CN103797991A - Granite mine slash ecological green returning technology - Google Patents

Granite mine slash ecological green returning technology Download PDF

Info

Publication number
CN103797991A
CN103797991A CN201210440646.2A CN201210440646A CN103797991A CN 103797991 A CN103797991 A CN 103797991A CN 201210440646 A CN201210440646 A CN 201210440646A CN 103797991 A CN103797991 A CN 103797991A
Authority
CN
China
Prior art keywords
slope
slash
soil
mine
granite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210440646.2A
Other languages
Chinese (zh)
Inventor
李征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210440646.2A priority Critical patent/CN103797991A/en
Publication of CN103797991A publication Critical patent/CN103797991A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/28Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for farming

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention belongs to the agricultural field, and particularly relates to the improvement of a granite mine slash ecological green returning technology. In order to solve the problems, the granite mine slash ecological green returning technology is provided. In order to achieve the purposes, the granite mine slash ecological green returning technology includes the following steps that firstly, land preparation is performed before construction, a ballast blocking wall is arranged on a stacking slope toe, a drainage ditch is excavated according to the peripheral terrain of a region, upstream rainfall runoff is drained out of the periphery of a mining area, meanwhile, when a hole is excavated in a slope, exposed stones are removed, the built soil stacked slope toe is cleared up in a centralized mode, and a soil body is retained; secondly, earth backing is carried out before renovation and green returning, the requirement for thickness is 1 m, a slope cutting and grading method is adopted on a mine wall soil texture slope, a horizontal trapezoid table face is formed, a bamboo joint building groove is then formed, and a water interception facility is built on the top of the slope; thirdly, a broadcast sowing method is adopted for performing greening.

Description

Slash, granite mine ecosystem recovery
Technical field
the invention belongs to agriculture field, in particular, the present invention relates to the improvement of slash, granite mine zoology green-recovery method.
Background technology
due to the exploitation of mining area large area, a large amount of forest covers are damaged, and earth's surface is exposed, and discarded soil, ore deposit quarrel are stacked everywhere.The soil body is loose, and water penetration is strong, under rainwater and rainwash intense impact and cutting, very easily produces landslide, debris flow, has caused serious water and soil loss, very harmful to ecotope.Be mainly manifested in.
1, destruction agricultural production mining area vegetation is destroyed, and the loose soil body, under the denudation of current, drops along slope, causes the water sand surfing of farmland, downstream to press, and soil desertification, is difficult to second ploughing, and cereal crops are lost and receive, and cause very large loss to local farmers.
2, harm water engineering facility, due to serious water and soil loss, a large amount of silt silts the water conservancy projects such as river course and pond on a hill, water channel up, has a strong impact on Jinjiang flood passage and drains off floodwaters and reduce water conservancy projects irrigation benifit, brings great threat to industrial and agricultural production and people's lives and properties.
3, polluted drinking water source, in mining process, a large amount of silt and dust, harmful physical, chemical substance flow in river, have caused pollution of waterhead.
4, affect ecoscape, mining area is located in city, Quanzhou City Beijing University door, adjoins mutually with Mount Jiuri, famous scenic area, the mountain of radically reforming.Mining area massif is exposed riddled with gaping wounds, formed in " green hill hang white ", heavy damage ecological natural view.
5, cause geological disaster, mining area part ore deposit point is not constructed by exploiting programme, and super gradient operation is usually come down, the geological disaster such as landslide, and Mine Safety in Production has been brought to very big harm.
6 jeopardize means of transportation, and mining area is located in by highway and railway, and mining explosion has larger impact to highway, safe railway operation.
Summary of the invention
the present invention is exactly for the problems referred to above, and slash, a kind of granite mine ecosystem recovery is provided.
for realizing above-mentioned purpose of the present invention, the present invention adopts following technical scheme, and slash, granite of the present invention mine ecosystem recovery is.
step 1 is first carried out whole ground before construction, blocks quarrel wall in the setting of accumulation toe, and according to district's periphery terrain excavation drain ditch, upstream rainfall runoff is discharged to periphery, mining area; ,, exposed stone is removed while digging cave domatic, concentrated arrangement assembles mound toe, retains the soil body meanwhile.
step 2, before regulation is multiple green, first carries out earth backing, and thickness requirement reaches lm; To rib soil slope face, take to cut slope and open the way of level, be made into horizontal ladder table top, after establish and build ring ditch; The facility that intercepts water is built on top, slope.
step 3, adopts the mode of broadcasting sowing to afforest; Select masson pine and add Paspalum wettsteinii and class reed seed through the acacia confusa seed of dewaxing treatment and mix in l:l:0.3:0.2 ratio, mix all and broadcast sowing afterwards with Nutrition Soil; Selection of time was carried out in the Ching Ming Festival.
beneficial effect of the present invention.
it is the new water and soil loss causing that the present invention can fundamentally control people; vegetation is restored substantially; ecotope and natural landscape obviously improve, and have effectively protected water source, promoted widely the health of local economy, steadily, continue to advance.
Embodiment
step 1, the heap ore body of falling slope greening is piled adverse slope face outward and is discarded soil quarrel, and the heap soil body is soft, easily sinks, and during Heavy Rain of Typhoon, is subject to powerful rainwash cutting and degrades, and easily produces the geological disaster such as dissected valley, slip and fall; Therefore, before construction, first carry out whole ground, block quarrel wall in the setting of accumulation toe, and according to district's periphery terrain excavation drain ditch, upstream rainfall runoff is discharged to periphery, mining area; ,, exposed stone is removed while digging cave domatic, concentrated arrangement assembles mound toe, retains the soil body, prevents landslide, avalanche and water and soil loss meanwhile, gets rid of that safety is steady to be suffered from, and guarantees production safety.
step 2, afforests in ore body in ore body spaciously and mostly is hard stone earth's surface or rubble quarrel spaciously, there is no soil matrix, and greening difficulty is very big; Therefore, before regulation is multiple green, first carry out earth backing, thickness requirement reaches lm left and right; To rib soil slope face, take to cut slope and open the way of level, be made into horizontal ladder table top, mesa width is according to the gradient, slope Gao Erding, table top anti-obliquity, after establish and build ring ditch; The facility that intercepts water is built on top, slope, and interception top direct runoff, prevents from washing away incision and avalanche.
step 3, landslide, the domatic greening of avalanche are for landslide, the domatic improvement greening of avalanche, and difficulty is larger, and the gradient is steeper conventionally, clay distribution inequality, having thickly has thinly, has dissected valley more simultaneously, is difficult for digging cave wholely and plants; Therefore, can only adopt the mode of broadcasting sowing to afforest; Specific practice: select masson pine and add Paspalum wettsteinii and class reed seed through the acacia confusa seed of dewaxing treatment and mix in l:l:0.3:0.2 ratio, mix all and broadcast sowing afterwards with Nutrition Soil; Time is typically chosen in around the Ching Ming Festival carries out.
in step 2, the multiple green method of regulation is: adopt Silvicultural Engineering, its specification: seeding row spacing is 2.5m × 2.5m, digging cave is 60cm × 50cm × 40cm, the every cave backfill of base manure municipal refuse 25kg, calcium magnesium phosphorus 0.5kg, nursery stock is selected the large nutritious bag seedling of height 60~80cm; Eucalyptus urophylla-grandis intermediate sleeve kind reed, Paspalum wettsteinii; Class reed adopts plant division way, and 2~3 every clump, seeding row spacing is 50cm × 50cm, and municipal refuse 2.5kg often spreads manuer in holes; Paspalum wettsteinii adopts planting seed, seed consumption l2kg/m 2 , mix all and broadcast sowing afterwards with Nutrition Soil, after cover the table soil of one deck l~2cm; Crassicarpa is selected in table top greening in ore body, and climbing plants kudzu is selected in terraced wall greening, dig cave specification and afforestation cave with, nursery stock is selected the raw nutritious bag seedlings of la; Plant rear management: after seedling planting,, in l month, continuous sunny is watered l time every 3d; 5, respectively execute quick-acting composite fertilizers l time July, every strain 0 .25kg.
above content is the further description of the present invention being done in conjunction with concrete preferred embodiment; can not assert that specific embodiment of the invention is confined to these explanations; for general technical staff of the technical field of the invention; without departing from the inventive concept of the premise; can also make some simple deduction or replace, all should be considered as belonging to the definite protection domain of claims that the present invention submits to.

Claims (2)

1. slash, granite mine ecosystem recovery, is characterized in that:
Step 1 is first carried out whole ground before construction, blocks quarrel wall in the setting of accumulation toe, and according to district's periphery terrain excavation drain ditch, upstream rainfall runoff is discharged to periphery, mining area; ,, exposed stone is removed while digging cave domatic, concentrated arrangement assembles mound toe, retains the soil body meanwhile;
Step 2, before regulation is multiple green, first carries out earth backing, and thickness requirement reaches lm; To rib soil slope face, take to cut slope and open the way of level, be made into horizontal ladder table top, after establish and build ring ditch; The facility that intercepts water is built on top, slope;
Step 3, adopts the mode of broadcasting sowing to afforest; Select masson pine and add Paspalum wettsteinii and class reed seed through the acacia confusa seed of dewaxing treatment and mix in l:l:0.3:0.2 ratio, mix all and broadcast sowing afterwards with Nutrition Soil; Selection of time was carried out in the Ching Ming Festival.
2. slash, granite according to claim 1 mine ecosystem recovery, it is characterized in that: in step 2, the multiple green method of regulation is: adopt Silvicultural Engineering, its specification: seeding row spacing is 2.5m × 2.5m, digging cave is 60cm × 50cm × 40cm, the every cave backfill of base manure municipal refuse 25kg, calcium magnesium phosphorus 0.5kg, nursery stock is selected the large nutritious bag seedling of height 60~80cm; Eucalyptus urophylla-grandis intermediate sleeve kind reed, Paspalum wettsteinii; Class reed adopts plant division way, and 2~3 every clump, seeding row spacing is 50cm × 50cm, and municipal refuse 2.5kg often spreads manuer in holes; Paspalum wettsteinii adopts planting seed, seed consumption l2kg/m 2, mix all and broadcast sowing afterwards with Nutrition Soil, after cover the table soil of one deck l~2cm; Crassicarpa is selected in table top greening in ore body, and climbing plants kudzu is selected in terraced wall greening, dig cave specification and afforestation cave with, nursery stock is selected the raw nutritious bag seedlings of la; Plant rear management: after seedling planting,, in l month, continuous sunny is watered l time every 3d; 5, respectively execute quick-acting composite fertilizers l time July, every strain 0 .25kg.
CN201210440646.2A 2012-11-07 2012-11-07 Granite mine slash ecological green returning technology Pending CN103797991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210440646.2A CN103797991A (en) 2012-11-07 2012-11-07 Granite mine slash ecological green returning technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210440646.2A CN103797991A (en) 2012-11-07 2012-11-07 Granite mine slash ecological green returning technology

Publications (1)

Publication Number Publication Date
CN103797991A true CN103797991A (en) 2014-05-21

Family

ID=50695769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210440646.2A Pending CN103797991A (en) 2012-11-07 2012-11-07 Granite mine slash ecological green returning technology

Country Status (1)

Country Link
CN (1) CN103797991A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104396688A (en) * 2014-11-07 2015-03-11 广西壮族自治区林业科学研究院 Building method of masson pine superior line breeding experimental forest
CN105248008A (en) * 2015-09-29 2016-01-20 谢庭生 Granite red earth hilly land gentle slope economic fruit land soil working method
CN108755714A (en) * 2018-06-22 2018-11-06 成都理工大学 Manually cut administering method and the application of slope slope and land slide in a kind of Slate Area
CN108755712A (en) * 2018-06-22 2018-11-06 成都理工大学 Cut administering method and the application of slope slope and land slide in a kind of phyllite area
CN108755713A (en) * 2018-06-22 2018-11-06 成都理工大学 Sandstone manually cuts slope slope and land slide administering method and its application
CN108797614A (en) * 2018-06-22 2018-11-13 福建省地质工程勘察院 Granite manually cuts hill wash slope administering method and application
CN109005722A (en) * 2018-07-30 2018-12-18 玉溪大红山矿业有限公司 A kind of iron ore waste-rock yard land reclamation comprehensive improvement method
CN109653216A (en) * 2018-12-19 2019-04-19 大连地拓环境科技有限公司 A kind of stone pit scree side slope restorative procedure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104396688A (en) * 2014-11-07 2015-03-11 广西壮族自治区林业科学研究院 Building method of masson pine superior line breeding experimental forest
CN105248008A (en) * 2015-09-29 2016-01-20 谢庭生 Granite red earth hilly land gentle slope economic fruit land soil working method
CN108755714A (en) * 2018-06-22 2018-11-06 成都理工大学 Manually cut administering method and the application of slope slope and land slide in a kind of Slate Area
CN108755712A (en) * 2018-06-22 2018-11-06 成都理工大学 Cut administering method and the application of slope slope and land slide in a kind of phyllite area
CN108755713A (en) * 2018-06-22 2018-11-06 成都理工大学 Sandstone manually cuts slope slope and land slide administering method and its application
CN108797614A (en) * 2018-06-22 2018-11-13 福建省地质工程勘察院 Granite manually cuts hill wash slope administering method and application
CN108797614B (en) * 2018-06-22 2021-02-05 福建省地质工程勘察院 Granite artificial slope cutting landslide control method and application
CN108755712B (en) * 2018-06-22 2021-02-09 成都理工大学 Treatment method and application of slope landslide of cut slope in phyllite region
CN108755714B (en) * 2018-06-22 2021-02-09 成都理工大学 Treatment method and application of landslide of manual slope cutting slope in slate area
CN109005722A (en) * 2018-07-30 2018-12-18 玉溪大红山矿业有限公司 A kind of iron ore waste-rock yard land reclamation comprehensive improvement method
CN109005722B (en) * 2018-07-30 2021-09-03 玉溪大红山矿业有限公司 Comprehensive reclamation method for land reclamation of iron ore waste stone yard
CN109653216A (en) * 2018-12-19 2019-04-19 大连地拓环境科技有限公司 A kind of stone pit scree side slope restorative procedure

Similar Documents

Publication Publication Date Title
CN103797991A (en) Granite mine slash ecological green returning technology
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN100473271C (en) System engineering method for modifying alkaline land by use of pipe drainage method
CN105103843A (en) Vegetation configuration method for preventing water and soil loss of mine dump of dry-hot valley
CN103416278B (en) Method for culturing vegetation in Karst landform region
CN103141176A (en) Method for improving saline soil in excavated grooves of border trees in coastal region
CN103262689A (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN101761086A (en) Three-dimensional net greening technique for roadbed side slope
CN105144888A (en) Saline land improvement method and improvement system
CN104686285A (en) Survival promoting method for planting big tree in saline and alkaline land
CN103858555A (en) Method for using caustic dross to establish nursery garden on saline and alkaline land
CN113875344A (en) Ecological restoration method for coal mine mountain geological environment
CN102612883B (en) Saline discharge and alkali reduction concealed conduit device for saline-alkali soil
CN110915348A (en) Ecological restoration method for stony desertification mountains
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN110800415A (en) Ecological treatment method in Qinba mountain land remediation engineering
CN111345139A (en) Three-dimensional space cooperative type comprehensive treatment mode and construction method for heavy salinization farmland
CN202455773U (en) Concealed conduit device for discharging salt and reducing alkali on saline-alkali land
CN210840602U (en) Coastal area heavy saline-alkali soil improvement system
CN106688800B (en) Water-retaining and fertilizer-retaining land reclamation method for tailing pond
CN113774934A (en) Ecological restoration method for coal gangue slag slope
CN103609386B (en) Muddy coastal zone plant groove or plant hole afforestation method
CN207739092U (en) Landscape ecology Pavement Construction
Islam Embankment erosion control: towards cheap and simple practical solutions for Bangladesh

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140521