CN109947068A - A kind of field data acquisition system and method - Google Patents
A kind of field data acquisition system and method Download PDFInfo
- Publication number
- CN109947068A CN109947068A CN201910333493.3A CN201910333493A CN109947068A CN 109947068 A CN109947068 A CN 109947068A CN 201910333493 A CN201910333493 A CN 201910333493A CN 109947068 A CN109947068 A CN 109947068A
- Authority
- CN
- China
- Prior art keywords
- module
- field data
- photo
- project
- field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of field data acquisition systems, are related to Construction Technology field, edit and record module, photo acquisition module, single hole the system comprises drilling and apply for checking and examination module, graph generation module and data transmission module;Module is edited and recorded in the drilling, for obtaining the field data of prospecting project;The photo acquisition module, for obtaining the core photo of prospecting project;Single hole module of applying for checking and examination generates for being detected according to preset condition to the field data and shows testing result;The graph generation module, for being generated according to the field data and showing field operation graph;The data transmission module, for the field data and the core photo to be transmitted to server.The invention also discloses a kind of field data acquisition methods, are able to achieve the informationization of field data acquisition, can effectively improve the working efficiency and work quality of operation, accelerate project process.
Description
Technical field
The present invention relates to Construction Technology field more particularly to a kind of field data acquisition systems and method.
Background technique
With the needs of social development, engineering construction cause is constantly developing, in order to guarantee the smooth head of engineering construction
First need to carry out is exactly geotechnical engineering investigation.
Currently, the field data acquisition method of geotechnical engineering investigation project mainly relies on manual work to complete.Firstly,
Field operation technical staff using total station or RTK and compares papery version topographic map and drills at the scene according to arrangement of prospect hole figure
Construction layout;Then, simple classification is carried out to the core information that engineering driller field survey is taken according to professional knowledge, with artificial
Hand-written mode edits and records detailed description, in-situ test data, sample information and the level of ground water that core is recorded on paper in field
Equal bulk informations, meanwhile, photo archive is carried out to core using digital camera;Finally, the position coordinate of drilling is completed in acquisition
Information is simultaneously inserted field and is edited and recorded in paper.
Inventor has found in the practice of the invention, acquires in the field data of existing geotechnical engineering investigation project
In the process, since the content of field data is many and diverse and the level of informatization is low, using it is artificial it is hand-written by the way of edited and recorded, field operation skill
The great work intensity of art personnel, longevity of service needed for field data acquisition, meanwhile, it is easy to appear such as hole mistake or core
The data such as qualitative mistake edit and record the situation of mistake, cause the working efficiency of operation and work quality low, influence project process.
Summary of the invention
The embodiment of the present invention provides a kind of field data acquisition system and method, is able to achieve the information of field data acquisition
Change, the working efficiency and work quality of operation can be effectively improved, accelerates project process.
To achieve the above object, the embodiment of the invention provides a kind of field data acquisition systems, including drilling to edit and record mould
Block, photo acquisition module, single hole apply for checking and examination module, graph generation module and data transmission module;
Module is edited and recorded in the drilling, for obtaining the field data of prospecting project;
The photo acquisition module, for obtaining the core photo of prospecting project;
Single hole module of applying for checking and examination generates for being detected according to preset condition to the field data and shows inspection
Survey result;
The graph generation module, for being generated according to the field data and showing field operation graph;
The data transmission module, for the field data and the core photo to be transmitted to server.
As an improvement of the above scheme, it includes the first display sub-module and data acquisition submodule that module is edited and recorded in the drilling
Block;
First display sub-module, for showing that table is edited and recorded in probing;
The data acquisition submodule, customized input area and standardization selection area for editing and recording table from the probing are obtained
Take the field data.
As an improvement of the above scheme, the photo acquisition module is obtained including the first photo acquisition submodule, photographic intelligence
Take submodule and the second photo acquisition submodule;
The first photo acquisition submodule, the core photo for being shot to core, before being numbered;
The photographic intelligence acquisition submodule, for obtaining the corresponding project information of core photo before the number and brill
Hole number;
The second photo acquisition submodule, for being numbered according to the project information and the drilling, to the number
Preceding core photo is numbered, the core photo after being numbered, using as the core photo.
As an improvement of the above scheme, the data transmission module is also used to obtain real-time position information.
As an improvement of the above scheme, the system also includes data inquiry modules;
The data inquiry module for obtaining the bore position of prospecting project, and shows the brill on the electronic map
Region in hole site and its preset range.
As an improvement of the above scheme, the system also includes user management modules and user log-in block;
The user management module, for managing the registration and unregistration of user account;Be also used to the user account into
The distribution of row permission;
The user log-in block is verified for obtaining the log-on message of user, and to the log-on message.
As an improvement of the above scheme, the system also includes project management modules;
The project management module, for obtaining the authority information of listed user account, when the user account
When authority information meets preset authority information, editor's information in standardization selection area is obtained, and believe according to the editor
Breath edits standardization selection area.
The embodiment of the invention also provides a kind of field data acquisition methods, are applied to described in any item field operation numbers as above
According to acquisition system, comprising steps of
The field data of module acquisition prospecting project is edited and recorded by drilling;
The core photo of prospecting project is obtained by photo acquisition module;
According to preset condition the field data is detected by single hole module of applying for checking and examination, generates and show detection knot
Fruit;
It is generated by graph generation module according to the field data and shows field operation graph;
The field data and the core photo are transmitted to server by data transmission module.
Compared with prior art, a kind of field data acquisition system and method disclosed by the invention edit and record mould by drilling
The field data of block acquisition prospecting project;The core photo of prospecting project is obtained by photo acquisition module;It is applied for checking and examination by single hole
Module detects the field data according to preset condition, generates and shows testing result;Pass through graph generation module root
It is generated according to the field data and shows field operation graph;By data transmission module by the field data and the core photo
It is transmitted to server, manually hand-written mode is avoided to carry out field data acquisition, work needed for reducing field data acquisition
Make the working strength of time and field operation technical staff, and collected field data can be detected according to preset condition, generates inspection
Result is surveyed so that field operation technical staff has found the mistake of data in time, can also intuitively be shown by the field operation graph of generation
The geological condition in place out, to realize the informationization of field data acquisition, is improved with assisting field operation technical staff to carry out operation
The working efficiency and work quality of operation accelerate project process.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for field data acquisition system that one embodiment of the invention provides.
Fig. 2 is a kind of structural schematic diagram for field data acquisition system that one embodiment of the invention provides.
Fig. 3 is that expression intention is edited and recorded in the probing that one embodiment of the invention provides.
Fig. 4 is a kind of flow diagram for field data acquisition method that one embodiment of the invention provides.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It is a kind of structural schematic diagram for field data acquisition system that one embodiment of the invention provides referring to Fig. 1.The system
100 include that drilling edits and records module 110, photo acquisition module 120, single hole and applies for checking and examination module 130, graph generation module 140 and data
Transmission module 150.
It should be noted that the field data acquisition system 100 is mainly in a manner of " internet+prospecting ", using B/S
The mode that (browser/server) and C/S (client/server) are combined realizes the real-time Transmission of field data acquisition, together
When support browser access service and mobile client access service, main modular include drilling edit and record module 110, photo acquisition
Module 120, single hole apply for checking and examination module 130, graph generation module 140 and data transmission module 150.The system 100, which can be, adopts
It is developed with JAVA platform, runs on the tool such as Android 4.4 and the above version or mobile phone, the tablet computer of other versions
There is the Intelligent mobile equipment of image collecting function.
Module 110 is edited and recorded in the drilling, for obtaining the field data of prospecting project.
It should be noted that uploading in advance in this system 100 has prospecting so that the running equipment of the system is mobile phone as an example
The information such as the project information of project, drilling number and exploratory spot, when needing to carry out when editing and recording of field data, field operation technical staff
By clicking the exploratory spot oneself got, that is, it can trigger drilling and edit and record module 110, and prospecting is inputted by the touch screen of mobile phone
The field data of project, drilling are edited and recorded the field data that module 110 obtains prospecting project by touch screen, are thoroughly changed existing
Geotechnical engineering investigation field operation is realized that field data electronization, intelligence are edited and recorded, is avoided by the operating mode of hand-written record data
Manually hand-written mode carries out field data acquisition, working time and field operation technology people needed for reducing field data acquisition
The working strength of member accelerates project process to improve the working efficiency and work quality of operation.Wherein, the field data
Including but not limited to drill hierarchical information, in-situ test information and sample intelligence.
The photo acquisition module 120, for obtaining the core photo of prospecting project.
It should be noted that field operation technical staff triggers photo acquisition module when needing to carry out the photo acquisition of core
120, and shooting instruction is issued by the touch screen of mobile phone and passes through mobile phone after photo acquisition module 120 receives shooting instruction
Camera is shot, and to obtain the core photo of prospecting project, is uniformly uploaded to server for subsequent, solves existing
Lead to subsequent the problem of needing manual copy photo to computer for subsequent processing because core photo acquires equipment disunity, reduces
The work that later period basic data arranges accelerates project process to improve the working efficiency and work quality of operation.
Single hole module 130 of applying for checking and examination is generated and is shown for being detected according to preset condition to the field data
Testing result.
It should be noted that after the completion of edit and record, field operation technical staff can be applied for checking and examination 130 pairs of drillings volumes of module by single hole
The field data that gets of record module 110 is detected, and generates and show testing result, and single hole applies for checking and examination the default item of module 130
Part can be set according to code requirement, and the preset condition can be the depth selection and rock-soil layer judged in field data
Depth of seam division whether contradiction, can also be judge mark pass through depth and rock-soil layer depth of seam division whether contradiction or other judge item
Part, can also be the multinomial combination of above-mentioned Rule of judgment, is selected according to the actual situation in practical applications, not influence this
Advantageous effect of the invention.By taking the preset condition is to judge whether depth selection contradicts with rock-soil layer depth of seam division as an example, when
Single hole applies for checking and examination module 130 when detecting that depth selection is contradicted with rock-soil layer depth of seam division, and generation error is reminded and in mobile phone
Screen display is touched, so that field operation technical staff has found the mistake of field data in time and corrects, to improve operation
Working efficiency and work quality accelerate project process.
The graph generation module 140, for being generated according to the field data and showing field operation graph.
It should be noted that field operation technical staff can also trigger graph generation module 140, graph after the completion of editing and recording
Generation module 140 is any in background data base to being stored in by the data analysis of the intelligent slidings moved ends such as mobile phone and statistical function
The field data of drilling is handled, generating such as log sheet and Hole cross-section plotting field operation graph and be shown in mobile phone
On touch screen, field operation technical staff can carry out STRATIGRAPHIC DIVISION, to send out in time by checking the field operation graph of generation at the scene
The presence of existing special soil layer or interlayer, is rationally sampled, intuitively shows the geological condition in place, solve it is existing because
Papery edits and records method and can not carry out processing to the field data for having edited and recorded completion in time and generate the information such as histogram, causes outer
Industry technical staff relies on merely papery to edit and record achievement and is difficult to be distributed to form visual understanding and be easy to make to the rock-soil layer at prospecting scene
The problem of mistake is qualitatively judged at rock-soil layer, to improve the working efficiency and work quality of operation, accelerates project process.Its
In, the field operation graph includes but is not limited to log sheet and Hole cross-section plotting.
The data transmission module 150, for the field data and the core photo to be transmitted to server.
It, can will be completed by data transmission module 150 it should be noted that after the completion of field operation technical staff's self-test
The field data and core photo of drilling are saved in directly uploading or carry out to upload onto the server after data encryption processing,
Realize that the electronization of field operation survey data saves, data general-purpose is high, also saves subsequent data processing personnel to field operation
The repetition Input Process of data saves labour, and auditor can also check the data of upload, sends out in time
Now edit and record the mistake of middle appearance, it is desirable that field operation technical staff modifies immediately at the scene, checks by self-test and auditor
Later, the borehole data in uploading onto the server can not be modified, and will be saved under corresponding prospecting project directory,
In, the server can be included in prospecting project management system.
A kind of field data acquisition system provided by the embodiment of the present invention 1 edits and records module by drilling and obtains prospecting item
Purpose field data;The core photo of prospecting project is obtained by photo acquisition module;Module is applied for checking and examination according to default by single hole
Condition detects the field data, generates and shows testing result;By graph generation module according to the field operation number
According to generating and show field operation graph;The field data and the core photo are transmitted to service by data transmission module
Device avoids manually hand-written mode from carrying out field data acquisition, working time needed for reducing field data acquisition and outer
The working strength of industry technical staff, and collected field data can be detected according to preset condition, generate testing result so that
Field operation technical staff has found the mistake of data in time, can also intuitively show the ground in place by the field operation graph of generation
Matter situation, to realize the informationization of field data acquisition, improves the work of operation to assist field operation technical staff to carry out operation
Efficiency and work quality accelerate project process.
In a preferred embodiment, the photo acquisition module is obtained including the first photo acquisition submodule, photographic intelligence
Take submodule and the second photo acquisition submodule;
The first photo acquisition submodule, the core photo for being shot to core, before being numbered;
The photographic intelligence acquisition submodule, for obtaining the corresponding project information of core photo before the number and brill
Hole number;
The second photo acquisition submodule, for being numbered according to the project information and the drilling, to the number
Preceding core photo is numbered, the core photo after being numbered, using as the core photo.
Specifically, field operation technical staff triggers photo acquisition module, and passes through when needing to carry out the photo acquisition of core
The touch screen of mobile phone issues shooting instruction, after the first photo acquisition submodule of photo acquisition module receives shooting instruction, leads to
The camera for crossing mobile phone is shot, to obtain the core photo before number;Photo acquisition module gets the core before number
After photo, the corresponding project information of core photo and drilling number when photographic intelligence acquisition submodule obtains shooting automatically;Second
Photo acquisition submodule is numbered according to the project information and the drilling in turn, is compiled to the core photo before the number
Number, the core photo after number is obtained and saved, to be uniformly uploaded to server as the core photo for subsequent, is solved
It is existing because core photo acquires equipment disunity cause it is subsequent need after manual copy photo to computer to core photo by
The problem of being classified and renamed according to drilling number, reduce the work of later period basic data arrangement, to further mention
The high working efficiency and work quality of operation, accelerates project process
In a further advantageous embodiment, the data transmission module is also used to obtain real-time position information.
Specifically, auditor can trigger data transmission module at any time, to obtain any field operation technology by GPS technology
The real-time position information of personnel, to carry out positioning supervision to field operation technical staff, it is ensured that be located at when field operation technical staff edits and records existing
, so that the accuracy and authenticity of content are edited and recorded in guarantee, to further improve the work quality of operation.
In another preferred embodiment, the system also includes data inquiry modules;
The data inquiry module for obtaining the bore position of prospecting project, and shows the brill on the electronic map
Region in hole site and its preset range.
Specifically, field operation technical staff can pass through number for after drill hole information import system after cloth hole scheme determines
The drill hole information that prospecting project is obtained according to enquiry module, and docks existing commercial electronic map port, is drilled position by GPS positioning
It sets, and checks the satellite image map at scene, consult bore position whenever and wherever possible to realize, it is no longer necessary to the hand-held large scale in scene
Papery topographic map, and the condition of operation field can be understood in advance, with complete in time coordination to place it is smooth and
The cleaning of site obstructions, the case where being likely to occur in advance to work-yard, make reply and arrangement, solve in the prior art
Because the drilling plane location drawing is largely traditional papery figure, lack remote sensing image as reference, cannot visual and clear ground it is anti-
Reflect the condition of work-yard, caused by only when technical staff to all drilled hole point completion setting-out after could accurately know
The specific works range and bore position at road scene, if scene need to carry out place coordination in advance or carry out barrier (such as seedling
Garden trees, place out-of-flatness etc.) processing when, then need etc. that further work could be carried out after completions drilling setting-out, efficiency is lower
And the problem of influencing job schedule, the working efficiency of operation is further increased, project process is accelerated.
It referring to fig. 2, is a kind of structural schematic diagram for field data acquisition system that one embodiment of the invention provides.The brill
It includes the first display sub-module 111 and data acquisition submodule 112 that module 110 is edited and recorded in hole;
First display sub-module 111, for showing that table is edited and recorded in probing;
The data acquisition submodule 112, for editing and recording customized input area and the standardization selection of table from the probing
Area obtains the field data.
Specifically, presetting field in the first display sub-module 111 edits and records table, the field edit and record in table according to country,
Local regulation and standard setting have in stratigraphic description, in-situ test data, sampled data, waterlevel data and repetition measurement coordinate data etc.
Hold, which, which edits and records table, can be the table that by the table (a) as shown in Fig. 3 (a) and the table (b) as shown in Fig. 3 (b) forms,
It can be according to the table (a) as shown in Fig. 3 (a) and the corresponding of the design of the table (b) as shown in Fig. 3 (b) be electronically entered table,
Standardization selection area is divided into the input that table is edited and recorded in the probing and customized input area, customized input area are made by oneself for staff
Standardization selection the area's preset coordinate information, the detailed description of rock-soil layer, in-situ test number of table are edited and recorded in justice input information, the probing
According to data frames such as, sample information and levels of ground water so that technical staff carries out the module of stratigraphic description information in intelligent sliding moved end
Change clicks, which edits and records the most contents in table can be according to the project templet Auto-matching that project leader uploads in advance more
Newly into corresponding stratigraphic description information, clicked so that field operation technical staff carries out drop-down menu, meanwhile, field operation technical staff
Can also the description of customized addition special formation, that is, ensure that the standard and specification for editing and recording content, also facilitate field operation technology people
The operation of member.By taking the running equipment of the system is mobile phone as an example, when needing to carry out when editing and recording of field data, field operation technology people
Module 110 is edited and recorded in member's triggering drilling, and the first display sub-module 111 that module 110 is edited and recorded in drilling shows pre-designed field
Table is edited and recorded, field operation technical staff inputs self-defining data in the customized input area that table is edited and recorded in probing by the touch screen of mobile phone,
Stratigraphic description information is clicked to input standardized content in standardization selection area, and data acquisition submodule 112 is obtained by touch screen
The self-defining data and the standardized content are taken, using the field data as prospecting project, stratigraphic description available for download
Template has unified the stratigraphic description of same project, so that field operation edits and records more standardized, standardization, while avoiding manually hand-written
Mode carry out field data acquisition, solve in the prior art because it is hand-written edit and record rely primarily on technical staff at the scene according to
The core that people's experience takes drilling machine carries out qualitative and hierarchical description, caused by usually occur due to the gap of personal experience
The different descriptions of same rock stratum in Same Site, during later period data processing, surveyor needs to edit and record field
Paper carries out taxonomic revision, and unified hierarchical description then just can be carried out the drafting of the graphs such as log sheet, sectional view, cause weight
The work of the problem of returning to work work, influencing efficiency, working time and field operation technical staff needed for reducing field data acquisition is strong
Degree, to further improve the working efficiency and work quality of operation, accelerates project process.
Preferably, the system also includes user management modules and user log-in block;
The user management module, for managing the registration and unregistration of user account;Be also used to the user account into
The distribution of row permission;
The user log-in block is verified for obtaining the log-on message of user, and to the log-on message.
Specifically, back-end data administrative staff can register new user account by user management module, nullify existing
User account, and to existing user account carry out permission distribution.After prospecting is approved and initiate a project, back-end data administrator
Member can will distribute permission, different permissions, workable function according to user account of project personnel's setting to technical staff
Also different, for example, project leader can possess the highest permission of prospecting project, it can upload and modify in systems Project Technical
The information such as outline, stratigraphic description template, and field operation technical staff then only possesses use and acquires relevant function to field data
Permission.User needs to carry out the login of user account by user log-in block input log-on message when using this system,
User log-in block verifies the log-on message of user account, to complete the login of user account.
Preferably, the system also includes project management modules;
The project management module, for obtaining the authority information of listed user account, when the user account
When authority information meets preset authority information, editor's information in standardization selection area is obtained, and believe according to the editor
Breath edits standardization selection area.
It should be noted that when project leader needs to upload and modify Project Technical outline in the present system, stratum is retouched
When stating the information such as template, after project leader logs in its user account, is obtained and detected listed by project management module
The authority information of user account, when the authority information of the user account is prescribed a time limit for highest weight, the touching that project leader passes through mobile phone
It touches screen and inputs the content for needing to select area to be edited standardization so that as editor's information, project management module passes through touch screen
Editor's information is obtained, and is edited according to related content of editor's information to standardization selection area, with the standardization that timely updates
The content for selecting area, ensure that the standard and specification for editing and recording content.
A kind of field data acquisition system provided by the embodiment of the present invention 2 is compiled by data acquisition submodule from probing
The customized input area and standardization selection area for recording table obtain field data, reduce the input quantity of self-defining data, make simultaneously
The input content of petrographic description project standardizes, and reduce does not cause the later period to need to re-start data because catalog data meets specification
The appearance of the case where arrangement accelerates project process to further improve the working efficiency and work quality of operation.
It is to be appreciated that above-described embodiment can in any combination, to constitute more preferred embodiment.
It referring to fig. 4, is a kind of flow diagram for field data acquisition method that one embodiment of the invention provides.The side
Method is applied to field data acquisition system described in any embodiment as above, comprising steps of
S1, the field data that module acquisition prospecting project is edited and recorded by drilling;
S2, the core photo that prospecting project is obtained by photo acquisition module;
S3, module of being applied for checking and examination by single hole detect the field data according to preset condition, generate and show detection
As a result;
S4, it is generated by graph generation module according to the field data and shows field operation graph;
S5, the field data and the core photo are transmitted to by server by data transmission module.
A kind of field data acquisition method provided by the embodiment of the present invention 3 edits and records module by drilling and obtains prospecting item
Purpose field data;The core photo of prospecting project is obtained by photo acquisition module;Module is applied for checking and examination according to default by single hole
Condition detects the field data, generates and shows testing result;By graph generation module according to the field operation number
According to generating and show field operation graph;The field data and the core photo are transmitted to service by data transmission module
Device avoids manually hand-written mode from carrying out field data acquisition, working time needed for reducing field data acquisition and outer
The working strength of industry technical staff, and collected field data can be detected according to preset condition, generate testing result so that
Field operation technical staff has found the mistake of data in time, can also intuitively show the ground in place by the field operation graph of generation
Matter situation, to realize the informationization of field data acquisition, improves the work of operation to assist field operation technical staff to carry out operation
Efficiency and work quality accelerate project process.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as
Protection scope of the present invention.
Claims (8)
1. a kind of field data acquisition system, which is characterized in that edit and record module, photo acquisition module, single hole including drilling and apply for checking and examination
Module, graph generation module and data transmission module;
Module is edited and recorded in the drilling, for obtaining the field data of prospecting project;
The photo acquisition module, for obtaining the core photo of prospecting project;
The single hole applies for checking and examination module, for being detected according to preset condition to the field data, generating and showing detection knot
Fruit;
The graph generation module, for being generated according to the field data and showing field operation graph;
The data transmission module, for the field data and the core photo to be transmitted to server.
2. field data acquisition system as described in claim 1, which is characterized in that it includes first aobvious that module is edited and recorded in the drilling
Show submodule and data acquisition submodule;
First display sub-module, for showing that table is edited and recorded in probing;
The data acquisition submodule, customized input area and standardization selection area for editing and recording table from the probing obtain institute
State field data.
3. field data acquisition system as described in claim 1, which is characterized in that the photo acquisition module includes the first photograph
Piece acquisition submodule, photographic intelligence acquisition submodule and the second photo acquisition submodule;
The first photo acquisition submodule, the core photo for being shot to core, before being numbered;
The photographic intelligence acquisition submodule is compiled for obtaining the corresponding project information of core photo before the number and drilling
Number;
The second photo acquisition submodule, for being numbered according to the project information and the drilling, before the number
Core photo is numbered, the core photo after being numbered, using as the core photo.
4. field data acquisition system as described in claim 1, which is characterized in that the data transmission module is also used to obtain
Real-time position information.
5. field data acquisition system as described in claim 1, which is characterized in that the system also includes data query moulds
Block;
The data inquiry module for obtaining the bore position of prospecting project, and shows the drilling position on the electronic map
Set and its preset range in region.
6. field data acquisition system as claimed in claim 2, which is characterized in that the system also includes user management modules
And user log-in block;
The user management module, for managing the registration and unregistration of user account;It is also used to weigh the user account
The distribution of limit;
The user log-in block is verified for obtaining the log-on message of user, and to the log-on message.
7. field data acquisition system as claimed in claim 6, which is characterized in that the system also includes project management moulds
Block;
The project management module, for obtaining the authority information of listed user account, when the permission of the user account
When information meets preset authority information, editor's information in standardization selection area is obtained, and according to editor's information pair
Standardization selection area is edited.
8. a kind of field data acquisition method is applied to field data acquisition system as described in any one of claim 1 to 7,
Characterized in that it comprises the following steps:
The field data of module acquisition prospecting project is edited and recorded by drilling;
The core photo of prospecting project is obtained by photo acquisition module;
According to preset condition the field data is detected by single hole module of applying for checking and examination, generates and show testing result;
It is generated by graph generation module according to the field data and shows field operation graph;
The field data and the core photo are transmitted to server by data transmission module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910333493.3A CN109947068A (en) | 2019-04-24 | 2019-04-24 | A kind of field data acquisition system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910333493.3A CN109947068A (en) | 2019-04-24 | 2019-04-24 | A kind of field data acquisition system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109947068A true CN109947068A (en) | 2019-06-28 |
Family
ID=67016068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910333493.3A Pending CN109947068A (en) | 2019-04-24 | 2019-04-24 | A kind of field data acquisition system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109947068A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110795578A (en) * | 2019-10-14 | 2020-02-14 | 中铁第四勘察设计院集团有限公司 | Core photo auditing method and device, equipment and storage medium |
CN110807023A (en) * | 2019-11-08 | 2020-02-18 | 山东电力工程咨询院有限公司 | Survey management and data intelligent analysis system and method based on GIS |
CN111159862A (en) * | 2019-12-17 | 2020-05-15 | 核工业二四三大队 | Electronic design and compiling method for uranium ore drilling design instruction |
CN112651476A (en) * | 2020-12-22 | 2021-04-13 | 山东省交通规划设计院有限公司 | Auxiliary device and method for logging drilling core |
CN112649429A (en) * | 2020-12-22 | 2021-04-13 | 山东省交通规划设计院有限公司 | Core shooting and recording device and method for industrial exploration drilling site |
CN112730806A (en) * | 2020-12-22 | 2021-04-30 | 山东省交通规划设计院有限公司 | Liquidity index detection device and method based on rock core penetration |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129701A (en) * | 2011-05-03 | 2011-07-20 | 广东省电力设计研究院 | Method and system for processing core photo |
CN102567526A (en) * | 2011-12-29 | 2012-07-11 | 国核电力规划设计研究院 | Method and system used for collecting and processing drilling information of geotechnical engineering |
CN103412967A (en) * | 2013-08-06 | 2013-11-27 | 长江岩土工程总公司(武汉) | Geologic field information collection system, geologic field information collection method and application method of collection system |
CN103810333A (en) * | 2014-01-27 | 2014-05-21 | 长江三峡勘测研究院有限公司(武汉) | Engineering geology informatization work system |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105160708A (en) * | 2015-08-26 | 2015-12-16 | 中国电建集团北京勘测设计研究院有限公司 | Information system for integration of indoor work and field work in engineering geology |
CN105930972A (en) * | 2016-04-22 | 2016-09-07 | 北京航天勘察设计研究院有限公司 | Geotechnical engineering investigation field data acquisition system |
CN106779417A (en) * | 2016-12-20 | 2017-05-31 | 黄河勘测规划设计有限公司 | The collection of engineering investigation information digitalization, management and integrated application method |
CN107341605A (en) * | 2017-07-03 | 2017-11-10 | 中冶集团武汉勘察研究院有限公司 | One kind prospecting field operation informationization monitoring and managing method and system |
CN207234758U (en) * | 2017-10-18 | 2018-04-13 | 西安科技大学 | A kind of hand-held Geological data collecting instrument |
CN107948298A (en) * | 2017-12-04 | 2018-04-20 | 深圳九九云科技有限公司 | Method and system are edited and recorded in a kind of drilling based on mobile terminal technology |
CN109059871A (en) * | 2018-09-03 | 2018-12-21 | 湖南城市学院 | A kind of accidental pollution event emergency remote control systems and method |
WO2019005776A1 (en) * | 2017-06-30 | 2019-01-03 | Baker Hughes, A Ge Company, Llc | Downhole intervention operation optimization |
-
2019
- 2019-04-24 CN CN201910333493.3A patent/CN109947068A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129701A (en) * | 2011-05-03 | 2011-07-20 | 广东省电力设计研究院 | Method and system for processing core photo |
CN102567526A (en) * | 2011-12-29 | 2012-07-11 | 国核电力规划设计研究院 | Method and system used for collecting and processing drilling information of geotechnical engineering |
CN103412967A (en) * | 2013-08-06 | 2013-11-27 | 长江岩土工程总公司(武汉) | Geologic field information collection system, geologic field information collection method and application method of collection system |
CN103810333A (en) * | 2014-01-27 | 2014-05-21 | 长江三峡勘测研究院有限公司(武汉) | Engineering geology informatization work system |
CN104850945A (en) * | 2015-05-05 | 2015-08-19 | 中国能源建设集团江苏省电力设计院有限公司 | Geological record acquisition system, and management and control method based on network and android system |
CN105160708A (en) * | 2015-08-26 | 2015-12-16 | 中国电建集团北京勘测设计研究院有限公司 | Information system for integration of indoor work and field work in engineering geology |
CN105930972A (en) * | 2016-04-22 | 2016-09-07 | 北京航天勘察设计研究院有限公司 | Geotechnical engineering investigation field data acquisition system |
CN106779417A (en) * | 2016-12-20 | 2017-05-31 | 黄河勘测规划设计有限公司 | The collection of engineering investigation information digitalization, management and integrated application method |
WO2019005776A1 (en) * | 2017-06-30 | 2019-01-03 | Baker Hughes, A Ge Company, Llc | Downhole intervention operation optimization |
CN107341605A (en) * | 2017-07-03 | 2017-11-10 | 中冶集团武汉勘察研究院有限公司 | One kind prospecting field operation informationization monitoring and managing method and system |
CN207234758U (en) * | 2017-10-18 | 2018-04-13 | 西安科技大学 | A kind of hand-held Geological data collecting instrument |
CN107948298A (en) * | 2017-12-04 | 2018-04-20 | 深圳九九云科技有限公司 | Method and system are edited and recorded in a kind of drilling based on mobile terminal technology |
CN109059871A (en) * | 2018-09-03 | 2018-12-21 | 湖南城市学院 | A kind of accidental pollution event emergency remote control systems and method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110795578A (en) * | 2019-10-14 | 2020-02-14 | 中铁第四勘察设计院集团有限公司 | Core photo auditing method and device, equipment and storage medium |
CN110795578B (en) * | 2019-10-14 | 2023-01-17 | 中铁第四勘察设计院集团有限公司 | Core photo auditing method and device, equipment and storage medium |
CN110807023A (en) * | 2019-11-08 | 2020-02-18 | 山东电力工程咨询院有限公司 | Survey management and data intelligent analysis system and method based on GIS |
CN111159862A (en) * | 2019-12-17 | 2020-05-15 | 核工业二四三大队 | Electronic design and compiling method for uranium ore drilling design instruction |
CN111159862B (en) * | 2019-12-17 | 2023-09-08 | 核工业二四三大队 | Electronic design and programming method for uranium mine drilling design instruction book |
CN112651476A (en) * | 2020-12-22 | 2021-04-13 | 山东省交通规划设计院有限公司 | Auxiliary device and method for logging drilling core |
CN112649429A (en) * | 2020-12-22 | 2021-04-13 | 山东省交通规划设计院有限公司 | Core shooting and recording device and method for industrial exploration drilling site |
CN112730806A (en) * | 2020-12-22 | 2021-04-30 | 山东省交通规划设计院有限公司 | Liquidity index detection device and method based on rock core penetration |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109947068A (en) | A kind of field data acquisition system and method | |
CN110807023B (en) | Survey management and data intelligent analysis system and method based on GIS | |
US9638032B2 (en) | Interactive wellbore design management | |
CN110097335A (en) | A kind of geotechnical engineering investigation informationization operating system and method | |
US20120274664A1 (en) | Mobile Device Application for Oilfield Data Visualization | |
US20130083031A1 (en) | Customizable User Interface for Real-Time Oilfield Data Visualization | |
US20090113332A1 (en) | System And Method For Hydrological Analysis | |
CN104011564B (en) | The modeling of 4D saturation degree | |
CN107948298A (en) | Method and system are edited and recorded in a kind of drilling based on mobile terminal technology | |
CN110646862B (en) | Method, device and equipment for processing engineering survey data and storage medium | |
CN111582729A (en) | System and method for acquiring field data of soil mass and geological survey | |
CN106522187A (en) | Foundation pit monitoring information management system | |
CN110069552A (en) | A kind of data processing system and method | |
CN105577827A (en) | Highway engineering geological drilling information acquisition and real-time transmission apparatus based on Internet | |
US11725483B2 (en) | Method and system of fracability measurement based on core fracture density | |
CN117056284A (en) | Management system for drilling achievements of water transport engineering | |
CN117076585A (en) | Investigation inside and outside industry integrated system based on three-dimensional geological information model | |
US10861110B2 (en) | Collaborative system and method for performing wellsite tasks | |
CN115617889A (en) | GIS-based survey data acquisition and processing method and system | |
Masson-MacLean et al. | Digitally recording excavations on a budget: A (low-cost) DIY approach from Scotland | |
JP2004046736A (en) | System for supporting environmental research, method for generating boring core histogram, and program for performing the method by computer | |
Sanasi et al. | Company data governance transformation to support the business evolution | |
CN114077946A (en) | Site survey monitoring system and method | |
CN205356411U (en) | Highway engineering geological drilling information acquisition and real time transport device based on internet | |
CN110159252A (en) | Data collection system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190628 |