施工方法
CN106592406A (zh) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 下承式系杆拱桥及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201609A (ja) * 2000-12-28 2002-07-19 Ps Corp コンクリートアーチ橋の構築方法
JP2004011196A (ja) * 2002-06-05 2004-01-15 Sumitomo Mitsui Construction Co Ltd コンクリートアーチ橋のアーチリブ架設方法
CN101024977A (zh) * 2007-03-17 2007-08-29 中铁六局集团太原铁路建设有限公司 大跨度钢筋混凝土拱形结构免预压施工工艺
CN105200925A (zh) * 2015-10-21 2015-12-30 杭州江润科技有限公司 高寒区大跨度空腹式拱桥超宽主拱圈施工方法
CN106592406A (zh) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 下承式系杆拱桥及其施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙全胜,苗建伟: "梁拱组合体系桥受力性能研究", 《中外公路》 *
申哲会: "斜靠式拱桥施工控制研究", 《工程科技II辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193601A (zh) * 2018-01-08 2018-06-22 王涛 一种桥梁施工方法
CN108286223A (zh) * 2018-04-17 2018-07-17 中铁二十局集团第四工程有限公司 一种箱型拱圈分段一次性成型施工用成型模板及施工方法
CN108286223B (zh) * 2018-04-17 2023-08-25 中铁二十一局集团第四工程有限公司 一种箱型拱圈分段一次性成型施工用成型模板及施工方法
CN110700071A (zh) * 2019-11-16 2020-01-17 福州大学 一种预制拼装uhpc板式拱桥及其施工方法
CN110700071B (zh) * 2019-11-16 2024-06-04 福州大学 一种预制拼装uhpc板式拱桥及其施工方法
CN110886237A (zh) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 拱桥施工方法
CN110886237B (zh) * 2019-12-25 2021-02-12 中交路桥华南工程有限公司 拱桥施工方法
CN113089498A (zh) * 2021-05-10 2021-07-09 中国电建集团贵阳勘测设计研究院有限公司 一种大跨度拱桥主拱圈混凝土分环分段现浇方法

Similar Documents

Publication Publication Date Title
CN107237262A (zh) 一种混凝土拱肋施工方法
CN100392190C (zh) 防波堤或波浪阻滞结构的保护元件、其制造方法和模板
CN106988436B (zh) 一种预留孔洞封堵的方法
CN104532985B (zh) 一种用榫卯式预制混凝土砌块代替模板浇筑的剪力墙及其施工方法
CN104480867A (zh) 一种桥梁支座垫石的更换维修方法
CN105463993B (zh) 适用于多幅梁的移动模架及施工方法
CN106111911A (zh) 复杂砂芯拆芯取芯方法
US2753711A (en) Method of constructing furnace arches
US1206150A (en) Method and apparatus for stripping ingots.
CN206241188U (zh) 用于熔模铸造的浇注补缩***
CN206829400U (zh) 一种3d打印墙体及其连接节点构造
CN102877416B (zh) 大跨径混凝土鱼脊连续梁桥的鱼脊墙身施工法
CN105221160B (zh) 一种错层隧道的竖向分岔布置结构
US587728A (en) Metal-mold
CN108035342A (zh) 灌注桩桩头施工方法
CN203066264U (zh) 用于混凝土后浇带的止水件
US1431803A (en) And ernest j
CN206997716U (zh) 一种木模起模结构
CN202595617U (zh) 桥梁顶升用混凝土盖梁反力平台***
CN107869251A (zh) 一种钢柱灌芯方法
CN106351131B (zh) 一种无支架改造刚架拱桥桥面板的方法
US1710247A (en) Furnace-arch construction
CN107386129A (zh) 一种采用预应力钢筋防止台身发生竖向裂缝的施工方法
US666671A (en) Flask for making seamless sash-weights.
CN204079800U (zh) 一种易于更换保温层的熔铸高温材料保温箱

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171010

RJ01 Rejection of invention patent application after publication