CN105003090B - Temporary support frame for mounting assembly type steel structure - Google Patents

Temporary support frame for mounting assembly type steel structure Download PDF

Info

Publication number
CN105003090B
CN105003090B CN201510507249.6A CN201510507249A CN105003090B CN 105003090 B CN105003090 B CN 105003090B CN 201510507249 A CN201510507249 A CN 201510507249A CN 105003090 B CN105003090 B CN 105003090B
Authority
CN
China
Prior art keywords
steel
joist
supporting frame
frame body
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510507249.6A
Other languages
Chinese (zh)
Other versions
CN105003090A (en
Inventor
秦元
黄祺合
林俊
曾宇博
覃飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201510507249.6A priority Critical patent/CN105003090B/en
Publication of CN105003090A publication Critical patent/CN105003090A/en
Application granted granted Critical
Publication of CN105003090B publication Critical patent/CN105003090B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A temporary support frame for mounting an assembled steel structure comprises a lattice support frame body, an operating platform, a guy cable and an elevation fine adjustment device; in an assembly state, a bottom frame body of the lattice type supporting frame body, a middle standard section frame body consisting of n standard frames and a top frame body are connected into the lattice type supporting frame body through bolts, an operating platform is arranged at the top of the lattice type supporting frame body, an elevation fine adjustment device is arranged in the middle of the operating platform, the lower end of a hydraulic jack of the elevation fine adjustment device is fixedly welded with a platform beam of the top frame body of the lattice type supporting frame body, and the upper end of the hydraulic jack of the elevation fine adjustment device props against a movable section steel joist; the joist limiting devices are arranged at two ends of the movable section steel joist and limit the movable section steel joist; the guy cables are symmetrically arranged, one end of each guy cable is fixedly connected with the top frame body of the lattice type supporting frame body, and the other end of each guy cable is fixedly connected with the ground reliable structure or the ground anchor. The temporary support frame for mounting the assembly type steel structure is convenient for elevation adjustment and unloading of the structure, and has applicability, economy and safety; n is more than or equal to 1 and less than or equal to 8.

Description

Assembling type steel structure installation temporary support
Technical field
Support frame, especially a kind of assembling type steel structure installation temporary support are installed the present invention relates to one kind.
Background technology
With the development of architectural design technology, huge large span steel truss is in public building using more and more extensive.By Construction site and the limitation of crane gear, the installation of huge large-span truss is generally using setting temporary support segmental hoisting Method is installed.Many large-scale steel structure temporary support systems domestic at present use the full hall frame that steel pipe scaffold is set up( Stress point local cypher)Or integral structural temporary support is made at the construction field (site).The full hall support frame of steel pipe and site welding Connect integral structural temporary support and be primarily present following deficiency:Support itself does not possess height adjusting function, is unfavorable for mark Top adjustment and structure unloading;Versatility and revolving difference, and assembly and disassembly and transport are inconvenient, cause a large amount of support frame materials Waste, cost of transportation is higher;Support system is without the construction safety for considering operating personnel very well.
Notification number is " CN202530789, entitled《The scattered lifting support system in large-span steel high-altitude》Reality A kind of scattered lifting support system in high-altitude including compositions such as main supporting structure, jack, cable wind ropes is disclosed with new patent, But its inconvenient for use, security is poor, poor universality, cost high.
The content of the invention
It is an object of the invention to provide a kind of assembling type steel structure installation temporary support, the support frame facilitates structure Absolute altitude is adjusted and unloaded, with applicability, economy and security.
The technical scheme solved the above problems is:A kind of assembling type steel structure installation temporary support, the assembled steel Structure installation includes lattice supporting frame, operating platform, cable wind rope and absolute altitude micromatic setting with temporary support;
The lattice supporting frame includes bottom support body, the intermediate standard section support body being made up of n standard frame and top Support body;Be bolted between each support body, n be more than or equal to 1, less than 8 between arbitrary integer;
The operating platform includes checkered steel plate platform and railing;The checkered steel plate platform is flat including rectangle checkered steel plate The matrix checkered steel plate platform that platform and two pieces are enclosed in outside rectangle decorative pattern plate platform;Railing is arranged on matrix checkered steel plate platform Surrounding;
The absolute altitude micromatic setting includes movable shaped steel joist, joist stopping means and hydraulic jack;The joist limit Position device includes the spacing column and spacing steel plate being made up of channel-section steel, and the movable shaped steel joist being made up of H profile steel is arranged on hydraulic pressure At the top of jack, spacing steel plate is welded in movable shaped steel joist two ends, movable shaped steel joist and is slidably matched with spacing column;
Under confined state, intermediate standard section support body and top that the bottom support body of lattice supporting frame, n standard frame are constituted Portion's support body is bolted into lattice supporting frame, and operating platform is arranged at the top of lattice supporting frame, absolute altitude fine setting Device is arranged in the middle part of operating platform, the hydraulic jack lower end of absolute altitude micromatic setting and the roof racks of lattice supporting frame Landing beam be welded and fixed, movable shaped steel joist is withstood in upper end;Joist stopping means is arranged on movable shaped steel joist two ends, to work Ejector half steel joist carries out spacing;
Cable wind rope is symmetrical arranged, and one end is fixedly connected with the roof racks of lattice supporting frame, and one end is reliable with ground Structure or earth anchorage connection.
Its further technical scheme is:Constitute lattice supporting frame centre standard paragraphs support body each standard frame by Longitudinal steel pipe post, horizontal angle steel web member and oblique angle steel web member composition frame structure;Longitudinal steel pipe post, horizontal angle steel Web member and oblique angle steel web member are connected with each other by connecting plate;The upper and lower side of longitudinal steel pipe post is uniformly arranged stiffener, The end face of longitudinal steel pipe post is provided with end plate, end plate is connected with stiffener, screw is provided with the end plate between stiffener, Intermediate standard section support body is attached by bolt up and down.
Its further technical scheme is:The bone that the matrix checkered steel plate platform of the operating platform is made by rectangular steel pipe Frame and the checkered steel plate composition laid thereon, matrix checkered steel plate platform surrounding are provided with the fixed seat matched with railing post Sleeve pipe, railing post is enclosed on blending bolt in fixed seat sleeve pipe and fixed.
Compared with prior art, " the assembling type steel structure installation temporary support " of the present invention has following beneficial effect Really:
1st, assembling type steel structure installation of the present invention can constitute different height as needed with temporary support, be applicable Property, highly versatile, the support frame proportion of goods damageds are low:
Assembling type steel structure installation of the present invention includes lattice supporting frame I, operating platform II, guy with temporary support Rope III and absolute altitude micromatic setting IV;The lattice supporting frame I includes bottom support body 1, the middle mark being made up of n standard frame Quasi- section support body 2 and roof racks 3;It is bolted between each support body;The standard of intermediate standard section support body is constituted by increasing and decreasing The quantity of frame, can constitute the support frame of different height, meet different height Steel Structure Installation needs, highly versatile.
2nd, production assurance, low manufacture cost:
Support frame of the present invention is in addition to bottom support body needs scene determination height, and remaining each several part can make sizing in workshop Product, product quality is easily guaranteed that production cost is low.
3rd, it is convenient to mount and dismount, removable to be divided into the delivery unit suitably transported, cost of transportation is cheap:
Assembling type steel structure installation of the present invention is connected by screw bolts between temporary support each several part, and each several part can be with Repeated disassembled and assembled, turnover are used in multiple projects, and the support frame expense for sharing each project is greatly reduced;Assembled support frame is torn open Section transport is dissipated into, amount transport cost is saved.
4th, assembling type steel structure installation temporary support of the present invention is by the function of bearing load, absolute altitude regulatory function and peace Full protection function rolls into one, and value is high, good reliability:
Assembling type steel structure installation of the present invention is micro- with the absolute altitude including hydraulic jack is provided with the top of temporary support Device is adjusted, can rise to drop, and possess absolute altitude regulatory function and offloading functions;And absolute altitude micromatic setting is pushed up by hydraulic jack 11 Push away movable shaped steel joist 9 and carry out height fine adjusting function, it is big with supported object contact surface, add the spacing auxiliary of joist stopping means 10 and make With, with only lean on the direct pushing tow supported object of hydraulic jack prior art compared with, it is safer, reliable;
Secondly, assembled safe operation platform is additionally provided with the top of support frame of the present invention, can preferably protects operating personnel Safety.
With reference to the accompanying drawings and examples to the technical characteristic of the assembling type steel structure installation temporary support of the present invention It is described further.
Brief description of the drawings
Fig. 1-1:The overall structure diagram of the assembling type steel structure installation temporary support of the present invention(Facade is illustrated Figure);
Fig. 1-2:It is Fig. 1-1 side view;
Fig. 1-3:It is Fig. 1-2 A-A sectional views;
Fig. 1-4:The matrix checkered steel plate platform structure schematic diagram of operating platform of the present invention;
Fig. 2-1:The roof racks structural representation of assembling type steel structure installation temporary support of the present invention;
Fig. 2-2:It is Fig. 2-1 side view;
Fig. 2-3:It is Fig. 2-2 B-B sectional views;
Fig. 3-1:The standard frame structural representation of the lattice supporting frame of the present invention;
Fig. 3-2:It is standard frame splicing construction schematic diagram;
Fig. 3-3:It is Fig. 3-2 C-C sectional views;
Fig. 4-1:The rail structure schematic diagram one of the operating platform of the present invention;
Fig. 4-2:The rail structure schematic diagram two of the operating platform of the present invention;
Fig. 5:It is railing scheme of installation;
Fig. 6:The rig bracket structural representation of the operating platform of the present invention;
Fig. 7:It is rig bracket scheme of installation.
In figure:
I-lattice supporting frame, II-operating platform, III-cable wind rope, IV-absolute altitude micromatic setting;
1- bottoms support body, 2- intermediate standards section support body;
21- longitudinal directions steel pipe post, 22- transverse direction angle steel web members, the oblique angle steel web members of 23-;
3- roof racks;The landing beam that 301- is made up of hot-rolling H-shaped girder steel, the landing beam of 3011- roof racks 3,4- columns Bar, 41- railings I, 401- railing posts;
5- fixed seat sleeve pipes, 6- rig brackets;7- checkered steel plate platforms, 71- matrix checkered steel plate platforms, 711- rectangle steels The skeleton that pipe makes, 712- checkered steel plates;72- rectangle decorative pattern plate platforms;
8- cable wind ropes, 9- activity shaped steel joists, 10- joist stopping means, the spacing columns of 101-, the spacing steel plates of 102-, 11- Jack;
12- connecting plates, 13- stiffeners, 14- end plates.
Embodiment
A kind of assembling type steel structure installation temporary support, as shown in Fig. 1-1~Fig. 1-2, assembling type steel structure peace Dress includes lattice supporting frame I, operating platform II, cable wind rope III and absolute altitude micromatic setting IV with temporary support;
The lattice supporting frame I includes bottom support body 1, the intermediate standard section support body 2 being made up of n standard frame and top Portion's support body 3;It is bolted between each support body;
The operating platform II includes checkered steel plate platform 7 and railing 4(Referring to Fig. 4-1~Fig. 4-2);The checkered steel plate Platform 7 includes the matrix checkered steel plate platform that rectangle decorative pattern plate platform 72 and two pieces are enclosed in outside rectangle decorative pattern plate platform 72 71;The described skeleton 711 made by rectangular steel pipe of matrix checkered steel plate platform 71 and 712 groups of the checkered steel plate laid thereon Into railing 4 is arranged on the surrounding of matrix checkered steel plate platform 71(Referring to Fig. 1-3~Fig. 1-4), the present embodiment takes matrix decorative pattern The surrounding of plate platform 71 is provided with the fixed seat sleeve pipe 5 matched with railing post 401, and railing post is enclosed on fixed seat sleeve pipe 5 In blending bolt fix(Referring to Fig. 5);Rig bracket 6 is on the tripod that angle steel is constituted is arranged at the top of roof racks column (Referring to Fig. 6, Fig. 7), matrix checkered steel plate platform 71 is arranged on the top of rig bracket 6, and rectangle decorative pattern plate platform 72 is arranged on The overcentre of roof racks 3;
The absolute altitude micromatic setting IV includes movable shaped steel joist 9, joist stopping means 10 and hydraulic jack 11;It is described Joist stopping means 10 includes the spacing column 101 and spacing steel plate 102 being made up of channel-section steel, the active type being made up of H-type groove steel Steel joist 9 is arranged on the top of hydraulic jack 11, and spacing steel plate 102 is welded in the movable two ends of shaped steel joist 9, movable shaped steel joist It is slidably matched with spacing column 101(Referring to Fig. 2-1~Fig. 2-3);
Under confined state, the intermediate standard section support body 2 that the bottom support body 1 of lattice supporting frame I, n standard frame are constituted The lattice supporting frame of different height is bolted into roof racks 3, operating platform II is arranged on lattice support At the top of support body, absolute altitude micromatic setting IV is arranged in the middle part of operating platform, the lower end of hydraulic jack 11 of absolute altitude micromatic setting IV with The landing beam 3011 of the roof racks 3 of lattice supporting frame is welded and fixed, and movable shaped steel joist 9 is withstood in upper end;Joist is spacing Device 10 is arranged on the movable two ends of shaped steel joist 9, movable shaped steel joist 9 is carried out spacing;N span is between 1-5;
Cable wind rope III is symmetrical arranged, and one end is fixedly connected with the roof racks 3 of lattice supporting frame I, one end and ground Reliable structure or earth anchorage connection.
As shown in Fig. 3-1- Fig. 3-3, the standard frame of intermediate standard section support body 2 is constituted by longitudinal steel pipe post 21, lateral angle Steel web member 22 and oblique angle steel web member 23 composition frame structure;Longitudinal steel pipe post, horizontal angle steel web member and oblique angle steel Web member is connected with each other by connecting plate 12;The upper and lower side of longitudinal steel pipe post is uniformly arranged stiffener 13, in longitudinal steel pipe The end face of column is provided with end plate 14, and end plate is connected with stiffener, and screw is provided with the end plate between stiffener, middle up and down Standard paragraphs support body 2 is attached by bolt.
The basic structure of the bottom support body 1 and roof racks 3 and the standard frame structure one for constituting intermediate standard section support body 2 Sample, difference is:The top of roof racks 3 is provided with the landing beam 301 being made up of hot-rolling H-shaped girder steel;The height of roof racks 3 Degree is generally made into 3 meters, and the height of bottom support body 1 is determined according to field condition, generally no greater than 3 meters, constitutes intermediate standard Number n at least one of the standard frame of section support body 2, can be up to 4~5, typically, lattice supporting frame I it is total it is high it is general not 18 meters must be more than;It is connected between each support body.
As one kind conversion of the embodiment of the present invention, as needed, the number n of standard frame can also increase and decrease, and general n is big In equal to 1, less than 8 between arbitrary integer.
The preparation method of assembling type steel structure installation temporary support of the present invention is as follows:
Assembling type steel structure installation of the present invention is arranged in car with each several part of the lattice supporting frame I of temporary support It is interior to make, to ensure product quality;
Making step is as follows:
A, worked out and material planning and got the raw materials ready according to design drawing;
The abrasive machine blanking of B, blanking, steel pipe and angle steel, steel plate and H profile steel flame cutting machine blanking;
C, part plate drilling, the hole of part plate is bored with two dimension NC auto drilling machine;
D, component groups are combined into type with fetal membrane on the operational platform and spot welding is fixed;
E, with carbon dioxide gas arc welding each tie point is welded, and weld seam is tested, it is unqualified to carry out Overhaul;
F, derusting, priming and finish paint on request after derusting;
G, product is tested, be put in storage after the assay was approved.
In use, assembling type steel structure installation of the present invention is installed at the construction field (site) with temporary support, its installation steps is such as Under:
A, live unwrapping wire determine to install the position of assembling type steel structure installation temporary support of the present invention and carry out basis And embedded part;
B, assembling type steel structure installation of the present invention installation on ground lattice support near temporary support rack position is being installed Support body I(It is sleeping to spell), note tightening connecting bolt;
C, use live tower crane(Or truck crane)Assembled good lattice supporting frame I is hung to installation site, by support frame The bottom support body 1 of body I is fixed with built-in fitting temporarily after, loose hook;
D, installed in lattice supporting frame I and be tensioned cable wind rope III:4 cable wind ropes 8 are symmetrical arranged, one end and lattice The roof racks 3 of formula supporting frame I are fixedly connected, and the other end is connected with ground reliable structure or earth anchorage;
E, last installation operation platform II and absolute altitude micromatic setting IV.

Claims (3)

1. a kind of assembling type steel structure installation temporary support, it is characterised in that:The assembling type steel structure is installed with interim branch Support includes lattice supporting frame(Ⅰ), operating platform(Ⅱ), cable wind rope(Ⅲ)With absolute altitude micromatic setting(Ⅳ);
The lattice supporting frame(Ⅰ)Including bottom support body(1), the intermediate standard section support body that is made up of n standard frame(2)With Roof racks(3);Be bolted between each support body, n be more than or equal to 1, less than 8 between arbitrary integer;
The operating platform(Ⅱ)Including checkered steel plate platform(7)And railing(4);The checkered steel plate platform(7)Including rectangle Checkered steel plate platform(72)Rectangle decorative pattern plate platform is enclosed in two pieces(72)Outer matrix checkered steel plate platform(71);Railing (4)It is arranged on matrix checkered steel plate platform(71)Surrounding;
The absolute altitude micromatic setting(Ⅳ)Including movable shaped steel joist(9), joist stopping means(10)And hydraulic jack(11); The joist stopping means(10)Including the spacing column being made up of channel-section steel(101)With spacing steel plate(102), it is made up of H profile steel Movable shaped steel joist(9)Installed in hydraulic jack(11)Top, spacing steel plate(102)It is welded in movable shaped steel joist(9) Two ends, movable shaped steel joist(9)With spacing column(101)It is slidably matched;
Under confined state, lattice supporting frame(Ⅰ)Bottom support body(1), n standard frame composition intermediate standard section support body (2)And roof racks(3)It is bolted into lattice supporting frame, operating platform(Ⅱ)It is arranged on lattice supporting frame Top, absolute altitude micromatic setting(Ⅳ)It is arranged in the middle part of operating platform, absolute altitude micromatic setting(Ⅳ)Hydraulic jack(11)Lower end With the roof racks of lattice supporting frame(3)Landing beam be welded and fixed, movable shaped steel joist is withstood in upper end(9);Joist is limited Position device(10)It is arranged on movable shaped steel joist(9)Two ends, to movable shaped steel joist(9)Carry out spacing;
Cable wind rope(Ⅲ)It is symmetrical arranged, one end and lattice supporting frame(Ⅰ)Roof racks(3)It is fixedly connected, one end and ground Face reliable structure or earth anchorage connection.
2. assembling type steel structure installation temporary support according to claim 1, it is characterised in that:Constitute lattice branch Support body(Ⅰ)Centre standard paragraphs support body(2)Each standard frame by longitudinal steel pipe post(21), horizontal angle steel web member(22) With oblique angle steel web member(23)Constitute frame structure;Longitudinal steel pipe post, horizontal angle steel web member and oblique angle steel web member are logical Cross connecting plate(12)It is connected with each other;The upper and lower side of longitudinal steel pipe post is uniformly arranged stiffener(13), it is vertical in longitudinal steel pipe The end face of post is provided with end plate(14), end plate is connected with stiffener, and screw is provided with the end plate between stiffener, up and down in the middle of Standard paragraphs support body(2)It is attached by bolt.
3. assembling type steel structure installation temporary support according to claim 1, it is characterised in that:The operating platform (Ⅱ)Matrix checkered steel plate platform(71)The skeleton made by rectangular steel pipe(711)The checkered steel plate laid thereon(712) Composition, matrix checkered steel plate platform(71)Surrounding is provided with and railing post(401)The fixed seat sleeve pipe matched(5), railing Upright post sleeve is in fixed seat sleeve pipe(5)In blending bolt fix.
CN201510507249.6A 2015-08-18 2015-08-18 Temporary support frame for mounting assembly type steel structure Active CN105003090B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510507249.6A CN105003090B (en) 2015-08-18 2015-08-18 Temporary support frame for mounting assembly type steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510507249.6A CN105003090B (en) 2015-08-18 2015-08-18 Temporary support frame for mounting assembly type steel structure

Publications (2)

Publication Number Publication Date
CN105003090A CN105003090A (en) 2015-10-28
CN105003090B true CN105003090B (en) 2017-07-21

Family

ID=54375931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510507249.6A Active CN105003090B (en) 2015-08-18 2015-08-18 Temporary support frame for mounting assembly type steel structure

Country Status (1)

Country Link
CN (1) CN105003090B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836498B (en) * 2016-12-28 2022-11-29 郑州工业应用技术学院 Hoisting construction method for steel truss of grand stand roof of super-large span stadium
CN106677543A (en) * 2016-12-30 2017-05-17 江苏沪宁钢机股份有限公司 Supporting structure for mounting of roof beam string segments
CN111188524B (en) * 2020-03-03 2021-04-09 衡水通广通信导航设备有限公司 Full-series multifunctional retractable radar tower and construction method thereof
CN111963883B (en) * 2020-08-02 2021-10-15 中国三冶集团有限公司 Construction method of Wiggins gas tank by means of temporary assembly platform
CN114439252B (en) * 2021-12-09 2023-06-02 陕西建工第一建设集团有限公司 Main arch supporting device for hoisting large-span steel structure roof
CN115324360A (en) * 2022-07-27 2022-11-11 成都建工第四建筑工程有限公司 Construction method of large-span suspended truss
CN116241103A (en) * 2022-11-16 2023-06-09 中国一冶集团有限公司 Large-span curved surface single-layer reticulated shell mounting support steel frame structure and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761244A (en) * 2009-12-29 2010-06-30 广东省工业设备安装公司 Installation method of double movable support frames
CN201953088U (en) * 2010-12-23 2011-08-31 中建三局建设工程股份有限公司 Combined support system for high and large special-shaped steel structure
CN202073100U (en) * 2011-05-17 2011-12-14 中建六局建设发展有限公司 Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN202170649U (en) * 2011-07-22 2012-03-21 中建三局第二建设工程有限责任公司 Temporary support steel frame for steel structure
CN103243933A (en) * 2013-04-28 2013-08-14 上海宝冶集团有限公司 Demountable combined supporting device used for steel structure construction
CN203247868U (en) * 2013-05-23 2013-10-23 中煤第七十二工程有限公司 Large-span steel structure construction temporary supporting frame
CN204876631U (en) * 2015-08-18 2015-12-16 广西建工集团第五建筑工程有限责任公司 Assembled steel structure installation uses interim support frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761244A (en) * 2009-12-29 2010-06-30 广东省工业设备安装公司 Installation method of double movable support frames
CN201953088U (en) * 2010-12-23 2011-08-31 中建三局建设工程股份有限公司 Combined support system for high and large special-shaped steel structure
CN202073100U (en) * 2011-05-17 2011-12-14 中建六局建设发展有限公司 Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN202170649U (en) * 2011-07-22 2012-03-21 中建三局第二建设工程有限责任公司 Temporary support steel frame for steel structure
CN103243933A (en) * 2013-04-28 2013-08-14 上海宝冶集团有限公司 Demountable combined supporting device used for steel structure construction
CN203247868U (en) * 2013-05-23 2013-10-23 中煤第七十二工程有限公司 Large-span steel structure construction temporary supporting frame
CN204876631U (en) * 2015-08-18 2015-12-16 广西建工集团第五建筑工程有限责任公司 Assembled steel structure installation uses interim support frame

Also Published As

Publication number Publication date
CN105003090A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN102535845A (en) Construction method of bearing frame of corridor structure
CN101775907A (en) Space truss structure aerial pairing integral slide installation method
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN101871259B (en) Building method of integral slip type scaffold used for steel grid construction
CN102337782B (en) Lift system for constructing truss platform on top of tall and large space
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN105298107B (en) A kind of high carriage of High Large Cantilever structure
CN105350760B (en) A kind of construction method of suspending scaffold
CN206581577U (en) Using housing construction builder's jack
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN104790644B (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN114214920A (en) Large-span double-layer combined construction steel truss arch bridge and construction method thereof
CN110952786B (en) Truss structure and installation method thereof
CN107816209A (en) The large-scale Roof Truss construction technology of installation is lifted across outer both sides
CN204126297U (en) A kind of temporary support of steel truss roof
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN215212427U (en) Adjustable unloading platform with steel structure for building
CN212201400U (en) Assembled steel structure external hanging type protective frame
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN111847272A (en) Supporting method of tower crane for reconstruction of existing building
CN207499525U (en) A kind of installation support construction for the main stage girder steel of theater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

CP01 Change in the name or title of a patent holder
PP01 Preservation of patent right

Effective date of registration: 20240314

Granted publication date: 20170721

PP01 Preservation of patent right