CN105586834B - A kind of bridge arch rib section manufacture craft - Google Patents

A kind of bridge arch rib section manufacture craft Download PDF

Info

Publication number
CN105586834B
CN105586834B CN201610106417.5A CN201610106417A CN105586834B CN 105586834 B CN105586834 B CN 105586834B CN 201610106417 A CN201610106417 A CN 201610106417A CN 105586834 B CN105586834 B CN 105586834B
Authority
CN
China
Prior art keywords
assembled
section
arch rib
wind
manufacture craft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610106417.5A
Other languages
Chinese (zh)
Other versions
CN105586834A (en
Inventor
那宪伟
孔德超
陈方能
韩庆广
郑毅
张平
王钦国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanqiao Nantong Co ltd
Original Assignee
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd filed Critical Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority to CN201610106417.5A priority Critical patent/CN105586834B/en
Publication of CN105586834A publication Critical patent/CN105586834A/en
Application granted granted Critical
Publication of CN105586834B publication Critical patent/CN105586834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention relates to a kind of bridge arch rib section manufacture craft, the manufacture craft includes assembled purlin piece, the assembly of wind brace horizontal-associate and entirety three steps of section assembling.The advantage of the invention is that:Bridge arch rib section manufacture craft of the present invention matches assembly using multi-segmental, and each section can realize that the matching between associated component is assembled by specific moulding bed, so as to ensure that the line style precision of arch rib section;The amount of labour of the overall preassembling of bridge arch rib section is reduced, and shortens the assembled cycle, operating efficiency is improved.

Description

A kind of bridge arch rib section manufacture craft
Technical field
The invention belongs to bridge manufacturing technology field, more particularly to a kind of bridge arch rib section manufacture craft.
Background technology
With China railways, expressway construction project it is increasing, built in the poor deep mountain valleys of natural conditions The engineering of bridge is more and more, especially long-span steel arch bridge, because the structure is particularly suitable for paddy and flows anxious, construction environment deeply Severe plateau narrow valley region.Therefore for the preparation method of bridge arch rib, also it is taken seriously more and more, especially for Execution conditions adverse conditions, then its preparation method be just particularly important.
In the bridge that the present invention is studied, main bridge is using the double-deck trussed bridge of half-through, and span setting is 496m, bridge main line It is divided into upper and lower two layers by function, upper deck of bridge service motor vehicle, beam overall 33m;Lower floor's bridge service slow-vehicle system, width 12m is main 108m lower floors bridge floor can be removed by being suspended on the vertical shift track at upper deck of bridge beam bottom to both sides in spanning, to meet 500t grades Ship navigation requirement;In usually lower floor's bridge floor closure state, beam bottom about 300m scopes meet yacht navigational clearance height;And Arch rib therein section is also indispensable structure composition in bridge.Found through retrieval, China Patent No. is 201310367055.1 proposing a kind of bridge arch rib preparation method, comprise the following steps:1)Blanking typesetting;2)Blanking;3)Volume Pipe;4)Group weldering internal stiffeners;5)Put ground sample, assembling steel pipe;6)Boom location is determined, using dotting punch as mark;7)Boom location Erection support is simultaneously welded;8)Welded pipe and pipe butt weld;9)Group weldering arch rib;10)Horizontal, bearing diagonal makes;11)Sectional making is simultaneously Carry out preassembling;12)Mark is carried out at arch rib segmentation position, it is same to connect first code;13)Paint;Using the invention Method, in carrying out the making of bridge arch rib and be assembled, simplifies flow, while assembled and welding quality is also significantly increased, The construction quality of bridge arch rib is greatly ensured;But the preparation method has the following disadvantages:1. the bridge arch rib preparation method, Steel pipe is used, but steel tube section is more using steel, and manufacture relative complex, connection is inconvenient;2. the preparation method, no It can meet to the assembled requirement made of arch rib section multi-segmental matching, while in arch rib section manufacturing process, line style camber requires high, But the preparation method is difficult to control line style camber.
Therefore, developing the bridge arch rib section manufacture craft that a kind of preparation method is simple and convenient to operate and line style precision is high is It is highly desirable to.
The content of the invention
It is simple and convenient to operate the technical problem to be solved in the present invention is to provide a kind of preparation method and the high bridge of line style precision Camber rib section manufacture craft.
In order to solve the above technical problems, the technical scheme is that:A kind of bridge arch rib section manufacture craft, its innovative point It is:The manufacture craft is specific as follows:
(1)Purlin piece is assembled:Arch rib main truss entirety purlin piece is made up of upper and lower chord member and vertical web rod, diagonal web member, single internode For a purlin piece;Overall purlin piece assembly is using the assembly of multi-segmental continuous coupling, i.e., often wheel carries out assembled, assembly not less than 5 sections When, first by top boom and lower boom positioned parallel on moulding bed A, being adjusted makes to reserve 3mm welding contractions between upper and lower chord member Amount, and by method of the theodolite using rotary angle of 90 DEG, wind up bar node and lower edge bar node relative position relation are controlled, then Detected, after detection is qualified, chord member is fixed temporarily;Vertical web rod and diagonal web member are then installed successively, pushed up when diagonal web member is in place Pick coordinates;Then weld seam between straight, diagonal web member and lower-chord panel point is welded, treats again to determine after the completion of straight, diagonal web member and lower boom weld seam Position is welded in straight, diagonal web member and top boom, and welding process, and purlin plate plane degree is controlled using spirit level;After welding terminates, to each Azimuth dimension is detected, is disintegrated after detection is qualified, is left one section of parent segment as next round and is participated in assembled, disintegrates as list Segment unit body simultaneously installs temporary support;
(2)Wind brace horizontal-associate is assembled:Wind brace horizontal-associate is used to connect both sides main truss, is made up of wind brace node and wind brace rod member;Wind When supportting horizontal-associate assembly, wind brace node is placed on moulding bed B first, being adjusted makes each azimuth dimension meet code requirement;Inspection After survey is qualified, wind brace node is fixed temporarily;Then, wind brace rod member and wind brace node spelling, it is assorted with chord member node simulation tire;Treat After each orientation size adjusting is qualified, fixed temporarily with simulation tire, then complete to weld with the penetration of wind brace node;
(3)Overall section assembling:After the completion of arch rib main truss purlin piece, wind brace horizontal-associate difference are assembled, on section assembling moulding bed Carry out segment matches assembled with welding;First, the both sides purlin piece of first section is positioned, wind cable and support frame are set, enter sector-style Support horizontal-associate matching assembled, and it is interim fixed;Then, assembled lower floor's Longitudinal Wind strut member, after each orientation dimensional gaughing is qualified, peace Fill temporary support;Then, assembled upper strata Longitudinal Wind strut member, after each orientation dimensional gaughing is qualified, installs temporary support;First After section assembling terminates, the both sides purlin piece of second section is repositioned, as first segment assembling method, then assembly second Individual section levels Longitudinal Wind strut member;Assembled follow-up section, after welding completion is qualified, leaves one section as next round successively Parent segment participates in assembled, and disintegrate lower tire.
Further, the step(1)Middle moulding bed A should be provided with according to the linear setting of bridge arch rib on the moulding bed A Chord member positions pier and brace positioning pier, and adds temporary rest pier and spacing shelves angle.
Further, the step(1)In the assembled open work of purlin piece when should be carried out under conditions of without sunshine, and weld Stitch as one-level melt-through weld.
Further, the step(3)In section assembling moulding bed according to arch rib line style set, the moulding bed typically press five Segment length is set, but the larger moulding bed length of rise difference is according to 4~5 sections of arrangements.
The advantage of the invention is that:
(1)Bridge arch rib section manufacture craft of the present invention uses pin-connected panel, with can scale it is prefabricated, transport and installation side Just, the construction period is short, and average labor power consumption is few, and construction quality is easy to ensure;
(2)Bridge arch rib section manufacture craft of the present invention matches assembly using multi-segmental, and each section passes through specific moulding bed It can realize that the matching between associated component is assembled, and moulding bed is all set according to arch rib line style, so as to ensure that the line style of arch rib section Precision;The amount of labour of the overall preassembling of bridge arch rib section is reduced, and shortens the assembled cycle, operating efficiency is improved;
(3)Bridge arch rib section manufacture craft of the present invention, wherein, piece assembly open work in purlin should enter under conditions of without sunshine OK, and then avoid considering fetalism and purlin piece linear expansion coefficient, deformed to prevent fetalism, so as to ensure that dimensional accuracy.
Brief description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1~Fig. 2 is the process schematic of purlin piece assembly in bridge arch rib section manufacture craft of the present invention.
Fig. 3 is the schematic diagram of wind brace horizontal-associate assembly in bridge arch rib section manufacture craft of the present invention.
Fig. 4~Fig. 6 is the process schematic of overall section assembling in bridge arch rib section manufacture craft of the present invention.
Embodiment
The following examples can make professional and technical personnel that the present invention is more fully understood, but therefore not send out this It is bright to be limited among described scope of embodiments.
Embodiment
The present embodiment bridge arch rib section manufacture craft, the manufacture craft is specific as follows:
(1)Purlin piece is assembled:Arch rib main truss entirety purlin piece is made up of top boom 1, lower boom 2 and vertical web rod 3, diagonal web member 4, Single internode is a purlin piece;
Overall purlin piece assembly uses the assembly of multi-segmental continuous coupling, i.e., often wheel carries out assembly, and outdoor spelling not less than 5 sections Carried out during dress under conditions of without sunshine;When assembled, as shown in figure 1, first by top boom 1 and the positioned parallel of lower boom 2 in tire On frame A, moulding bed A is additionally provided with chord member positioning pier and brace positioning pier, and add according to the linear setting of bridge arch rib on moulding bed A If temporary rest pier and spacing shelves angle;Make to reserve 3mm welding contracted quantities between top boom 1, lower boom 2 by adjustment, and pass through longitude and latitude The method that instrument uses rotary angle of 90 DEG, the control node of top boom 1 and the node relative position relation of lower boom 2, are then detected, are examined After survey is qualified, chord member is fixed temporarily;
As shown in Fig. 2 then installing vertical web rod 3 and diagonal web member 4 successively, coordinated when diagonal web member 4 is in place with top pick;Then weld Weld seam between straight, diagonal web member and lower-chord panel point is connect, straight, the oblique abdomen of repositioning welding after the completion of straight, diagonal web member and the weld seam of lower boom 2 is treated Bar and top boom 1, and in welding process, purlin plate plane degree is controlled using spirit level;
After welding terminates, each azimuth dimension is detected, is disintegrated after detection is qualified, leaves one section as next round Parent segment participate in assembled, disintegrate as single hop cell cube and temporary support be installed;
(2)Wind brace horizontal-associate is assembled:Wind brace horizontal-associate is used to connect both sides main truss, is made up of wind brace node and wind brace rod member;
When wind brace horizontal-associate is assembled, as shown in figure 3, wind brace node 5 is placed on moulding bed B first, being adjusted makes each side Position size meets code requirement;After detection is qualified, wind brace node 5 is temporarily fixed;Then, 5 groups of wind brace rod member 6 and wind brace node Spell, it is assorted with chord member node simulation tire;After each orientation size adjusting is qualified, fix, then complete and wind temporarily with simulation tire Support the penetration welding of node 5;
(3)Overall section assembling:After the completion of arch rib main truss purlin piece, wind brace horizontal-associate difference are assembled, on section assembling moulding bed Carry out segment matches assembled with welding, section assembling moulding bed is set according to arch rib line style, and the moulding bed is typically set by five segment length Put, but the larger moulding bed length of rise difference is according to 4~5 sections of arrangements;
As shown in figure 4, first, positioning the both sides purlin piece 7 of first section, wind cable and support frame are set, wind brace is carried out horizontal The matching of connection 8 is assembled, and interim fixed;
As shown in figure 5, then, assembled lower floor's Longitudinal Wind strut member 9 after each orientation dimensional gaughing is qualified, installs interim Support;
As shown in fig. 6, then, assembled upper strata Longitudinal Wind strut member 10 after each orientation dimensional gaughing is qualified, installs interim Support;
After first segment assembly terminates, the both sides purlin piece of second section is repositioned, as first segment assembling method, Then assembled second section levels Longitudinal Wind strut member;Assembled follow-up section, after welding completion is qualified, leaves one section successively Participate in assembled as the parent segment of next round, disintegrate lower tire.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The skill of the industry Art personnel are it should be appreciated that the present invention is not limited to the above embodiments, and described in above-described embodiment and specification is explanation The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and Its equivalent thereof.

Claims (4)

1. a kind of bridge arch rib section manufacture craft, it is characterised in that:The manufacture craft is specific as follows:
(1)Purlin piece is assembled:Arch rib main truss entirety purlin piece is made up of upper and lower chord member and vertical web rod, diagonal web member, and single internode is one Individual purlin piece;Overall purlin piece assembly uses multi-segmental continuous coupling assembled, i.e., often wheel carries out assembly not less than 5 sections, when assembled, first First by top boom and lower boom positioned parallel on moulding bed A, being adjusted makes to reserve 3mm welding contracted quantities between upper and lower chord member, and The method that rotary angle of 90 DEG is used by theodolite, controls wind up bar node and lower edge bar node relative position relation, then carries out Detection, after detection is qualified, chord member is fixed temporarily;Vertical web rod and diagonal web member are then installed successively, matched somebody with somebody when diagonal web member is in place with top pick Close;Then weld seam between straight, diagonal web member and lower edge bar node is welded, treats to reposition after the completion of straight, diagonal web member and lower boom weld seam Weld in straight, diagonal web member and top boom, and welding process, purlin plate plane degree is controlled using spirit level;After welding terminates, to each side Position size is detected, is disintegrated after detection is qualified, is left one section of parent segment as next round and is participated in assembled, disintegrates as single hop Cell cube simultaneously installs temporary support;
(2)Wind brace horizontal-associate is assembled:Wind brace horizontal-associate is used to connect both sides main truss, is made up of wind brace node and wind brace rod member;Wind brace is horizontal When connection is assembled, wind brace node is placed on moulding bed B first, being adjusted makes each azimuth dimension meet code requirement;Detection is closed After lattice, wind brace node is fixed temporarily;Then, wind brace rod member and wind brace node spelling, it is assorted with chord member node simulation tire;Treat each side After position size adjusting is qualified, fixed temporarily with simulation tire, then complete to weld with the penetration of wind brace node;
(3)Overall section assembling:Arch rib main truss purlin piece, wind brace horizontal-associate after the completion of assembly, are carried out on section assembling moulding bed respectively Segment matches are assembled with welding;First, the both sides purlin piece of first section is positioned, wind cable and support frame are set, wind brace is carried out horizontal Lump is fixed with assembly, and temporarily;Then, assembled lower floor's Longitudinal Wind strut member, after each orientation dimensional gaughing is qualified, installation is faced When support;Then, assembled upper strata Longitudinal Wind strut member, after each orientation dimensional gaughing is qualified, installs temporary support;First segment After assembly terminates, the both sides purlin piece of second section is repositioned, as first segment assembling method, then assembled second is saved Section levels Longitudinal Wind strut member;Assembled follow-up section, after welding completion is qualified, leaves one section of parent segment as next round successively Participate in assembled, disintegrate lower tire.
2. bridge arch rib section manufacture craft according to claim 1, it is characterised in that:The step(1)Middle moulding bed A answers root According to the linear setting of bridge arch rib, be provided with the moulding bed A chord member positioning pier and brace positioning pier, and add temporary rest pier and Spacing shelves angle.
3. bridge arch rib section manufacture craft according to claim 1, it is characterised in that:The step(1)In purlin piece spell It should be carried out during dress open work under conditions of without sunshine, and weld seam is one-level melt-through weld.
4. bridge arch rib section manufacture craft according to claim 1, it is characterised in that:The step(3)In section spell Fill moulding bed to be set according to arch rib line style, the section assembling moulding bed is set by five segment length.
CN201610106417.5A 2016-02-26 2016-02-26 A kind of bridge arch rib section manufacture craft Active CN105586834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610106417.5A CN105586834B (en) 2016-02-26 2016-02-26 A kind of bridge arch rib section manufacture craft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610106417.5A CN105586834B (en) 2016-02-26 2016-02-26 A kind of bridge arch rib section manufacture craft

Publications (2)

Publication Number Publication Date
CN105586834A CN105586834A (en) 2016-05-18
CN105586834B true CN105586834B (en) 2017-07-28

Family

ID=55926720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610106417.5A Active CN105586834B (en) 2016-02-26 2016-02-26 A kind of bridge arch rib section manufacture craft

Country Status (1)

Country Link
CN (1) CN105586834B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368126B (en) * 2016-08-30 2018-07-03 中铁第四勘察设计院集团有限公司 The construction method of cluster type assembly arch rib
CN106284087B (en) * 2016-08-30 2018-03-09 中铁第四勘察设计院集团有限公司 Construction method suitable for the cluster type assembly arch rib of narrow bridge
CN107988908A (en) * 2017-06-27 2018-05-04 宝鸡中铁宝桥天元实业发展有限公司 The total assembling method of tubular arch
CN107905108B (en) * 2017-11-14 2019-05-03 宝鸡中铁宝桥天元实业发展有限公司 Tubular arch bolted web member hole group's accuracy control method
CN108894510A (en) * 2018-08-14 2018-11-27 中国铁建大桥工程局集团有限公司 Large Diameter Pipeline spacing gradient cam combination arch rib manufacturing construction method
CN109306655A (en) * 2018-10-25 2019-02-05 中信国安建工集团有限公司 A kind of steelframe bridge structure and construction method quickly spliced
CN109702363B (en) * 2018-12-26 2021-02-02 江苏中铁山桥重工有限公司 All-welded steel truss arch bridge welding method
CN111172889A (en) * 2020-02-26 2020-05-19 中交二公局第二工程有限公司 Assembling method for plate girder combination beam of suspension bridge
CN112176868A (en) * 2020-09-04 2021-01-05 中铁大桥局第七工程有限公司 Positioning method of welded lower chord for erecting main truss
CN112900740B (en) * 2021-01-21 2023-06-30 中交二航局第二工程有限公司 Truss girder segment and truss girder segment manufacturing method
CN113233324B (en) * 2021-04-30 2023-02-28 上海振华重工(集团)股份有限公司 Manufacturing method of truss type girder, truss type girder and telescopic shore bridge
CN115365690A (en) * 2021-05-19 2022-11-22 南通振华重型装备制造有限公司 Construction method of large-scale steel bridge S690 high-strength steel large-section box type arch rib
CN113585098B (en) * 2021-09-28 2021-12-28 南通华川交通装备有限责任公司 Construction method of steel structure bridge of super-large bridge
CN114808750A (en) * 2022-04-25 2022-07-29 中铁山桥(南通)有限公司 Manufacturing and assembling process for double-layer highway bridge deck steel truss girder segments
CN117569185B (en) * 2024-01-16 2024-03-22 贵州省公路工程集团有限公司 Steel truss web member-concrete combined arch bridge main arch ring segment steel structure stamping connecting plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0381462A (en) * 1989-08-24 1991-04-05 Okabe Co Ltd Form timbering in arch shape
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
CN101660295A (en) * 2009-09-28 2010-03-03 中铁八局集团第一工程有限公司 Hoisting method of arch bridge arch rib or beam body along bridge direction and used cable balance wheel
CN102220811A (en) * 2011-04-18 2011-10-19 武船重型工程有限公司 Truss arching-erecting splicing method of extra-large-pan steel pipe
CN202047356U (en) * 2011-04-20 2011-11-23 四川省交通厅公路规划勘察设计研究院 Combined steel tube concrete intercostal cross-brace structure
CN102912736A (en) * 2012-11-07 2013-02-06 中铁六局集团有限公司 Vertical assembling construction method for trussed arch bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0381462A (en) * 1989-08-24 1991-04-05 Okabe Co Ltd Form timbering in arch shape
CN101117795A (en) * 2007-08-29 2008-02-06 中铁大桥局股份有限公司 Mounting method for steel case basket arch single-frame segment
CN101660295A (en) * 2009-09-28 2010-03-03 中铁八局集团第一工程有限公司 Hoisting method of arch bridge arch rib or beam body along bridge direction and used cable balance wheel
CN102220811A (en) * 2011-04-18 2011-10-19 武船重型工程有限公司 Truss arching-erecting splicing method of extra-large-pan steel pipe
CN202047356U (en) * 2011-04-20 2011-11-23 四川省交通厅公路规划勘察设计研究院 Combined steel tube concrete intercostal cross-brace structure
CN102912736A (en) * 2012-11-07 2013-02-06 中铁六局集团有限公司 Vertical assembling construction method for trussed arch bridge

Also Published As

Publication number Publication date
CN105586834A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN105586834B (en) A kind of bridge arch rib section manufacture craft
CN108049302B (en) A kind of manufacturing method of full welding steel case and full bolt truss combined bridge lower edge steel box-girder
CN108103938B (en) A kind of double deck module solid trial assembly method of large steel girder
CN101440667A (en) Installation method of large-span single-layer canopy latticed shell structure
CN101182772B (en) Two lines intersection small radius, shallow earth covering and large longitudinal slope complicated linetype shield construction method
CN107498269B (en) A kind of large-scale ship reception chamber manufacturing method suitable for dry type ship compartment room
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN107253026B (en) A kind of multidirectional four anchor heads overall steel anchor beam production method
CN103084806A (en) Large curve steel box grider manufacture method
CN1978801A (en) Super-span steel skew arch construction method
CN104878699B (en) Pitching type truss-type bridges manufacture method
CN102251478A (en) Control method for synchronous construction survey of pylons and beams of cable-stayed bridge
CN109457615A (en) A kind of construction method of installation of abnormity bowstring arch bridge arch ring
CN211340473U (en) Steel guide beam for large-span steel beam pushing construction
CN110373988A (en) The big segment steel truss girder and manufacturing technology of a kind of band pair purlin
CN202099719U (en) Steel truss bridge
CN102877421A (en) Construction control method capable of realizing unstressed line shapes of pushing construction beam bodies at high accuracy
CN205858357U (en) Shield range restraint measures the mounting structure of forced centering bracket
CN205152802U (en) Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN109162723A (en) A kind of more pilot tunnel tunnel temporary steel support Demolition Construction methods of big cross section
CN105544410A (en) Joining method for rigid suspension cable stiffening chord in incremental launching method construction
CN108517779B (en) Across the high speed door opening assembling Method for Installation of low clearance variable cross-section curved box girder
CN107905108A (en) Tubular arch bolted web member hole group's accuracy control method
CN100366855C (en) Inclined triangular pyramid truss type frame construction and method for making, mounting and measuring the same
CN106545690B (en) The assemble method and system that prefabricated group pair of nuclear power station pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee after: China Railway Shanqiao (Nantong) Co.,Ltd.

Address before: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee before: JIANGSU CHINA RAILWAY SHANHAIGUAN BRIDGE HEAVY INDUSTRY Co.,Ltd.

CP01 Change in the name or title of a patent holder