CN106654993B - A kind of electric wire stringer - Google Patents

A kind of electric wire stringer Download PDF

Info

Publication number
CN106654993B
CN106654993B CN201611053638.7A CN201611053638A CN106654993B CN 106654993 B CN106654993 B CN 106654993B CN 201611053638 A CN201611053638 A CN 201611053638A CN 106654993 B CN106654993 B CN 106654993B
Authority
CN
China
Prior art keywords
telescopic arm
electric wire
earth anchor
expansion link
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611053638.7A
Other languages
Chinese (zh)
Other versions
CN106654993A (en
Inventor
郭毅鹏
武振宇
智勇军
汪锋
陈瑾
郑俊洋
侯帅
孔德风
李晓航
王培川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201611053638.7A priority Critical patent/CN106654993B/en
Publication of CN106654993A publication Critical patent/CN106654993A/en
Application granted granted Critical
Publication of CN106654993B publication Critical patent/CN106654993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Foundations (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of electric wire stringer, including the earth anchor mechanism for strengthening stability, the supporting mechanism being arranged in earth anchor mechanism, and the leap mechanism on the supporting mechanism is arranged on, the earth anchor mechanism, the supporting mechanism and the mechanism of crossing over are connected with controlling organization;The present invention uses split type design concept, larger crossover device can be resolved into multiple small modules, for portable carrying, so that it is guaranteed that it can transport it respectively, it is combined after the predetermined area is delivered to, and different height, bearing capacity and the crossover device across width can be designed as needed;Pose adjustment can be carried out according to the balance monitoring module of front end in run-off the straight or harsh weather in setting balance adjustment module on the first telescopic arm simultaneously, so that it is guaranteed that the stability of present apparatus operation.

Description

A kind of electric wire stringer
Technical field
The invention belongs to power construction technical field of auxiliary equipment, more particularly, to a kind of electric wire stringer.
Background technology
Because the quality of transmission pressure particularly high voltage electricity transmission conductive wire in itself is with regard to larger, and for supporting the phase of transmission pressure Adjacent two steel towers have larger span, while electrical body, crops, trees, river, road between two neighboring steel tower be present The barrier that road, building and structures etc. are spanned, so, set up or dismounting transmission pressure is a complexity and difficult work Journey.
In the prior art, set up or dismantle guide rope that transmission pressure generally use is arranged between two neighboring steel tower and The coaster for being suspended on guide rope and being controlled by bracing wire, and to avoid transmission pressure and ground or being spanned barrier with above-mentioned The crossing frame and insulation net being in contact, the logical framework knot made of steel alloy or the aluminium alloy of lighter weight of crossing frame therein Structure.Transmission pressure due to needing to set up or be removed will move under the traction of coaster between two neighboring steel tower, And it is to be supported by crossing frame and slid thereon during transmission pressure moves, it can be seen that, crossing frame not only carries The weight of transmission pressure, while sliding friction is also produced between transmission pressure, so, crossing frame is firm also easy in any case Larger frictional force abrasion caused by the transmission pressure slid, be particularly removed old transmission pressure, because of its surface Have and be similar to zigzag tip, it is easier to make to damage away from more frame;In addition, the frictional resistance between transmission pressure and crossing frame can also Considerable influence is produced to traction element, because guide rope and coaster, and bracing wire are acted on by wind-force in the air in height, often gone out Phenomena such as existing guide rope and guy winding and coaster are offset, coaster movement is more difficult after this phenomenon occurs, and guide rope and drawing Line is wound and coaster also needs to overcome the frictional resistance between transmission pressure and crossing frame could to lead transmission of electricity under shift state Line moves, it is easy to phenomena such as causing transmission pressure to stagnate, and then the process such as construction progress and increase maintenance capacity is influenceed, it is constructed Cost significantly improves.A kind of overhead transmission line is disclosed in the Chinese patent of Application No. 201310373308.6 to fill across wiring Put, including overhead messenger wire, wire barrow, the extension pulley with drive mechanism and vacantly hold in the palm line wheel, the overhead crane line front end leads to Cross tensioning mechanism to be connected to across on the fixture in front of thing, the extension pulley draws wire to be laid and transported on overhead messenger wire Dynamic, the hanging support line wheel holds up the wire and is suspended on overhead messenger wire, and the wire barrow leading-out terminal sets wire anti-twist device, The extension pulley bottom sets counterweight balancer;Although the invention can solve the problem that the problem of wiring, but and unresolved public at a high speed The technical problem of operation is crossed on road.
The content of the invention
In view of this, the purpose of the present invention is in view of the shortcomings of the prior art, there is provided one kind can quickly solve public at a high speed Road cross-line operation, and it is simple to operate, reclaim safety and reduce the electric wire stringer that operation is influenceed by weather.
To achieve these goals, the present invention uses following technical scheme:A kind of electric wire stringer, including for strengthening The earth anchor mechanism of stability, the supporting mechanism being arranged in earth anchor mechanism, and be arranged on the supporting mechanism and cross over machine Structure, the earth anchor mechanism, the supporting mechanism and the mechanism of crossing over are connected with controlling organization;
The earth anchor mechanism include be made up of multiple earth anchor units anchor block, be arranged on anchor block counterweight element, The pulling rope for being arranged on the load-bearing ring of anchor block the week side of boss and being connected with the load-bearing ring;
The supporting mechanism includes fixed pedestal, the expansion link being arranged on fixed pedestal and is arranged on described flexible Fixed seat on bar, the retainer ring being connected with the pulling rope is set on the expansion link;
It is described to include the main telescopic arm being flexibly connected with the fixed seat and secondary telescopic arm across mechanism, it is arranged on main flexible The first telescopic arm and the second telescopic arm on arm, fixed pulley is set on first telescopic arm;
Each sub- telescopic arm end set on first telescopic arm is used for the balance adjustment module for adjusting balance, each balance Flexible tracheae connection, the end of the flexible tracheae and the high-pressure pump being arranged on anchor block are connected through between adjustment module It is connected, the leading section of first telescopic arm sets MEMS gyroscope and MEMS accelerometer.
The balance adjustment module includes circular base, the endless glide being arranged on circular base, is arranged on the ring Jet seat on shape slide rail, air nozzle, upper air nozzle and lower air nozzle, the upper air nozzle and lower spray are set on the jet seat It is tangent that valve moves the circumference to be formed with the jet seat.
The air nozzle is vertically set on the surface of the jet seat.
The jet seat side sets electromagnet, and the jet seat side sets the absorption mutually fixed with the sub- telescopic arm , multiple through holes are set on the adsorption site.
Wear pin rod in the through hole, described pin rod one end sets steel disc, and the other end of the pin rod is by spring by steel Piece is arranged on adsorption site, and it is spacing that the pin rod end sets boss to carry out the spring.
The passage being connected with the flexible tracheae is set on the circular base.
It is connected between the main telescopic arm and the first telescopic arm by electric rotating machine, setting and institute on the main telescopic arm State the support slot that the first telescopic arm is engaged.
Its folding is controlled by the 3rd telescopic arm between second telescopic arm and main telescopic arm.
The earth anchor unit lower surface sets multiple holdfasts, sets through hole between the earth anchor unit, is set in the through hole Put fix bar that can be movable.
Precaution device and monitor be set on the anchor block, the precaution device include audible-visual annunciator, MEMS gyroscope and MEMS accelerometer, the pressure that the monitor includes being arranged on the anchor block and set positioned at the fixed pedestal front lower portion Force snesor.
It is three-level expansion link that the expansion link, which includes, and the fixed seat on the first order expansion link is mutually cut with scissors with secondary telescopic arm Connect, the fixed seat on the second level expansion link is hinged with the main telescopic arm.
The expansion link upper end sets the steel wire rope being engaged with the main telescopic arm.
The controlling organization is computer.
The application method of the electric wire stringer:
1)Each mechanism of decomposition is carried to precalculated position, then laid earth anchor unit, and worn thereon Fix bar, then fixed pedestal is set on earth anchor, expansion link is arranged on;
2)The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete telescopic arm Composition, then sets fixed seat on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then by expansion link Lifted, untill pulling rope is tensioned by it, and counterweight element is set on anchor block;
3)Then by the mass input computer obtained on anchor block, it is modified by computer, then to flexible Arm is tested, and monitors whether its whether working properly and simulation elongation matches with counterweight element quality;It is big when occurring Wind or elongation is long when causing front end to wave or having tilt phenomenon, then monitored partially by MEMS gyroscope and MEMS accelerometer The direction of shifting and angle, by the angle adjustment to jet seat in balance adjustment module, and the high speed blowback of high velocity air is carried out, So as to be adjusted to the posture of the first telescopic arm so that staff has time enough to carry out increase counterweight;
4)By way of the fixed pulley combination rope set on the first telescopic arm, the defeated of highway both sides goods and materials is carried out Send, the first telescopic arm of preferred recovery after erection, then again shrink the second telescopic arm, and shunk by the 3rd telescopic arm To the first telescopic arm, then by the retracted for clearance of the first telescopic arm, and according to step 2)Reverse direction dismantled, so as to Complete whole assembling, the work of work and dismounting.
The present invention generally requires to set up by bow and arrow or the mode of jettisoninging according to when acrossing highway in the prior art be present Mode tentatively set up, then placing second or by first arranging the 3rd, the 4th etc., this operation Mode not only tedious process, and the phenomenon that failure causes to drop on a highway of jettisoninging be present, to highway driving car Cause very big potential safety hazard, although and set up that the mode of steel pipe support is stable, and its structure is too complicated, it is impossible to meet quick The needs of erection, therefore demountable modular equipment is used, it is not only convenient for transporting and is easy to set up, using by multiple The earth anchor mechanism of anchor unit composition, as weighing, layer provides stable fixed force for pedestal, while can be according to the width of leap The addition of balancing weight is adjusted, and then is able to ensure that its stability;But in order to ensure unfolding or in actual fed goods in leap It is each at its due to the phenomenon that goods is overweight or is influenceed to cause the first telescopic arm to wave by natural weather during thing Sub- telescopic arm end set is used for the balance adjustment module for adjusting balance, and flexible tracheae is connected through between each balance adjustment module Connection, the end of the flexible tracheae are connected with the high-pressure pump being arranged on anchor block, are produced by air pump substantial amounts of high Calm the anger body, and the size for the Air Valve Control air-flow for passing through upper air nozzle, air nozzle and lower air nozzle rear portion and folding, so as to spray The angle of valve is adjusted, and that the circumference to be formed is rotated with the jet seat is tangent for upper air nozzle and lower air nozzle, can Stable carry out pose adjustment, after angle is adjusted, the magnetic of high intensity is produced by electromagnet thereon, and then cause pin Bar compression spring so that pin rod stretches out, and then steel disc, to being attached together, is played with electromagnet so as to play to jet seat The effect of spacing fixation.
The earth anchor mechanism of use is made up of multiple earth anchor units, and anchor block bottom sets holdfast, for strengthening itself and ground The contact area in face, the phenomenon slided is avoided, set balancing weight to strengthen the stability with total thereon, and It is attached between earth anchor unit by fix bar so that overall structure is connected as, the phenomenon for avoiding structure from deforming upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, set in anchor block avris and lead with what expansion link upper end was connected Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is set to be used for the change for monitoring its pressure on the inside of load-bearing ring;After anchor block is set with pedestal After expansion link lifting, the secondary telescopic arm for controlling main telescopic arm bottom by computer opens, and then or so static half an hour, passes through Computer monitoring stability problem, the phenomenon for avoiding breakking away occur, and the pressure sensor set by earth anchor front edge of board is supervised The change of data is surveyed, when monitoring pressure value gravity close on anchor block, alarm and reminding operating personnel is sent and is added Balancing weight, while carry out locking and avoid maloperation from causing to continue the potential safety hazard that elongation causes to topple, crossed in main telescopic arm single To after track, the second telescopic arm is expanded into by vertical state by the 3rd telescopic arm, then the second telescopic arm extends downwardly from, and places In the greenbelt in the middle part of highway, so as to effect as secondary support, in order to strengthen the stability of support, second Telescopic arm bottom sets support plate, and the contact area for increasing itself and ground strengthens stability, then by the fortune of computer The stability status for obtaining its structure are calculated, then drive the first telescopic arm to rotate by electric rotating machine after the time of pause one end, So as to spread out and in the end set support slot of main telescopic arm, so as to obtain favourable support to it, then by thereon The effect of support bar, stabilize it across next unidirectional track, smoothly arrive at offside, stretched to strengthen practical function first Contracting arm end set fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that the stability of transmission, can be at it Upper transmission line also can transmit goods by it, be handed over so as to accelerate the article of the erection of circuit and highway both sides Stream.
In addition, light-weight design material of the material of each component used for high intensity, not only without reduction component Quality, and its quality can be reduced, the quality of transfer module is reduced, makes it easy to carry with combining, in particular for needs When crossing over over long distances, the quality of main telescopic arm is small and structural strength is big, while can smoothly realizing leap, it is ensured that quality is not Greatly, reduce it is larger on earth anchor segment structure requirement caused by influence, the present invention uses split type design concept, can will be larger Crossover device resolves into multiple small modules, for portable carrying, so that it is guaranteed that it can transport it respectively, is being delivered to It is combined behind the predetermined area, and different height, bearing capacity and the crossover device across width can be designed as needed;Simultaneously Setting balance adjustment module can be supervised in run-off the straight or harsh weather according to the balance of front end on first telescopic arm Survey module and carry out pose adjustment, so that it is guaranteed that the stability of present apparatus operation.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural representation of alarm of the present invention;
Fig. 3 is the structural representation of the first telescopic arm of the invention;
Fig. 4 is the structural representation of the first telescopic arm expansion of the invention;
Fig. 5 is the end structure illustration of balance adjustment module of the present invention;
Fig. 6 is the side structure schematic diagram of balance adjustment module of the present invention.
Embodiment
The invention will be further described for 1-6 and embodiment below in conjunction with the accompanying drawings.
Embodiment one
A kind of electric wire stringer, including for the earth anchor mechanism for strengthening stability, the support being arranged in earth anchor mechanism Mechanism, and the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the supporting mechanism and described cross over machine Structure is connected with controlling organization;
The earth anchor mechanism includes the anchor block 19 being made up of multiple earth anchor units, the counterweight list being arranged on anchor block 19 Member 23, the pulling rope 1 for being arranged on the load-bearing ring 18 of the week side of boss of anchor block 19 and being connected with the load-bearing ring 18;
The supporting mechanism includes fixed pedestal 15, the expansion link 2 being arranged on fixed pedestal 15 and is arranged on described Fixed seat 3 on expansion link 2, the retainer ring being connected with the pulling rope 1 is set on the expansion link 2;
The main telescopic arm 6 and secondary telescopic arm 13 for including being flexibly connected with the fixed seat 3 across mechanism, is arranged on master The first telescopic arm 8 and the second telescopic arm 12 on telescopic arm 6, fixed pulley 5 is set on first telescopic arm 8;
Each sub- telescopic arm end set on first telescopic arm 9 is used for the balance adjustment module 4 for adjusting balance, each flat Flexible tracheae 24 is connected through between weighing apparatus adjustment module 4 to connect, the end of the flexible tracheae 24 is with being arranged on anchor block 19 High-pressure pump 25 be connected, the leading section of first telescopic arm 9 sets balance detection module 23, the balance detection module 23 include MEMS gyroscope and MEMS accelerometer.
The balance adjustment module 4 includes circular base 46, the endless glide 45 being arranged on circular base 46, is arranged on Jet seat 48 in the endless glide 45, air nozzle 49, upper air nozzle 47 and lower air nozzle 50 are set on the jet seat 48, The circumference that the upper air nozzle 47 and lower air nozzle 50 are formed with the jet seat 48 motion is tangent.
The air nozzle 49 is vertically set on the surface of the jet seat 48.
The side of jet seat 48 sets electromagnet 51, and the side of jet seat 48 sets and mutually fixed with the sub- telescopic arm Adsorption site 43, multiple through holes are set on the adsorption site 43.
Pin rod 41 is worn in the through hole, described one end of pin rod 41 sets steel disc 44, and the other end of the pin rod 41 passes through Steel disc 44 is arranged on adsorption site 43 by spring 42, and it is spacing that the end of pin rod 41 sets boss to carry out the spring 42.
The passage being connected with the flexible tracheae is set on the circular base.
It is connected between the main telescopic arm 6 and the first telescopic arm 8 by electric rotating machine 10.
Its folding is controlled by the 3rd telescopic arm 9 between second telescopic arm 12 and main telescopic arm 6.
The earth anchor unit lower surface sets multiple holdfasts 16, sets through hole between the earth anchor unit, in the through hole Fix bar 17 that can be movable is set.
Precaution device 20 and monitor are set on the anchor block, and the precaution device includes audible-visual annunciator 201, MEMS gyro Instrument 202 and MEMS accelerometer 203, the monitor 14 are to be arranged on the anchor block 19 and be located at the fixed pedestal front end The pressure sensor that bottom is set.
It is three-level expansion link that the expansion link 2, which includes, fixed seat 3 and the secondary phase of telescopic arm 13 on the first order expansion link Be hinged, the fixed seat 3 on the second level expansion link is hinged with the main telescopic arm 6.
The upper end of expansion link 2 sets the steel wire rope 22 being engaged with the main telescopic arm 6.
The controlling organization 21 is computer.
In the embodiment by the way of combined type earth anchor unit, and by way of fix bar is connected, formed The anchor block of arbitrary area, for the stability of adjustment structure, and for the stability of further enhancing structure, in load-bearing ring Inner side is provided for the pressure sensor of monitoring, avoids expansion link from being caused during vertical expansion due to not being fully deployed During so that the phenomenon of expansion link run-off the straight;Cause pulling rope tight to fracture if expansion unlifting pressure crosses conference Phenomenon, due to the presence of load-bearing ring pressure sensor, can control under rational pressure.
The present invention generally requires to set up by bow and arrow or the mode of jettisoninging according to when acrossing highway in the prior art be present Mode tentatively set up, then placing second or by first arranging the 3rd, the 4th etc., this operation Mode not only tedious process, and the phenomenon that failure causes to drop on a highway of jettisoninging be present, to highway driving car Cause very big potential safety hazard, although and set up that the mode of steel pipe support is stable, and its structure is too complicated, it is impossible to meet quick The needs of erection, therefore demountable modular equipment is used, it is not only convenient for transporting and is easy to set up, using by multiple The earth anchor mechanism of anchor unit composition, as weighing, layer provides stable fixed force for pedestal, while can be according to the width of leap The addition of balancing weight is adjusted, and then is able to ensure that its stability;But in order to ensure unfolding or in actual fed goods in leap It is each at its due to the phenomenon that goods is overweight or is influenceed to cause the first telescopic arm to wave by natural weather during thing Sub- telescopic arm end set is used for the balance adjustment module for adjusting balance, and flexible tracheae is connected through between each balance adjustment module Connection, the end of the flexible tracheae are connected with the high-pressure pump being arranged on anchor block, are produced by air pump substantial amounts of high Calm the anger body, and the size for the Air Valve Control air-flow for passing through upper air nozzle, air nozzle and lower air nozzle rear portion and folding, so as to spray The angle of valve is adjusted, and that the circumference to be formed is rotated with the jet seat is tangent for upper air nozzle and lower air nozzle, can Stable carry out pose adjustment, after angle is adjusted, the magnetic of high intensity is produced by electromagnet thereon, and then cause pin Bar compression spring so that pin rod stretches out, and then steel disc, to being attached together, is played with electromagnet so as to play to jet seat The effect of spacing fixation.
In addition, the endless glide used and the annular ring gear being arranged in the endless glide, its structure and swivel joint Structure is similar, differs only in and airway is set in endless glide, it is not only realized that it is set in sub- telescopic arm, again It can realize that air nozzle is led in gases at high pressure rotation.
The earth anchor mechanism of use is made up of multiple earth anchor units, and anchor block bottom sets holdfast, for strengthening itself and ground The contact area in face, the phenomenon slided is avoided, set balancing weight to strengthen the stability with total thereon, and It is attached between earth anchor unit by fix bar so that overall structure is connected as, the phenomenon for avoiding structure from deforming upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, set in anchor block avris and lead with what expansion link upper end was connected Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is set to be used for the change for monitoring its pressure on the inside of load-bearing ring;After anchor block is set with pedestal After expansion link lifting, the secondary telescopic arm for controlling main telescopic arm bottom by computer opens, and then or so static half an hour, passes through Computer monitoring stability problem, the phenomenon for avoiding breakking away occur, and the pressure sensor set by earth anchor front edge of board is supervised The change of data is surveyed, when monitoring pressure value gravity close on anchor block, alarm and reminding operating personnel is sent and is added Balancing weight, while carry out locking and avoid maloperation from causing to continue the potential safety hazard that elongation causes to topple, crossed in main telescopic arm single To after track, the second telescopic arm is expanded into by vertical state by the 3rd telescopic arm, then the second telescopic arm extends downwardly from, and places In the greenbelt in the middle part of highway, so as to effect as secondary support, in order to strengthen the stability of support, second Telescopic arm bottom sets support plate, and the contact area for increasing itself and ground strengthens stability, then by the fortune of computer The stability status for obtaining its structure are calculated, then drive the first telescopic arm to rotate by electric rotating machine after the time of pause one end, So as to spread out and in the end set support slot of main telescopic arm, so as to obtain favourable support to it, then by thereon The effect of support bar, stabilize it across next unidirectional track, smoothly arrive at offside, stretched to strengthen practical function first Contracting arm end set fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that the stability of transmission, can be at it Upper transmission line also can transmit goods by it, be handed over so as to accelerate the article of the erection of circuit and highway both sides Stream.
In addition, light-weight design material of the material of each component used for high intensity, not only without reduction component Quality, and its quality can be reduced, the quality of transfer module is reduced, makes it easy to carry with combining, in particular for needs When crossing over over long distances, the quality of main telescopic arm is small and structural strength is big, while can smoothly realizing leap, it is ensured that quality is not Greatly, reduce it is larger on earth anchor segment structure requirement caused by influence, the present invention uses split type design concept, can will be larger Crossover device resolves into multiple small modules, for portable carrying, so that it is guaranteed that it can transport it respectively, is being delivered to It is combined behind the predetermined area, and different height, bearing capacity and the crossover device across width can be designed as needed;Simultaneously Setting balance adjustment module can be supervised in run-off the straight or harsh weather according to the balance of front end on first telescopic arm Survey module and carry out pose adjustment, so that it is guaranteed that the stability of present apparatus operation.
Embodiment two
The difference of itself and embodiment one is:The branch being engaged with first telescopic arm 8 is set on the main telescopic arm 6 Support groove 11.
The expansion link top sets the first fixed pulley 26 being engaged with fixed pulley.
Support slot is with the addition of in the embodiment, for being supported to the first support arm, so that it is guaranteed that the first telescopic arm exists Strong support can be obtained during expansion, it is ensured that the stability of structure, and hauling rope is set by fixed pulley and the first fixed pulley Rope, carry out article conveying.
Embodiment three
The difference of itself and embodiment two is:First telescopic arm 8 sets honeycomb 82 to be internal, and its surface is set Put chromium coating 81.
Honeycomb is set inside the first telescopic arm used in the embodiment, construction weight can be reduced, and do not change Structural strength.
Example IV
The application method of the electric wire stringer:
1)Each mechanism of decomposition is carried to precalculated position, then laid earth anchor unit, and worn thereon Fix bar, then fixed pedestal is set on earth anchor, expansion link is arranged on;
2)The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete telescopic arm Composition, then sets fixed seat on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then by expansion link Lifted, untill pulling rope is tensioned by it, and counterweight element is set on anchor block;
3)Then by the mass input computer obtained on anchor block, it is modified by computer, then to flexible Arm is tested, and monitors whether its whether working properly and simulation elongation matches with counterweight element quality;It is big when occurring Wind or elongation is long when causing front end to wave or having tilt phenomenon, then monitored partially by MEMS gyroscope and MEMS accelerometer The direction of shifting and angle, by the angle adjustment to jet seat in balance adjustment module, and the high speed blowback of high velocity air is carried out, So as to be adjusted to the posture of the first telescopic arm so that staff has time enough to carry out increase counterweight
4)By way of the fixed pulley combination rope set on the first telescopic arm, the defeated of highway both sides goods and materials is carried out Send, the first telescopic arm of preferred recovery after erection, then again shrink the second telescopic arm, and shunk by the 3rd telescopic arm To the first telescopic arm, then by the retracted for clearance of the first telescopic arm, and according to step 2)Reverse direction dismantled, so as to Complete whole assembling, the work of work and dismounting.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, this area is common Other modifications or equivalent substitution that technical staff is made to technical scheme, without departing from technical solution of the present invention Spirit and scope, all should cover among scope of the presently claimed invention.

Claims (10)

1. a kind of electric wire stringer, including for the earth anchor mechanism for strengthening stability, the support machine being arranged in earth anchor mechanism Structure, and the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the supporting mechanism and described cross over mechanism It is connected with controlling organization;The earth anchor mechanism include be made up of multiple earth anchor units anchor block, be arranged on anchor block Counterweight element, the pulling rope that is arranged on the load-bearing ring of anchor block the week side of boss and is connected with the load-bearing ring;The support machine Structure includes fixed pedestal, the expansion link being arranged on fixed pedestal and the fixed seat being arranged on the expansion link, described to stretch The retainer ring being connected with the pulling rope is set on contracting bar;The master for including being flexibly connected with the fixed seat across mechanism Telescopic arm and secondary telescopic arm, the first telescopic arm and the second telescopic arm being arranged on main telescopic arm, set on first telescopic arm Put fixed pulley;Each sub- telescopic arm end set on first telescopic arm is used for the balance adjustment module for adjusting balance, each flat Flexible tracheae connection, the end of the flexible tracheae and the high pressure gas being arranged on anchor block are connected through between weighing apparatus adjustment module Pump is connected, and the leading section of first telescopic arm sets MEMS gyroscope and MEMS accelerometer.
2. electric wire stringer according to claim 1, it is characterised in that:The balance adjustment module includes annular base Seat, the endless glide being arranged on circular base, the jet seat that is arranged in the endless glide, spray is set on the jet seat Valve, upper air nozzle and lower air nozzle, the upper air nozzle and lower air nozzle move the circumference phase to be formed with the jet seat Cut.
3. electric wire stringer according to claim 2, it is characterised in that:The air nozzle is vertically set on the jet The surface of seat.
4. electric wire stringer according to claim 2, it is characterised in that:The jet seat side sets electromagnet, institute State jet seat side and the adsorption site mutually fixed with the sub- telescopic arm is set, multiple through holes are set on the adsorption site.
5. electric wire stringer according to claim 4, it is characterised in that:Pin rod, the pin rod are worn in the through hole One end sets steel disc, and steel disc is arranged on adsorption site by the other end of the pin rod by spring, and the pin rod end sets convex Platform carries out spacing to the spring.
6. electric wire stringer according to claim 1, it is characterised in that:Between the main telescopic arm and the first telescopic arm It is connected by electric rotating machine, the support slot being engaged with first telescopic arm is set on main telescopic arm.
7. electric wire stringer according to claim 6, it is characterised in that:Between second telescopic arm and main telescopic arm Its folding is controlled by the 3rd telescopic arm.
8. electric wire stringer according to claim 1, it is characterised in that:The earth anchor unit lower surface sets multiple anchors Follow closely, through hole, the fix bar that the interior setting of the through hole can be movable are set between the earth anchor unit.
9. electric wire stringer according to claim 1, it is characterised in that:Precaution device and monitoring are set on the anchor block Device, the precaution device include audible-visual annunciator, MEMS gyroscope and MEMS accelerometer, and the monitor includes being arranged on describedly The pressure sensor set on anchor slab and positioned at the fixed pedestal front lower portion.
10. the application method of the electric wire stringer according to claim any one of 1-9, it is characterised in that:
Each mechanism of decomposition is carried to precalculated position, then laid earth anchor unit, and fix bar is worn thereon, Then fixed pedestal is set on earth anchor, expansion link is arranged on;
The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete the composition of telescopic arm, Then fixed seat is set on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then carries out expansion link Lifting, untill pulling rope is tensioned by it, and sets counterweight element on anchor block;
Then by the mass input computer obtained on anchor block, it is modified by computer, then telescopic arm is carried out Test, monitors whether its whether working properly and simulation elongation matches with counterweight element quality;When generation strong wind or stretch Long amount is long when causing front end to wave or having tilt phenomenon, then the side of skew is monitored by MEMS gyroscope and MEMS accelerometer To with angle, by the angle adjustment to jet seat in balance adjustment module, and the high speed blowback of high velocity air is carried out, so as to right The posture of first telescopic arm is adjusted so that staff has time enough to carry out increase counterweight;
By way of the fixed pulley combination rope set on the first telescopic arm, the conveying of highway both sides goods and materials is carried out, The first telescopic arm of preferred recovery after erection, then again shrinks the second telescopic arm, and is contracted to the by the 3rd telescopic arm On one telescopic arm, then by the retracted for clearance of the first telescopic arm, and according to step 2)Reverse direction dismantled, so as to complete Whole assembling, the work of work and dismounting.
CN201611053638.7A 2016-11-25 2016-11-25 A kind of electric wire stringer Active CN106654993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611053638.7A CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611053638.7A CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Publications (2)

Publication Number Publication Date
CN106654993A CN106654993A (en) 2017-05-10
CN106654993B true CN106654993B (en) 2018-01-26

Family

ID=58812990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611053638.7A Active CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Country Status (1)

Country Link
CN (1) CN106654993B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109524916A (en) * 2017-09-20 2019-03-26 胡广生 A kind of crossing frame
CN110148907A (en) * 2019-05-27 2019-08-20 广东电网有限责任公司 A kind of block crossing frame of two sides docking
CN110061448B (en) * 2019-05-29 2020-11-13 国网河南省电力公司社旗县供电公司 Device is demolishd to old and useless electric wire of cross-line
CN117394206A (en) * 2023-12-13 2024-01-12 邯郸欣和电力建设有限公司 Circuit screen sealing equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917914B1 (en) * 2007-06-20 2009-09-04 Cqfd Composites Sarl CABLE ROUTING ELEMENT
CN201450279U (en) * 2009-09-03 2010-05-05 江苏省电力公司无锡供电公司 Multifunctional guide sliding support
CN103151750A (en) * 2013-02-02 2013-06-12 永贵能源开发有限责任公司 Roadway cable bracket
CN205471963U (en) * 2016-03-21 2016-08-17 国网安徽省电力公司电力科学研究院 Cable dish floor truck
CN205419342U (en) * 2016-03-24 2016-08-03 张泽寅 Cable tool bogie for electric power construction

Also Published As

Publication number Publication date
CN106654993A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106549338B (en) A kind of highway both sides pole lattice crossing frame
CN106654993B (en) A kind of electric wire stringer
CN106547060A (en) A kind of Construction of Optical Cable Line crossover device
CN106486924B (en) A kind of power circuit wire-binding device across river
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN102740938B (en) Stationary track with gimbaled rider carriages amusement ride
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN105620493B (en) A kind of novel rapid-installation freight ropeway
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN201458591U (en) Lifting device for installing sound barrier
CN206442061U (en) A kind of Construction of Optical Cable Line crosses over equipment
DK3132137T3 (en) MOBILE CRANE DEVICE AND METHOD FOR THE TEMPORARY ASSEMBLY OF SUCH A CRANE DEVICE
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN206164034U (en) Electric wire erects equipment
CN207903864U (en) A kind of side slope protection material lifting device
CN107230944B (en) A kind of high-altitude support line vehicle
CN206164001U (en) Span overhead line device of through street
CN105490210B (en) A kind of hydraulic pressure assembled crosses over special equipment and application method
CN204821555U (en) Light -duty fast -assembling cableway
CN106410683B (en) A kind of wire-binding device across highway
CN106586921A (en) Crossing block device
CN110820555A (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN104229685B (en) The lifting of one modal test under water and assistant stability system
CN202729638U (en) Lifting device
CN206108848U (en) Stride across block device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant