CN106654993A CN201611053638.7A CN201611053638A CN106654993A CN 106654993 A CN106654993 A CN 106654993A CN 201611053638 A CN201611053638 A CN 201611053638A CN 106654993 A CN106654993 A CN 106654993A
Authority
CN
China
Prior art keywords
telescopic arm
expansion link
electric wire
seat
earth anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611053638.7A
Other languages
Chinese (zh)
Other versions
CN106654993B (en
Inventor
郭毅鹏
武振宇
智勇军
汪锋
陈瑾
郑俊洋
侯帅
孔德风
李晓航
王培川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201611053638.7A priority Critical patent/CN106654993B/en
Publication of CN106654993A publication Critical patent/CN106654993A/en
Application granted granted Critical
Publication of CN106654993B publication Critical patent/CN106654993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a power transmission line erecting apparatus. The power transmission line erecting apparatus comprises a ground anchor mechanism used for strengthening stability, a supporting mechanism arranged on the ground anchor mechanism, and a crossing mechanism arranged on the supporting mechanism, wherein the ground anchor mechanism, the supporting mechanism and the crossing mechanism are connected with a control mechanism separately. By adopting a split type design philosophy, a relatively large crossing apparatus can be divided into multiple small-sized modules to be carried conveniently, so that it is ensured that the modules can be transported separately and then can be combined after the modules are transported to an appointed position; in addition, the crossing apparatuses of different heights, bearing forces and crossing widths can be designed according to requirements; and meanwhile, balance adjustment modules are arranged on a first telescopic arm, so that posture adjustment can be performed in case of inclination or rough weather according to a balance monitoring module at the front end, thereby ensuring the operational stability of the apparatus.

Description

A kind of electric wire stringer
Technical field
The invention belongs to power construction technical field of auxiliary equipment, more particularly, to a kind of electric wire stringer.
Background technology
Due to the quality that transmission pressure is particularly high voltage electricity transmission conductive wire itself it is just larger, and for supporting the phase of transmission pressure Adjacent two steel towers have larger span, while there is electrical body, crops, trees, river, road between two neighboring steel tower The barrier that road, building and structures etc. are spanned, so, setting up or dismantle transmission pressure is a complexity and difficult work Journey.
In prior art, set up or dismantle transmission pressure generally using the guide rope between two neighboring steel tower and The coaster for being suspended on guide rope and being controlled by bracing wire, and to avoid transmission pressure from being spanned barrier with ground or with above-mentioned The crossing frame for contacting and insulation net, the logical framework knot by made by the aluminium alloy of steel alloy or lighter weight of crossing frame therein Structure.Because the transmission pressure for needing to set up or be removed is under the traction of coaster, to move between two neighboring steel tower, And be to be supported by crossing frame and sliding thereon during transmission pressure is moved, it can be seen that, crossing frame not only carries The weight of transmission pressure, while sliding friction is also produced between transmission pressure, so, crossing frame is firm also easy in any case Larger frictional force abrasion produced by the transmission pressure of sliding, be particularly removed old transmission pressure, because of its surface Have similar to zigzag tip, it is easier to make to be damaged away from more frame;In addition, the frictional resistance between transmission pressure and crossing frame can also Considerable influence is produced to traction element, because guide rope and coaster, and bracing wire are acted in the air in height by wind-force, is often gone out Existing guide rope and the phenomenon such as guy winding and coaster skew, coaster movement is more difficult after this phenomenon occurs, and guide rope and drawing Line winds and coaster also needs to overcome the frictional resistance between transmission pressure and crossing frame to lead transmission of electricity under shift state Line is moved, it is easy to is caused the phenomenons such as transmission pressure stagnation, and then is affected construction progress and increase the operations such as maintenance capacity, its construction Cost is significantly improved.Disclose a kind of overhead transmission line in the Chinese patent of Application No. 201310373308.6 to fill across wiring Put, including overhead messenger wire, wire barrow, the extension pulley with drive mechanism and vacantly hold in the palm line wheel, the overhead crane line front end leads to Cross tensioning mechanism to be connected to across on the fixture in front of thing, the extension pulley draws wire to be laid and transports on overhead messenger wire Dynamic, the hanging support line wheel holds up the wire and is suspended on overhead messenger wire, and the wire barrow leading-out terminal arranges wire anti-twist device, The extension pulley bottom arranges counterweight balancer;Although the invention can solve the problem that the problem of wiring, but and unresolved public at a high speed Technical problem of the road across operation.
The content of the invention
In view of this, the purpose of the present invention is for the deficiencies in the prior art, there is provided one kind can quickly solve public at a high speed Road cross-line operation, and it is simple to operate, reclaim safety and reduce the electric wire stringer that operation is affected by weather.
To achieve these goals, the present invention is employed the following technical solutions:A kind of electric wire stringer, including for strengthening The earth anchor mechanism of stability, the supporting mechanism being arranged in earth anchor mechanism, and the leap machine being arranged on the supporting mechanism Structure, the earth anchor mechanism, the supporting mechanism and the leap mechanism are connected with controlling organization;
The earth anchor mechanism includes the anchor block being made up of multiple earth anchor units, the counterweight element being arranged on anchor block, arranges In the load-bearing ring of anchor block the week side of boss and the pulling rope being connected with the load-bearing ring;
The supporting mechanism includes fixed pedestal, the expansion link being arranged on fixed pedestal and is arranged on the expansion link Fixed seat, the retainer ring being connected with the pulling rope is set on the expansion link;
The leap mechanism includes the main telescopic arm being flexibly connected with the fixed seat and secondary telescopic arm, is arranged on main telescopic arm The first telescopic arm and the second telescopic arm, fixed pulley is set on first telescopic arm;
Each sub- telescopic arm end on first telescopic arm is provided for adjusting the balance adjustment module of balance, each balance adjustment Flexible tracheae connection is connected through between module, the end of the flexible tracheae is connected with the high-pressure pump being arranged on anchor block Connect, the leading section of first telescopic arm arranges MEMS gyroscope and MEMS accelerometer.
The balance adjustment module includes circular base, the endless glide being arranged on circular base, is arranged on the ring Jet seat on shape slide rail, arranges air nozzle, upper air nozzle and lower air nozzle, the upper air nozzle and lower spray on the jet seat It is tangent that valve moves the circumference to be formed with the jet seat.
The air nozzle is vertically set on the surface of the jet seat.
The jet seat side arranges electromagnet, and the jet seat side arranges the absorption mutually fixed with the sub- telescopic arm Seat, arranges multiple through holes on the adsorption site.
Pin rod is worn in the through hole, described pin rod one end arranges steel disc, and the other end of the pin rod passes through spring by steel Piece is arranged on adsorption site, and the pin rod end setting boss carries out spacing to the spring.
The passage being connected with the flexible tracheae is set on the circular base.
Be connected by electric rotating machine between the main telescopic arm and the first telescopic arm, on first expansion link arrange with The support slot that first telescopic arm is engaged.
Its folding is controlled by the 3rd telescopic arm between second telescopic arm and main telescopic arm.
The earth anchor unit lower surface arranges multiple holdfasts, and through hole is arranged between the earth anchor unit, sets in the through hole Putting can be with the fix bar of activity.
Precaution device and monitor be set on the anchor block, the precaution device include audible-visual annunciator, MEMS gyroscope and MEMS accelerometer, the monitor includes the pressure for being arranged on the anchor block and arranging positioned at the fixed pedestal front lower portion Force snesor.
The expansion link includes that for three-level expansion link the fixed seat on the first order expansion link is mutually cut with scissors with secondary telescopic arm Connect, the fixed seat on the second level expansion link is hinged with the main telescopic arm.
The expansion link upper end arranges the steel wire rope being engaged with the main telescopic arm.
The controlling organization is computer.
The using method of the electric wire stringer:
1)Each mechanism for decomposing is carried into precalculated position, is then laid earth anchor unit, and wear fixation thereon Bar, then arranges fixed pedestal on earth anchor, and expansion link is arranged on;
2)The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete the group of telescopic arm Into, then fixed seat is set on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then expansion link is entered Row is lifted, and till it is tensioned pulling rope, and counterweight element is arranged on anchor block;
3)Then by the mass input computer obtained on anchor block, it is modified by computer, then telescopic arm is entered Row test, monitors whether its whether working properly and simulation elongation matches with counterweight element quality;When occur strong wind or Elongation is long when causing front end to wave or have tilt phenomenon, then monitor what is offset by MEMS gyroscope and MEMS accelerometer Direction and angle, by the angle adjustment to jet seat in balance adjustment module, and carry out the high speed blowback of high velocity air, so as to The attitude of the first telescopic arm is adjusted so that staff has time enough to carry out increasing counterweight or by the first expansion link Withdraw;
4)By way of the fixed pulley arranged on the first telescopic arm combines rope, the conveying of highway both sides goods and materials is carried out, It is first-selected after erection is finished to reclaim the first support arm, then again by the contraction of the second support arm, and it is contracted to by the 3rd support arm On first support arm, then by the retracted for clearance of the first support arm, and according to step 2)Reverse direction dismantled, so as to complete Into whole assembling, work and the work dismantled.
When the present invention in prior art according to having acrossing highway, generally require to be set up by bow and arrow or the mode of jettisoninging Mode tentatively set up, then placing second or arranging by first the 3rd, the 4th etc., this operation Mode not only tedious process, and there is the phenomenon that failure of jettisoninging causes to drop on a highway, to highway driving car Cause very big potential safety hazard, although and the mode that sets up steel pipe support is stable, its structure is too complicated, it is impossible to meet quick Needs of erection, therefore using demountable modular equipment, are not only convenient for transporting and are easy to set up, using by multiple The earth anchor mechanism of anchor unit composition, stable fixing force is provided as layer is weighed for pedestal, while can be according to the width crossed over The addition of adjustment balancing weight, and then it is able to ensure that its stability;But in order to ensure unfolding or in actual fed goods in leap During thing, due to the phenomenon that goods is overweight or by natural weather is affected to cause the first telescopic arm to wave, its each Sub- telescopic arm end is provided for adjusting the balance adjustment module of balance, and between each balance adjustment module flexible tracheae is connected through Connection, the end of the flexible tracheae is connected with the high-pressure pump being arranged on anchor block, and by air pump substantial amounts of height is produced Calm the anger body, and size and the folding of the Air Valve Control air-flow for passing through upper air nozzle, air nozzle and lower air nozzle rear portion, so as to spray The angle of valve is adjusted, and upper air nozzle and lower air nozzle that the circumference to be formed is rotated with the jet seat is tangent, can Stable carries out pose adjustment, after angle is adjusted, by electromagnet thereon the magnetic of high intensity is produced, and then causes pin Bar compression spring so that pin rod stretches out, and then cause steel disc with electromagnet to being attached together, jet seat is played so as to play The effect of spacing fixation.
Using earth anchor mechanism be made up of multiple earth anchor units, and anchor block bottom arrange holdfast, for strengthening it with ground The contact area in face, it is to avoid the phenomenon slided occurs, balancing weight is arranged thereon can strengthen stability with total, and It is attached by fix bar between earth anchor unit so that be connected as overall structure, it is to avoid the phenomenon that structure is deformed upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, arrange and leading that expansion link upper end is connected in anchor block avris Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is arranged on the inside of load-bearing ring to be used to monitor the change of its pressure;With pedestal after anchor block is set After expansion link lifting, opened by the secondary telescopic arm of the main telescopic arm bottom of computer controls, then or so static half an hour, passed through Computer monitoring stability problem, it is to avoid the phenomenon for occurring to break away occurs, the pressure sensor arranged by earth anchor front edge of board is supervised The change of data is surveyed, when gravity on the close anchor block of pressure value is monitored, alarm and reminding operating personnel is sent and is added Balancing weight, while carry out locking avoid maloperation from causing to continue to extend the potential safety hazard for causing to topple, in main telescopic arm across list To after track, the second telescopic arm is expanded into by vertical state by the 3rd telescopic arm, then the second telescopic arm is extended downwardly from, placed In greenbelt in the middle part of highway, so as to as the effect of secondary support, in order to strengthen the stability of support, second Telescopic arm bottom arranges support plate, strengthens stability with the contact area on ground for increasing it, then through the fortune of computer The stability status for obtaining its structure are calculated, then the rotation of the first telescopic arm are driven by electric rotating machine after the time of pause one end, So as to spread out and support slot is set in the end of main telescopic arm, so as to obtain favourable support to it, then by thereon The effect of support bar so as to stable smoothly to arrive at offside across next unidirectional track, stretches to strengthen practical function first Contracting arm end arranges fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that the stability of transmission, can be at it Upper transmission line also can transmit goods by it such that it is able to which the article of the erection and highway both sides of accelerating circuit is handed over Stream.
In addition, light-weight design material of the material of each component for adopting for high intensity, does not only reduce component Quality, and its quality can be reduced, reduce the quality of transfer module so as to be easy to carry and combine, in particular for needs When crossing over over long distances, the quality of the first expansion link is little and structural strength is big, while smoothly can realizing crossing over, it is ensured that quality is not Greatly, reduce and require earth anchor segment structure the larger impact for causing, the present invention adopts split type design concept, can will be larger Crossover device resolves into multiple small modules, for portable carrying, so that it is guaranteed that it can respectively transport it, is being delivered to It is combined behind the predetermined area, and can as needed designs differing heights, bearing capacity and the crossover device across width;Simultaneously Balance adjustment module is arranged on the first telescopic arm can supervise in run-off the straight or harsh weather according to the balance of front end Surveying module carries out pose adjustment, so that it is guaranteed that the stability of this plant running.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural representation of alarm of the present invention;
Fig. 3 is the structural representation of the first telescopic arm of the invention;
Fig. 4 is the structural representation that the first telescopic arm of the invention launches;
Fig. 5 is the end face structure schematic diagram of balance adjustment module of the present invention;
Fig. 6 is the side structure schematic diagram of balance adjustment module of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described for 1-6 and embodiment.
Embodiment one
A kind of electric wire stringer, including for the earth anchor mechanism for strengthening stability, the supporting mechanism that is arranged in earth anchor mechanism, And the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the supporting mechanism and the leap mechanism are equal It is connected with controlling organization;
The earth anchor mechanism includes the anchor block 19 being made up of multiple earth anchor units, the counterweight element being arranged on anchor block 19 23rd, the load-bearing ring 18 for being arranged on the week side of boss of anchor block 19 and the pulling rope 1 being connected with the load-bearing ring 18;
The supporting mechanism includes fixed pedestal 15, the expansion link 2 being arranged on fixed pedestal 15 and is arranged on described flexible Fixed seat 3 on bar 2, arranges the retainer ring being connected with the pulling rope 1 on the expansion link 2;
The leap mechanism includes the main telescopic arm 6 being flexibly connected with the fixed seat 3 and secondary telescopic arm 13, is arranged on main flexible The first telescopic arm 8 and the second telescopic arm 12 on arm 6, arranges fixed pulley 5 on first telescopic arm 8;
Each sub- telescopic arm end on first telescopic arm 9 is provided for adjusting the balance adjustment module 4 of balance, and each balance is adjusted Flexible tracheae 24 is connected through between section module 4 to connect, end and the height being arranged on anchor block 19 of the flexible tracheae 24 Compression pump 25 is connected, and the leading section of first telescopic arm 9 arranges balance detection module 23, and the balance detection module 23 is wrapped Include MEMS gyroscope and MEMS accelerometer.
The balance adjustment module 4 includes circular base 46, the endless glide 45 being arranged on circular base 46, is arranged on Jet seat 48 in the endless glide 45, arranges air nozzle 49, upper air nozzle 47 and lower air nozzle 50 on the jet seat 48, It is tangent that the upper air nozzle 47 and lower air nozzle 50 move the circumference for being formed with the jet seat 48.
The air nozzle 49 is vertically set on the surface of the jet seat 48.
The side of jet seat 48 arranges electromagnet 51, and the side of jet seat 48 arranges and mutually fixed with the sub- telescopic arm Adsorption site 43, multiple through holes are set on the adsorption site 43.
Pin rod 41 is worn in the through hole, the one end of the pin rod 41 arranges steel disc 44, and the other end of the pin rod 41 passes through Spring 42 is arranged on steel disc 44 on adsorption site 43, and the end of the pin rod 41 setting boss carries out spacing to the spring 42.
The passage being connected with the flexible tracheae is set on the circular base.
It is connected by electric rotating machine 10 between the main telescopic arm 6 and the first telescopic arm 8.
Its folding is controlled by the 3rd telescopic arm 9 between second telescopic arm 12 and main telescopic arm 6.
The earth anchor unit lower surface arranges multiple holdfasts 16, through hole is arranged between the earth anchor unit, in the through hole Arranging can be with the fix bar 17 of activity.
Precaution device 20 and monitor are set on the anchor block, and the precaution device includes audible-visual annunciator 201, MEMS gyro Instrument 202 and MEMS accelerometer 203, the monitor 14 is to be arranged on the anchor block 19 and positioned at the fixed pedestal front end The pressure sensor that bottom is arranged.
The expansion link 2 is included for three-level expansion link, the fixed seat 3 on the first order expansion link and the secondary phase of telescopic arm 13 It is hinged, the fixed seat 3 on the second level expansion link is hinged with the main telescopic arm 6.
The upper end of the expansion link 2 arranges the steel wire rope 22 being engaged with the main telescopic arm 6.
The controlling organization 21 is computer.
In the embodiment by the way of combined type earth anchor unit, and by way of fix bar is connected, constituted The anchor block of arbitrary area, for the stability of adjustment structure, and for the stability of further enhancing structure, in load-bearing ring Inner side is provided for the pressure sensor monitored, it is to avoid expansion link is caused during vertical expansion due to not being fully deployed Across during so that the phenomenon of expansion link run-off the straight;Cause pulling rope tight to fracture if launching unlifting pressure and crossing conference Phenomenon, due to the presence of load-bearing ring pressure sensor, under rational pressure can be controlled.
When the present invention in prior art according to having acrossing highway, generally require to be set up by bow and arrow or the mode of jettisoninging Mode tentatively set up, then placing second or arranging by first the 3rd, the 4th etc., this operation Mode not only tedious process, and there is the phenomenon that failure of jettisoninging causes to drop on a highway, to highway driving car Cause very big potential safety hazard, although and the mode that sets up steel pipe support is stable, its structure is too complicated, it is impossible to meet quick Needs of erection, therefore using demountable modular equipment, are not only convenient for transporting and are easy to set up, using by multiple The earth anchor mechanism of anchor unit composition, stable fixing force is provided as layer is weighed for pedestal, while can be according to the width crossed over The addition of adjustment balancing weight, and then it is able to ensure that its stability;But in order to ensure unfolding or in actual fed goods in leap During thing, due to the phenomenon that goods is overweight or by natural weather is affected to cause the first telescopic arm to wave, its each Sub- telescopic arm end is provided for adjusting the balance adjustment module of balance, and between each balance adjustment module flexible tracheae is connected through Connection, the end of the flexible tracheae is connected with the high-pressure pump being arranged on anchor block, and by air pump substantial amounts of height is produced Calm the anger body, and size and the folding of the Air Valve Control air-flow for passing through upper air nozzle, air nozzle and lower air nozzle rear portion, so as to spray The angle of valve is adjusted, and upper air nozzle and lower air nozzle that the circumference to be formed is rotated with the jet seat is tangent, can Stable carries out pose adjustment, after angle is adjusted, by electromagnet thereon the magnetic of high intensity is produced, and then causes pin Bar compression spring so that pin rod stretches out, and then cause steel disc with electromagnet to being attached together, jet seat is played so as to play The effect of spacing fixation.
In addition, using endless glide and the annular ring gear that is arranged in the endless glide, its structure and swivel joint Structure is similar, differs only in and airway is arranged in endless glide so as to not only realize that it can be set in sub- telescopic arm, and Can realize that air nozzle is led in gases at high pressure rotation.
Using earth anchor mechanism be made up of multiple earth anchor units, and anchor block bottom arrange holdfast, for strengthening it with ground The contact area in face, it is to avoid the phenomenon slided occurs, balancing weight is arranged thereon can strengthen stability with total, and It is attached by fix bar between earth anchor unit so that be connected as overall structure, it is to avoid the phenomenon that structure is deformed upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, arrange and leading that expansion link upper end is connected in anchor block avris Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is arranged on the inside of load-bearing ring to be used to monitor the change of its pressure;With pedestal after anchor block is set After expansion link lifting, opened by the secondary telescopic arm of the main telescopic arm bottom of computer controls, then or so static half an hour, passed through Computer monitoring stability problem, it is to avoid the phenomenon for occurring to break away occurs, the pressure sensor arranged by earth anchor front edge of board is supervised The change of data is surveyed, when gravity on the close anchor block of pressure value is monitored, alarm and reminding operating personnel is sent and is added Balancing weight, while carry out locking avoid maloperation from causing to continue to extend the potential safety hazard for causing to topple, in main telescopic arm across list To after track, the second telescopic arm is expanded into by vertical state by the 3rd telescopic arm, then the second telescopic arm is extended downwardly from, placed In greenbelt in the middle part of highway, so as to as the effect of secondary support, in order to strengthen the stability of support, second Telescopic arm bottom arranges support plate, strengthens stability with the contact area on ground for increasing it, then through the fortune of computer The stability status for obtaining its structure are calculated, then the rotation of the first telescopic arm are driven by electric rotating machine after the time of pause one end, So as to spread out and support slot is set in the end of main telescopic arm, so as to obtain favourable support to it, then by thereon The effect of support bar so as to stable smoothly to arrive at offside across next unidirectional track, stretches to strengthen practical function first Contracting arm end arranges fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that the stability of transmission, can be at it Upper transmission line also can transmit goods by it such that it is able to which the article of the erection and highway both sides of accelerating circuit is handed over Stream.
In addition, light-weight design material of the material of each component for adopting for high intensity, does not only reduce component Quality, and its quality can be reduced, reduce the quality of transfer module so as to be easy to carry and combine, in particular for needs When crossing over over long distances, the quality of the first expansion link is little and structural strength is big, while smoothly can realizing crossing over, it is ensured that quality is not Greatly, reduce and require earth anchor segment structure the larger impact for causing, the present invention adopts split type design concept, can will be larger Crossover device resolves into multiple small modules, for portable carrying, so that it is guaranteed that it can respectively transport it, is being delivered to It is combined behind the predetermined area, and can as needed designs differing heights, bearing capacity and the crossover device across width;Simultaneously Balance adjustment module is arranged on the first telescopic arm can supervise in run-off the straight or harsh weather according to the balance of front end Surveying module carries out pose adjustment, so that it is guaranteed that the stability of this plant running.
Embodiment two
It is with the difference of embodiment one:The support slot being engaged with first telescopic arm 8 is set on the main telescopic arm 6 11。
The expansion link top arranges the first fixed pulley 26 being engaged with fixed pulley.
Support slot is with the addition of in the embodiment, for being supported to the first support arm, so that it is guaranteed that the first telescopic arm exists Strong support can be obtained during expansion, it is ensured that the stability of structure, and hauling rope is arranged by fixed pulley and the first fixed pulley Rope, carries out article conveying.
Embodiment three
It is with the difference of embodiment two:First telescopic arm 8 arranges honeycomb 82 for internal, and its surface arranges plating Layers of chrome 81.
The the first telescopic arm inside adopted in the embodiment arranges honeycomb, can reduce construction weight, and does not change Structural strength.
Example IV
The using method of the electric wire stringer:
1)Each mechanism for decomposing is carried into precalculated position, is then laid earth anchor unit, and wear fixation thereon Bar, then arranges fixed pedestal on earth anchor, and expansion link is arranged on;
2)The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete the group of telescopic arm Into, then fixed seat is set on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then expansion link is entered Row is lifted, and till it is tensioned pulling rope, and counterweight element is arranged on anchor block;
3)Then by the mass input computer obtained on anchor block, it is modified by computer, then telescopic arm is entered Row test, monitors whether its whether working properly and simulation elongation matches with counterweight element quality;When occur strong wind or Elongation is long when causing front end to wave or have tilt phenomenon, then monitor what is offset by MEMS gyroscope and MEMS accelerometer Direction and angle, by the angle adjustment to jet seat in balance adjustment module, and carry out the high speed blowback of high velocity air, so as to The attitude of the first telescopic arm is adjusted so that staff has time enough to carry out increasing counterweight or by the first expansion link Withdraw;
4)By way of the fixed pulley arranged on the first telescopic arm combines rope, the conveying of highway both sides goods and materials is carried out, It is first-selected after erection is finished to reclaim the first support arm, then again by the contraction of the second support arm, and it is contracted to by the 3rd support arm On first support arm, then by the retracted for clearance of the first support arm, and according to step 2)Reverse direction dismantled, so as to complete Into whole assembling, work and the work dismantled.
Finally illustrate, above example is only to illustrate technical scheme and unrestricted, and this area is common Other modifications or equivalent that technical staff is made to technical scheme, without departing from technical solution of the present invention Spirit and scope, all should cover in the middle of scope of the presently claimed invention.

Claims (10)

1. a kind of electric wire stringer, including for the earth anchor mechanism for strengthening stability, the support machine that is arranged in earth anchor mechanism Structure, and the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the supporting mechanism and the leap mechanism It is connected with controlling organization;The earth anchor mechanism includes the anchor block being made up of multiple earth anchor units, is arranged on anchor block Counterweight element, the load-bearing ring for being arranged on anchor block the week side of boss and the pulling rope being connected with the load-bearing ring;The support machine Structure includes fixed pedestal, the expansion link being arranged on fixed pedestal and the fixed seat being arranged on the expansion link, described to stretch The retainer ring being connected with the pulling rope is set on contracting bar;The leap mechanism includes the master being flexibly connected with the fixed seat Telescopic arm and secondary telescopic arm, the first telescopic arm and the second telescopic arm being arranged on main telescopic arm sets on first telescopic arm Put fixed pulley;Each sub- telescopic arm end on first telescopic arm is provided for adjusting the balance adjustment module of balance, each flat Flexible tracheae connection, end and the high pressure gas being arranged on anchor block of the flexible tracheae are connected through between weighing apparatus adjustment module Pump is connected, and the leading section of first telescopic arm arranges MEMS gyroscope and MEMS accelerometer.
2. electric wire stringer according to claim 1, it is characterised in that:The balance adjustment module includes annular base Seat, the endless glide being arranged on circular base, the jet seat being arranged in the endless glide, arrange spray on the jet seat Valve, upper air nozzle and lower air nozzle, the upper air nozzle and lower air nozzle move the circumference phase to be formed with the jet seat Cut.
3. electric wire stringer according to claim 2, it is characterised in that:The air nozzle is vertically set on the jet The surface of seat.
4. electric wire stringer according to claim 2, it is characterised in that:The jet seat side arranges electromagnet, institute State jet seat side and the adsorption site mutually fixed with the sub- telescopic arm is set, multiple through holes are set on the adsorption site.
5. electric wire stringer according to claim 4, it is characterised in that:Pin rod, the pin rod are worn in the through hole One end arranges steel disc, and the other end of the pin rod is arranged on steel disc on adsorption site by spring, and the pin rod end arranges convex Platform carries out spacing to the spring.
6. electric wire stringer according to claim 1, it is characterised in that:Between the main telescopic arm and the first telescopic arm It is connected by electric rotating machine, the support slot being engaged with first telescopic arm is set on first expansion link.
7. electric wire stringer according to claim 6, it is characterised in that:Between second telescopic arm and main telescopic arm Its folding is controlled by the 3rd telescopic arm.
8. electric wire stringer according to claim 1, it is characterised in that:The earth anchor unit lower surface arranges multiple anchors Nail, setting in through hole, the through hole is arranged between the earth anchor unit can be with the fix bar of activity.
9. electric wire stringer according to claim 1, it is characterised in that:Precaution device is set on the anchor block with monitoring Device, the precaution device includes audible-visual annunciator, MEMS gyroscope and MEMS accelerometer, and the monitor includes being arranged on describedly The pressure sensor arranged on anchor slab and positioned at the fixed pedestal front lower portion.
10. the using method of the electric wire stringer according to any one of claim 1-9, it is characterised in that:
Each mechanism for decomposing is carried into precalculated position, is then laid earth anchor unit, and wear fix bar thereon, Then fixed pedestal is set on earth anchor, expansion link is arranged on;
The pulling rope of expansion link upper end is mutually fixed with the load-bearing ring being arranged on anchor block, so as to complete the composition of telescopic arm, Then fixed seat is set on expansion link, and main telescopic arm and secondary telescopic arm are set in fixed seat, then carry out expansion link Lifted, till it is tensioned pulling rope, and counterweight element is set on anchor block;
Then by the mass input computer obtained on anchor block, it is modified by computer, then telescopic arm is carried out Test, monitors whether its whether working properly and simulation elongation matches with counterweight element quality;When occurring strong wind or to stretch Long amount is long when causing front end to wave or have tilt phenomenon, then the side for offseting is monitored by MEMS gyroscope and MEMS accelerometer To with angle, by the angle adjustment to jet seat in balance adjustment module, and the high speed blowback of high velocity air is carried out, so as to right The attitude of the first telescopic arm is adjusted so that staff has time enough to carry out increasing counterweight or receive the first expansion link Return;
By way of the fixed pulley arranged on the first telescopic arm combines rope, the conveying of highway both sides goods and materials is carried out, Erection is first-selected after finishing to reclaim the first support arm, then again shrinks the second support arm, and is contracted to the by the 3rd support arm On one support arm, then by the retracted for clearance of the first support arm, and according to step 2)Reverse direction dismantled, so as to complete Whole assembling, work and the work dismantled.
CN201611053638.7A 2016-11-25 2016-11-25 A kind of electric wire stringer Active CN106654993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611053638.7A CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611053638.7A CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Publications (2)

Publication Number Publication Date
CN106654993A true CN106654993A (en) 2017-05-10
CN106654993B CN106654993B (en) 2018-01-26

Family

ID=58812990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611053638.7A Active CN106654993B (en) 2016-11-25 2016-11-25 A kind of electric wire stringer

Country Status (1)

Country Link
CN (1) CN106654993B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109524916A (en) * 2017-09-20 2019-03-26 胡广生 A kind of crossing frame
CN110061448A (en) * 2019-05-29 2019-07-26 国网河南省电力公司社旗县供电公司 A kind of cross-line road scrap electrical wires remove device
CN110148907A (en) * 2019-05-27 2019-08-20 广东电网有限责任公司 A kind of block crossing frame of two sides docking
CN117394206A (en) * 2023-12-13 2024-01-12 邯郸欣和电力建设有限公司 Circuit screen sealing equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917914A1 (en) * 2007-06-20 2008-12-26 Cqfd Composites Sarl CABLE ROUTING ELEMENT
CN201450279U (en) * 2009-09-03 2010-05-05 江苏省电力公司无锡供电公司 Multifunctional guide sliding support
CN103151750A (en) * 2013-02-02 2013-06-12 永贵能源开发有限责任公司 Roadway cable bracket
CN205419342U (en) * 2016-03-24 2016-08-03 张泽寅 Cable tool bogie for electric power construction
CN205471963U (en) * 2016-03-21 2016-08-17 国网安徽省电力公司电力科学研究院 Cable dish floor truck

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2917914A1 (en) * 2007-06-20 2008-12-26 Cqfd Composites Sarl CABLE ROUTING ELEMENT
CN201450279U (en) * 2009-09-03 2010-05-05 江苏省电力公司无锡供电公司 Multifunctional guide sliding support
CN103151750A (en) * 2013-02-02 2013-06-12 永贵能源开发有限责任公司 Roadway cable bracket
CN205471963U (en) * 2016-03-21 2016-08-17 国网安徽省电力公司电力科学研究院 Cable dish floor truck
CN205419342U (en) * 2016-03-24 2016-08-03 张泽寅 Cable tool bogie for electric power construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109524916A (en) * 2017-09-20 2019-03-26 胡广生 A kind of crossing frame
CN110148907A (en) * 2019-05-27 2019-08-20 广东电网有限责任公司 A kind of block crossing frame of two sides docking
CN110061448A (en) * 2019-05-29 2019-07-26 国网河南省电力公司社旗县供电公司 A kind of cross-line road scrap electrical wires remove device
CN117394206A (en) * 2023-12-13 2024-01-12 邯郸欣和电力建设有限公司 Circuit screen sealing equipment

Also Published As

Publication number Publication date
CN106654993B (en) 2018-01-26

Similar Documents

Publication Publication Date Title
CN106549338B (en) A kind of highway both sides pole lattice crossing frame
CN106654993B (en) A kind of electric wire stringer
CN106547060A (en) A kind of Construction of Optical Cable Line crossover device
CN102740938B (en) Stationary track with gimbaled rider carriages amusement ride
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN106486924B (en) A kind of power circuit wire-binding device across river
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN201458591U (en) Lifting device for installing sound barrier
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN103342318A (en) Lifting device for steel truss inspection trolley working platform and installation method thereof
CN101559905A (en) Deck unit erection gantry
DK3132137T3 (en) MOBILE CRANE DEVICE AND METHOD FOR THE TEMPORARY ASSEMBLY OF SUCH A CRANE DEVICE
CN206442061U (en) A kind of Construction of Optical Cable Line crosses over equipment
CN105735103B (en) Portable quick installation can dismantle bridge on foot
EP1810733B1 (en) An amusement ride
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN105586832A (en) Suspension type catwalk surface net mounting system
CN206164034U (en) Electric wire erects equipment
CN207903864U (en) A kind of side slope protection material lifting device
EP1800723B1 (en) An amusement ride
CN206164001U (en) Span overhead line device of through street
CN204821555U (en) Light -duty fast -assembling cableway
CN106586921A (en) Crossing block device
CN104229685B (en) The lifting of one modal test under water and assistant stability system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant