CN104818857B CN201510187285.9A CN201510187285A CN104818857B CN 104818857 B CN104818857 B CN 104818857B CN 201510187285 A CN201510187285 A CN 201510187285A CN 104818857 B CN104818857 B CN 104818857B
Authority
CN
China
Prior art keywords
pull bar
roofing
roof
conveying arrangement
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510187285.9A
Other languages
Chinese (zh)
Other versions
CN104818857A (en
Inventor
朱道付
程玉洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510187285.9A priority Critical patent/CN104818857B/en
Publication of CN104818857A publication Critical patent/CN104818857A/en
Application granted granted Critical
Publication of CN104818857B publication Critical patent/CN104818857B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of many uniform purlin thin pull bar installation methods of long-span roofing, including following construction procedure: step one;Roof purline checks;Step 2;Pull bar roofing conveying arrangement is set;Step 3;Seat belt is set;Step 4;Pull bar transport and installation.The invention have the advantage that the Fast Installation achieving pull bar, improve efficiency of construction;Improve transport and the installment work efficiency of pull bar, lower construction cost.

Description

Many uniform purlin thin pull bar installation methods of long-span roofing
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to a kind of many uniform purlin thin pull bar installation methods of long-span roofing.
Background technology
At present, in steel house surface construction, it is frequently encountered by the support strength into increasing roof purline, between every two purlins, is vertically all placed equidistant two to four pull bars, after pull head is typically inserted through the connecting hole that two purlins are reserved, two ends nut is fixed, and will form entirety by purlin two-by-two.Pull bar normal length is about 1 to 2m, the pull bar quantity of whole Roof system configuration is many, owing to purlin wall is thin and many with roof girder junction point, pull bar diameter is relatively thin (general diameter is at about 12mm) in addition, is difficulty with carrying out after ground assembles the installation method of burst lifting.And conventional project way is to use the method installed by root to carry out in place, install because of pull bar and belong to work high above the ground, pull bar lifting is in place and be arranged on each junction point to be repeated once more, and safety rope often shifts and is once both needed to untie reset, cause efficiency of construction ratio relatively low, construction period will extend, and construction cost increases.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of on the premise of roofing pull bar is more, improve transport and the installment work efficiency of pull bar, reduce many uniform purlin thin pull bar installation methods of long-span roofing of construction cost.
Many uniform purlin thin pull bar installation methods of the long-span roofing of the present invention, including following construction procedure:
Step one roof purline inspection:
According to design requirement, check roof girder and the installation procedure of roof purline and quality;
Step 2 arranges pull bar roofing conveying arrangement:
Roof purline longitudinal pitch is set to 1 ~ 2m, according to roof purline spacing dimension and the weight of pull bar, use cable testing bridge horizontal on the longitudinal direction of four roof purlines of roofing, and it is vertical with roof purline longitudinal centre line, by the groove of cable testing bridge, upwards and both ends open Plate Welding seals, the roofing conveying arrangement of one upper opening of composition;
Step 3 arranges seat belt:
Side at the everywhere contact position of roofing conveying arrangement and four roof purlines, it is respectively provided with one and is fixed on seat belt on roofing conveying arrangement, when making pull bar in transport or install, the track that four workmens vertically move all can be worn safely the seat belt without untiing;
The transport of step 4 pull bar and installation:
nullDescribed roofing conveying arrangement once can transport four roof purlines of covering,Between two roof girders, lay equidistant four piece roof purline 6 pull bars are set altogether,During pull bar transport,Everyone is gap bridge in the middle of roof girder with roof purline one by one to arrange four workmens,And wear the seat belt being arranged on roofing conveying arrangement,Each column at roof girder with hoisting apparatus by 6 pull bar handlings to roofing conveying arrangement groove,Then four people press the position that pull bar is arranged in roof purline longitudinal center,Common promote roofing conveying arrangement to after the installation site of pull bar,Pull bar is penetrated in roof purline by technical size requirement,Every workmen is responsible for installation and the fastening of pull-rod nut in this running orbit,The pull bar having circulated these four roof purlines successively is installed,The most whole roofing pull bar is all installed.
Roofing conveying arrangement bottom portion of groove in described step 2 respectively installs a position-limited wheel.Described position-limited wheel and roof purline side clearance are 2 ~ 3mm, play the restriction that the longitudinally running track of roofing conveying arrangement is anti-deviation.Described cable testing bridge specification is 300 × 100mm.Described pull bar quality is 1 ~ 2kg.The described a length of 6m of roofing conveying arrangement, quality is 180kg.
The invention has the beneficial effects as follows: (1) achieves the Fast Installation of pull bar, improve efficiency of construction, save the engineering time;(2) improve transport and the installment work efficiency of pull bar, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the Roof system end view of the present invention.
Fig. 2 is the Roof system schematic top plan view of the present invention.
Fig. 3 is the roofing conveying arrangement schematic top plan view of the present invention.
Fig. 4 is the roofing conveying arrangement end view of the present invention.
Fig. 5 is the pull bar transport of the present invention and installs schematic top plan view.
Fig. 6 is the pull bar transport of the present invention and installs end view.
In figure: roof girder 1, roof purline 2, conveying arrangement 3, position-limited wheel 4, seat belt 5, pull bar 6.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
In the drawings, many uniform purlin thin pull bar installation methods of the long-span roofing of the present invention, including following construction procedure:
Step one as shown in Figure 1, 2, roof purline inspection;According to design requirement, check roof girder 1 and the installation procedure of roof purline 2 and quality;
Step 2 as shown in Figure 3,4, arranges pull bar roofing conveying arrangement;Roof purline 2 longitudinal pitch is 1 ~ 2m, pull bar 6 is single weighs about 1 ~ 2kg, according to roof purline 2 spacing dimension and the weight of pull bar 6, the cable testing bridge selecting 300 × 100mm is horizontal on the longitudinal direction of four roof purlines 2 of roofing, and it is vertical with roof purline 2 longitudinal centre line, by the groove of cable testing bridge, upwards and both ends open Plate Welding seals, the roofing conveying arrangement 3 of one upper opening of composition;
Step 3 as shown in Figure 4,5, arranges seat belt;In roofing conveying arrangement 3 and the side of the everywhere contact position of four roof purlines 2, it is respectively provided with one and is fixed on seat belt 5 on roofing conveying arrangement 3, when making pull bar 6 in transport or install, the track that four workmens vertically move all can be worn safely the seat belt 5 without untiing;
As shown in Figure 5,6, pull bar transports and installs step 4;nullDescribed roofing conveying arrangement 3 once can transport four roof purlines 2 of covering,Described roofing conveying arrangement 3 length about 6m,Between two roof girders 1, lay equidistant four piece roof purline 26 pull bars 6 are set altogether,6 pull bars 6 weigh about 12kg,Roofing conveying arrangement 3 weighs about 180kg,Roofing conveying arrangement 3 equipped with pull bar 6 always weighs about 200kg,When pull bar 6 transports,Everyone passes a bridge with roof purline 2 one by one in the middle of roof girder 1 to arrange four workmens,And wear the seat belt 5 being arranged on roofing conveying arrangement 3,Each column at roof girder 1 with hoisting apparatus by 6 pull bars 6 handling to roofing conveying arrangement 3 groove,Then four people press the position that pull bar 6 is arranged in roof purline 2 longitudinal center,After the common installation site promoting roofing conveying arrangement 3 to pull bar 6,Pull bar 6 is penetrated in roof purline 2 by technical size requirement,Every workmen is responsible for installation and the fastening of pull bar 6 nut in this running orbit,The pull bar 6 having circulated these four roof purlines 2 successively is installed,The most whole roofing pull bar 6 is all installed.
Roofing conveying arrangement 3 bottom portion of groove in described step 2 respectively installs a position-limited wheel 4.Described position-limited wheel 4 is 2 ~ 3mm with roof purline 2 side clearance, plays the restriction that the longitudinally running track of roofing conveying arrangement 3 is anti-deviation.
Lianyun Harbour engineering Factory Building be monolayer five across portal-rigid frames steel construction, often across 30m, post is away from 7.5m, and eaves height is 15.00m, and roof structure is purlin system light roof, and the slope of roof is 1/10.Factory Building head factory 400m, wide 150m, construction area is about 60000.Roof girder is welded H section steel roof girder, and roof girder spacing is 7500mm, and the connection of roofing Z-shaped purline is seated in roof girder, spacing 1500mm.Tie rod between purlin, specification ф 12 × 1621, number of packages 9752, substance 1.3kg, spacing 2500mm.Using the method to achieve the Fast Installation of pull bar, using effect is good.

Claims (6)

1. many uniform purlin thin pull bar installation methods of a long-span roofing, it is characterised in that include following construction procedure:
Step one roof purline inspection:
According to design requirement, check roof girder (1) and the installation procedure of roof purline (2) and quality;
Step 2 arranges pull bar roofing conveying arrangement:
Roof purline (2) longitudinal pitch is set to 1 ~ 2m, according to roof purline (2) spacing dimension and the weight of pull bar (6), use cable testing bridge horizontal on the longitudinal direction of four roof purlines (2) of roofing, and it is vertical with roof purline (2) longitudinal centre line, by the groove of cable testing bridge, upwards and both ends open Plate Welding seals, the roofing conveying arrangement (3) of one upper opening of composition;
Step 3 arranges seat belt:
Side at roofing conveying arrangement (3) Yu the everywhere contact position of four roof purlines (2), it is respectively provided with a seat belt (5) being fixed on roofing conveying arrangement (3), when making pull bar (6) in transport or install, the track that four workmens vertically move all can be worn safely the seat belt (5) without untiing;
The transport of step 4 pull bar and installation:
nullDescribed roofing conveying arrangement (3) once can transport four roof purlines (2) of covering,Between two roof girders (1), lay equidistant four piece roof purline (2) 6 pull bars (6) are set altogether,During pull bar (6) transport,Everyone passes a bridge with a roof purline (2) in the middle of roof girder (1) to arrange four workmens,And wear the seat belt (5) being arranged on roofing conveying arrangement (3),In each column across roof girder (1) place hoisting apparatus by 6 pull bars (6) handling to roofing conveying arrangement (3) groove,Then four people press the position that pull bar (6) is arranged in roof purline (2) longitudinal center,Common promote roofing conveying arrangement (3) to after the installation site of pull bar (6),Pull bar (6) is penetrated in roof purline (2) by technical size requirement,Every workmen is responsible for installation and the fastening of pull bar in this running orbit (6) nut,The pull bar (6) having circulated these four roof purlines (2) successively is installed,The most whole roofing pull bar (6) is all installed.
Many uniform purlin thin pull bar installation methods of long-span roofing the most according to claim 1, it is characterised in that roofing conveying arrangement (3) bottom portion of groove in described step 2 respectively installs a position-limited wheel (4).
Many uniform purlin thin pull bar installation methods of long-span roofing the most according to claim 2, it is characterized in that, described position-limited wheel (4) and roof purline (2) side clearance are 2 ~ 3mm, play the restriction that roofing conveying arrangement (3) longitudinally running track is anti-deviation.
Many uniform purlin thin pull bar installation methods of long-span roofing the most according to claim 2, it is characterised in that described cable testing bridge specification is 300 × 100mm.
Many uniform purlin thin pull bar installation methods of long-span roofing the most according to claim 1, it is characterised in that described pull bar (6) quality is 1 ~ 2kg.
Many uniform purlin thin pull bar installation methods of long-span roofing the most according to claim 1, it is characterised in that a length of 6m of described roofing conveying arrangement (3), quality is 180kg.
CN201510187285.9A 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing Active CN104818857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187285.9A CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187285.9A CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Publications (2)

Publication Number Publication Date
CN104818857A CN104818857A (en) 2015-08-05
CN104818857B true CN104818857B (en) 2016-10-05

Family

ID=53729317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187285.9A Active CN104818857B (en) 2015-04-21 2015-04-21 Many uniform purlin thin pull bar installation methods of long-span roofing

Country Status (1)

Country Link
CN (1) CN104818857B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888262B (en) * 2016-04-14 2018-06-29 中国十七冶集团有限公司 A kind of construction method of large span piping lane pipeline
CN106930539B (en) * 2017-03-15 2019-01-29 广东大粤新能源科技股份有限公司 Purlin localization method
CN109898649A (en) * 2017-12-11 2019-06-18 美建建筑***(中国)有限公司 A kind of high strength steel constructional device

Also Published As

Publication number Publication date
CN104818857A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
CN104818857B (en) Many uniform purlin thin pull bar installation methods of long-span roofing
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN106088141B (en) For the construction method for the foundation structure for reinforcing lowering or hoisting gear
CN109440985B (en) Hydraulic synchronous lifting system for super large curtain wall unit of super high-rise building and construction method thereof
CN110593125A (en) Suspension bridge catwalk system
CN107447973A (en) A kind of unilateral suspension type aerial movement steel platform
CN110629691A (en) Totally-enclosed sound barrier structure for noise reduction engineering of high-speed railway
CN202578055U (en) Height and width adjustable greenhouse for coke oven building construction
CN103993666A (en) Improved supporting system construction method suitable for large overhung outer floating plate roof
CN107059656B (en) The construction method of active service bridge maintenance maintenance boat scaffold operating platform
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN211142832U (en) Suspension bridge catwalk system
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN215212427U (en) Adjustable unloading platform with steel structure for building
CN104818856B (en) Mounting method of roof thin-wall Z-shaped purline
CN107447931B (en) The closed factory building roof skylight frame installation method of overlarge area
CN211395417U (en) Totally-enclosed sound barrier structure for noise reduction engineering of high-speed railway
CN207228604U (en) A kind of unilateral suspension type aerial movement steel platform
CN103790388B (en) Greatly install improve one's methods across the waft high-altitude of eaves of cantilever roofing steel
CN220352624U (en) Catwalk system
CN206299022U (en) One kind is based on truss raw bamboo skeleton composite floor
CN104912339A (en) Long-distance multi-span welding H-section steel roof beam installation method
CN209940311U (en) Movable portal frame for construction of lock chamber wall template of ship lock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of multiple uniform purlin thin tie rods on long span roof

Effective date of registration: 20210519

Granted publication date: 20161005

Pledgee: Industrial and Commercial Bank of China Limited MAANSHAN Tuanjie square sub branch

Pledgor: CHINA MCC17 GROUP Co.,Ltd.

Registration number: Y2021980003566

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230810

Granted publication date: 20161005

Pledgee: Industrial and Commercial Bank of China Limited MAANSHAN Tuanjie square sub branch

Pledgor: CHINA MCC17 GROUP Co.,Ltd.

Registration number: Y2021980003566