CN107909271A - A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system - Google Patents

A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system Download PDF

Info

Publication number
CN107909271A
CN107909271A CN201711130347.8A CN201711130347A CN107909271A CN 107909271 A CN107909271 A CN 107909271A CN 201711130347 A CN201711130347 A CN 201711130347A CN 107909271 A CN107909271 A CN 107909271A
Authority
CN
China
Prior art keywords
data
assessment
geotechnical
engineering investigation
information system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711130347.8A
Other languages
Chinese (zh)
Inventor
范荣全
李源亮
肖红
张玉鸿
张正勇
李惠民
王文广
任光明
王滨
张烨
黄建平
谢伟
李根富
李小涛
胡勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Become Capital Electricity Power Engineering Design Co Ltd
State Grid Sichuan Electric Power Co Ltd
Chengdu Univeristy of Technology
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Become Capital Electricity Power Engineering Design Co Ltd
State Grid Sichuan Electric Power Co Ltd
Chengdu Univeristy of Technology
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Become Capital Electricity Power Engineering Design Co Ltd, State Grid Sichuan Electric Power Co Ltd, Chengdu Univeristy of Technology, Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical Become Capital Electricity Power Engineering Design Co Ltd
Priority to CN201711130347.8A priority Critical patent/CN107909271A/en
Publication of CN107909271A publication Critical patent/CN107909271A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Databases & Information Systems (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Quality & Reliability (AREA)
  • Remote Sensing (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Geotechnical Engineering Investigation Data management and generalized information system is assessed, the system comprises:Collector unit, for collecting the existing ground geotechnical engineering investigation data in somewhere;Unit is established, for the data collected based on collector unit, establishes database;Geotechnical Engineering Investigation Data management and assessment generalized information system, for based on database data, data are managed, are inquired about, analogy soil geotechnical parameter, prediction soil geotechnical parameter, realize the integrated management to municipal engineering investigation result and utilization, the potential value of existing investigation result is fully excavated, important reference frame is provided for urban planning, prospecting, construction, the technique effect with significant economic results in society.

Description

A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system
Technical field
The present invention relates to geotechnical engineering investigation field, and in particular, to a kind of Geotechnical Engineering Investigation Data management and assessment GIS systems System.
Background technology
Traditional engineering prospecting data is scattered in each prospecting, designing unit, investigation result be used only for it is specific certain A engineering project, investigation result is more after completion of works acceptance(check) is sealed up for safekeeping in the form of report, form and graph, is hardly resulted in again Secondary utilization.Existing investigation result is caused the fact that investigation result disperses, is mixed and disorderly under tale quale to cannot get the unified management of science And utilization.
The content of the invention
The present invention provides a kind of Geotechnical Engineering Investigation Data management and assessment generalized information system, solves existing under tale quale The defects of investigation result disperses, is mixed and disorderly, realize the integrated management to engineering investigation achievement and utilization, fully excavated and reconnoitred The potential value of achievement, provides important reference frame for urban planning, prospecting, construction, has significant economic results in society Technique effect.
For achieving the above object, it is described this application provides a kind of Geotechnical Engineering Investigation Data management and assessment generalized information system System includes:
Collector unit, for collecting the existing ground geotechnical engineering investigation data in somewhere;
Unit is established, for the data collected based on collector unit, establishes database;
Geotechnical Engineering Investigation Data management and assessment generalized information system, for based on database data, being managed, inquiring about to data, Analogy soil geotechnical parameter, prediction soil geotechnical parameter.
Wherein, in ground and Geological Engineering field, " analogy method " is the important of assessment construction project to be built rock & soil mechanical parameter Method, this method refer to the soil geotechnical parameter with similar geologic setting, similar engineering scale condition to determine this engineering Parameter value.Therefore, these existing investigation results for the engineering construction with similar geologic setting with important Reference value.Geotechnical Engineering Investigation Data management and assessment generalized information system in the application, realize and municipal engineering investigation result are integrated Management and utilization, " parameter analogy module " based on system can provide reference for construction project to be built soil geotechnical parameter value, utilize " the parameter evaluation prediction module " of system can be to specifying non-investigation region in region (a such as city scope, a kind of formation volumes) Geotechnical Parameter be predicted assessment, fully excavated the potential value of existing investigation result, be urban planning, prospecting, construction Important reference frame is provided, there are significant economic results in society.
Further, the Geotechnical Engineering Investigation Data management and assessment generalized information system are additionally operable to ornamenting map, make special topic, beat Print output.
Wherein, map is adornd:Be arrangement, modification map, by the way that map range size is adjusted, adding proportion ruler, Compass, adjusting map color matching etc. make map beautiful.Make special topic:Than if any various mechanics parameter thematic maps, such as:Soil The thematic maps such as three Phase Proportion indexs, clay physical mechanics state index, intensity and deformation index.Printout:For example print Exploratory spot spatial distribution map, above-mentioned mechanics parameter thematic maps etc..
Further, the collector unit is additionally operable to pre-process the data of collection, including:Remove unnecessary information Only retain crucial information, the information of completion missing, correct error message.
Further, using ArcGIS as database platform is established, tissue, expression are come with Geodatabase data models Geodata.
Further, the data in database are divided into:Fundamental geological and geology, two major class of engineering investigation point data;Basis Geodata includes:Administrative boundaries data, traffic data, building data, remote sensing image data;Basic geological data includes:Ground Shape relief data, layer soil body data, water system data;Engineering investigation point data includes:Project profile data, in-situ test number According to, three Phase Proportion achievement datas, clay physical state achievement data, intensity and deformation achievement data.
Further, project profile data include:Position coordinate data, engineering type data, ground geotechnical data;It is in situ Test data includes:Mark passes through test data, dynamic sounding data, load test data;Three Phase Proportion achievement datas include:The soil body Severe data, specific gravity of soil partical data, moisture content data, void ratio data;Clay physical state achievement data includes:Plastic limit liquid limit Data, plasticity index data, liquidity index data;Intensity and deformation index data packet include:Cohesion force data, internal friction angle number According to, compression modulus data.
Further, Geotechnical Engineering Investigation Data management and assessment generalized information system specifically include:
Data inputting module, data are imported by online input system database or by swap file batch, and using in advance If data validity rule there is responsiveness to test data;
Map view module, is used for realization the function of browse of map, supports map scaling, translation;Utilize the ground of prospecting point It is included being superimposed on map, and with Administrative boundaries, DEM, stratum, River Data by reason coordinate in the form of a key element, over the ground Figure is browsed;
Parameter analogy module, for according to keyword input by user, the data in database being scanned for and being returned Engineering comprising keyword and its soil geotechnical parameter information, refer to for the construction project to be built with similar geologic setting and scale;
Interpolative prediction module, for based on kriging method using the investigation result included in database to not reconnoitring area Geotechnical Parameter be predicted assessment;In common Kriging model, general Kriging model and association gram built in interpolative prediction module Golden model, selects most suitably used Kriging model to join zone of ignorance ground in interpolative prediction according to the specific feature of sample data Number is predicted assessment;
Thematic mapping and print module, are used for realization map appearance, special topic makes and print output function.Map appearance By the way that map size is adjusted, adding proportion ruler, addition compass, addition longitude and latitude frame, adjust map color matching render etc. it is whole Reason modification work makes map beautiful.The thematic maps that can be made includes the various mechanics parameters formed based on exploratory spot information interpolation Thematic maps, including three Phase Proportion indexs of soil, clay physical mechanics state index, intensity and deformation index etc..Printout Realize printing exploratory spot spatial distribution map, above-mentioned mechanics parameter thematic maps etc..
One or more technical solutions that the application provides, have at least the following technical effects or advantages:
Disperse for Traditional project prospecting data, prospecting data hardly results in further profit after the completion of difficult management and project With the characteristics of, develop a kind of Geotechnical Engineering Investigation Data management and assessment generalized information system, not only realize the system to engineering investigation achievement One management, also reference class ratio, interpolative prediction mould can be provided using parameter analogy module for construction project to be built soil geotechnical parameter value Block can utilize existing investigation result to be predicted assessment to the soil geotechnical parameter of non-investigation region.System realizes investigation result Effective integration management, fully excavated the use value of existing investigation result, can serve as urban planning, prospecting, construction Etc. unit and department, there are significant economic results in society.
Brief description of the drawings
Attached drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention;
Fig. 1 is that database mainly forms block schematic illustration in the application;
Fig. 2 is Geotechnical Engineering Investigation Data management and assessment generalized information system module and functional schematic in the application;
Fig. 3 is Area of Chengdu City Geotechnical Engineering Investigation Data storehouse schematic diagram in the application;
Fig. 4 is the Area of Chengdu City exploratory spot distribution schematic diagram of acceptance system in the application;
Fig. 5 is in the second bottom bearing eigenvalue of foundation soil cloud atlas of interpolative prediction module estimation in the application.
Embodiment
The present invention provides a kind of Geotechnical Engineering Investigation Data management and assessment generalized information system, solves existing under tale quale The defects of investigation result disperses, is mixed and disorderly, realize the integrated management to engineering investigation achievement and utilization, fully excavated and reconnoitred The potential value of achievement, provides important reference frame for urban planning, prospecting, construction, has significant economic results in society Technique effect.
It is to better understand the objects, features and advantages of the present invention, below in conjunction with the accompanying drawings and specific real Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting mutually, the application's Feature in embodiment and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also Implemented with the other modes in the range of being different from being described herein using other, therefore, protection scope of the present invention and under The limitation of specific embodiment disclosed in face.
This invention is established on the basis of the existing ground geotechnical engineering investigation data in a certain area is systematically collected, structure Engineering investigation GIS database is built, prospecting data is managed collectively based on database and processing and utilization.Its flow is roughly divided into Following steps:1. systematic collection reconnoitres data;2. data prediction;3. build engineering investigation GIS database;4. data pipe Reason and utilization.
1. systematic collection reconnoitres data
For a certain given area:The survey in each place is generally completed by different surveying unit, place prospecting Data is scattered in these units, therefore firstly the need of the prospecting data of comprehensive collection engineering ground, data source in surveying unit, Related authorities, the document published and report etc..
2. data prediction
The inevitable Shortcomings of prospecting data tentatively collected, such as shortage of data, mistake, structure confusion.Therefore must be right The data being collected into is pre-processed.The main mesh of data prediction is " de-redundant ", " mend residual ", " error correction "." de-redundant " removes Unnecessary information and the information for only retaining key." mending residual " refers to the information of completion missing, such as most exploration reports will not inform Reconnoitre the geographical coordinate of point, it is therefore desirable to try to fill the coordinate value for reconnoitring point position." error correction ":For various reasons, reconnoitre Data inevitably can there are some mistakes, it is therefore necessary to which this partial information is corrected.
3. build engineering investigation GIS database;
Enter the stage of engineering investigation GIS database construction after the work of Data Collection and pretreatment is completed, with ArcGIS comes tissue, expression geodata as storehouse platform is built, with Geodatabase data models.
Fig. 1 is shown in database structure design, is logically divided into fundamental geological according to data use and technicality and geology, engineering are surveyed Examine two major class of data.Geo-spatial data includes Administrative boundaries, traffic, building and remote sensing image etc., and basic geology includes landform Landforms (the predominantly data such as gradient of DEM and its derivation), layer soil body, water system etc..Geotechnical Engineering Investigation Data is deposited in database The critical data of storage, in addition to the information such as prospecting point position, coordinate and project profile, has also included each engineering investigation point ground ground The mechanics index of physics parameter of body, mainly includes foundation soil in-situ test data, three Phase Proportion indexs, clay physical state and refers to Mark, intensity and deformation index etc..Foundation soil in-situ test data mainly include SPT blow count, dynamic sounding and plate It can be directly used for calculating bearing eigenvalue of foundation soil, evaluation non-sticky ground soil compactness etc. Deng, this kind of data;Soil be it is solid, Liquid, the parameter such as gas three-phase comprehensive body, soil body severe, specific gravity of soil partical, moisture content and void ratio have reacted solid, liquid, gas three-phase in soil The ratio respectively accounted for;Clay plastic limit, liquid in the different state such as semisolid, plastic, database with its water content difference Limit, plasticity index etc. describe the physical state of cohesive soil.Intensity and deformation index have reacted intensity and the deformation spy of foundation soil Property, including the cohesive force of foundation soil, internal friction angle and compression modulus etc..
(4) function of Geotechnical Engineering Investigation Data management and assessment generalized information system
Database based on exploitation, system realize the functions such as data management, inquiry and parameter prediction by disparate modules.Please With reference to figure 2, main modular includes:1. data inputting module;2. map view module;3. parameter analogy module;4. interpolative prediction Module;4. thematic mapping and print module.
1. data inputting module:Online data is supported to directly enter or by extended formatting (such as .xls .txt .dbf) Swap file batch imports;Tested using the data validity rule of setting to the validity of data, such as by a certain ginseng Several reasonable values is set in certain scope, and system will be prompted to mistake when logging data exceedes this scope, so as to avoid people For the factors such as operation shine into abnormal or even wrong data typing.
2. map view module:Map view module is used for realization the function of browse of map, support map scaling, translate with And the function such as hawkeye, using prospecting point geographical coordinate by its in the form of a key element include on map, and with Administrative boundaries, The data investigations such as DEM (digital elevation model), stratum, river, browse map.
3. parameter analogy module:As it was previously stated, " analogy method " is assessment construction project to be built rock in ground and Geological Engineering field The important method of Soil Parameters, this method refer to the engineering with similar geologic setting, similar Size estimation to determine this work The size of ground Rock And Soil parameter value in journey, parameter analogy module are exactly to realize this function and develop.The module base In the principle of data fuzzy query, according to keyword input by user, module is scanned for and returned to the data in database Engineering comprising keyword and its soil geotechnical parameter information, refer to for the construction project to be built with similar geologic setting and scale.
4. interpolative prediction module:This is one of innovative point of this invention.To the units such as urban construction, planning and department Speech, they weigh which place can build what what, which place cannot build it should be understood that the overall geological condition in city, On the premise of no exact prospecting data, the geology ground situation of target area how is understoodWith regard to certain area (such as some City) for, existing engineering investigation is carried out in locality, and " the sesame just as being scattered on region is selected in these prospectings Point ", interpolative prediction module are based on kriging method (Kriging method) using the investigation result included in database to not The Geotechnical Parameter in prospecting area is predicted assessment.Kriging technique has considered regionalized variable using poor varying function as instrument Structural and randomness the characteristics of, have the characteristics that precision of prediction is high, its practical value is in the geology such as mineral exploration field It is confirmed.Common Kriging model (OK models), general Kriging model (UK models) and association gram built in interpolative prediction module In golden model (CK models), most suitably used Kriging model is selected to unknown according to the specific feature of sample data in interpolative prediction Region Geotechnical Parameter is predicted assessment.
4. thematic mapping and print module:The module realizes the function that map appearance, special topic make and print out.
With example:
Integrated management and utilization of the system Successful utilization in Area of Chengdu City Geotechnical Engineering Investigation Data, acceptance system Chengdu The physical mechanics parameter of rock and soil of base in detail (Fig. 3) of 54 engineering investigation points in area.
Chengdu is seated the southeastern edge of Ming River alluvial-proluvial fan, and urban district east is third terrace, and Midwest is Ming River one Level terrace and second-order terrace, landform are relatively flat.By the distributing position (Fig. 4) of each prospecting point it can be found that in the range of second bottom Exploratory spot it is more, be evaluated as target as example selection second bottom bearing eigenvalue of foundation soil, with second bottom Some prospecting points are predicted the bearing eigenvalue of foundation soil of non-investigation region using interpolative prediction module as seed point Assessment, the result is shown in Fig. 5.It can be found that the characteristic load bearing capacity of target area south and northwestern foundation soil is higher, generally About 400-520kpa, and the characteristic load bearing capacity of middle part and east is slightly smaller, generally about 270-320Kpa.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make these embodiments other change and modification.So appended claims be intended to be construed to include it is excellent Select embodiment and fall into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (7)

1. a kind of Geotechnical Engineering Investigation Data management and assessment generalized information system, it is characterised in that the system comprises:
Collector unit, for collecting the existing ground geotechnical engineering investigation data in somewhere;
Unit is established, for the data collected based on collector unit, establishes database;
Geotechnical Engineering Investigation Data management and assessment generalized information system, for based on database data, being managed, inquiring about to data, analogy Soil geotechnical parameter, prediction soil geotechnical parameter.
2. Geotechnical Engineering Investigation Data management according to claim 1 and assessment generalized information system, it is characterised in that the engineering is surveyed Examine data management and assessment generalized information system is additionally operable to ornamenting map, makes special topic, printout.
3. Geotechnical Engineering Investigation Data management according to claim 1 and assessment generalized information system, it is characterised in that described to collect list Member is additionally operable to pre-process the data of collection, including:Remove unnecessary information only retain key information, completion missing Information, correct error message.
4. Geotechnical Engineering Investigation Data management according to claim 1 and assessment generalized information system, it is characterised in that made with ArcGIS To establish database platform, tissue, expression geodata are come with Geodatabase data models.
5. Geotechnical Engineering Investigation Data management according to claim 1 and assessment generalized information system, it is characterised in that in database Data are divided into:Fundamental geological and geology, two major class of engineering investigation point data;Geo-spatial data includes:Administrative boundaries data, hand over Logical data, building data, remote sensing image data;Basic geological data includes:Topography and geomorphology data, layer soil body data, water system Data;Engineering investigation point data includes:Project profile data, in-situ test data, three Phase Proportion achievement datas, clay physics shape State achievement data, intensity and deformation achievement data.
6. Geotechnical Engineering Investigation Data management according to claim 5 and assessment generalized information system, it is characterised in that project profile number According to including:Position coordinate data, engineering type data, ground geotechnical data;In-situ test data include:Mark pass through test data, Dynamic sounding data, load test data;Three Phase Proportion achievement datas include:It is soil body severe data, specific gravity of soil partical data, aqueous Rate data, void ratio data;Clay physical state achievement data includes:Plastic limit liquid limit data, plasticity index data, liquidity index Data;Intensity and deformation index data packet include:Cohesion force data, internal friction angle data, compression modulus data.
7. Geotechnical Engineering Investigation Data management according to claim 1 and assessment generalized information system, it is characterised in that engineering investigation number Specifically included according to managing and assessing generalized information system:
Data inputting module, data are imported by online input system database or by swap file batch, and are utilized default Data validity rule has responsiveness to test to data;
Map view module, is used for realization the function of browse of map, supports map scaling, translation;Utilize geographical the sitting of prospecting point It is included being superimposed on map, and with Administrative boundaries, DEM, stratum, River Data by mark in the form of a key element, to map into Row browses;
Parameter analogy module, for according to keyword input by user, scanning for and returning to include to the data in database The engineering and its soil geotechnical parameter information of keyword, refer to for the construction project to be built with similar geologic setting and scale;
Interpolative prediction module, for based on kriging method using the investigation result included in database to do not reconnoitre area rock Native parameter is predicted assessment;Common Kriging model, general Kriging model and synergism Kriging method mould built in interpolative prediction module Type, in interpolative prediction according to the specific feature of sample data select most suitably used Kriging model to zone of ignorance Geotechnical Parameter into Row forecast assessment;
Thematic mapping and print module, are used for realization map appearance, special topic makes and print output function.
CN201711130347.8A 2017-11-15 2017-11-15 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system Pending CN107909271A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711130347.8A CN107909271A (en) 2017-11-15 2017-11-15 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711130347.8A CN107909271A (en) 2017-11-15 2017-11-15 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system

Publications (1)

Publication Number Publication Date
CN107909271A true CN107909271A (en) 2018-04-13

Family

ID=61844221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711130347.8A Pending CN107909271A (en) 2017-11-15 2017-11-15 A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system

Country Status (1)

Country Link
CN (1) CN107909271A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977485A (en) * 2019-03-05 2019-07-05 重庆市地质矿产测试中心 Rock and soil material parameter unified analysis management system
CN110807023A (en) * 2019-11-08 2020-02-18 山东电力工程咨询院有限公司 Survey management and data intelligent analysis system and method based on GIS
CN111221930A (en) * 2019-11-20 2020-06-02 张拥军 Ground texture data application platform for urban planning and construction
CN111460061A (en) * 2020-03-05 2020-07-28 中国地质大学(武汉) Database management system for solid core data
CN111612405A (en) * 2019-02-25 2020-09-01 山东电力工程咨询院有限公司 Rock and soil dynamic information processing system and method based on cloud GIS platform
CN112116307A (en) * 2020-08-05 2020-12-22 佛山科学技术学院 Traceable engineering investigation data management method and system
CN115113228A (en) * 2022-05-09 2022-09-27 江苏省水利科学研究院 Polder reduction lake engineering test method based on geographic information technology
CN117252042A (en) * 2023-11-16 2023-12-19 成都建工第三建筑工程有限公司 Urban underground space comprehensive bearing capacity evaluation system and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366633A (en) * 2013-04-16 2013-10-23 中国水利水电科学研究院 Water conservation map data model-based flood risk map drawing method and system thereof
CN103810301A (en) * 2014-03-11 2014-05-21 中国建筑西南勘察设计研究院有限公司 Geological data processing method and device
CN104019813A (en) * 2014-06-19 2014-09-03 无锡知谷网络科技有限公司 Method and system of target immediate location and map establishing
CN104299270A (en) * 2014-09-30 2015-01-21 长江岩土工程总公司(武汉) Method for establishing three-dimensional geologic model based on database
CN105118091A (en) * 2015-08-26 2015-12-02 中国电建集团北京勘测设计研究院有限公司 Method and system for constructing multi-precision non-uniform geological grid curved surface model
CN106651609A (en) * 2016-09-27 2017-05-10 云南大学 Auxiliary information system and method of remote-sensing monitoring for mineral resource exploitation environment
CN106702995A (en) * 2016-12-27 2017-05-24 福建省建筑设计研究院 BIM-based building method of geotechnical engineering monitoring model
CN106779417A (en) * 2016-12-20 2017-05-31 黄河勘测规划设计有限公司 The collection of engineering investigation information digitalization, management and integrated application method
CN106844871A (en) * 2016-12-27 2017-06-13 福建省建筑设计研究院 Three-dimensional geotechnical engineering investigation information model construction method based on BIM

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366633A (en) * 2013-04-16 2013-10-23 中国水利水电科学研究院 Water conservation map data model-based flood risk map drawing method and system thereof
CN103810301A (en) * 2014-03-11 2014-05-21 中国建筑西南勘察设计研究院有限公司 Geological data processing method and device
CN104019813A (en) * 2014-06-19 2014-09-03 无锡知谷网络科技有限公司 Method and system of target immediate location and map establishing
CN104299270A (en) * 2014-09-30 2015-01-21 长江岩土工程总公司(武汉) Method for establishing three-dimensional geologic model based on database
CN105118091A (en) * 2015-08-26 2015-12-02 中国电建集团北京勘测设计研究院有限公司 Method and system for constructing multi-precision non-uniform geological grid curved surface model
CN106651609A (en) * 2016-09-27 2017-05-10 云南大学 Auxiliary information system and method of remote-sensing monitoring for mineral resource exploitation environment
CN106779417A (en) * 2016-12-20 2017-05-31 黄河勘测规划设计有限公司 The collection of engineering investigation information digitalization, management and integrated application method
CN106702995A (en) * 2016-12-27 2017-05-24 福建省建筑设计研究院 BIM-based building method of geotechnical engineering monitoring model
CN106844871A (en) * 2016-12-27 2017-06-13 福建省建筑设计研究院 Three-dimensional geotechnical engineering investigation information model construction method based on BIM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李剑: "GIS技术在岩土工程勘察中的应用", 《四川水泥》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111612405A (en) * 2019-02-25 2020-09-01 山东电力工程咨询院有限公司 Rock and soil dynamic information processing system and method based on cloud GIS platform
CN109977485A (en) * 2019-03-05 2019-07-05 重庆市地质矿产测试中心 Rock and soil material parameter unified analysis management system
CN110807023A (en) * 2019-11-08 2020-02-18 山东电力工程咨询院有限公司 Survey management and data intelligent analysis system and method based on GIS
CN111221930A (en) * 2019-11-20 2020-06-02 张拥军 Ground texture data application platform for urban planning and construction
CN111460061A (en) * 2020-03-05 2020-07-28 中国地质大学(武汉) Database management system for solid core data
CN112116307A (en) * 2020-08-05 2020-12-22 佛山科学技术学院 Traceable engineering investigation data management method and system
CN115113228A (en) * 2022-05-09 2022-09-27 江苏省水利科学研究院 Polder reduction lake engineering test method based on geographic information technology
CN115113228B (en) * 2022-05-09 2023-10-24 江苏省水利科学研究院 Method for detecting return-to-polder and lake engineering based on geographic information technology
CN117252042A (en) * 2023-11-16 2023-12-19 成都建工第三建筑工程有限公司 Urban underground space comprehensive bearing capacity evaluation system and method
CN117252042B (en) * 2023-11-16 2024-01-23 成都建工第三建筑工程有限公司 Urban underground space comprehensive bearing capacity evaluation system and method

Similar Documents

Publication Publication Date Title
CN107909271A (en) A kind of Geotechnical Engineering Investigation Data management and assessment generalized information system
Thornton et al. A 3D geological model of a structurally complex Alpine region as a basis for interdisciplinary research
Royse et al. Property attribution of 3D geological models in the Thames Gateway, London: new ways of visualising geoscientific information
Wang et al. Application of MODFLOW and geographic information system to groundwater flow simulation in North China Plain, China
Van der Meulen et al. 3D geology in a 2D country: perspectives for geological surveying in the Netherlands
Goodchild CHAPTER ONE Measurement-based GIS
CN110096565B (en) Multi-source data standardization processing method for integrated engineering geological achievement
Fuka et al. Improving the spatial representation of soil properties and hydrology using topographically derived initialization processes in the SWAT model
Dou et al. 3D geological suitability evaluation for urban underground space development–A case study of Qianjiang Newtown in Hangzhou, Eastern China
Mathers et al. GB 3D–a framework for the bedrock geology of Great Britain
Dodagoudar An integrated geotechnical database and GIS for 3D subsurface modelling: Application to Chennai City, India
Harris et al. Online beach profile management and analysis system (PMAS)
de Rienzo et al. 3D GIS supporting underground urbanisation in the city of Turin (Italy)
Allen et al. Data integration and standardization in cross-border hydrogeological studies: a novel approach to hydrostratigraphic model development
Cools et al. Large-scale GIS-based hydrogeological modeling of Flanders: a tool for groundwater management
Marache et al. Understanding subsurface geological and geotechnical complexity at various scales in urban soils using a 3D model
Lavine et al. Total station geologic mapping: an innovative approach to analyzing surface-faulting hazards
CN101515283A (en) Oil field geographical information system
Pagiatakis et al. Gravimetric geoid modelling with GIS
Cripps et al. Application Theme 4–Regulatory Support
Timinskas et al. How to prepare engineering data and graphic systems for smart country
Zhao Research on Basin Geomorphic Survey Based on Digital Geographic Information System Technology
Cete et al. Cadastre: The Key Component in Urban Based Information Systems
Çelik et al. Geodetic infrastructure of Turkey for GIS, GPS and remote sensing applications
Zdechlik et al. GIS AS A SUPPORTING TOOL FOR CONSTRUCTING GROUNDWATER FLOW MODELS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413