CN106848938A - Cable testing bridge hanging installation method under a kind of High Altitude Platform - Google Patents

Cable testing bridge hanging installation method under a kind of High Altitude Platform Download PDF

Info

Publication number
CN106848938A
CN106848938A CN201710085878.3A CN201710085878A CN106848938A CN 106848938 A CN106848938 A CN 106848938A CN 201710085878 A CN201710085878 A CN 201710085878A CN 106848938 A CN106848938 A CN 106848938A
Authority
CN
China
Prior art keywords
bridge
springboard
vertical rod
crane span
span structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710085878.3A
Other languages
Chinese (zh)
Other versions
CN106848938B (en
Inventor
王新成
倪淑梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201710085878.3A priority Critical patent/CN106848938B/en
Publication of CN106848938A publication Critical patent/CN106848938A/en
Application granted granted Critical
Publication of CN106848938B publication Critical patent/CN106848938B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses cable testing bridge hanging installation method under a kind of High Altitude Platform, making and installation including mobile platform, the installation of crane span structure, springboard, the laying of safety rope, the step such as cable laying and follow-up dismounting, mobile platform includes steel tube poles, crossbeam, springboard and right-angle coupler, steel tube poles include left vertical rod, right vertical rod, according to construction drawing field surveys crane span structure installation site, the steel pipe right angle fastener that is connected by of the left vertical rod, right vertical rod and cross bar is connected, and the hanger of left vertical rod, right vertical rod and upper end is connected by screw bolts, and is easy to peace to tear open;Being constructed using the inventive method being capable of safe efficient facility, the construction task that completion crane span structure is installed and crane span structure inner cable lays of guaranteeing the quality, saving full hall scaffold rental charge;The inventive method solves the awkward situation of conventional installation methods long-time active channel, the advantages of with easy for installation, safe operation, reducing construction cost, and be not take up passage.

Description

Cable testing bridge hanging installation method under a kind of High Altitude Platform
Technical field
The invention belongs to architectural engineering construction technique field, more particularly, to cable testing bridge hanging peace under a kind of High Altitude Platform Dress method.
Background technology
Smelt that engineering steelshop steel-structure factory building is high, technique platform level is more, and crane span structure installation difficulty is big, especially first Layer converter platform, the cable testing bridge hanging being usually under 8~11 meters, platform away from ground level is installed generally to use and sets up landing steel Pin hand cradle, sets up artificial operation mounting platform, and standing time is long after scaffold building, waits until that crane span structure inner cable has laid always And can be removed after installing bridge cover plate, scaffold leasing period is long, and occupancy construction channel time is long, and other constructions are made Industry brings unfavorable, increases construction cost.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing defect, there is provided cable testing bridge hanging under a kind of High Altitude Platform Installation method, using the inventive method construct can safe efficient facility, guarantee the quality completion crane span structure install and crane span structure inner cable lay Construction task, save full hall scaffold rental charge;Steelshop ground construction space is narrow, and professional many, material is installed in workshop Stockpile is put and engineering equipment temporary storage space is squeezed, and ground space seems especially precious in workshop, the inventive method The awkward situation of conventional installation methods long-time active channel is solved, with easy for installation, safe operation, construction cost is reduced, and The advantages of being not take up passage.
To achieve the above object, the present invention provides cable testing bridge hanging installation method under a kind of High Altitude Platform, including following Step:
A. according to steel smelting platform lower edge clear height from the ground, mobile platform is made;Mobile platform include steel tube poles, crossbeam, Springboard and right-angle coupler, steel tube poles include left vertical rod, right vertical rod, described according to construction drawing field surveys crane span structure installation site The steel pipe right angle fastener that is connected by of left vertical rod, right vertical rod and cross bar is connected, and the hanger of left vertical rod, right vertical rod and upper end uses spiral shell Tether and connect, be easy to peace to tear open;
B. utilize mobile platform two steel tube poles of welded and installed at, then with right-angle coupler cross bar respectively at two Steel tube poles are connected, and form " U " type frame;Along crane span structure installation direction a set of " U " type frame is filled at interval of 1.5 meter amperes;
C. springboard is laid for the first time.It is being close to steel tube poles and cross bar connection place is laid side by side springboard, springboard and cross bar connect Contact portion position is firm with 10# iron wire colligations;
D. tensioning side safety rope, a galvanized steel wire rope of ∮ 6 is tensioned on the inside of steel tube poles along crane span structure installation direction, Highly it is 1.2 meters from springboard;
E. stand on mounted springboard, be first respectively mounted bridge upright at the two ends of crane span structure, continue to pacify after tensioning chalk line Remaining bridge upright, then erection bridge trailing arm are filled, in the taut chalk line of bridge bracket arm setting height(from bottom), the height to every place's bridge bracket arm enters Row adjustment;
F. springboard is laid second.After all bridge bracket arm installations, springboard binding wire is removed, moved horizontally Springboard to the side of bridge bracket arm, springboard with beam contact at fastened with 10# iron wire plates solid, be easily installed cable testing bridge;Stand It is that safety installation cable testing bridge carries out standard in the inner side tensioning galvanized steel wire rope of steel tube poles on springboard after movement;
G. after the completion of cable testing bridge fixed installation, treat that crane span structure inner cable has laid, bridge cover plate is installed after terminating, using shifting Moving platform successively removes springboard, cross bar, finally removes steel tube poles with gas cutting.
As a preferred technical solution of the present invention, the width calculation of " U " type frame, B=crane span structures width+cable laying people Row of channels width+bridge upright weld job space length.
Used as a preferred technical solution of the present invention, cable laying walkway width is 600mm, bridge upright Weld job space length is 200mm.
As a preferred technical solution of the present invention, the clipping room of " U " type frame away from being 1.5 meters, according to straightway crane span structure Column welded and installed, every 1.5 meter ampere of code requirement fills column at, in crane span structure jointing herein;" U " type frame and bridge upright At one, workmen has a strong point when bridge upright is welded in the overhead position.
Used as a preferred technical solution of the present invention, the left vertical rod, right vertical rod and cross bar are ∮ 48 × 3.5mm steel Pipe is made.
Used as a preferred technical solution of the present invention, the hanger is processed with 120 × 120mm square 12mm steel plates Form, there is the drilling of a diameter of 14mm at center.
Compared with prior art, the beneficial effects of the invention are as follows:
Using the inventive method construct can safe efficient facility, guarantee the quality completion crane span structure install and crane span structure inner cable lay Construction task, save full hall scaffold rental charge it is hundreds thousand of;Steelshop ground construction space is narrow, and specialty is installed in workshop Many, placing of material and engineering equipment temporary storage space are squeezed, and ground space seems especially precious in workshop, the present invention Method solves the awkward situation of conventional installation methods long-time active channel.
Brief description of the drawings
Fig. 1 is mounting structure schematic diagram of the present invention.
In figure:1-1, left vertical rod;1-2, right vertical rod 2, cross bar;3rd, bridge upright;4th, bridge bracket arm;5th, cable testing bridge;6、 Springboard;7th, galvanized steel wire rope;8th, hanger;9th, bolt.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is referred to, the present invention provides a kind of technical scheme:11.5 meters of converter platforms of certain steel mill, construction drawing requirement The crane span structure for installing two-layer 600mm width is hung under platform, every converter 1 is arranged, and 3 converters amount to 3 row;Through charging across and converter Across, 1 48 meters of row, 144 meters of length altogether.Laid to crane span structure inner cable since crane span structure is installed, about needed 5 months.
Crane span structure installation method is hung under the three row platform identical, it is specific as follows:
A. converter platform beam lower edge 11.25 meters of clear height from the ground, make 9.6 meters of highly mobile platforms;Show according to construction drawing The field specific mounting coordinate of mapping crane span structure;Prepare the springboard 6 of the steel pipes of ∮ 48 × 3.5, right-angle coupler and 200 × 3000 specifications;
B., mobile platform is installed, to be drilled respectively at left vertical rod 1-1, the hanging of right vertical rod 1-2 and use spiral shell with the hanger 8 of upper end Bolt 9 is connected, and the steel pipe right angle fastener that is connected by of left vertical rod 1-1, right vertical rod 1-2 and cross bar 2 is connected, and is installed along crane span structure Direction fills a set of " U " type frame at interval of 1.5 meter amperes, it is considered to which crane span structure width 600mm, walkway width is pre- after crane span structure installation 600mm is stayed, left vertical rod 1-1 is added with the clipping room of bridge upright 3 away from terms of 200mm, so " U " type width of frame is amounted to 1400mm;Height is considered with the average height 1700mm of people;
C. laying springboard 6 for the first time, is being close to left vertical rod 1-1 and the connection place of cross bar 2 is laid side by side springboard 6, springboard 6 and horizontal stroke Firmly, welded and installed bridge upright 3 and the fastening bridge bracket arm 4 of bolt 9 use this position to the 10# iron wires colligation of the contact site of bar 2 Springboard 6;
D. tensioning side safety rope, a galvanized steel wire rope of ∮ 6 is tensioned on the inside of left vertical rod 1-1 along crane span structure installation direction 7, highly it is that 1.2 meters with a distance from springboard 6, welded and installed bridge upright 3 and bolt 9 fasten bridge bracket arm 4, and workmen uses this Place's suspension safety belt of galvanized steel wire rope 7;
E. stand on mounted springboard 6, be first respectively mounted bridge upright 3 at the two ends of crane span structure, continue after tensioning chalk line Remaining bridge upright 3, then erection bridge trailing arm 4 are installed, in the taut chalk line of the setting height(from bottom) of bridge bracket arm 4, to every place's bridge bracket arm 4 Highly it is adjusted;
F. second laying springboard 6, after the installation of all bridge bracket arms 4, removes the binding wire of springboard 6, level Moved right springboard 6 to the side of bridge bracket arm 4, and springboard 6 is fastened admittedly with the contact position of cross bar 2 with 10# iron wire plates, is easily installed Cable testing bridge 5, is that safety installs cable in the inner side tensioning galvanized steel wire rope 7 of steel tube poles on the springboard 6 stood after movement Crane span structure 5 is ready;
G. after the completion of cable testing bridge 5 is fixedly mounted, treat that crane span structure inner cable has laid, bridge cover plate is installed after terminating, and is utilized Mobile platform successively removes springboard 6, cross bar 2, and it is left vertical rod 1-1 and right vertical rod 1-2 finally to remove steel tube poles.
Using the inventive method construct can safe efficient facility, guarantee the quality completion crane span structure install and crane span structure inner cable lay Construction task, full hall scaffold rental charge can be just saved according to above-described embodiment quantities hundreds thousand of;Steelshop ground Construction space is narrow, professional many, placing of material is installed in workshop and engineering equipment temporary storage space is squeezed, in workshop Ground space seems especially precious, and the inventive method solves the awkward situation of conventional installation methods long-time active channel.Although Through embodiments of the invention have shown and described, for the ordinary skill in the art, it is possible to understand that do not departing from this These embodiments can be carried out with various changes, modification, replacement and modification in the case of the principle and spirit of invention, it is of the invention Scope is defined by the appended claims and the equivalents thereof.

Claims (6)

1. cable testing bridge hangs installation method under a kind of High Altitude Platform, it is characterised in that comprise the following steps:
A. according to steel smelting platform lower edge clear height from the ground, mobile platform is made;The mobile platform include steel tube poles, crossbeam, Springboard and right-angle coupler, the steel tube poles include left vertical rod, right vertical rod, according to construction drawing field surveys crane span structure installation site, The steel pipe right angle fastener that is connected by of the left vertical rod, right vertical rod and cross bar is connected, and the hanger of left vertical rod, right vertical rod and upper end is adopted It is connected with, is easy to peace to tear open;
B. utilize mobile platform two steel tube poles of welded and installed at, then with right-angle coupler cross bar respectively at two steel pipes Vertical rod is connected, and forms " U " type frame;Along crane span structure installation direction a set of " U " type frame is filled at interval of 1.5 meter amperes;
C. springboard is laid for the first time.It is being close to steel tube poles and cross bar connection place is laid side by side springboard, springboard and beam contact portion Position is firm with 10# iron wire colligations;
D. tensioning side safety rope, a galvanized steel wire rope of ∮ 6, height are tensioned on the inside of steel tube poles along crane span structure installation direction It is 1.2 meters from springboard;
E. stand on mounted springboard, be first respectively mounted bridge upright at the two ends of crane span structure, continue that it is installed after tensioning chalk line Remaining bridge upright, then erection bridge trailing arm, in the taut chalk line of bridge bracket arm setting height(from bottom), the height to every place's bridge bracket arm is adjusted It is whole;
F. springboard is laid second.After all bridge bracket arm installations, springboard binding wire is removed, move horizontally springboard To the side of bridge bracket arm, springboard with beam contact at fastened with 10# iron wire plates solid, be easily installed cable testing bridge;Stand and moving It is that safety installation cable testing bridge carries out standard in the inner side tensioning galvanized steel wire rope of steel tube poles on springboard after dynamic;
G. after the completion of cable testing bridge fixed installation, treat that crane span structure inner cable has laid, bridge cover plate is installed after terminating, using mobile flat Platform successively removes springboard, cross bar, finally removes steel tube poles with gas cutting.
2. cable testing bridge hangs installation method under a kind of High Altitude Platform according to claim 1, it is characterised in that:" U " type frame Width calculation, B=crane span structures width+cable laying walkway width+bridge upright weld job space length.
3. cable testing bridge hangs installation method under a kind of High Altitude Platform according to claim 2, it is characterised in that:The cable Walkway width is laid for 600mm, bridge upright weld job space length is 200mm.
4. cable testing bridge hangs installation method under a kind of High Altitude Platform according to any one of claim 1 or 2, and its feature exists In:Away from being 1.5 meters, according to straightway bridge upright welded and installed, every 1.5 meter ampere of code requirement fills one to the clipping room of " U " type frame Place's column, in crane span structure jointing herein;At one, workmen has when bridge upright is welded in the overhead position for " U " type frame and bridge upright One strong point.
5. according to cable testing bridge hanging installation method under a kind of High Altitude Platform described in claim 1, it is characterised in that:It is described left vertical Bar, right vertical rod and cross bar are ∮ 48 × 3.5mm steel pipe manufacturings and form.
6. according to cable testing bridge hanging installation method under a kind of High Altitude Platform described in claim 1, it is characterised in that:The hanger is used 120 × 120mm square 12mm steel plates are processed, and there is the drilling of a diameter of 14mm at center.
CN201710085878.3A 2017-02-17 2017-02-17 Cable testing bridge hangs installation method under a kind of High Altitude Platform Active CN106848938B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710085878.3A CN106848938B (en) 2017-02-17 2017-02-17 Cable testing bridge hangs installation method under a kind of High Altitude Platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710085878.3A CN106848938B (en) 2017-02-17 2017-02-17 Cable testing bridge hangs installation method under a kind of High Altitude Platform

Publications (2)

Publication Number Publication Date
CN106848938A true CN106848938A (en) 2017-06-13
CN106848938B CN106848938B (en) 2018-08-21

Family

ID=59128443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710085878.3A Active CN106848938B (en) 2017-02-17 2017-02-17 Cable testing bridge hangs installation method under a kind of High Altitude Platform

Country Status (1)

Country Link
CN (1) CN106848938B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494625A (en) * 2018-10-24 2019-03-19 中国二十冶集团有限公司 The installation method of cable testing bridge
CN109650276A (en) * 2018-12-31 2019-04-19 宁波二十冶建设有限公司 A kind of multi-layer cable gantry more changing device and construction method
CN109888698A (en) * 2019-04-12 2019-06-14 枣庄矿业集团新安煤业有限公司 Inverted T shaped cable trough
CN111446663A (en) * 2020-04-29 2020-07-24 象山旭雯钢铁科技有限公司 High altitude cable removes auxiliary device
CN112242678A (en) * 2020-09-23 2021-01-19 安徽华希电力科技有限公司 Glass fiber reinforced plastic cable bridge and fastening device of cover plate thereof
CN115864215A (en) * 2022-11-21 2023-03-28 曹夏畅 Cable bridge hanging and mounting equipment and method under high-altitude platform

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251679A (en) * 2011-05-10 2011-11-23 中广核工程有限公司 Construction method
CN203082364U (en) * 2012-12-14 2013-07-24 中国二十冶集团有限公司 Support for cabling of overhead bridge frame
CN203411226U (en) * 2013-07-29 2014-01-29 沈阳市华域建筑设计有限公司 Common lifting device for cable bridge and vent pipeline
CN103628918A (en) * 2013-12-06 2014-03-12 中铁二十三局集团有限公司 Construction method of road tunnel lighting engineering
CN104065006A (en) * 2014-06-26 2014-09-24 镇江市江岛电器制造有限公司 Cable bridge installation method
CN104089090A (en) * 2014-07-08 2014-10-08 江苏海纬集团有限公司 Cable tray installation requirements
CN204609266U (en) * 2015-04-20 2015-09-02 中建安装工程有限公司 A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline
US20160007738A1 (en) * 2013-04-05 2016-01-14 Rolando S. Garcia A cabled pipe rack

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251679A (en) * 2011-05-10 2011-11-23 中广核工程有限公司 Construction method
CN203082364U (en) * 2012-12-14 2013-07-24 中国二十冶集团有限公司 Support for cabling of overhead bridge frame
US20160007738A1 (en) * 2013-04-05 2016-01-14 Rolando S. Garcia A cabled pipe rack
CN203411226U (en) * 2013-07-29 2014-01-29 沈阳市华域建筑设计有限公司 Common lifting device for cable bridge and vent pipeline
CN103628918A (en) * 2013-12-06 2014-03-12 中铁二十三局集团有限公司 Construction method of road tunnel lighting engineering
CN104065006A (en) * 2014-06-26 2014-09-24 镇江市江岛电器制造有限公司 Cable bridge installation method
CN104089090A (en) * 2014-07-08 2014-10-08 江苏海纬集团有限公司 Cable tray installation requirements
CN204609266U (en) * 2015-04-20 2015-09-02 中建安装工程有限公司 A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109494625A (en) * 2018-10-24 2019-03-19 中国二十冶集团有限公司 The installation method of cable testing bridge
CN109650276A (en) * 2018-12-31 2019-04-19 宁波二十冶建设有限公司 A kind of multi-layer cable gantry more changing device and construction method
CN109888698A (en) * 2019-04-12 2019-06-14 枣庄矿业集团新安煤业有限公司 Inverted T shaped cable trough
CN111446663A (en) * 2020-04-29 2020-07-24 象山旭雯钢铁科技有限公司 High altitude cable removes auxiliary device
CN112242678A (en) * 2020-09-23 2021-01-19 安徽华希电力科技有限公司 Glass fiber reinforced plastic cable bridge and fastening device of cover plate thereof
CN115864215A (en) * 2022-11-21 2023-03-28 曹夏畅 Cable bridge hanging and mounting equipment and method under high-altitude platform
CN115864215B (en) * 2022-11-21 2023-08-15 国网湖北省电力有限公司荆州供电公司 Cable bridge hanging and installing equipment and method under high-altitude platform

Also Published As

Publication number Publication date
CN106848938B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN106848938B (en) Cable testing bridge hangs installation method under a kind of High Altitude Platform
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN201221193Y (en) High altitude packway ceiling construction operating platform
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN206521197U (en) A kind of adjustable balance hoisting beam
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN106193099A (en) Lowering or hoisting gear adheres to the supporting construction on basis
CN107313360A (en) Overhead cable formula is without support bearing replacement operating platform
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN202214974U (en) 5.8 m ultrahigh external lifting scaffold
CN106049843A (en) Hanging type anti-shaking construction platform and mounting method thereof
CN104818857B (en) Many uniform purlin thin pull bar installation methods of long-span roofing
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN109083395B (en) Large-span suspension cable operation platform and erecting method thereof
CN105040592B (en) A kind of horizontal drawing cable bridge and its erection method
CN102022003A (en) Suspended ceiling keel sheet assembling and hoisting method
CN204825531U (en) Reversal of natural order of things formula rail installation appurtenance
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN107524285A (en) A kind of external wall construction suspension bracket and its installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant