CN105684698A - Petroleum development well site road greening method - Google Patents

Petroleum development well site road greening method Download PDF

Info

Publication number
CN105684698A
CN105684698A CN201610057431.0A CN201610057431A CN105684698A CN 105684698 A CN105684698 A CN 105684698A CN 201610057431 A CN201610057431 A CN 201610057431A CN 105684698 A CN105684698 A CN 105684698A
Authority
CN
China
Prior art keywords
construction
slope
greening
maintenance
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610057431.0A
Other languages
Chinese (zh)
Inventor
朱天龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610057431.0A priority Critical patent/CN105684698A/en
Publication of CN105684698A publication Critical patent/CN105684698A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a petroleum development well site road greening method. The method includes the first step of slope greening, the second step of road base reinforced cushion addition, the third step of slope reinforcement, the fourth step of low and short embankment slope greening, the fifth step of thick layer base material spraying and the sixth step of spray sowing greening. According to the method, the soil layer condition required for growth of plants is constructed on a slope face; grass is planted through a hydraulic spray sowing or spread sowing method, wherein a spray layer has certain stability and is suitable for growth of plants, it is ensured that plants on the slope face can stably grow for a long time, and a constructed external soil layer or a directly-sprayed layer can directly bear erosion of rainwater; a large amount of organic matter and the like are used as long-acting fertilizer, the phenomenon that nutrient runs out can not happen before a stable and health plant colony is formed on the slope face, engineering reinforcing measures are taken, the effect on reducing instability and erosion at the initial stage of slope face construction is very good, vegetation damaged by engineering construction can be restored, and the function of beautifying the environment is achieved.

Description

A kind of oil development well site road greening method
Technical field
The present invention relates to roadside greening technical field, be specifically related to a kind of oil development well site road greening method。
Background technology
Pengyang County in Ningxia Province is located in Liupan Mountain Area core space, it is that one of special poverty-stricken areas in flakes are concentrated greatly in the Qin Bashan Liupan Mountain Area given special assistance to of new round country development for poverty relief etc. six, domestic mountain, river, plateau have concurrently, ditch, loess hills, beam are alternate, frequent natural calamity, ecological environment frailty, masses' production and living conditions are poor。Since oil Changqing oilfields branch company starts exploration in 2006, also destroy forest cover while bringing huge motive force to local economy, exacerbated soil erosion, pollute ecological environment。Oil is as a kind of important energy, its range of application is also continuing expansion, consumption also increases increasingly, in the exploitation of oil, refining, storing, use procedure, restriction due to technological level and treatment technology, a large amount of waste water containing petroleum substance, waste residue have inevitably entered soil, and a large amount of in soil environment of oil exist and have a strong impact on whole soil ecosystem。
After oil enters soil, soil destructurized, physicochemical properties also change。Owing to oil can penetrate into rapidly in soil, killing the microorganism in soil, thus changing soil constituent, changing earth's surface ecological, suffering contaminated area to be likely to even to go up in the time of a century in decades all can not even a blade of grass grows。The oil pollution of soil directly results in the underproduction of grain, and is affected the health of the mankind by the edible plants and plant product being grown on farm land。Additionally, petroleum substance is constituted also by the transfer of the pollution of subsoil water and pollution, bad on environment for human survival many levels is coerced。Therefore, oil pollution increasingly comes into one's own, and has caused the very big concern of various circles of society。Fully understand petroleum substance absorption in soil and transfer behavior, the clear petroleum substance regularity of distribution in soil, be conducive to eliminating and reducing oil delay in soil environment, also can for providing reliable standby technology to ensure after oil accidental release, preventing and treating and management to petroleum-type dirt have important theory significance。
Therefore, for the greening of petroleum well field road, there is very great meaning。
Summary of the invention
For problem above, the invention provides a kind of oil development well site road greening method, employ substantial amounts of organic matter etc. as depot fertilizer, therefore, nutrient depletion phenomenon was not had before the stable healthy phytobiocoenose of domatic formation, take engineering reinforcement measure, the effect alleviating the domatic unstability building the initial stage and erosion aspect is fine, effect highly significant, the vegetation owing to engineering construction destroys can be recovered, there is the function beautified the environment, it is possible to effectively solve the problem in technical background。
To achieve these goals, the technical solution used in the present invention is as follows: a kind of oil development well site road greening method, comprises the steps:
(1) greening side slope: its sequence of construction is: artificial clear slope → excavation wedge shape ditch → domatic anchor bolt construction → wedge shape ditch backfill → spread three dimensional network and with " u "-shaped nail fixing → installation roof bolt plate, nut → earthing is in three dimensional network and infiltrates → hydraulic sprinkle (or broadcasting sowing) → paving non-woven fabrics maintenance;
(2) reinforcement bed course: its sequence of construction is: labor cleaning, smooth domatic → boring → the install fixing nail in top → hang geotechnical grid the insertion anchor pole that is in the milk → installations bottom fix connection → lattice indoor between nail → lattice room and banket → spread three dimensional network fix → hydraulic sprinkle → paving non-woven fabrics maintenance;
(3) reinforcing side slope: its sequence of construction is: banket in paving GSZ fixing → anchor pole and concrete frame beam construction → framework and infiltrate → hydraulic sprinkle → paving non-woven fabrics maintenance;
(4) short side slope of embankment greening: its sequence of construction is: anchor pole and completely spreading in concrete frame beam construction → framework in six side's hollow bricks → hollow brick bankets → and top layer broadcasts sowing grass seeds and covers dwarf soil → maintenance;
(5) thick layer base material spraying: its sequence of construction is: cleaning side slope → linked network also installs anchor pole → injection base material mixture → maintenance;
(6) spray-mix greening: its sequence of construction is: slope trimming → linked network and install anchor pole → spray mixed → paving non-woven fabrics maintenance。
Beneficial effects of the present invention:
(1) first the present invention builds soil layer condition necessary to plant growing on domatic, then hydraulic sprinkle or the method grass planting broadcasted sowing are adopted again, it is all that directly injection contains the mixture of grass seeds in domatic, the existing certain stability of jetted layers, it is suitable for again the growth of plant, ensureing that slope plants can grow steadily in the long term, external soil layer or the direct jetted layers of construction allow for standing the erosion of rainwater。
(2) present invention uses substantial amounts of organic matter etc. as depot fertilizer, therefore, before the stable healthy phytobiocoenose of domatic formation, do not have nutrient depletion phenomenon。
(3) present invention takes engineering reinforcement measure, and the effect alleviating the domatic unstability building the initial stage and erosion aspect is fine, acts on highly significant, it is possible to recovers the vegetation owing to engineering construction destroys, has the function beautified the environment。
Detailed description of the invention
According to following embodiment, it is possible to be better understood from the present invention。But, as it will be easily appreciated by one skilled in the art that the content described by embodiment is merely to illustrate the present invention, and should without the present invention described in detail in restriction claims。
Embodiment:
A kind of oil development well site road greening method, comprises the steps:
(1) greening side slope: its sequence of construction is: artificial clear slope → excavation wedge shape ditch → domatic anchor bolt construction → wedge shape ditch backfill → spread three dimensional network and with " u "-shaped nail fixing → installation roof bolt plate, nut → earthing is in three dimensional network and infiltrates → hydraulic sprinkle (or broadcasting sowing) → paving non-woven fabrics maintenance;
(2) reinforcement bed course: its sequence of construction is: labor cleaning, smooth domatic → boring → the install fixing nail in top → hang geotechnical grid the insertion anchor pole that is in the milk → installations bottom fix connection → lattice indoor between nail → lattice room and banket → spread three dimensional network fix → hydraulic sprinkle → paving non-woven fabrics maintenance;
(3) reinforcing side slope: its sequence of construction is: banket in paving GSZ fixing → anchor pole and concrete frame beam construction → framework and infiltrate → hydraulic sprinkle → paving non-woven fabrics maintenance;
(4) short side slope of embankment greening: its sequence of construction is: anchor pole and completely spreading in concrete frame beam construction → framework in six side's hollow bricks → hollow brick bankets → and top layer broadcasts sowing grass seeds and covers dwarf soil → maintenance;
(5) thick layer base material spraying: its sequence of construction is: cleaning side slope → linked network also installs anchor pole → injection base material mixture → maintenance;
(6) spray-mix greening: its sequence of construction is: slope trimming → linked network and install anchor pole → spray mixed → paving non-woven fabrics maintenance。
Based on above-mentioned, first the present invention builds soil layer condition necessary to plant growing on domatic, then hydraulic sprinkle or the method grass planting broadcasted sowing are adopted again, it is all that directly injection contains the mixture of grass seeds in domatic, the existing certain stability of jetted layers, being suitable for again the growth of plant, ensure that slope plants can grow steadily in the long term, external soil layer or the direct jetted layers of construction allow for standing the erosion of rainwater;Employ substantial amounts of organic matter etc. as depot fertilizer, therefore, before the stable healthy phytobiocoenose of domatic formation, do not have nutrient depletion phenomenon;Take engineering reinforcement measure, the effect alleviating the domatic unstability building the initial stage and erosion aspect is fine, act on highly significant, it is possible to recover the vegetation owing to engineering construction destroys, there is the function beautified the environment。
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all any amendment, equivalent replacement and improvement etc. made within the spirit and principles in the present invention, should be included within protection scope of the present invention。

Claims (1)

1. an oil development well site road greening method, it is characterised in that: comprise the steps:
(1) greening side slope: its sequence of construction is: artificial clear slope → excavation wedge shape ditch → domatic anchor bolt construction → wedge shape ditch backfill → spread three dimensional network and with " u "-shaped nail fixing → installation roof bolt plate, nut → earthing is in three dimensional network and infiltrates → hydraulic sprinkle (or broadcasting sowing) → paving non-woven fabrics maintenance;
(2) reinforcement bed course: its sequence of construction is: labor cleaning, smooth domatic → boring → the install fixing nail in top → hang geotechnical grid the insertion anchor pole that is in the milk → installations bottom fix connection → lattice indoor between nail → lattice room and banket → spread three dimensional network fix → hydraulic sprinkle → paving non-woven fabrics maintenance;
(3) reinforcing side slope: its sequence of construction is: banket in paving GSZ fixing → anchor pole and concrete frame beam construction → framework and infiltrate → hydraulic sprinkle → paving non-woven fabrics maintenance;
(4) short side slope of embankment greening: its sequence of construction is: anchor pole and completely spreading in concrete frame beam construction → framework in six side's hollow bricks → hollow brick bankets → and top layer broadcasts sowing grass seeds and covers dwarf soil → maintenance;
(5) thick layer base material spraying: its sequence of construction is: cleaning side slope → linked network also installs anchor pole → injection base material mixture → maintenance;
(6) spray-mix greening: its sequence of construction is: slope trimming → linked network and install anchor pole → spray mixed → paving non-woven fabrics maintenance。
CN201610057431.0A 2016-01-28 2016-01-28 Petroleum development well site road greening method Pending CN105684698A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610057431.0A CN105684698A (en) 2016-01-28 2016-01-28 Petroleum development well site road greening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610057431.0A CN105684698A (en) 2016-01-28 2016-01-28 Petroleum development well site road greening method

Publications (1)

Publication Number Publication Date
CN105684698A true CN105684698A (en) 2016-06-22

Family

ID=56228810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610057431.0A Pending CN105684698A (en) 2016-01-28 2016-01-28 Petroleum development well site road greening method

Country Status (1)

Country Link
CN (1) CN105684698A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968261A (en) * 2017-05-12 2017-07-21 中国十七冶集团有限公司 A kind of ecology bag means of defence of green side slope
CN111636444A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Water and soil conservation method for side slope in high-altitude area

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200375A (en) * 1998-01-12 1999-07-27 Fukudagumi:Kk Greening soil-structure for slope face
JP2001348874A (en) * 2000-06-08 2001-12-21 Naoyuki Hashimoto Vegetation base for protecting face of slope and work execution method
CN1358908A (en) * 2001-10-09 2002-07-17 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN1360821A (en) * 2002-01-23 2002-07-31 李绍才 Method of utilizing plant straw to green rocky side slope
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN1411686A (en) * 2002-11-12 2003-04-23 深圳市金晖生态环境有限公司 Three-D network skeleton for building culture soil layer for greening slope and its application method
CN1548663A (en) * 2003-05-20 2004-11-24 �㶫ʡ��̬�����������о��� Greening technology for sheer soft slope
CN1570292A (en) * 2003-07-15 2005-01-26 中国科学院地质与地球物理研究所 Surface afforestation method for anchor spraying construction slopes
CN1739331A (en) * 2004-08-27 2006-03-01 刘照朗 Re-greening technology of high gradient slope in stone pit
KR100729417B1 (en) * 2006-02-21 2007-06-15 주식회사 한천조경개발 Cutting area greening structure and soil spray greening method
CN101213910A (en) * 2008-01-09 2008-07-09 卢正才 Method for using gridding plant biological bag to process greening slope
CN101713192A (en) * 2009-11-20 2010-05-26 四川大学 Seed band-net-fiber bundle ecological slope protection structure
CN102644289A (en) * 2012-04-19 2012-08-22 福建省景观园林建筑发展有限公司 Spray sowing ecological restoration method for stone side slope of highway
CN204690762U (en) * 2015-03-09 2015-10-07 深圳市红树林园林绿化工程有限公司 The protecting and greening structure of a kind of geotechnological guipure and land waste side slope

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200375A (en) * 1998-01-12 1999-07-27 Fukudagumi:Kk Greening soil-structure for slope face
JP2001348874A (en) * 2000-06-08 2001-12-21 Naoyuki Hashimoto Vegetation base for protecting face of slope and work execution method
CN1358908A (en) * 2001-10-09 2002-07-17 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN1360821A (en) * 2002-01-23 2002-07-31 李绍才 Method of utilizing plant straw to green rocky side slope
CN1383714A (en) * 2002-06-14 2002-12-11 章梦涛 Mixed planting material for rocky slope and its prepn and construction process
CN1411686A (en) * 2002-11-12 2003-04-23 深圳市金晖生态环境有限公司 Three-D network skeleton for building culture soil layer for greening slope and its application method
CN1548663A (en) * 2003-05-20 2004-11-24 �㶫ʡ��̬�����������о��� Greening technology for sheer soft slope
CN1570292A (en) * 2003-07-15 2005-01-26 中国科学院地质与地球物理研究所 Surface afforestation method for anchor spraying construction slopes
CN1739331A (en) * 2004-08-27 2006-03-01 刘照朗 Re-greening technology of high gradient slope in stone pit
KR100729417B1 (en) * 2006-02-21 2007-06-15 주식회사 한천조경개발 Cutting area greening structure and soil spray greening method
CN101213910A (en) * 2008-01-09 2008-07-09 卢正才 Method for using gridding plant biological bag to process greening slope
CN101713192A (en) * 2009-11-20 2010-05-26 四川大学 Seed band-net-fiber bundle ecological slope protection structure
CN102644289A (en) * 2012-04-19 2012-08-22 福建省景观园林建筑发展有限公司 Spray sowing ecological restoration method for stone side slope of highway
CN204690762U (en) * 2015-03-09 2015-10-07 深圳市红树林园林绿化工程有限公司 The protecting and greening structure of a kind of geotechnological guipure and land waste side slope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张俊云等: "高速公路岩石边坡绿化方法探讨", 《岩石力学与工程学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968261A (en) * 2017-05-12 2017-07-21 中国十七冶集团有限公司 A kind of ecology bag means of defence of green side slope
CN111636444A (en) * 2020-05-22 2020-09-08 中电建十一局工程有限公司 Water and soil conservation method for side slope in high-altitude area

Similar Documents

Publication Publication Date Title
US10913894B1 (en) Construction method for ecologically protecting expansive soil slope by combining phosphogypsum with microbial mineralization
CN103262689B (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
US10405502B2 (en) Water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature difference in dry, hot valley
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN106900342A (en) Integrated half rockmass high slope revegetation guard method
CN105165325B (en) A kind of cohesive soil with low liquid protecting slope ecology method
CN105519274A (en) Integration method of large-scale coastal newly reclaimed beach agricultural land ecologicalization exploitation
CN105917787A (en) Method for fast and efficient improvement greening of coastal saline soil
KR20220123696A (en) Restoration management method of coal waste-rock stockyard using coal-based solid waste
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN104770257B (en) Method for recovering vegetation through micropore thin films
CN109757146B (en) Method for ecological greening of seaside saline-alkali sand land by utilizing salt-tolerant plants
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN103265355A (en) Plant growth matrix with high water retention for spray seeding revegetation and preparation method thereof
CN103797991A (en) Granite mine slash ecological green returning technology
CN113875344A (en) Ecological restoration method for coal mine mountain geological environment
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN101144280A (en) Efflorescence granite slope green safeguard structure system and construction method thereof
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN102612883B (en) Saline discharge and alkali reduction concealed conduit device for saline-alkali soil
CN105684698A (en) Petroleum development well site road greening method
CN111887067B (en) Method for ecological restoration of artificial vegetation on high and steep rock slope
CN2928836Y (en) Plant bed type waste water resource treating system
CN102027849A (en) Vegetation protection and recovery technology for plateau high-cold steppe area
CN107012829B (en) Soften slope surface silt soil and flinty slope remodeling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160622