CN106184237A - A kind of Light-duty Quick-installation cableway - Google Patents

A kind of Light-duty Quick-installation cableway Download PDF

Info

Publication number
CN106184237A
CN106184237A CN201510232182.XA CN201510232182A CN106184237A CN 106184237 A CN106184237 A CN 106184237A CN 201510232182 A CN201510232182 A CN 201510232182A CN 106184237 A CN106184237 A CN 106184237A
Authority
CN
China
Prior art keywords
cableway
light
hoist engine
holder device
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510232182.XA
Other languages
Chinese (zh)
Inventor
焦光伟
蒲宏斌
陈飞
陈明
尹恒
常向东
卢彦博
张世峡
范晓明
邓松圣
陈绍令
陈玉玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Logistical Engineering University of PLA
Original Assignee
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Logistical Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp, Logistical Engineering University of PLA filed Critical Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Priority to CN201510232182.XA priority Critical patent/CN106184237A/en
Publication of CN106184237A publication Critical patent/CN106184237A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The present invention relates to a kind of Light-duty Quick-installation cableway, including power control unit, holder device, carriage device, described power control unit includes hoist engine, secondary hoist engine, switch board, described holder device includes upper bracket and the lower carriage being arranged on different geographical height, described upper bracket is connected with lower carriage by hauling rope, described carriage device includes roller, adapter, support, chain block, described roller is connected by adapter and two supports of cross-like, described hoist engine and secondary hoist engine are connected with hauling rope respectively, described entablature is slidably connected with described hauling rope by roller, described sill is connected with described carrier cable.The present invention provides a kind of Light-duty Quick-installation cableway, solve existing cableway to fixedly mount, reclaim difficulty, the technical problem of construction period length, Light-duty Quick-installation cableway can be with Fast Installation in the complicated landform such as mountain stream, river, cliff, it is also possible to the goods and materials conveying when emergency relief or temporary construction.

Description

A kind of Light-duty Quick-installation cableway
Technical field
The present invention relates to a kind of transport cableway, in particular, the present invention relates to be applied to the one of goods transport field Light-duty Quick-installation cableway.
Background technology
Along with new technique, the progress of new technology, the application of cableway is more and more extensive, the manufacture of cableway simultaneously Technology is more ripe, and it is more and more comprehensive that it makes specification accordingly.Such as, classify according to cableway, have specially Door, for the manned sightseeing cableway in famous mountains and great rivers, also has the timber skidding ropeway being exclusively used in forest harvesting, the most useful Simple slip rope crossed a river in remote mountain areas etc..Wherein simple slip rope, it is simply that fixing between upper and lower two ends Steel cable, relies on the natural-drop of different terrain, become can across mountain, the various complicated landform of Yue He, adaptation Means of transport.
Certain above-mentioned slip rope is higher for the requirement of landform, and the manned/loading cableway of complexity may prolong continuous thousands of Rice, will cross multiple hilltop, so needing the structural system of complexity, controlling system.But no matter simple in construction or Complexity, above-mentioned cableway all plays important transportation function, and playing other vehicles in express zone can not replace The effect in generation.
Cableway, as the effective means of transport of one, has its limitation on using at present, i.e. can only fix and make With, and the construction period is long, reclaims more difficulty.So cableway is built mostly has large area felling demand Forest zone, or the sightseeing scenic spot that flow of personnel amount is bigger.
A kind of cableway can be designed, be applicable not only to major part landform, assemble simple, all right after use Again reclaim?Design one can Fast Installation, reclaim simple cableway, be instantly in cableway development course urgently The technical problem that need to solve.
Summary of the invention
It is an advantage of the invention to provide a kind of Light-duty Quick-installation cableway, solving existing cableway can only fix Install, reclaim difficult, construction period length technical problem.
The above-mentioned purpose of the present invention and other purposes solve by the following technical programs:
The present invention provides a kind of Light-duty Quick-installation cableway, including power control unit, holder device, carriage device, Described power control unit includes hoist engine, secondary hoist engine, switch board, described hoist engine, secondary hoist engine and control Cabinet processed is successively set on the smooth ground of geographical position lower end, and described holder device includes being arranged on different geography The upper bracket of height and lower carriage, described upper bracket is connected with lower carriage by hauling rope, described carriage device bag Including roller, adapter, support, chain block, described roller is connected with crossbeam by the adapter of cross-like, Described crossbeam includes entablature and sill, it is characterised in that:
Described hoist engine and secondary hoist engine are connected with a hauling rope respectively;
The top of described holder device is provided with angle pulley or corner block;
By being wrapped in leading of described angle pulley or corner block foreign steamer external diameter between described upper bracket and lower carriage Straw line is connected;
By taking turns holding of external diameter in being wrapped in described angle pulley or corner block between described upper bracket and lower carriage Power rope is connected;
Described entablature is slidably connected with described hauling rope by roller, and described sill is connected with described carrier cable.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described storage rope device is fixedly installed on by frame On the ground of described lower carriage side.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described tension regulator is fixed on described lower The top of frame, described tension regulator is connected with described carrier cable.
The present invention provide a kind of Light-duty Quick-installation cableway, it is preferable that described storage rope device by cordage with described Draught control mechanism connects.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described holder device is herringbone, described Rack device is fixed on the ground by lower margin, and described holder device is connected triangular in shape with described side tension cords.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described holder device is by lambdoid bracing frame Composition, is provided with the tension ropes of intersection between support frame as described above.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that be provided with vertical between described holder device Two stabiliser bars, are separately positioned on the symmetric position of described lambdoid bracing frame.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described chain block is by vertical attachment means Being connected with described sill, described chain block is connected with material by steel wire rope.
The present invention provide a kind of Light-duty Quick-installation cableway, it is preferable that one end of material by safety line with described on Support connects.
A kind of Light-duty Quick-installation cableway that the present invention provides, it is preferable that described holder device is articulated structure, described The weight of the parts of holder device both less than equal to 50kg, the height of described holder device be 6.5m-7.5m, Width is 3.5m-4.5m, and model chosen respectively by described hoist engine and secondary hoist engine is the special of 1T and 0.5T standard With hoist engine, material fed distance is 0-200m.
Advantages of the present invention and having the beneficial effects that:
1, cableway is manufactured into Portable detachable, standard product by the present invention first, it is adaptable to emergency relief, river The manpower of the landform such as stream, mountain stream or Material Transportation;
2, a kind of Light-duty Quick-installation cableway that the present invention provides, sets up the time short, and single component weight is light, is suitable for Manpower transport, it is adaptable to the area that plant equipment cannot arrive.
3, a kind of Light-duty Quick-installation this cableway of cableway that the present invention provides, carrier cable, hauling rope use super high molecular weight Polyethylene fibre rope, replaces traditional structure steel wire rope, and therefore cable body is soft, lightweight, adds that quick support is Heretofore described cableway is suitable to artificial fast erecting in the wild.
Accompanying drawing explanation
Carry out the preferred embodiment of the present invention below in conjunction with the accompanying drawings describing in detail or preferably, wherein,
Fig. 1 is the total arrangement structural representation of the present invention;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the structural representation of holder device;
Fig. 4 is the structural scheme of mechanism of carriage device;
Power control unit-1, hoist engine-11, secondary hoist engine-12, switch board-13, holder device-2, upper Frame-21, lower carriage-22, bracing frame-23, tension ropes-24, stabiliser bar-25, carriage device-3, roller-31, Adapter-32, crossbeam-33, entablature-331, sill-332, chain block-34, hauling rope-4, carrier cable -5, Chu Shengqi-6, tension regulator-7, lower margin-8, side tension cords-9, safety line-10.
Detailed description of the invention
The present invention provides a kind of Light-duty Quick-installation cableway, including power control unit 1, holder device 2, carriage device 3, power control unit includes hoist engine 11, secondary hoist engine 12, switch board 13, hoist engine 11, secondary hoist engine 12 and switch board 13 be successively set on the smooth ground of geographical position lower end, holder device 2 includes being arranged on The upper bracket 21 of different geographical height and lower carriage 22, upper bracket 21 is by hauling rope 4 with lower carriage 23 even Connecing, carriage device 3 includes roller 31, adapter 32, crossbeam 33, chain block 34, and roller 31 is by handing over Forked adapter 32 is connected with crossbeam 33, and crossbeam 33 includes entablature 331 and sill 332, its feature It is:
Hoist engine 11 and secondary hoist engine 12 are connected with a hauling rope 4 respectively;
The top of holder device 2 is provided with angle pulley or corner block;
By being wrapped in angle pulley or the traction of corner block foreign steamer external diameter between upper bracket 21 and lower carriage 22 Rope 4 is connected;
By taking turns the load of external diameter in being wrapped in angle pulley or corner block between upper bracket 21 and lower carriage 22 Rope 5 is connected;
Entablature 331 is slidably connected with hauling rope 4 by roller 31, and sill 332 is connected with carrier cable 5.
Preferably, storage rope device 6 is fixedly installed on the ground of lower carriage 22 side by frame.
Preferably, tension regulator 7 is fixed on the top of lower carriage 22, tension regulator 7 and carrier cable 5 Connect.
Preferably, storage rope device 6 is connected with tension regulator 7 by cordage.
Preferably, holder device 2 is in herringbone, and holder device 2 is fixed on the ground by lower margin 8, support Device 2 is connected triangular in shape with side tension cords 9.
Preferably, holder device 2 is made up of lambdoid bracing frame 23, is provided with intersection between bracing frame 23 Tension ropes 24.
Preferably, it is provided with vertical two piece stabiliser bar 25 between holder device 2, is separately positioned on lambdoid The symmetric position of bracing frame 23.
Preferably, chain block 34 is connected with sill 332 by vertical attachment means, and chain block 34 leads to Cross steel wire rope to be connected with material.
Preferably, one end of material is connected with upper bracket 21 by safety line 10.
Preferably, holder device 2 is articulated structure, and the weight of the parts of holder device 2 is both less than equal to 50kg, the height of holder device 2 is 6.5m-7.5m, width is 3.5m-4.5m, hoist engine 11 and secondary hoist engine 12 choose the special hoist engine that model is 1T and 0.5T standard respectively, and material fed distance is 0-200m.
The present invention provides a kind of Light-duty Quick-installation cableway, its technical scheme and corresponding technique effect as follows:
1. a kind of Light-duty Quick-installation cableway provided with reference to the accompanying drawing 1-3 present invention, uses single-point reciprocating cargo ropeway Basic structure, but compare with standard single-point reciprocating cargo ropeway, in order to Fast Installation, holder device 2 by being constituted with the metal structure of fast assembling-disassembling, and holder device 2 each component part deadweight no more than 50Kg, meets artificial carrying on mountain pass.Holder device 2, in herringbone, is connected with side tension cords 9 and collectively forms One stable gusseted.Side tension cords 9 undertakes the main pulling force of cableway carrier cable 5, and adjustable length is permissible According to field landform, it is bundled on the rock of thick trees, projection or the most architectural, otherwise can only use Anchorage is fixedly connected with the ground.
Carrier cable 5 is arranged between upper bracket 21 and lower carriage 22, and carrier cable 5 uses superhigh molecular weight polyethylene Alkene cordage, effect acts as the slideway that carriage device 3 moves.The surface of carrier cable 5 is through polyureas or other sprays Painting processes so that cable body closely and has good anti-wear performance.The quality of cordage only has the 1/7 of steel wire rope to arrive 1/8, it is suitable for a dead lift and installation.
Hauling rope 4 uses superhigh molecular weight polyethylene fibers rope, hoist engine 11 and secondary hoist engine 12 respectively with one Root hauling rope 4 connects, and therefore the upper and lower operation of hauling rope 4 all uses power traction, to ensure at upper bracket 21 With the height between lower carriage 22 is not enough to rely on gravity to use when making suspension hook glide.Equally, hoist engine 11, The deadweight of secondary hoist engine 12 building block is less than 50Kg.
2. storage rope device 6 is fixedly installed on lower carriage 22 one end by frame, and tension regulator 7 is fixed on lower carriage The top of 22, tension regulator 7 is connected with carrier cable 5, and storage rope device 6 and tension regulator 7 are for adjusting at any time Accurate distance between the joint degree of speeding of carrier cable 5 and upper bracket 21 and lower carriage 22.
With reference to accompanying drawing 4:
3. roller 31 is connected by adapter and two supports of cross-like, and the upper end of carriage device 3 relies on roller 31 roll walking on carrier cable 5, and carrier cable 5 bears overwhelming majority gravity.Entablature 331 is by roller 31 Being slidably connected with hauling rope 4, hauling rope 4 trailer wagon device 3 walks up and down.Chain block 34 is by vertical Attachment means is connected with sill 332, and chain block 34 is connected with material by steel wire rope, facilitates rising of material Hang and unload, it is also possible to transporting when apparatus needs holding level.
The concrete steps installed: be transported to the parts of Light-duty Quick-installation cableway rapidly specify position, assemble complete After, outside taking turns in carrier cable 5 is wrapped in angle pulley or corner block, upper bracket 21 and lower carriage 22 are connected Get up, start tension regulator 7, tighten up carrier cable 5.While tightening up carrier cable 5, two end supports are stood Rise (pulling up).Range estimation support and horizontal plane are substantially vertical.
After installation, a full and down workpiece is hung in examination, and whether range estimation can pass through whole barriers, regulates carrier cable The degree of speeding of 5, it is ensured that all workpiece can smooth delivery of power, both can normally use.
In conjunction with specific embodiments the technical scheme in the present invention is further understood that
Embodiment: QKS-1-200 type fast installation cableway
One, cableway parameter
Q: light-duty;K: quick mounting type;S: single fulcrum list rope reversible tramway;1 conveying articles weight 0-1 ton, 200 effective fed distance 20 meters-200 meters.
Two, runway structures form
Cableway pattern: single fulcrum list rope reversible tramway;
The speed of service: the maximal rate of operation is 2.5m/s, putting rope speed is 2.5m/s;
Carrier cable: φ 24mm super-high wear-resistant ultra-high molecular weight polyethylene rope, safety coefficient take > 2.5, Chu Shengqi One (200), special tension regulator one (15 tons)
Holder device: integrally assembled type steel structure support, bracing frame height divides 5 joints, high 7.0m, the width of support Spend about 4.0m.
Hauling rope: super-high wear-resistant φ 12mm ultra-high molecular weight polyethylene rope (special), safety coefficient takes > 2.5;
1, special hoist engine (1 ton), secondary 1, hoist engine (0.5 ton);
Three, operation instruction
Cableway addressing: the selection to aerial cableway should follow following principle: first reply decorating position carries out scene On-site inspection, and, centre minimum according to aerial cableway span do not have smooth former of obvious ridge, two ends physical features The most preferentially choose;Cableway two ends should be able to allow people to pass through, it is possible to removes and unloads primary goods and lay cable;Traction Rope 4 and cable are together laid, and avoiding trees etc. as far as possible can affect the barrier of cable body tensioning lift-off, if must The little scope trees in local must can be carried out migration process by the woods etc..
Basis is with fixing: in the fixation procedure of cableway agent structure, for improving installation rate, it should as far as possible Utilize site environment, be fixed such as thick trees, stump, the rock of projection or firm building etc., Fixture stress should be not less than 13 tons.
For not highlighting rock, mild heavy soil layer etc., it is impossible to find the distinguishingly condition of fixing side tension cords 9, Must be according to the making situation of micro-judgment ground.According to practical situation, utilize the rock anchors and quick hardening cement carried Ground is quickly fixed, or makes soil layer foundation pile, the geomatics engineer of specialty must be had if desired to do correct Anticipation, in use, it should test ground load-bearing.
Holder device is installed: selected basis, is all transported by the parts of holder device 2 grade and puts in place.First, The most fixing ground of holder device 2 is made according to size.The pre-buried upper bracket of ground 21 and the axle of lower carriage 22 Hole line, range estimation substantially to keep vertical with carrier cable 5.Ground, after quick hardening cement fastens substantially, starts group Dress holder device 2.
When assembling holder device 2, the direction of holder device 2 is that top is outside, i.e. close to earth anchor.By side tension cords The tops of 9 link earth anchors and supports, and long needed for estimating side tension cords 9 according to the angle of side tension cords 9 with horizontal plane Degree, the length of regulation side tension cords 9, make holder device 2 will not tumble to offside when erecting.Holder device 2 is pacified Load after admittedly completing, the tension ropes 24 of intersection be set between the lambdoid bracing frame 23 of holder device 2, By holder device 2 tensioning, its tensioning degree should not rock with two timbering with rafter arch sets's framves 23, do not bend and be as the criterion.
Carrier cable is installed: while holder device 2 transports appointment position, put a diameter 4mm in advance Superhigh molecular weight polyethylene fibers rope, artificial directly carrier cable 5 and hauling rope 4 being dragged to specifies position. Carrier cable 5 and hauling rope 4 are connected with related device, simply fix.
Holder device erects and tensioning: above-mentioned steps carries out complete, check errorless after, can be energized startup elevator The slow tensioning carrier cable 5 of machine 11, utilizes the tensile force of carrier cable 5 upper bracket 21 and lower carriage 22 to be erected. Adjusting the tension force of side tension cords 9, (can make weight by oneself, simple test is hung down to keep holder device 2 and horizontal vertical Straight degree).By suitable for hauling rope 4 tensioning, during the hoisting of hauling rope 4, should ensure that hauling rope 4 does not comes off, The most do not hang over branch or dolly side.
Trail run adjusts with degree of speeding: the size of the degree of speeding of carrier cable 5 is the basis that can cableway normally work, and speeds Degree is too big, in transportation, because of being acted on by load, hopper or by material and equipment easy be spanned Thing collides;Degree of speeding is the least, then, under the effect of load, carrier cable 5 stress can be significantly increased, and reduces rope The launch weight in road.Therefore, when setting up cableway, the degree of speeding of cableway should be increased as far as possible, it is ensured that material passes through ?.For barriers such as indivedual prominent rocks, trees, if desired, above-mentioned barrier is removed.
In view of above principle, cableway is when trail run first, and the material examination of optional 1.05 tons is hung, and emphasis should be examined Look into holder device 2, related fittings, side tension cords 9 and the firmness of other vitals, regulate load The degree of speeding of rope 5, whether range estimation material waits enough passes through.The degree of speeding of carrier cable 5 cannot be less than 4 meters.
Suspended object material (controllable distance) in short distance is run for several times repeatedly, normal operation, then can be normal Use Light-duty Quick-installation cableway.
Cableway reclaims and maintenance: when this cableway reclaims, checks and identifies the damaged condition of parts, eliminate in time Undesirable parts, the dust of the piece surface that clears all, it is coated with lubricating oil to operating position.
Vanning is with the minimum principle that takes up room, and parts should conveniently be dismantled, it is simple to transport, each parts of casing It is not more than 50kg, after being numbered, is put in the fixed position in case, convenient access.
For the characteristic that holding cableway entirety is succinct, practical, light, in terms of electrical control, also take the simplest Single design, installs concentratedly the device of electrical control in switch board 13, meets the needs of controllable property.
According to technical scheme, in the case of the connotation not changing the present invention, this area general Logical technical staff can propose multiple frame modes of the present invention.Therefore detailed description below and accompanying drawing are only It is that technical scheme is illustrated, and is not to be construed as the whole of the present invention or is considered as this Defining or limiting of bright technical scheme.

Claims (10)

1. a Light-duty Quick-installation cableway, including power control unit (1), holder device (2), dolly dress Putting (3), described power control unit (1) includes hoist engine (11), secondary hoist engine (12), switch board (13), described hoist engine (11), secondary hoist engine (12) and switch board (13) are successively set on geography On the smooth ground of position lower end, described holder device (2) include being arranged on different geographical height upper Frame (21) and lower carriage (22), described upper bracket (21) is by hauling rope (4) and lower carriage (22) Connecting, described carriage device (3) includes roller (31), adapter (32), crossbeam (33), pulls Calabash (34), described roller (31) is connected with crossbeam (33) by the adapter (32) of cross-like, Described crossbeam (33) includes entablature (331) and sill (332), it is characterised in that:
Described hoist engine (11) and secondary hoist engine (12) are connected with a hauling rope (4) respectively;
The top of described holder device (2) is provided with angle pulley or corner block;
By being wrapped in described angle pulley or turning between described upper bracket (21) and lower carriage (22) The hauling rope (4) of coaster foreign steamer external diameter is connected;
By being wrapped in described angle pulley or turning between described upper bracket (21) and lower carriage (22) In coaster, the carrier cable (5) of wheel external diameter is connected;
Described entablature (331) is slidably connected with described hauling rope (4) by roller (31), described Sill (332) is connected with described carrier cable (5).
A kind of Light-duty Quick-installation cableway the most according to claim 1, it is characterised in that described storage rope device (6) It is fixedly installed on the ground of described lower carriage (22) side by frame.
A kind of Light-duty Quick-installation cableway the most according to claim 2, it is characterised in that described tension regulator (7) top of described lower carriage (22), described tension regulator (7) and described carrier cable (5) it are fixed on Connect.
A kind of Light-duty Quick-installation cableway the most according to claim 3, it is characterised in that described storage rope device (6) It is connected with described tension regulator (7) by cordage.
A kind of Light-duty Quick-installation cableway the most according to claim 1, it is characterised in that described holder device (2) In herringbone, described holder device (2) is fixed on the ground by lower margin (8), described holder device (2) It is connected triangular in shape with described side tension cords (9).
A kind of Light-duty Quick-installation cableway the most according to claim 5, it is characterised in that described holder device (2) It is made up of lambdoid bracing frame (23), between support frame as described above (23), is provided with the tension ropes (24) of intersection.
A kind of Light-duty Quick-installation cableway the most according to claim 6, it is characterised in that described holder device (2) Between be provided with vertical two piece stabiliser bar (25), be separately positioned on the right of described lambdoid bracing frame (23) Claim position.
A kind of Light-duty Quick-installation cableway the most according to claim 1, it is characterised in that described chain block (34) Be connected with described sill (332) by vertical attachment means, described chain block (34) by steel wire rope with Material connects.
A kind of Light-duty Quick-installation cableway the most according to claim 1, it is characterised in that one end of material is passed through Safety line (10) is connected with described upper bracket (21).
A kind of Light-duty Quick-installation cableway the most according to claim 1, it is characterised in that described holder device (2) For articulated structure, the weight of the parts of described holder device (2) is both less than equal to 50kg, and described rack-mounted The height putting (2) is 6.5m-7.5m, width is 3.5m-4.5m, described hoist engine (11) and secondary hoist engine (12) choosing the special hoist engine that model is 1T and 0.5T standard respectively, material fed distance is 0-200m.
CN201510232182.XA 2015-05-08 2015-05-08 A kind of Light-duty Quick-installation cableway Pending CN106184237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510232182.XA CN106184237A (en) 2015-05-08 2015-05-08 A kind of Light-duty Quick-installation cableway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510232182.XA CN106184237A (en) 2015-05-08 2015-05-08 A kind of Light-duty Quick-installation cableway

Publications (1)

Publication Number Publication Date
CN106184237A true CN106184237A (en) 2016-12-07

Family

ID=57460210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510232182.XA Pending CN106184237A (en) 2015-05-08 2015-05-08 A kind of Light-duty Quick-installation cableway

Country Status (1)

Country Link
CN (1) CN106184237A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792790A (en) * 2017-10-16 2018-03-13 中国化学工程第十四建设有限公司 Installation and application for the aerial cableway of mountain region construction material transport
CN108797347A (en) * 2018-07-20 2018-11-13 中交武汉港湾工程设计研究院有限公司 Cycle is drawn into anchor system
CN110182226A (en) * 2019-06-13 2019-08-30 福建农林大学 Double carrying circulation traction multispan cableway sport cars and application method
CN110510527A (en) * 2019-08-01 2019-11-29 中国建筑土木建设有限公司 Installation system of high slope variable cross-section slope precast block and construction method thereof
CN114633768A (en) * 2022-02-14 2022-06-17 北京城建集团有限责任公司 Carrier cable laying and braiding method
CN115045175A (en) * 2022-06-30 2022-09-13 徐少钢 Temporary explosion-proof suspended ropeway bridge formed by single steel rope
CN110510527B (en) * 2019-08-01 2024-07-26 中国建筑土木建设有限公司 Installation system of high-side-slope variable-section side-slope precast block and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0678061B2 (en) * 1990-04-27 1994-10-05 ▲うお▼谷鉄工株式会社 Cable carrier
CN201209090Y (en) * 2008-03-07 2009-03-18 中铁十三局集团有限公司 Ropeway cable crane using single machine traction and lifting at steep terrain
CN201494438U (en) * 2009-10-13 2010-06-02 中国石油天然气股份有限公司 Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN102020206A (en) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 Ropeway transport system of long-span steep terrain wind power device
CN102654102A (en) * 2011-03-01 2012-09-05 周振文 Self-control kite group generator
CN103171975A (en) * 2013-01-17 2013-06-26 广东安元矿业技术服务有限公司 Method for transporting slope engineering material
CN204821555U (en) * 2015-05-08 2015-12-02 中国石油化工股份有限公司天然气川气东送管道分公司 Light -duty fast -assembling cableway

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0678061B2 (en) * 1990-04-27 1994-10-05 ▲うお▼谷鉄工株式会社 Cable carrier
CN201209090Y (en) * 2008-03-07 2009-03-18 中铁十三局集团有限公司 Ropeway cable crane using single machine traction and lifting at steep terrain
CN201494438U (en) * 2009-10-13 2010-06-02 中国石油天然气股份有限公司 Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN102020206A (en) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 Ropeway transport system of long-span steep terrain wind power device
CN102654102A (en) * 2011-03-01 2012-09-05 周振文 Self-control kite group generator
CN103171975A (en) * 2013-01-17 2013-06-26 广东安元矿业技术服务有限公司 Method for transporting slope engineering material
CN204821555U (en) * 2015-05-08 2015-12-02 中国石油化工股份有限公司天然气川气东送管道分公司 Light -duty fast -assembling cableway

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李金赐: "装配式索道在输电线路工程中的应用", 《电力与电工》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107792790A (en) * 2017-10-16 2018-03-13 中国化学工程第十四建设有限公司 Installation and application for the aerial cableway of mountain region construction material transport
CN108797347A (en) * 2018-07-20 2018-11-13 中交武汉港湾工程设计研究院有限公司 Cycle is drawn into anchor system
CN110182226A (en) * 2019-06-13 2019-08-30 福建农林大学 Double carrying circulation traction multispan cableway sport cars and application method
CN110510527A (en) * 2019-08-01 2019-11-29 中国建筑土木建设有限公司 Installation system of high slope variable cross-section slope precast block and construction method thereof
CN110510527B (en) * 2019-08-01 2024-07-26 中国建筑土木建设有限公司 Installation system of high-side-slope variable-section side-slope precast block and construction method thereof
CN114633768A (en) * 2022-02-14 2022-06-17 北京城建集团有限责任公司 Carrier cable laying and braiding method
CN115045175A (en) * 2022-06-30 2022-09-13 徐少钢 Temporary explosion-proof suspended ropeway bridge formed by single steel rope

Similar Documents

Publication Publication Date Title
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN201494438U (en) Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN105620493B (en) A kind of novel rapid-installation freight ropeway
CN206706584U (en) Pier arch rib in the asymmetric button lashed cable cable system installation Multi-arch bridge of middle pier
CN101446066B (en) Erection method of stiffening girder of suspension bridge and device thereof
US10053115B2 (en) Integrated bollard, anchor, and tower (IBAT) apparatus and method
CN106245527B (en) A kind of erection method of dicyclic suspender and Long span cat road track cable
CN105442446B (en) Hanging basket for detecting and maintaining anchor mooring heads of boom and stay cable of bridge
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN109371854A (en) The method of cable crane construction large-span suspension bridge stiff girder
CN204821555U (en) Light -duty fast -assembling cableway
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN106976797A (en) Three suspension centres turn round suspender
CN103626042A (en) Cableway transport lifting device
CN105735103A (en) Portable quick installation can dismantle bridge on foot
CN107476195A (en) A kind of suspension bridge transports the fortune beam tackle system of stiff girder
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN107022958A (en) The method in cable-stayed bridge across girder is installed using cable crane
CN207091932U (en) A kind of equipment of aerial trackless erecting suspension bridge stiff girder
CN110820555B (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN109291938A (en) A kind of four rope freight ropeway systems with pulley-type self balancing device
CN110886188A (en) Large-span suspension bridge stiffening beam erecting system and use method thereof
CN209065230U (en) A kind of towed vertical transferring apparatus system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication