CN106779417A - The collection of engineering investigation information digitalization, management and integrated application method - Google Patents

The collection of engineering investigation information digitalization, management and integrated application method Download PDF

Info

Publication number
CN106779417A
CN106779417A CN201611183348.4A CN201611183348A CN106779417A CN 106779417 A CN106779417 A CN 106779417A CN 201611183348 A CN201611183348 A CN 201611183348A CN 106779417 A CN106779417 A CN 106779417A
Authority
CN
China
Prior art keywords
data
information
map
prospecting
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611183348.4A
Other languages
Chinese (zh)
Inventor
李清波
戴其祥
刘振红
齐菊梅
刘灏
侯清波
裴丽娜
王***
温秋生
罗延婷
王***
娄国川
王耀军
闫思泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201611183348.4A priority Critical patent/CN106779417A/en
Publication of CN106779417A publication Critical patent/CN106779417A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Abstract

The invention discloses a kind of collection of engineering investigation information digitalization, management and integrated application method, realized by desktop management subsystem and mobile device acquisition subsystem joint, completed in PC desktop ends and PDA mobile terminals respectively, whole process is based on same data framework, same data model to be carried out.A set of engineering investigation information resources collection production proposed by the present invention, the methods and techniques of organization and administration to diversification utilization, it is adaptable to the collection of resources of every profession and trade investigation information, management and use, directly can apply and promote in the engineering investigation of every profession and trade.

Description

The collection of engineering investigation information digitalization, management and integrated application method
Technical field
The present invention relates to engineering investigation information gathering, treatment and application, adopted more particularly, to engineering investigation information digitalization Collection, management and integrated application method.
Background technology
The information content that is related to during geotechnical engineering investigation is various, complex structure, including point, line, surface spatial information and Topological relation between it, the information such as the attribute information of structuring and non-structured photo, sketch map;Attribute information is further related to The geological phenomenon description of substantial amounts of word description and multi-time Scales, it is special with multi-source, multiclass, volume, multidimensional, multi-time Scales and multistage Levy, while each applied analysis of Geotechnical Engineering Investigation Data is directed to a large amount of different types of data, data processing is considerably complicated.
At present, most surveying unit are still continuing to use traditional field condition investigation way, i.e. geomatics engineer utilizes geology The location equipment such as the traditional work such as hammer, compass, magnifying glass, camera instrument and theodolite, spirit level, total powerstation, GPS, leads to Cross continuous field geology observation and observe(Including drilling, footrill, on-the-spot test and experiment etc.), the basic geology money for obtaining Material record is on the paper medias such as topographic map, field book, recording card.Traditional Geotechnical Engineering Investigation Data acquisition mode is determined Its own certainly exists problems with:1st, field observation point location and topographic map lack real time correlation, and the level of informatization is low;2、 Often there is imperfect, lack of standardization, nonstandard phenomenon in the data of collection, and inconvenience is preserved;3rd, original data record, arrangement and number Word workload is big, intricate operation;4th, data message lies substantially in scattered, non-dynamic controlled state, and fragmentation is serious, " data silo " on even coming true, sharing is poor, and later-stage utilization is difficult, and whole work efficiency is low.
Both at home and abroad successively for particular professional fields such as regional geologic reconnaissance, Geological Hazards Investigation, groundwater resources investigation The digital collection technique study of some field geology data is completed, and is applied within the specific limits, but be substantially all The research work for being directed to a certain specific objective and some particular requirements and carrying out;In engineering geology field, emerged in recent years Some field geology information acquisition systems(China Patent Publication No. is:CN201310340991.3), set based on portable intelligent (China Patent Publication No. is for standby geology navigation and geological mapping method:CN201510017847.5), field operation one in engineering geology (China Patent Publication No. is the information system of body:N201510532049.6) etc., but exist in application process Prominent shortcomings and deficiencies.It is mainly manifested in the following aspects:1st, data model is different or incomplete:Engineering investigation needs over the ground The comprehensive analysis application of the information such as matter mapping, exploration, physical prospecting, experiment;Geology survey is laid particular emphasis on existing acquisition system and method more Paint, explore, be seldom related to physical prospecting, the comprehensive analysis application of experiment, it is difficult to meet the basic demand of engineering investigation.2nd, spatial data Conversion is difficult cumbersome:Field data collection system location navigation is based on GIS platform and GNSS information, engineering investigation and its upstream and downstream Then many to carry out engineering design using CAD system, available data acquisition system does not possess the GIS and CAD form translation functions of simplicity, Cause format map conversion, map styles setting and desktop end and the movement of Field data collection system and engineering design system Transmission, simultaneously operating of end data etc. are inconvenient, and workload is very big, are unfavorable for popularization and application.3rd, difference can not be realized Seamless link between survey data:The data such as data, physical prospecting, the laboratory test of existing Field data collection system collection do not have Have carries out seamless link with Geotechnical Engineering Investigation Data storehouse, it is impossible to be directly two dimensional drafting, three-dimensional geological modeling, numerical simulation calculation, Geotechnical engineering design provides standard, the support of the engineering investigation information data of specification, reduces the secondary utilization ratio of data.
The content of the invention
Present invention aim at a kind of engineering investigation information digitalization collection of offer, management and integrated application method.
To achieve the above object, the present invention takes following technical proposals:
Engineering investigation information digitalization collection of the present invention, management and integrated application method, by desktop management subsystem and shifting Dynamic equipment acquisition subsystem joint realizes that completed in PC desktop ends and PDA mobile terminals respectively, whole process is based on same data shelf Structure, same data model are carried out;Realize that step is as follows:
The first step, indoors PC desktop ends carry out the project preparation that field operation reconnoitres field data digital collection, including new Build project, import Project Areas work background map, set coordinate system, editor's investigation information dictionary library, decompose prospecting task, Generation PDA movement end lines file, synchronous different circuit file to the work such as different PDA mobile terminals;
Second step, the circuit file that by PDA mobile terminal opening computer desktop end is formed live in field operation prospecting, carry out coordinate Correction;Using the function of GNSS location navigations and background map real time correlation, positioning prospecting point or line position, confirm prospecting point or The attribute information of space of lines information, the typing prospecting point or line, or shoot relevant picture;Carry out GNSS positioning, space attribute letter After multiple circulations of breath typing, the prospecting task of whole circuit is completed;For the prospecting point information of typing, can look at any time See, edit, update;
3rd step, interior is returned to, respectively imported the circuit survey data of field data acquisition by the PC desktop ends, compiled Volume, check after, carry out collecting for different circuit survey datas;Ground observation data seamless after collecting enters engineering investigation number According to center, while the Geotechnical Engineering Investigation Data center is imported by physical prospecting, indoor experimental data typing or using excel, using work The survey data at journey survey data center carries out batch Drawing Figures, statistical analysis, report output, three-dimensional geological modeling, ground Numerical simulation calculation function, completes a complete digital engineering prospecting process.
The desktop management subsystem is by project management module, the first management map module, the first coordinate system module, One wire management module, the first data management module, data interface module, data application module, system management module are constituted;
The project management module:Structure and editor for carrying out engineering investigation project and its essential information, including:New any Mesh, opening project, deletion project, project basic information management function;The essential information of project includes:Project name, design rank Formation rock group information involved by section, program member's information and the project;The formation rock group letter of the grassroot project input Breath is automatically added to the dictionary library of stratum code name, facilitates field data collection to use;
The first management map module:For being managed with background map to project work, the work background map Including Vector Topographic Map, geologic map, photo-topographmap, geologic map, satellite remote sensing images;For the vector map of CAD forms, separately After saving as dxf forms, shp forms are converted into by the binary factor kind mapping pool technology of system design, form background map VectorLayer;For the VectorLayer of shp forms, system is introduced directly into, adds the new VectorLayer for background map;For Image map refers to JPG, PNG format, by after the image coordinate registration function of system, forming the tiff format with coordinate information Map, after import system, forms the image figure layer in background map;In background map, VectorLayer and image map overlay make With;
The first coordinate system module:Specified according to the coordinate system of the background map, system supports geographical coordinate System and projected coordinate system;
The first line management module, including three functions:
A, Task-decomposing:According to prospecting personnel be grouped situation prospecting task is decomposed, according to each prospecting group task, Working region is different, and the background map is distributed into different groups, forms different circuit file system, the circuit text Part system includes background map, pre-acquired figure layer and its database file, and each project has a plurality of circuit;
B, data syn-chronization:For the quick data exchange between the desktop end and mobile terminal data file;
C, data summarization:The survey data that different circuits are gathered is aggregated into unified database, is that the final-period management of data should Use provides convenient;
The data interface module:For the survey data of field data acquisition, state properties, indoor experimental data to be joined seamlessly to The Geotechnical Engineering Investigation Data center, persistence prospecting initial data;The survey data of field data acquisition is used from database to number According to the method in storehouse, the method that physical prospecting interpretation data and indoor experimental data are imported using excel;System is provided and surveyed all kinds of simultaneously Examine data output into the function of excel files;
The data application module:Survey data storehouse has completed during prospecting, and data application module is based on database, i.e., The Geotechnical Engineering Investigation Data center is carried out, and pooled applications are at four aspects:
A, Drawing Figures, automatically generate real material figure, including geological map, log sheet, comprehensive stratigraphic column in batches Figure, and exploratory heading, test pit, exploratory trench displaying figure, Luoyang Spade block diagram, log sheet, the rose of Joint Statistics, pole graph And stereogram;All maps can be converted to the CAD forms that downstream specialty needs with a key;
B, statistical analysis:Including survey amount statistics, joint Information Statistics, formation lithology thickness statistics, weathering degree Statistics, mark is passed through, moves the on-the-spot test such as spy, pressure water, water filling with the indicator-specific statistics of experiment;During Joint Statistics, by Joint Statistics point Joint information is individually counted, or the joint information combination of Joint Statistics point, spy cave, prospect pit is counted;
C, report output:The report of output field record, the output of ground water sample presentation list, list;Field record report contains prospecting work Measure, reconnoitre details a little, and corresponding position is inserted into photo, sketch map;
D, three-dimensional geological modeling:The data at the Geotechnical Engineering Investigation Data center directly serve in three-dimensional geological modeling platform ItasCAD, the Geotechnical Engineering Investigation Data according to collection builds visualization of 3 d geological model, the geology of each model of real-time query automatically Attribute, is that the realization of three-dimensional collaborative design lays the foundation;
E, numerical simulation calculation:Parsing numerical simulation software calculates the data form of demand, from the Geotechnical Engineering Investigation Data center Survey data form needed for output numerical value simulation calculating, directly participates in calculating, for geological analysis evaluation provides foundation;
The system management module:Editor including symbolic library, investigation information dictionary library;The investigation information dictionary library is used for side Just field PDA data inputtings, authority data typing and in default collection information commonly use, in relatively-stationary attribute description Hold;Before field data collection, for the data to be reconnoitred engineering, investigation information dictionary library with strong points is edited, data are same During step circuit file, investigation information dictionary library enters mobile collection equipment with circuit file, and the utilization of prospecting letter dictionary library is obvious Improve the efficiency and standardization level of field data collection typing, it is ensured that Data Enter is not omitted;
The mobile device acquisition subsystem is by the second wire management module, the second management map module, the second coordinate system mould Block, GNSS locating modules, data acquisition module, the second data management module, system setup module are constituted;
Second wire management module:Circuit file for opening, closing current investigation region;
The second management map module:For being amplified to prospecting chorography, being reduced, moved, and show suitable for figure layer Sequence, layer visibility, layer style size, the setting of color;
The second coordinate system module:Because the coordinate that GNSS is measured in itself is WGS-84 coordinates, due to different coordinates Ellipsoid, reference points of origin are different, cause the error between different coordinates, before using collecting device positioning, first carry out coordinate Correction improves positioning precision;I.e.:
Different projective parameters, Reference Transforming and correction fitting parameter unified management are integrated, and with coordinate system parameter selectivity Memory function;The coordinates correction takes input reference conversion parameter, including three parameters, seven parameters or input correction parameter, Or take scene to calculate the method for correction parameter, obtain the correction parameter between engineering coordinate system and GNSS system;Scene meter Correction parameter is calculated, single point correction is taken or is taken Supplements, coordinate that control point true coordinate and GNSS are measured and calculating Correction parameter is stored in database;
The GNSS locating modules:By after coordinates correction, the coordinate that system is measured is by the position of user with the icon of small red flag It is displayed on map, realizes the real time correlation of GNSS positioning and the background map;For large scale geological mapping, precision will Ask comparing high, on the map under the prompting of current location, by observing surrounding microrelief, the function using map reconnaissance, confirm Prospecting point position, it is to avoid the error for purely being caused by GNSS positioning;Position to realize navigating to impact point, impact point by GNSS Selection include four kinds of methods:Bit selecting puts the navigation of navigation, lists navigation and historical position in input coordinate navigation, map;
The data acquisition module:Field operation survey data mainly gathers coordinate information i.e. spatial data, the attribute information of prospecting point And the data such as sketch map, photo;In properties interface fill message reconnoitre point a numbering must be input into, other attribute informations according to Choosing is needed to fill out;After the field of the investigation information dictionary library is clicked on, the dictionary library into the field carries out Select input, selection The typing information of dictionary library enters edlin;
Acquisition interface is acquired and manages according to the rank of investigation information, during collection with management, first acquisition management Primary information, then management is acquired to second-level message, then three-level information;Second-level message is the sublist of primary information, three-level Information is the sublist of second-level message, and collection is shown in Table 1 with management survey data rank;According to Regulations requirement, geological mapping must Must first pinpoint just carries out other related works;Ground particle and its two grades of subobjects are not only relevant each other but also with different skies Between position, therefore in interface, the secondary table under ground particle is simultaneously displayed in the interface of one-level table;
Table 1
In order to exploratory trench, spy cave, prospect pit realize that system draws the requirement of displaying figure automatically, relative coordinate is introduced(LX、LY)Concept, According to displaying figure rendering request, basic point and baseline are set respectively, the corresponding attribute information of typing after collection spatial information realizes institute Exploratory trench is stated, cave, prospect pit interior details geological phenomenon space is visited and is associated with attribute;
Second data management module:The investigation information of typing, supplemented in the data management module of mobile terminal, The editors such as modification, deletion, realize the correlation inquiry of spatial information and attribute information.
A set of engineering investigation information resources collection production proposed by the present invention, the method for organization and administration to diversification utilization and Technology, it is adaptable to the collection of resources of every profession and trade investigation information, management and use, can directly in the engineering investigation of every profession and trade using and Promote.Its advantage is embodied in:
1st, this method proposition is a set of connects suitable for engineering investigation information classifying and coding, database table structure and identifier, service Mouthful etc. technical standard, the construction of Geotechnical Engineering Investigation Data data center be very easy to the storage of survey data, treatment, inquiry, It is shared, improve the secondary utilization rate of survey data;
2nd, many attribute engineering investigation Integrated Management Application Platforms are constructed, the digitlization based on Geotechnical Engineering Investigation Data center is realized The functions such as collection, Drawing Figures, statistical analysis, report output, three-dimensional geological modeling, numerical simulation calculation, realize engineering and survey Full-scale digital is examined, the mode of operation of traditional engineering investigation Information Collecting & Processing application is lifted and breach, significantly improved Operating efficiency;
3rd, the present invention integrates the intelligent acquisition system of the functions such as GNSS location navigations, digital geological compass, digital camera, drawing System, realizes GNSS positioning and topographic map real time correlation, is surveyed in geology such as the enterprising style of writing word of intelligent terminal, sketch, a photos Paint(Ground particle, occurrence, water sample, ground sample, Joint Statistics, sketch map, photo, video, audio), exploration(Drilling, test pit, spy Groove, exploratory heading, prospect pit, the layering of Luoyang Spade, sampling, structural plane), in-situ test and experiment(Mark is passed through, dynamic spy, packer permeability test, water filling Experiment)Digital collection and treatment etc. data, have innovated the work pattern of Traditional project prospecting;
4th, the investigation information dictionary library that can dynamically update is set up, survey data content and form to needing field acquisition carry out specification Change constraint, so as to ensure that collection in worksite data are not leaked item, uniform format, measurement unit and meet standard dimension, realize data acquisition Standardization, standardization, high efficiency;
5th, the space diagram switch technology that this method is proposed, realizes fusion application of the multi-source data during engineering investigation, Solve engineering investigation design upstream and downstream specialty between(GIS and CAD)The problem of the convenient lossless conversion of data.
Brief description of the drawings
Fig. 1 is workflow block diagram of the invention.
Fig. 2 is that the present invention realizes that system draws the displaying figure of the exploratory trench automatically.
Fig. 3 is that the present invention realizes that system draws the displaying figure of the prospect pit automatically.
Fig. 4 is that the present invention realizes that system draws the displaying figure of the spy cave automatically.
Specific embodiment
Embodiments of the invention are elaborated below in conjunction with the accompanying drawings, the present embodiment is with technical solution of the present invention as preceding Put and implemented, give detailed implementation method and specific operating process, but protection scope of the present invention is not limited to down State embodiment.
As shown in figure 1, engineering investigation information digitalization collection of the present invention, management and integrated application method, by table Facial canal manages subsystem and mobile device acquisition subsystem joint is realized, is completed in PC desktop ends and PDA mobile terminals respectively, whole mistake Journey is based on same data framework, same data model to be carried out;Realize that step is as follows:
The first step, indoors PC desktop ends carry out the project preparation that field operation reconnoitres field data digital collection, including new Build project, import Project Areas work background map, set coordinate system, editor's investigation information dictionary library, decompose prospecting task, Generation PDA movement end lines file, synchronous different circuit file to the work such as different PDA mobile terminals;
Second step, the circuit file that by PDA mobile terminal opening computer desktop end is formed live in field operation prospecting, carry out coordinate Correction;Using the function of GNSS location navigations and background map real time correlation, positioning prospecting point or line position, confirm prospecting point or The attribute information of space of lines information, the typing prospecting point or line, or shoot relevant picture;Carry out GNSS positioning, space attribute letter After multiple circulations of breath typing, the prospecting task of whole circuit is completed;For the prospecting point information of typing, can look at any time See, edit, update;
3rd step, interior is returned to, respectively imported the circuit survey data of field data acquisition by the PC desktop ends, compiled Volume, check after, carry out collecting for different circuit survey datas;Ground observation data seamless after collecting enters engineering investigation number According to center, while the Geotechnical Engineering Investigation Data center is imported by physical prospecting, indoor experimental data typing or using excel, using work The survey data at journey survey data center carries out batch Drawing Figures, statistical analysis, report output, three-dimensional geological modeling, ground Numerical simulation calculation function, completes a complete digital engineering prospecting process.
The desktop management subsystem is by project management module, the first management map module, the first coordinate system module, One wire management module, the first data management module, data interface module, data application module, system management module are constituted;
The project management module:Structure and editor for carrying out engineering investigation project and its essential information, including:New any Mesh, opening project, deletion project, project basic information management function;The essential information of project includes:Project name, design rank Formation rock group information involved by section, program member's information and the project;The formation rock group letter of the grassroot project input Breath is automatically added to the dictionary library of stratum code name, facilitates field data collection to use;
The first management map module:For being managed with background map to project work, the work background map Including Vector Topographic Map, geologic map, photo-topographmap, geologic map, satellite remote sensing images;For the vector map of CAD forms, separately After saving as dxf forms, shp forms are converted into by the binary factor kind mapping pool technology of system design, form background map VectorLayer;For the VectorLayer of shp forms, system is introduced directly into, adds the new VectorLayer for background map;For Image map refers to JPG, PNG format, by after the image coordinate registration function of system, forming the tiff format with coordinate information Map, after import system, forms the image figure layer in background map;In background map, VectorLayer and image map overlay make With;
The first coordinate system module:Specified according to the coordinate system of the background map, system supports geographical coordinate System and projected coordinate system;Beijing 54 of Gauss Kru&4&ger projection for commonly using, Xi'an 80, the difference of country 2000, WGS84 The coordinate of reel number sets and is predefined, and user can directly select;For the coordinate system being of little use, i.e. engineering coordinate System, external other projected coordinate systems, user can be configured with self-defined;The GNSS when operation of this step is field information acquisition Location navigation is serviced;
The first line management module, including three functions:
A, Task-decomposing:According to prospecting personnel be grouped situation prospecting task is decomposed, according to each prospecting group task, Working region is different, and the background map is distributed into different groups, forms different circuit file system, the circuit text Part system includes background map, pre-acquired figure layer and its database file, and each project has a plurality of circuit;
B, data syn-chronization:For the quick data exchange between the desktop end and mobile terminal data file;
C, data summarization:The survey data that different circuits are gathered is aggregated into unified database, is that the final-period management of data should Use provides convenient;
The data interface module:For the survey data of field data acquisition, state properties, indoor experimental data to be joined seamlessly to The Geotechnical Engineering Investigation Data center, persistence prospecting initial data;The survey data of field data acquisition is used from database to number According to the method in storehouse, the method that physical prospecting interpretation data and indoor experimental data are imported using excel;System is provided and surveyed all kinds of simultaneously Examine data output into the function of excel files;
The data application module:Survey data storehouse has completed during prospecting, and data application module is based on database, i.e., The Geotechnical Engineering Investigation Data center is carried out, and pooled applications are at four aspects:
A, Drawing Figures, automatically generate real material figure, including geological map, log sheet, comprehensive stratigraphic column in batches Figure, and exploratory heading, test pit, exploratory trench displaying figure, Luoyang Spade block diagram, log sheet, the rose of Joint Statistics, pole graph And stereogram;All maps can be converted to the CAD forms that downstream specialty needs with a key;
B, statistical analysis:Including survey amount statistics, joint Information Statistics, formation lithology thickness statistics, weathering degree Statistics, mark is passed through, moves the on-the-spot test such as spy, pressure water, water filling with the indicator-specific statistics of experiment;During Joint Statistics, by Joint Statistics point Joint information is individually counted, or the joint information combination of Joint Statistics point, spy cave, prospect pit is counted;
C, report output:The report of output field record, the output of ground water sample presentation list, list;Field record report contains prospecting work Measure, reconnoitre details a little, and corresponding position is inserted into photo, sketch map;
D, three-dimensional geological modeling:The data at the Geotechnical Engineering Investigation Data center directly serve in three-dimensional geological modeling platform ItasCAD, the Geotechnical Engineering Investigation Data according to collection builds visualization of 3 d geological model, the geology of each model of real-time query automatically Attribute, is that the realization of three-dimensional collaborative design lays the foundation;
E, numerical simulation calculation:Parsing numerical simulation software calculates the data form of demand, from the Geotechnical Engineering Investigation Data center Survey data form needed for output numerical value simulation calculating, directly participates in calculating, for geological analysis evaluation provides foundation;
The system management module:Editor including symbolic library, investigation information dictionary library;The investigation information dictionary library is used for side Just field PDA data inputtings, authority data typing and in default collection information commonly use, in relatively-stationary attribute description Hold;Before field data collection, for the data to be reconnoitred engineering, investigation information dictionary library with strong points is edited, data are same During step circuit file, investigation information dictionary library enters mobile collection equipment with circuit file, and the utilization of prospecting letter dictionary library is obvious Improve the efficiency and standardization level of field data collection typing, it is ensured that Data Enter is not omitted;
The mobile device acquisition subsystem is by the second wire management module, the second management map module, the second coordinate system mould Block, GNSS locating modules, data acquisition module, the second data management module, system setup module are constituted;
Second wire management module:Circuit file for opening, closing current investigation region;
The second management map module:For being amplified to prospecting chorography, being reduced, moved, and show suitable for figure layer Sequence, layer visibility, layer style size, the setting of color;
The second coordinate system module:Because the coordinate that GNSS is measured in itself is WGS-84 coordinates, due to different coordinates Ellipsoid, reference points of origin are different, cause the error between different coordinates, before using collecting device positioning, first carry out coordinate Correction improves positioning precision;I.e.:
Different projective parameters, Reference Transforming and correction fitting parameter unified management are integrated, and with coordinate system parameter selectivity Memory function;The coordinates correction takes input reference conversion parameter, including three parameters, seven parameters or input correction parameter, Or take scene to calculate the method for correction parameter, obtain the correction parameter between engineering coordinate system and GNSS system;Scene meter Correction parameter is calculated, single point correction is taken or is taken Supplements, coordinate that control point true coordinate and GNSS are measured and calculating Correction parameter is stored in database;
The GNSS locating modules:By after coordinates correction, the coordinate that system is measured is by the position of user with the icon of small red flag It is displayed on map, realizes the real time correlation of GNSS positioning and the background map;For large scale geological mapping, precision will Ask comparing high, on the map under the prompting of current location, by observing surrounding microrelief, the function using map reconnaissance, confirm Prospecting point position, it is to avoid the error for purely being caused by GNSS positioning;Position to realize navigating to impact point, impact point by GNSS Selection include four kinds of methods:Bit selecting puts the navigation of navigation, lists navigation and historical position in input coordinate navigation, map;
The data acquisition module:Field operation survey data mainly gathers coordinate information i.e. spatial data, the attribute information of prospecting point And the data such as sketch map, photo;In properties interface fill message reconnoitre point a numbering must be input into, other attribute informations according to Choosing is needed to fill out;After the field of the investigation information dictionary library is clicked on, the dictionary library into the field carries out Select input, selection The typing information of dictionary library enters edlin;
Acquisition interface is acquired and manages according to the rank of investigation information, during collection with management, first acquisition management Primary information, then management is acquired to second-level message, then three-level information;Second-level message is the sublist of primary information, three-level Information is the sublist of second-level message, and collection is shown in Table 1 with management survey data rank list;According to Regulations requirement, geology Mapping must first be pinpointed and just carry out other related works;Ground particle and its two grades of subobjects are not only relevant each other but also with not Same locus, therefore in interface, the secondary table under ground particle is simultaneously displayed in the interface of one-level table;It is shown in Table 1;
Table 1
As shown in Figure 2,3, 4, in order to realize the requirement that system is drawn exploratory trench, prospect pit, visits cave displaying figure automatically, relative coordinate is introduced (LX、LY)Concept, according to displaying figure rendering request, respectively set basic point and baseline, collection spatial information after typing it is corresponding Attribute information, realizes that the exploratory trench, prospect pit, spy cave interior details geological phenomenon space associate with attribute.
Second data management module:The investigation information of typing, is carried out in the data management module of mobile terminal The editors such as supplement, modification, deletion, realize the correlation inquiry of spatial information and attribute information.

Claims (2)

1. a kind of engineering investigation information digitalization is gathered, managed and integrated application method, it is characterised in that:By desktop management subsystem System and mobile device acquisition subsystem combine realization, are completed in PC desktop ends and PDA mobile terminals respectively, and whole process is based on same Data framework, same data model are carried out;Realize that step is as follows:
The first step, indoors PC desktop ends carry out the project preparation that field operation reconnoitres field data digital collection, including new Build project, import Project Areas work background map, set coordinate system, editor's investigation information dictionary library, decompose prospecting task, Generation PDA movement end lines file, synchronous different circuit file to the work such as different PDA mobile terminals;
Second step, the circuit file that by PDA mobile terminal opening computer desktop end is formed live in field operation prospecting, carry out coordinate Correction;Using the function of GNSS location navigations and background map real time correlation, positioning prospecting point or line position, confirm prospecting point or The attribute information of space of lines information, the typing prospecting point or line, or shoot relevant picture;Carry out GNSS positioning, space attribute letter After multiple circulations of breath typing, the prospecting task of whole circuit is completed;For the prospecting point information of typing, can look at any time See, edit, update;
3rd step, interior is returned to, respectively imported the circuit survey data of field data acquisition by the PC desktop ends, compiled Volume, check after, carry out collecting for different circuit survey datas;Ground observation data seamless after collecting enters engineering investigation number According to center, while the Geotechnical Engineering Investigation Data center is imported by physical prospecting, indoor experimental data typing or using excel, using work The survey data at journey survey data center carries out batch Drawing Figures, statistical analysis, report output, three-dimensional geological modeling, ground Numerical simulation calculation function, completes a complete digital engineering prospecting process.
2. engineering investigation information digitalization is gathered, managed and integrated application method according to claim 1, it is characterised in that:
The desktop management subsystem is by project management module, the first management map module, the first coordinate system module, First Line Road management module, the first data management module, data interface module, data application module, system management module are constituted;
The project management module:Structure and editor for carrying out engineering investigation project and its essential information, including:New any Mesh, opening project, deletion project, project basic information management function;The essential information of project includes:Project name, design rank Formation rock group information involved by section, program member's information and the project;The formation rock group letter of the grassroot project input Breath is automatically added to the dictionary library of stratum code name, facilitates field data collection to use;
The first management map module:For being managed with background map to project work, the work background map Including Vector Topographic Map, geologic map, photo-topographmap, geologic map, satellite remote sensing images;For the vector map of CAD forms, separately After saving as dxf forms, shp forms are converted into by the binary factor kind mapping pool technology of system design, form background map VectorLayer;For the VectorLayer of shp forms, system is introduced directly into, adds the new VectorLayer for background map;For Image map refers to JPG, PNG format, by after the image coordinate registration function of system, forming the tiff format with coordinate information Map, after import system, forms the image figure layer in background map;In background map, VectorLayer and image map overlay make With;
The first coordinate system module:Specified according to the coordinate system of the background map, system supports geographical coordinate System and projected coordinate system;
The first line management module, including three functions:
A, Task-decomposing:According to prospecting personnel be grouped situation prospecting task is decomposed, according to each prospecting group task, Working region is different, and the background map is distributed into different groups, forms different circuit file system, the circuit text Part system includes background map, pre-acquired figure layer and its database file, and each project has a plurality of circuit;
B, data syn-chronization:For the quick data exchange between the desktop end and mobile terminal data file;
C, data summarization:The survey data that different circuits are gathered is aggregated into unified database, is that the final-period management of data should Use provides convenient;
The data interface module:For the survey data of field data acquisition, state properties, indoor experimental data to be joined seamlessly to The Geotechnical Engineering Investigation Data center, persistence prospecting initial data;The survey data of field data acquisition is used from database to number According to the method in storehouse, the method that physical prospecting interpretation data and indoor experimental data are imported using excel;System is provided and surveyed all kinds of simultaneously Examine data output into the function of excel files;
The data application module:Survey data storehouse has completed during prospecting, and data application module is based on database, i.e., The Geotechnical Engineering Investigation Data center is carried out, and pooled applications are at four aspects:
A, Drawing Figures, automatically generate real material figure, including geological map, log sheet, comprehensive stratigraphic column in batches Figure, and exploratory heading, test pit, exploratory trench displaying figure, Luoyang Spade block diagram, log sheet, the rose of Joint Statistics, pole graph And stereogram;All maps can be converted to the CAD forms that downstream specialty needs with a key;
B, statistical analysis:Including survey amount statistics, joint Information Statistics, formation lithology thickness statistics, weathering degree Statistics, mark is passed through, moves the on-the-spot test such as spy, pressure water, water filling with the indicator-specific statistics of experiment;During Joint Statistics, by Joint Statistics point Joint information is individually counted, or the joint information combination of Joint Statistics point, spy cave, prospect pit is counted;
C, report output:The report of output field record, the output of ground water sample presentation list, list;Field record report contains prospecting work Measure, reconnoitre details a little, and corresponding position is inserted into photo, sketch map;
D, three-dimensional geological modeling:The data at the Geotechnical Engineering Investigation Data center directly serve in three-dimensional geological modeling platform ItasCAD, the Geotechnical Engineering Investigation Data according to collection builds visualization of 3 d geological model, the geology of each model of real-time query automatically Attribute, is that the realization of three-dimensional collaborative design lays the foundation;
E, numerical simulation calculation:Parsing numerical simulation software calculates the data form of demand, from the Geotechnical Engineering Investigation Data center Survey data form needed for output numerical value simulation calculating, directly participates in calculating, for geological analysis evaluation provides foundation;
The system management module:Editor including symbolic library, investigation information dictionary library;The investigation information dictionary library is used for side Just field PDA data inputtings, authority data typing and in default collection information commonly use, in relatively-stationary attribute description Hold;Before field data collection, for the data to be reconnoitred engineering, investigation information dictionary library with strong points is edited, data are same During step circuit file, investigation information dictionary library enters mobile collection equipment with circuit file, and the utilization of prospecting letter dictionary library is obvious Improve the efficiency and standardization level of field data collection typing, it is ensured that Data Enter is not omitted;
The mobile device acquisition subsystem is by the second wire management module, the second management map module, the second coordinate system mould Block, GNSS locating modules, data acquisition module, the second data management module, system setup module are constituted;
Second wire management module:Circuit file for opening, closing current investigation region;
The second management map module:For being amplified to prospecting chorography, being reduced, moved, and show suitable for figure layer Sequence, layer visibility, layer style size, the setting of color;
The second coordinate system module:Because the coordinate that GNSS is measured in itself is WGS-84 coordinates, due to different coordinates Ellipsoid, reference points of origin are different, cause the error between different coordinates, before using collecting device positioning, first carry out coordinate Correction improves positioning precision;I.e.:
Different projective parameters, Reference Transforming and correction fitting parameter unified management are integrated, and with coordinate system parameter selectivity Memory function;The coordinates correction takes input reference conversion parameter, including three parameters, seven parameters or input correction parameter, Or take scene to calculate the method for correction parameter, obtain the correction parameter between engineering coordinate system and GNSS system;Scene meter Correction parameter is calculated, single point correction is taken or is taken Supplements, coordinate that control point true coordinate and GNSS are measured and calculating Correction parameter is stored in database;
The GNSS locating modules:By after coordinates correction, the coordinate that system is measured is by the position of user with the icon of small red flag It is displayed on map, realizes the real time correlation of GNSS positioning and the background map;For large scale geological mapping, precision will Ask comparing high, on the map under the prompting of current location, by observing surrounding microrelief, the function using map reconnaissance, confirm Prospecting point position, it is to avoid the error for purely being caused by GNSS positioning;Position to realize navigating to impact point, impact point by GNSS Selection include four kinds of methods:Bit selecting puts the navigation of navigation, lists navigation and historical position in input coordinate navigation, map;
The data acquisition module:Field operation survey data mainly gathers coordinate information i.e. spatial data, the attribute information of prospecting point And the data such as sketch map, photo;In properties interface fill message reconnoitre point a numbering must be input into, other attribute informations according to Choosing is needed to fill out;After the field of the investigation information dictionary library is clicked on, the dictionary library into the field carries out Select input, selection The typing information of dictionary library enters edlin;
Acquisition interface is acquired and manages according to the rank of investigation information, during collection with management, first acquisition management Primary information, then management is acquired to second-level message, then three-level information;Second-level message is the sublist of primary information, three-level Information is the sublist of second-level message, and collection is shown in Table 1 with management survey data rank list;According to Regulations requirement, geology Mapping must first be pinpointed and just carry out other related works;Ground particle and its two grades of subobjects are not only relevant each other but also with not Same locus, therefore in interface, the secondary table under ground particle is simultaneously displayed in the interface of one-level table;
Table 1
In order to exploratory trench, spy cave, prospect pit realize that system draws the requirement of displaying figure automatically, relative coordinate is introduced(LX、LY)Concept, According to displaying figure rendering request, basic point and baseline are set respectively, the corresponding attribute information of typing after collection spatial information realizes institute Exploratory trench is stated, cave, prospect pit interior details geological phenomenon space is visited and is associated with attribute;
Second data management module:The investigation information of typing, supplemented in the data management module of mobile terminal, The editors such as modification, deletion, realize the correlation inquiry of spatial information and attribute information.
CN201611183348.4A 2016-12-20 2016-12-20 The collection of engineering investigation information digitalization, management and integrated application method Pending CN106779417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611183348.4A CN106779417A (en) 2016-12-20 2016-12-20 The collection of engineering investigation information digitalization, management and integrated application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611183348.4A CN106779417A (en) 2016-12-20 2016-12-20 The collection of engineering investigation information digitalization, management and integrated application method

Publications (1)

Publication Number Publication Date
CN106779417A true CN106779417A (en) 2017-05-31

Family

ID=58891309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611183348.4A Pending CN106779417A (en) 2016-12-20 2016-12-20 The collection of engineering investigation information digitalization, management and integrated application method

Country Status (1)

Country Link
CN (1) CN106779417A (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107357767A (en) * 2017-07-26 2017-11-17 湖南省地质矿产勘查开发局四七队 A kind of engineering investigation data processing method and device
CN107797980A (en) * 2017-11-24 2018-03-13 山东省煤田地质规划勘察研究院 A kind of geological prospecting borehole data processing and control system based on Internet of Things
CN107832340A (en) * 2017-10-13 2018-03-23 中国煤炭地质总局物测队 The big data system of data intellectual analysis is surveyed over the ground
CN107909271A (en) * 2017-11-15 2018-04-13 国网四川省电力公司经济技术研究院 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system
CN107990882A (en) * 2017-12-14 2018-05-04 北京龙软科技股份有限公司 A kind of mine working geological record drafting system
CN108121825A (en) * 2018-01-15 2018-06-05 霍亮 Topographic data manages system
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN108256826A (en) * 2018-01-09 2018-07-06 上海隧道工程有限公司 Construction regulations control system and method
CN108492079A (en) * 2018-03-06 2018-09-04 平湖市城工建设测绘设计有限责任公司 A kind of mapping work compound method
CN108776659A (en) * 2018-03-07 2018-11-09 华能澜沧江水电股份有限公司 A kind of structural plane statistical analysis technique based on the Iso density map of pole containing spatial position
CN108804600A (en) * 2018-05-29 2018-11-13 山东省地质矿产勘查开发局第三水文地质工程地质大队(山东省鲁南地质工程勘察院) Information analysis display method for basic data of coal mining subsidence area
CN108985974A (en) * 2018-06-11 2018-12-11 山西大学 A kind of tourist resources data collection system based on mobile GIS
CN109035068A (en) * 2018-07-26 2018-12-18 中佳勘察设计有限公司 A kind of comprehensive platform for project management
CN109271745A (en) * 2018-11-06 2019-01-25 浙江华厦工程勘测设计研究院有限公司 A kind of Datamation System of Geotechnical Experiment
CN109446281A (en) * 2018-09-05 2019-03-08 广州市城市规划勘测设计研究院 On-line intelligence Mapping System construction method, system and drafting method based on ArcGIS
CN109636312A (en) * 2018-11-15 2019-04-16 武汉市国土资源和规划信息中心 Land control engineering online monitoring and management system
CN109947068A (en) * 2019-04-24 2019-06-28 广州市城市规划勘测设计研究院 A kind of field data acquisition system and method
CN110095129A (en) * 2019-06-06 2019-08-06 广东电网有限责任公司 A kind of navigation system for roading prospecting
CN110097335A (en) * 2019-04-08 2019-08-06 广州市城市规划勘测设计研究院 A kind of geotechnical engineering investigation informationization operating system and method
CN110209754A (en) * 2019-06-06 2019-09-06 广东电网有限责任公司 A kind of roading navigation system automatically generating prospecting figure
CN110222373A (en) * 2019-05-09 2019-09-10 中国地质大学(武汉) A kind of Geotechnical Engineering Investigation Data processing method towards geotechnical engineering Life cycle
CN110807023A (en) * 2019-11-08 2020-02-18 山东电力工程咨询院有限公司 Survey management and data intelligent analysis system and method based on GIS
CN112529983A (en) * 2020-12-22 2021-03-19 山东省交通规划设计院有限公司 Internet of things and cloud computing based geological exploration record smart cloud platform and method
CN112762948A (en) * 2021-01-09 2021-05-07 化学工业第一勘察设计院有限公司 Reconnaissance path generation method and device, server and storage medium
CN112766931A (en) * 2021-01-29 2021-05-07 北京城建勘测设计研究院有限责任公司 Whole-process and interior and exterior integrated investigation production system and method
CN113156472A (en) * 2020-01-07 2021-07-23 北京林业大学 Technology and method for building mixed forest by smart phone/tablet computer according to 3S technology
CN113535878A (en) * 2021-07-23 2021-10-22 石家庄铁道大学 Line selection method, device, terminal and storage medium based on three-dimensional geological modeling
CN113779658A (en) * 2021-08-23 2021-12-10 中冶集团武汉勘察研究院有限公司 Method for automatically generating editable survey map based on B/S and C/S terminals
CN114199242A (en) * 2020-09-17 2022-03-18 中国石油化工股份有限公司 Map superposition-based target exploration stratum dew point navigation method and system
CN114511303A (en) * 2022-04-06 2022-05-17 四川省大数据中心 Investigation result examination system, method and equipment
CN114693281A (en) * 2022-06-01 2022-07-01 山东志诚地理信息技术有限公司 Engineering investigation information management system based on cloud platform
CN115221172A (en) * 2022-07-25 2022-10-21 中国人民解放军陆军航空兵学院 Method for electronic acquisition and storage based on portable terminal
CN115272812A (en) * 2022-08-10 2022-11-01 深圳朗道智通科技有限公司 Artificial intelligence big data acquisition system
CN115499779A (en) * 2022-09-23 2022-12-20 山东智源电力设计咨询有限公司 Line cloud reconnaissance system based on mobile terminal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480892A (en) * 2002-10-10 2004-03-10 中国地质调查局发展研究中心 Method for filling digit on map utilized in regional geological survey
KR20050065476A (en) * 2005-05-20 2005-06-29 웅진개발 주식회사 The breaking method of under water rock using slope drilling
CN1838164A (en) * 2006-04-26 2006-09-27 东南大学 Full-digitized field information acquisition, recording and processing method for land survey
CN101452072A (en) * 2008-12-26 2009-06-10 东南大学 Electronic information system for earth monitor and method thereof
CN103810333A (en) * 2014-01-27 2014-05-21 长江三峡勘测研究院有限公司(武汉) Engineering geology informatization work system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480892A (en) * 2002-10-10 2004-03-10 中国地质调查局发展研究中心 Method for filling digit on map utilized in regional geological survey
KR20050065476A (en) * 2005-05-20 2005-06-29 웅진개발 주식회사 The breaking method of under water rock using slope drilling
CN1838164A (en) * 2006-04-26 2006-09-27 东南大学 Full-digitized field information acquisition, recording and processing method for land survey
CN101452072A (en) * 2008-12-26 2009-06-10 东南大学 Electronic information system for earth monitor and method thereof
CN103810333A (en) * 2014-01-27 2014-05-21 长江三峡勘测研究院有限公司(武汉) Engineering geology informatization work system

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107357767A (en) * 2017-07-26 2017-11-17 湖南省地质矿产勘查开发局四七队 A kind of engineering investigation data processing method and device
CN107832340A (en) * 2017-10-13 2018-03-23 中国煤炭地质总局物测队 The big data system of data intellectual analysis is surveyed over the ground
CN107909271A (en) * 2017-11-15 2018-04-13 国网四川省电力公司经济技术研究院 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system
CN107797980A (en) * 2017-11-24 2018-03-13 山东省煤田地质规划勘察研究院 A kind of geological prospecting borehole data processing and control system based on Internet of Things
CN107990882B (en) * 2017-12-14 2019-04-23 北京龙软科技股份有限公司 A kind of mine working geological record drafting system
CN107990882A (en) * 2017-12-14 2018-05-04 北京龙软科技股份有限公司 A kind of mine working geological record drafting system
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN108195423B (en) * 2017-12-26 2020-08-25 上海勘察设计研究院(集团)有限公司 Engineering monitoring data integration system
CN108256826A (en) * 2018-01-09 2018-07-06 上海隧道工程有限公司 Construction regulations control system and method
CN108121825A (en) * 2018-01-15 2018-06-05 霍亮 Topographic data manages system
CN108492079A (en) * 2018-03-06 2018-09-04 平湖市城工建设测绘设计有限责任公司 A kind of mapping work compound method
CN108776659B (en) * 2018-03-07 2021-11-26 华能澜沧江水电股份有限公司 Structural surface statistical analysis method based on isopycnic map containing space position poles
CN108776659A (en) * 2018-03-07 2018-11-09 华能澜沧江水电股份有限公司 A kind of structural plane statistical analysis technique based on the Iso density map of pole containing spatial position
CN108804600A (en) * 2018-05-29 2018-11-13 山东省地质矿产勘查开发局第三水文地质工程地质大队(山东省鲁南地质工程勘察院) Information analysis display method for basic data of coal mining subsidence area
CN108985974A (en) * 2018-06-11 2018-12-11 山西大学 A kind of tourist resources data collection system based on mobile GIS
CN109035068A (en) * 2018-07-26 2018-12-18 中佳勘察设计有限公司 A kind of comprehensive platform for project management
CN109446281A (en) * 2018-09-05 2019-03-08 广州市城市规划勘测设计研究院 On-line intelligence Mapping System construction method, system and drafting method based on ArcGIS
CN109446281B (en) * 2018-09-05 2020-11-24 广州市城市规划勘测设计研究院 ArcGIS-based online intelligent mapping system construction method, system and mapping method
CN109271745A (en) * 2018-11-06 2019-01-25 浙江华厦工程勘测设计研究院有限公司 A kind of Datamation System of Geotechnical Experiment
CN109636312A (en) * 2018-11-15 2019-04-16 武汉市国土资源和规划信息中心 Land control engineering online monitoring and management system
CN110097335A (en) * 2019-04-08 2019-08-06 广州市城市规划勘测设计研究院 A kind of geotechnical engineering investigation informationization operating system and method
CN109947068A (en) * 2019-04-24 2019-06-28 广州市城市规划勘测设计研究院 A kind of field data acquisition system and method
CN110222373A (en) * 2019-05-09 2019-09-10 中国地质大学(武汉) A kind of Geotechnical Engineering Investigation Data processing method towards geotechnical engineering Life cycle
CN110222373B (en) * 2019-05-09 2020-10-30 中国地质大学(武汉) Geotechnical engineering full life cycle oriented engineering investigation data processing method
CN110209754A (en) * 2019-06-06 2019-09-06 广东电网有限责任公司 A kind of roading navigation system automatically generating prospecting figure
CN110095129A (en) * 2019-06-06 2019-08-06 广东电网有限责任公司 A kind of navigation system for roading prospecting
CN110209754B (en) * 2019-06-06 2020-08-14 广东电网有限责任公司 Road planning navigation system capable of automatically generating survey map
CN110807023A (en) * 2019-11-08 2020-02-18 山东电力工程咨询院有限公司 Survey management and data intelligent analysis system and method based on GIS
CN113156472A (en) * 2020-01-07 2021-07-23 北京林业大学 Technology and method for building mixed forest by smart phone/tablet computer according to 3S technology
CN114199242A (en) * 2020-09-17 2022-03-18 中国石油化工股份有限公司 Map superposition-based target exploration stratum dew point navigation method and system
CN112529983A (en) * 2020-12-22 2021-03-19 山东省交通规划设计院有限公司 Internet of things and cloud computing based geological exploration record smart cloud platform and method
CN112762948A (en) * 2021-01-09 2021-05-07 化学工业第一勘察设计院有限公司 Reconnaissance path generation method and device, server and storage medium
CN112766931A (en) * 2021-01-29 2021-05-07 北京城建勘测设计研究院有限责任公司 Whole-process and interior and exterior integrated investigation production system and method
CN113535878B (en) * 2021-07-23 2022-09-27 石家庄铁道大学 Line selection method, device, terminal and storage medium based on three-dimensional geological modeling
CN113535878A (en) * 2021-07-23 2021-10-22 石家庄铁道大学 Line selection method, device, terminal and storage medium based on three-dimensional geological modeling
CN113779658A (en) * 2021-08-23 2021-12-10 中冶集团武汉勘察研究院有限公司 Method for automatically generating editable survey map based on B/S and C/S terminals
CN113779658B (en) * 2021-08-23 2023-11-21 中冶集团武汉勘察研究院有限公司 Method for automatically generating editable investigation drawing based on B/S and C/S ends
CN114511303B (en) * 2022-04-06 2022-07-22 四川省大数据中心 Investigation result examination system, method and equipment
CN114511303A (en) * 2022-04-06 2022-05-17 四川省大数据中心 Investigation result examination system, method and equipment
CN114693281A (en) * 2022-06-01 2022-07-01 山东志诚地理信息技术有限公司 Engineering investigation information management system based on cloud platform
CN115221172A (en) * 2022-07-25 2022-10-21 中国人民解放军陆军航空兵学院 Method for electronic acquisition and storage based on portable terminal
CN115272812A (en) * 2022-08-10 2022-11-01 深圳朗道智通科技有限公司 Artificial intelligence big data acquisition system
CN115499779A (en) * 2022-09-23 2022-12-20 山东智源电力设计咨询有限公司 Line cloud reconnaissance system based on mobile terminal

Similar Documents

Publication Publication Date Title
CN106779417A (en) The collection of engineering investigation information digitalization, management and integrated application method
CN101452072B (en) Electronic information system for earth monitor and method thereof
CN112115198B (en) Urban remote sensing intelligent service platform
CN101901244B (en) Geological geographic information system processing method
CN101051076B (en) Mobile space data collection and processing and publishing method
CN1838164B (en) Full-digitized field information acquisition, recording and processing method for land survey
CN110222445A (en) Based on BIM and the integrated of design information, collaborative design and delivery method and system
CN101051077A (en) Satellite positioning, remote sensing and geographical in for mation integrating method based on mobile device
CN110096565B (en) Multi-source data standardization processing method for integrated engineering geological achievement
CN103699634A (en) Database creation method and database creation system for one-stop pipeline detection
CN103412967A (en) Geologic field information collection system, geologic field information collection method and application method of collection system
CN113157665A (en) Intelligent multi-measurement-in-one geographic information system
CN112035983A (en) Urban medium-voltage power grid planning and designing platform based on three-dimensional real scene
CN104006805A (en) Electric power engineering field reconnaissance method based on mobile GIS
CN116304152A (en) Intelligent investigation result display system based on GIS and BIM
CN110197035A (en) A kind of navigation channel change of Underwater Topography analysis system and method
CN113626455A (en) Method and device for updating picture library in linkage manner, electronic equipment and storage medium
CN117436054B (en) Geotechnical engineering big data sharing platform
CN112907732A (en) Three-dimensional modeling based cooperative working method and device, storage medium and computer equipment
CN201622567U (en) Geological and geographic information system
Chen et al. The design and implementation of the geological data acquisition system based on mobile GIS
Qian The application of GIS in the real estate management system
US8782564B2 (en) Method for collaborative display of geographic data
CN113418511B (en) Digital mapping system and mapping method for water conservancy and hydropower engineering geology
CN114048278B (en) Modeling correction system and method applied to homeland mapping space data resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531