CN106486924B CN201610928989.1A CN201610928989A CN106486924B CN 106486924 B CN106486924 B CN 106486924B CN 201610928989 A CN201610928989 A CN 201610928989A CN 106486924 B CN106486924 B CN 106486924B
Authority
CN
China
Prior art keywords
expansion link
telescopic arm
power circuit
binding device
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610928989.1A
Other languages
Chinese (zh)
Other versions
CN106486924A (en
Inventor
时伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Pingxian Power Supplying Co
Original Assignee
State Grid Henan Pingxian Power Supplying Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Pingxian Power Supplying Co filed Critical State Grid Henan Pingxian Power Supplying Co
Priority to CN201610928989.1A priority Critical patent/CN106486924B/en
Publication of CN106486924A publication Critical patent/CN106486924A/en
Application granted granted Critical
Publication of CN106486924B publication Critical patent/CN106486924B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a kind of power circuit wire-binding device across river, including the earth anchor mechanism for strengthening stability, the supporting mechanism being arranged in earth anchor mechanism, and the leap mechanism on the supporting mechanism is arranged on, earth anchor mechanism, supporting mechanism and leap mechanism are connected with controlling organization;Revolution pedestal, the expansion link being arranged on revolution pedestal and the fixed seat being arranged on expansion link that supporting mechanism includes being rotatably arranged on anchor block, expansion link upper end, which rotates, sets the collar, set ring outer surface sets the retainer ring being connected with pulling rope, gear wheel is fixedly installed in expansion link bottom, motor is set on anchor block, and the little gear being meshed with gear wheel is set on the output shaft of motor, motor is connected with controlling organization using electric signal.The present invention has simple to operate, easy recovery, safe operation and is influenceed the advantages of small by weather.

Description

A kind of power circuit wire-binding device across river
Technical field
The invention belongs to power construction technical field of auxiliary equipment, more particularly, to a kind of power circuit frame across river Line apparatus.
Background technology
Because the quality of transmission pressure particularly high voltage electricity transmission conductive wire in itself is with regard to larger, and for supporting the phase of transmission pressure Adjacent two steel towers have larger span, while electrical body, crops, trees, river, road between two neighboring steel tower be present The barrier that road, building and structures etc. are spanned, so, set up or dismounting transmission pressure is a complexity and difficult work Journey.
In the prior art, set up or dismantle guide rope that power circuit generally use is arranged between two neighboring steel tower and The coaster for being suspended on guide rope and being controlled by bracing wire, and to avoid power circuit and ground or being spanned barrier with above-mentioned The crossing frame and insulation net being in contact, the logical framework knot made of steel alloy or the aluminium alloy of lighter weight of crossing frame therein Structure.Power circuit due to needing to set up or be removed will move under the traction of coaster between two neighboring steel tower, And it is to be supported by crossing frame and slid thereon during power circuit moves, it can be seen that, crossing frame not only carries The weight of power circuit, while sliding friction is also produced between power circuit, so, crossing frame is firm also easy in any case Larger frictional force abrasion caused by the power circuit slid, be particularly removed old power circuit, because of its surface Have and be similar to zigzag tip, it is easier to make to damage away from more frame;In addition, the frictional resistance between power circuit and crossing frame can also Considerable influence is produced to traction element, because guide rope and coaster, and bracing wire are acted on by wind-force in the air in height, often gone out Phenomena such as existing guide rope and guy winding and coaster are offset, coaster movement is more difficult after this phenomenon occurs, and guide rope and drawing Line is wound and coaster also needs to overcome the frictional resistance between power circuit and crossing frame could be by power line under shift state Move on road, it is easy to phenomena such as causing power circuit to stagnate, and then the process such as construction progress and increase maintenance capacity is influenceed, it is constructed Cost significantly improves.A kind of overhead transmission line is disclosed in the Chinese patent of Application No. 201310373308.6 to fill across wiring Put, including overhead messenger wire, wire barrow, the extension pulley with drive mechanism and vacantly hold in the palm line wheel, the overhead crane line front end leads to Cross tensioning mechanism to be connected to across on the fixture in front of thing, the extension pulley draws wire to be laid and transported on overhead messenger wire Dynamic, the hanging support line wheel holds up the wire and is suspended on overhead messenger wire, and the wire barrow leading-out terminal sets wire anti-twist device, The extension pulley bottom sets counterweight balancer;Although the invention can solve the problem that the problem of wiring, but and unresolved river across The more technical problem of operation.
The content of the invention
In view of this, the purpose of the present invention is in view of the shortcomings of the prior art, there is provided one kind can quickly solve river across Line operation, and simple to operate, easy recovery, safe operation and reduction are influenceed the power circuit frame across river of operation by weather Line apparatus.
To achieve these goals, the present invention uses following technical scheme:
A kind of power circuit wire-binding device across river, including for strengthening the earth anchor mechanism of stability, being arranged on ground Supporting mechanism on windlass structure, and the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the support machine Structure and the mechanism of crossing over are connected with controlling organization;
The earth anchor mechanism include be made up of multiple earth anchor units anchor block, be arranged on anchor block counterweight element, The pulling rope for being arranged on the load-bearing ring of anchor block the week side of boss and being connected with the load-bearing ring;
The supporting mechanism include be rotatably arranged on anchor block revolution pedestal, be arranged on it is described turn round pedestal on stretching Contracting bar and the fixed seat being arranged on the expansion link, the expansion link upper end, which rotates, sets the collar, the set ring outer surface The retainer ring being connected with the pulling rope is set, and the expansion link bottom is fixedly installed gear wheel, driving is set on anchor block Motor, and the little gear being meshed with the gear wheel, the motor and institute are set on the output shaft of the motor Controlling organization is stated using electric signal to be connected;
It is described to include the main telescopic arm being flexibly connected with the fixed seat and secondary telescopic arm across mechanism, it is arranged on main flexible The first telescopic arm on arm, fixed pulley is set on first telescopic arm.
Further, interim Cargo Lift is set in the earth anchor mechanism, on anchor block with four supporting legs of the interim Cargo Lift Position corresponding section sets chute, and the chute side sets locking pin to be used for four supporting legs for locking the interim Cargo Lift, institute State interim Cargo Lift top and interim operating desk is set, and the both sides of the edge of the interim Cargo Lift and the periphery of the interim operating desk are equal Safe fence is set.
Further, the main telescopic arm bottom sets automatic yarn feeding mechanism, and the automatic yarn feeding mechanism includes being arranged on The support of the main telescopic arm bottom, it is rotatably arranged on the active wheels of the support lower inside, is rotatably arranged on the branch Frame inside upper part and the driven wheels that are engaged with the active wheels and the output for being arranged on top on the left of the support Motor, the output motor are connected with the controlling organization, and the output end of the output motor turns with the active wheels Axle is connected, and the space for transmitting power line is formed between the active wheels and the driven wheels.
Further, it is connected between the main telescopic arm and the first telescopic arm by electric rotating machine, the main telescopic arm It is upper that the support slot being engaged with first telescopic arm is set.
Further, the earth anchor unit lower surface sets multiple holdfasts, and through hole is set between the earth anchor unit, described Fix bar that can be movable is set in through hole.
Further, precaution device and monitor are set on the anchor block, and the precaution device includes audible-visual annunciator, MEMS Gyroscope and MEMS accelerometer, the monitor include the pressure sensor for being arranged on the anchor block front lower portion.
Further, the expansion link is three-level expansion link, the fixed seat on the first order expansion link of the expansion link with Secondary telescopic arm is hinged, and the fixed seat on the second level expansion link of the expansion link is hinged with the main telescopic arm.
Further, the expansion link upper end sets the steel wire rope being engaged with the main telescopic arm.
Further, the controlling organization is computer.
The beneficial effects of the invention are as follows:
Present invention basis in the presence of when crossing over river, generally requires the side set up by bow and arrow or the mode of jettisoninging in the prior art Formula is tentatively set up, and is then being placed second or is being arranged the 3rd, the 4th etc. by first, this mode of operation Not only tedious process, and failure of jettisoninging be present and cause to drop the phenomenon in river, to travelled on river ship cause it is very big Potential safety hazard, although and set up that the mode of steel pipe support is stable, and its structure is too complicated, it is impossible to meet the need of fast erecting Will, therefore demountable modular equipment is used, it is not only convenient for transporting and is easy to set up, using by multiple earth anchor unit group Into earth anchor mechanism, as weighing, layer provides stable fixed force for pedestal, while can be according to the width adjustment counterweight of leap The addition of block, and then it is able to ensure that its stability.
The earth anchor mechanism of use is made up of multiple earth anchor units, and anchor block bottom sets holdfast, for strengthening itself and ground The contact area in face, the phenomenon slided is avoided, set balancing weight to strengthen the stability with total thereon, and It is attached between earth anchor unit by fix bar so that overall structure is connected as, the phenomenon for avoiding structure from deforming upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, set in anchor block avris and lead with what expansion link upper end was connected Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is set to be used for the change for monitoring its pressure on the inside of load-bearing ring;After anchor block is set with revolution After the lifting of pedestal expansion link, the secondary telescopic arm for controlling main telescopic arm bottom by computer opens, then or so static half an hour, By computer monitoring stability problem, the phenomenon for avoiding breakking away occurs, the pressure sensing set by earth anchor front edge of board The change of device Monitoring Data, when monitoring pressure value gravity close on anchor block, send alarm and reminding operating personnel progress Add balancing weight, while carry out locking and avoid maloperation from causing to continue the potential safety hazard that elongation causes to topple, main telescopic arm across More behind river, the stability status of its structure are obtained by the computing of computer, then pass through rotation after the time of pause one end The telescopic arm of motor driven first rotates, so as to spread out and in the end set support slot of main telescopic arm, so as to be obtained to it Favourable support, then by the effect of its upper support bar, stabilize it across river, smoothly arrive at opposite bank, in order to strengthen reality With effect in the first telescopic arm end set fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that transmission Stability, goods also can be transmitted by it in transmission line thereon, so as to accelerate the erection of circuit and public at a high speed The article exchange of road both sides.
In addition, in order to which angle of the main telescopic arm relative to riverbed can be adjusted according to the tendency in riverbed in work progress, Expansion link is rotatably arranged on anchor block by turning round pedestal, and is driven by motor and is fixedly installed on expansion link bottom Bull gear drive, so as to complete the adjustment to main telescopic arm relative to the angle in riverbed.
Brief description of the drawings
Fig. 1 is the structural representation of the first embodiment of the invention;
Fig. 2 is the structural representation of precaution device of the present invention;
Fig. 3 is the structural representation of second of embodiment of the invention;
Fig. 4 is the structural representation of the third embodiment of the invention;
Fig. 5 is the structural representation of automatic yarn feeding mechanism of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is this hair Bright part of the embodiment, rather than whole embodiments.Based on described embodiments of the invention, ordinary skill The every other embodiment that personnel are obtained, belongs to the scope of protection of the invention.
Embodiment one:
As depicted in figs. 1 and 2, a kind of power circuit wire-binding device across river, including for strengthening the ground of stability Windlass structure, the supporting mechanism being arranged in earth anchor mechanism, and the leap mechanism being arranged on the supporting mechanism, the earth anchor Mechanism, the supporting mechanism and the mechanism of crossing over are connected with controlling organization 16.
The earth anchor mechanism includes the anchor block 1 being made up of multiple earth anchor units, the counterweight element being arranged on anchor block 1 2nd, the pulling rope 4 for being arranged on the load-bearing ring 3 of the week side of boss of anchor block 1 and being connected with the load-bearing ring 3.
The supporting mechanism include be rotatably arranged on anchor block 1 revolution pedestal 5, be arranged on it is described revolution pedestal 5 on Expansion link 6 and the fixed seat 7 that is arranged on the expansion link 6, the upper end of expansion link 6, which rotates, sets the collar 8, the set The outer surface of ring 8 sets the retainer ring 9 being connected with the pulling rope 4, and gear wheel 10, ground is fixedly installed in the bottom of expansion link 6 On anchor slab 1 set motor 11, and on the output shaft of the motor 11 set be meshed with the gear wheel 10 it is small Gear 12, the motor 11 are connected with the electric signal of controlling organization 16.
The main telescopic arm 13 and secondary telescopic arm 14 for including being flexibly connected with the fixed seat 7 across mechanism, is arranged on The first telescopic arm 15 on main telescopic arm 13, fixed pulley 17 is set on first telescopic arm 15.
It is connected between the main telescopic arm 13 and the first telescopic arm 15 by electric rotating machine 25, on the main telescopic arm 13 The support slot 26 being engaged with first telescopic arm 15 is set.
The earth anchor unit lower surface sets multiple holdfasts 28, sets through hole between the earth anchor unit, in the through hole Fix bar 29 that can be movable is set.
Precaution device 30 and monitor 31 be set on the anchor block 1, the precaution device 30 include audible-visual annunciator 301, MEMS gyroscope 302 and MEMS accelerometer 303, the monitor 31 include being arranged on the pressure of the front lower portion of anchor block 1 Sensor.
The expansion link 6 is three-level expansion link, and the fixed seat 7 on the first order expansion link of the expansion link 6 is stretched with pair Arm 14 is hinged, and the fixed seat 7 on the second level expansion link of the expansion link 6 is hinged with the main telescopic arm 13.
The upper end of expansion link 6 sets the steel wire rope 27 being engaged with the main telescopic arm 13.
The controlling organization 16 is computer.
Present invention basis in the presence of when crossing over river, generally requires the side set up by bow and arrow or the mode of jettisoninging in the prior art Formula is tentatively set up, and is then being placed second or is being arranged the 3rd, the 4th etc. by first, this mode of operation Not only tedious process, and failure of jettisoninging be present and cause to drop the phenomenon in river, to travelled on river ship cause it is very big Potential safety hazard, although and set up that the mode of steel pipe support is stable, and its structure is too complicated, it is impossible to meet the need of fast erecting Will, therefore demountable modular equipment is used, it is not only convenient for transporting and is easy to set up, using by multiple earth anchor unit group Into earth anchor mechanism, as weighing, layer provides stable fixed force for pedestal, while can be according to the width adjustment counterweight of leap The addition of block, and then it is able to ensure that its stability.
The earth anchor mechanism of use is made up of multiple earth anchor units, and anchor block bottom sets holdfast, for strengthening itself and ground The contact area in face, the phenomenon slided is avoided, set balancing weight to strengthen the stability with total thereon, and It is attached between earth anchor unit by fix bar so that overall structure is connected as, the phenomenon for avoiding structure from deforming upon, together When in order to strengthen the stability of the upper expansion link of fixed pedestal, set in anchor block avris and lead with what expansion link upper end was connected Drawstring, after hoisting depth is designed, expansion link is raised above, rise to pulling rope it is tight when stop, in order to increase drawing Security, pressure sensor is set to be used for the change for monitoring its pressure on the inside of load-bearing ring;After anchor block is set with revolution After the lifting of pedestal expansion link, the secondary telescopic arm for controlling main telescopic arm bottom by computer opens, then or so static half an hour, By computer monitoring stability problem, the phenomenon for avoiding breakking away occurs, the pressure sensing set by earth anchor front edge of board The change of device Monitoring Data, when monitoring pressure value gravity close on anchor block, send alarm and reminding operating personnel progress Add balancing weight, while carry out locking and avoid maloperation from causing to continue the potential safety hazard that elongation causes to topple, main telescopic arm across More behind river, the stability status of its structure are obtained by the computing of computer, then pass through rotation after the time of pause one end The telescopic arm of motor driven first rotates, so as to spread out and in the end set support slot of main telescopic arm, so as to be obtained to it Favourable support, then by the effect of its upper support bar, stabilize it across river, smoothly arrive at opposite bank, in order to strengthen reality With effect in the first telescopic arm end set fixed pulley, for transmitting article by its setting transmission rope, so that it is guaranteed that transmission Stability, goods also can be transmitted by it in transmission line thereon, so as to accelerate the erection of circuit and public at a high speed The article exchange of road both sides.
In addition, in order to which angle of the main telescopic arm relative to riverbed can be adjusted according to the tendency in riverbed in work progress, Expansion link is rotatably arranged on anchor block by turning round pedestal, and is driven by motor and is fixedly installed on expansion link bottom Bull gear drive, so as to complete the adjustment to main telescopic arm relative to the angle in riverbed.
Embodiment two:
As shown in figure 3, the difference of itself and embodiment two is:Interim Cargo Lift 18, anchor block 1 are set in the earth anchor mechanism The upper position corresponding section of four supporting legs 19 with the interim Cargo Lift 18 sets chute 20, and the side of chute 20 sets locking pin 21 four supporting legs 19 for locking the interim Cargo Lift 18, the interim top of Cargo Lift 18 set interim operating desk 22, and institute State the both sides of the edge of interim Cargo Lift 18 and the periphery of the interim operating desk 22 and be respectively provided with safe fence 23.
In the embodiment, it is easy to climb up on expansion link and main telescopic arm for workmen and is operated and repaired, on ground Interim Cargo Lift is set on windlass structure, and interim operating desk is set on interim Cargo Lift top, in addition, in order in Operation and maintenance process In, prevent that interim Cargo Lift is mobile or topples, chute is set in four leg locations of interim Cargo Lift, and will be interim by locking pin Cargo Lift is fixed in chute.
Embodiment three:
As shown in Figure 4 and Figure 5, it is with the difference of embodiment two:The bottom of main telescopic arm 13 sets automatic defeated line Mechanism 24, the automatic yarn feeding mechanism 24 include being arranged on the support 241 of the bottom of main telescopic arm 13, be rotatably arranged on it is described The active wheels 242 of the lower inside of support 241, be rotatably arranged on the inside upper part of support 241 and with the active wheels 242 driven wheels 243 being engaged and the output motor 244 for being arranged on the left side of support 241 top, the output motor 244 are connected with the electric signal of controlling organization 16, and the output end of the output motor 244 turns with the active wheels 242 Axle is connected, and the space for transmitting power line is formed between the active wheels 242 and the driven wheels 243.
In the embodiment, automatic yarn feeding mechanism is set up in main telescopic arm bottom, and automatic yarn feeding mechanism uses active wheels The mode being engaged with driven wheels, active wheels drive under the driving of output motor and are located in active wheels and driven wheels Between power line rotate, while driven wheels apply certain pressure to power line, increase between power line and active wheels Frictional force, so as to power line power line is sent to from the side in river automatically under the transmission of automatic yarn feeding mechanism it is another Side, eliminate the trouble for needing more people to pull power line in river opposite side.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, this area is common Other modifications or equivalent substitution that technical staff is made to technical scheme, without departing from technical solution of the present invention Spirit and scope, all should cover among scope of the presently claimed invention.

Claims (9)

1. a kind of power circuit wire-binding device across river, including for strengthening the earth anchor mechanism of stability, being arranged on earth anchor Supporting mechanism in mechanism, and the leap mechanism being arranged on the supporting mechanism, the earth anchor mechanism, the supporting mechanism It is connected with described across mechanism with controlling organization;It is characterized in that:The earth anchor mechanism is included by multiple earth anchor unit groups Into anchor block, be arranged on anchor block counterweight element, be arranged on anchor block the week side of boss load-bearing ring and with the load-bearing ring The pulling rope being connected;The supporting mechanism include be rotatably arranged on anchor block revolution pedestal, be arranged on the revolution base Expansion link on seat and the fixed seat being arranged on the expansion link, the expansion link upper end, which rotates, sets the collar, the set Ring outer surface sets the retainer ring that is connected with the pulling rope, the expansion link bottom fixed setting gear wheel, on anchor block Motor is set, and the little gear being meshed with the gear wheel, the driving are set on the output shaft of the motor Motor is connected with the controlling organization using electric signal;The master for including being flexibly connected with the fixed seat across mechanism stretches Contracting arm and secondary telescopic arm, the first telescopic arm being arranged on main telescopic arm, fixed pulley is set on first telescopic arm.
A kind of 2. power circuit wire-binding device across river according to claim 1, it is characterised in that:The ground anchor machine Interim Cargo Lift is set on structure, and four leg location corresponding sections on anchor block with the interim Cargo Lift set chute, the cunning Groove side sets locking pin to be used for four supporting legs for locking the interim Cargo Lift, and the interim Cargo Lift top sets interim operation Platform, and the both sides of the edge of the interim Cargo Lift and the periphery of the interim operating desk are respectively provided with safe fence.
A kind of 3. power circuit wire-binding device across river according to claim 1, it is characterised in that:The master stretches Arm bottom sets automatic yarn feeding mechanism, and the automatic yarn feeding mechanism includes being arranged on the support of the main telescopic arm bottom, rotated Be arranged on the active wheels of the support lower inside, be rotatably arranged on the support inside upper part and with the active wheels The driven wheels being engaged and the output motor being arranged on above on the left of the support, the output motor and the control machine Structure is connected, and the output end of the output motor is connected with the rotating shaft transmission of the active wheels, the active wheels with it is described The space for transmitting power line is formed between driven wheels.
A kind of 4. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: It is connected between the main telescopic arm and the first telescopic arm by electric rotating machine, sets on the main telescopic arm and stretched with described first The support slot that contracting arm is engaged.
A kind of 5. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: The earth anchor unit lower surface sets multiple holdfasts, through hole is set between the earth anchor unit, being set in the through hole to live Dynamic fix bar.
A kind of 6. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: Precaution device and monitor are set on the anchor block, and the precaution device includes audible-visual annunciator, MEMS gyroscope and MEMS and accelerated Meter, the monitor include the pressure sensor for being arranged on the anchor block front lower portion.
A kind of 7. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: The expansion link is three-level expansion link, and the fixed seat on the first order expansion link of the expansion link is hinged with secondary telescopic arm, institute The fixed seat stated on the second level expansion link of expansion link is hinged with the main telescopic arm.
A kind of 8. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: The expansion link upper end sets the steel wire rope being engaged with the main telescopic arm.
A kind of 9. power circuit wire-binding device across river according to any one of claims 1 to 3, it is characterised in that: The controlling organization is computer.
CN201610928989.1A 2016-10-31 2016-10-31 A kind of power circuit wire-binding device across river Expired - Fee Related CN106486924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610928989.1A CN106486924B (en) 2016-10-31 2016-10-31 A kind of power circuit wire-binding device across river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610928989.1A CN106486924B (en) 2016-10-31 2016-10-31 A kind of power circuit wire-binding device across river

Publications (2)

Publication Number Publication Date
CN106486924A CN106486924A (en) 2017-03-08
CN106486924B true CN106486924B (en) 2017-12-22

Family

ID=58271217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610928989.1A Expired - Fee Related CN106486924B (en) 2016-10-31 2016-10-31 A kind of power circuit wire-binding device across river

Country Status (1)

Country Link
CN (1) CN106486924B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106300145B (en) * 2016-08-25 2017-10-24 国网山东省电力公司商河县供电公司 City or farm-to-market road power consumption cable arrangement installation special tool
CN107834478B (en) * 2017-11-16 2023-10-20 国网安徽省电力公司滁州供电公司 Wire fixing frame and wire fixing device for high-voltage electric tower
CN109160366A (en) * 2018-10-30 2019-01-08 国网河南省电力公司新野县供电公司 A kind of electric transmission line erection take-up and pay-off device
CN110416918A (en) * 2019-08-21 2019-11-05 广东电网有限责任公司 It is a kind of to cross over bracket
CN112186637B (en) * 2020-09-21 2021-09-14 国网山东省电力公司齐河县供电公司 Cable crossing device for power construction
CN112455685A (en) * 2020-11-11 2021-03-09 国网四川省电力公司检修公司 Unmanned aerial vehicle insulating rope throwing device and method with tension measurement protection function

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5538207A (en) * 1994-10-28 1996-07-23 Danford Technologies Inc. Boom-mountable robotic arm
KR20050079506A (en) * 2004-02-06 2005-08-10 윤재흥 Cable traction device
CN201674163U (en) * 2010-07-16 2010-12-15 中铁七局集团第四工程有限公司 Railway stringing operation vehicle
CN202556399U (en) * 2012-04-01 2012-11-28 山东电力研究院 High-voltage live-working robot device
CN205159901U (en) * 2015-10-29 2016-04-13 国网山东省电力公司莱芜供电公司 Special dolly is installed and removed to high -order earth connection
CN105610093A (en) * 2016-03-01 2016-05-25 国家电网公司 Anchor device and anchor method
CN105846354A (en) * 2016-05-31 2016-08-10 国网河南省电力公司南阳供电公司 Overhaul equipment for preventing device mistakenly entering charged interval in power engineering operation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5538207A (en) * 1994-10-28 1996-07-23 Danford Technologies Inc. Boom-mountable robotic arm
KR20050079506A (en) * 2004-02-06 2005-08-10 윤재흥 Cable traction device
CN201674163U (en) * 2010-07-16 2010-12-15 中铁七局集团第四工程有限公司 Railway stringing operation vehicle
CN202556399U (en) * 2012-04-01 2012-11-28 山东电力研究院 High-voltage live-working robot device
CN205159901U (en) * 2015-10-29 2016-04-13 国网山东省电力公司莱芜供电公司 Special dolly is installed and removed to high -order earth connection
CN105610093A (en) * 2016-03-01 2016-05-25 国家电网公司 Anchor device and anchor method
CN105846354A (en) * 2016-05-31 2016-08-10 国网河南省电力公司南阳供电公司 Overhaul equipment for preventing device mistakenly entering charged interval in power engineering operation

Also Published As

Publication number Publication date
CN106486924A (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN106486924B (en) A kind of power circuit wire-binding device across river
CN106549338B (en) A kind of highway both sides pole lattice crossing frame
CN206034277U (en) Bridge pier column maintenance plastic film wraps up construction equipment
CN106547060B (en) A kind of Construction of Optical Cable Line crossover device
CN109494621B (en) Power transmission line blocking device
CN106654993B (en) A kind of electric wire stringer
CN206442061U (en) A kind of Construction of Optical Cable Line crosses over equipment
CN207903864U (en) A kind of side slope protection material lifting device
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN105490210B (en) A kind of hydraulic pressure assembled crosses over special equipment and application method
CN203582341U (en) Lifted rotary-type self-balancing tower crane
CN206164001U (en) Span overhead line device of through street
CN207121403U (en) A kind of bridge machinery portable lift
CN206107539U (en) Take aerostatics of nacelle
CN206164034U (en) Electric wire erects equipment
CN209273680U (en) A kind of box beam rubber tube aid-pulling device
CN204982819U (en) Diversion tunnel shutoff gate detecting system
CN106986278A (en) The steel wire rope equalization of strain system and method adjusted based on head sheave
CN206401808U (en) A kind of highway both sides pole lattice crossover device
CN206834616U (en) Hold in the palm line car in high-altitude
CN106639853A (en) Novel electric power overhaul ladder and electric power rush repair equipment
CN202441342U (en) Derrick frame type oil pumping unit
CN106410683B (en) A kind of wire-binding device across highway
CN203911340U (en) Safe and reliable crossing frame
CN219914807U (en) Rotary drop test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222