CN105463993A - Movable formwork suitable for multiple beams and construction method - Google Patents
Movable formwork suitable for multiple beams and construction method Download PDFInfo
- Publication number
- CN105463993A CN105463993A CN201510825147.9A CN201510825147A CN105463993A CN 105463993 A CN105463993 A CN 105463993A CN 201510825147 A CN201510825147 A CN 201510825147A CN 105463993 A CN105463993 A CN 105463993A
- Authority
- CN
- China
- Prior art keywords
- side form
- suspension bracket
- mobile formwork
- applicable
- several beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a movable formwork suitable for multiple beams and a construction method. The movable formwork comprises main beams, a hanging bracket and a casting mold. The direction of the pair of fixedly connected main beams is identical with the length direction of a bridge. Guide beams are arranged at the front end and the rear end of each main beam. A front supporting leg, a middle supporting leg and a rear supporting leg are arranged on the bottom face of each main beam in a sliding mode. The hanging bracket is arranged on the outer sides of the two main beams. A through track beam is arranged on the bottom face of the hanging bracket. The casting mold is movably arranged on the lower side of the hanging bracket and comprises a side mold body and a bottom mold body vertically arranged on the lower side of the side mold body. Reverse hooking wheels are arranged on the upper portion of the side mold body. The cross section of the track beam is in an I shape, and the reverse hooking wheels are movably arranged in an I-shaped cavity of the track beam. By the adoption of only one movable formwork, the multiple transverse beams are cast and transversely moved; besides, the position of the movable formwork does not need to be moved in the transverse direction, materials are saved, the number of hole passing times is reduced, operation is easier, and the safety of bridge construction is improved.
Description
Technical field
The present invention relates to field of bridge construction, be specifically related to the mobile formwork and the construction method that are applicable to several beams.
Background technology
Mobile formwork is applied widely in the construction of concrete-bridge, for the bridge engineering of several concrete beam of lateral arrangement, the Construction Through Form on Traveler of general employing and width number equal number at present, each mobile formwork wants via hole, via hole number of times total is like this just many, or adopt the whole concrete beam of a mobile formwork along a direction by a width to construct, again mobile formwork is disassembled and reinstall to other width, to construct a width by same method again, circulation like this, owing to only having a mobile formwork, the via hole number of times moving to other width from a width also will be had more than the former mode.The former method uses more mobile formwork, and waste resource and manpower, although the latter comparatively saves material, load and unload more loaded down with trivial details.No matter the former or the latter, mobile formwork (refers to that mobile formwork moves across the length direction along bridge from one of bridge across to adjacent) during twice via hole all can only build a width concrete beam.And via hole is the operation that in Construction Through Form on Traveler process, security risk is maximum, therefore should reduce the via hole number of times of mobile formwork as far as possible.
As can be seen here, in the bridge construction of several beams, there is via hole problem often at present.
Summary of the invention
For the defect that prior art exists, the object of the present invention is to provide a kind of mobile formwork and the construction method that are applicable to several beams, when being intended to reduce the construction of several beams, the via hole number of times of mobile formwork, reduces security risk.
The technical solution adopted in the present invention there is provided a kind of construction method of the mobile formwork for several beams, comprises the following steps:
The side form and suspension bracket of building mould are fixed, build the first width beam,
Side form and suspension bracket are taken apart, and mould entirety will be built transfers, make the anti-hook wheel on side form top hang on the rail beam of suspension bracket, mould will be built and be divided into front and back two parts, below the nose girder longitudinally moving to rear and front end respectively,
The first width beam of having built is moved to precalculated position along the width of bridge,
Move back into original position by building the nose girder of mould from rear and front end again, and repeat above-mentioned steps, build with traversing until horizontal all concrete beam all complete,
Mobile formwork entirety is moved forward, completes via hole.
Be applicable in the construction method of the mobile formwork of several beams above-mentioned, before the side form and suspension bracket of building mould being fixed, utilize hydraulic means or jack device promote or transfer side form.
Be applicable in the construction method of the mobile formwork of several beams above-mentioned, time fixing, add reinforcement, adopt bearing pin to fix suspension bracket, side form and described reinforcement, and make three form three-legged structure.
Be applicable in the construction method of the mobile formwork of several beams above-mentioned, by side form from after suspension bracket is pulled down, side form anti-hook wheel card lean against suspension bracket under rail beam on.
The present invention also provides a kind of mobile formwork being applicable to several beams, comprising:
The girder be fixedly connected with for a pair consistent with bridge length direction, its front-end and back-end are provided with nose girder, slide and be provided with front leg strut, middle supporting leg and rear support leg in its bottom surface,
Be arranged on the suspension bracket outside girder described in two, the bottom surface of described suspension bracket is provided with elongated rail beam,
Be movably arranged on and build mould under described suspension bracket, comprise side form and be vertically set on the bed die below described side form, the top of described side form is provided with and instead hooks wheel, and the cross section of described rail beam is I shape, and described anti-hook wheel is movably arranged in the I-shaped chamber of described rail beam.
Be applicable in the mobile formwork of several beams above-mentioned, described suspension bracket is provided with stub axis hole, and described side form is provided with the secondary pin shaft hole measure-alike with described stub axis hole.
Be applicable in the mobile formwork of several beams above-mentioned, described side form is also provided with reinforcement, form three-legged structure with described suspension bracket, described side form.
Be applicable in the mobile formwork of several beams above-mentioned, described side form is provided with hydraulic means or the jack device of the vertical distance for controlling itself and described suspension bracket.
The present invention, only adopts a mobile formwork, to be built by several crossbeams of transverse direction and traversing, and mobile formwork is not laterally needing shift position, both saved material, decreased via hole number of times, operated more simple, improve the safety of bridge construction.
Accompanying drawing explanation
Fig. 1 is the side view of the present invention when concreting beam;
Fig. 2 be in Fig. 1 about I-I to sectional drawing;
Fig. 3 is the sectional drawing of the present invention when building the second horizontal width concrete beam
Fig. 4 is the schematic enlarged-scale view (during concreting) at A place in Fig. 2;
Fig. 5 is the elevation of the present invention when template system is opened;
Fig. 6 is the schematic enlarged-scale view while opening (build mould) at A place in Fig. 2.
Detailed description of the invention
The invention provides a kind of mobile formwork and the construction method that are applicable to several beams, decrease via hole number of times, simple to operate, improve the safety of bridge construction.Below in conjunction with specific embodiment and Figure of description, the present invention is described in detail.
As shown in Figure 1 and Figure 5, the invention provides a kind of mobile formwork being applicable to several beams, comprise girder 11, suspension bracket 13 and build mould 12.
A pair girder 11 consistent with bridge length direction is fixedly connected with, and its front-end and back-end are provided with nose girder 14, slides and be provided with front leg strut 15, middle supporting leg 16 and rear support leg 17 in its bottom surface.
As shown in Figure 2, Figure 3 and Figure 4, suspension bracket 13 is arranged on outside two girders 11, and the bottom surface of suspension bracket 13 is provided with elongated rail beam 18.Build mould 12 to be movably arranged on below suspension bracket 13, the bed die 122 comprising side form 121 and be vertically set on below side form 121.
As shown in Figure 4 and Figure 6, the top of side form 121 is provided with anti-hook wheel 110, and the cross section of rail beam 18 is I shape, and the anti-wheel 110 that hooks is movably arranged in the I-shaped chamber of rail beam 18.Suspension bracket 13 is provided with stub axis hole, and side form 121 is provided with the secondary pin shaft hole measure-alike with stub axis hole, fixes between suspension bracket 13, side form 12 by bearing pin 19.Side form 121 can also set up reinforcement, form three-legged structure with suspension bracket 13, side form 121, increase stability.
Side form 121 is provided with hydraulic means or the jack device of the vertical distance for controlling itself and suspension bracket 13.
Present invention also offers a kind of construction method of the mobile formwork for several beams, comprise the following steps:
The side form 121 of building mould 12 is fixed with suspension bracket 13, builds the first width beam 311,
Side form 121 and suspension bracket 13 are taken apart, and mould 12 entirety will be built transfers, make the anti-hook wheel 110 on side form 121 top hang on the rail beam 18 of suspension bracket 13, mould 12 will be built and be divided into front and back two parts, below the nose girder 14 longitudinally moving to rear and front end respectively,
By traversing to precalculated position along the width of bridge for the first width beam 311 of having built,
Original position is moved back into again by building the nose girder 14 of mould 12 from rear and front end, and repeat above-mentioned steps, until laterally all concrete beam all complete build with traversing (can composition graphs 2 and Fig. 3, comprise multiple beam in the horizontal, the first width beam 311 and the second width beam 312 as adjacent)
Add interim supporting leg in the front end of nose girder 14, mobile formwork is carried out first time reach by entirety along bridge length direction, arrive next empty bridge pier 23 to interim supporting leg,
Have bad luck middle supporting leg 16, front leg strut 15 and rear support leg 17 successively, make front leg strut 15 be placed on sky bridge pier, middle supporting leg 16 is placed in processing beam 31 front end newly completed, and rear support leg 17 is placed in the middle part of the processing beam 31 that newly completes, and then mobile formwork entirety is carried out second time reach, complete via hole.
Preferably, when first time moves forward, when interim supporting leg arrives empty bridge pier 23, during rear support leg 17 arrives near supporting leg 16, middle supporting leg 16 comes to nothing and hangs on girder 11, and now mobile formwork is in the supported at three point state of rear support leg 17, front leg strut 15, interim supporting leg,
Have bad luck middle supporting leg 16, make it arrive near front leg strut 15, being come to nothing by front leg strut 15 hangs on girder 11, and now mobile formwork is in the supported at three point state of rear support leg 17, middle supporting leg 16, interim supporting leg,
Have bad luck front leg strut 15, make it arrive empty bridge pier 23, interim supporting leg is come to nothing and hangs on the nose girder 14 of rear end, now mobile formwork is in 2 supports of front leg strut 15, middle supporting leg 16.
Preferably, hydraulic means or jack device is utilized to promote or transfer side form 121.
Preferably, time fixing, add reinforcement, adopt bearing pin to fix suspension bracket 13, side form 121 and reinforcement, and make three form three-legged structure.
Preferably, by side form 121 from after suspension bracket 13 is pulled down, anti-hook wheel 110 card of side form 121 leans against on the rail beam 18 under suspension bracket 13.
The present invention, only adopts a mobile formwork, to be built by several crossbeams of transverse direction and traversing, and mobile formwork is not laterally needing shift position, both saved material, decreased via hole number of times, operated more simple, improve the safety of bridge construction.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structure change made under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.
Claims (7)
1. be applicable to the construction method of the mobile formwork of several beams, it is characterized in that, comprise the following steps:
The side form and suspension bracket of building mould are fixed, build the first width beam,
Side form and suspension bracket are taken apart, and mould entirety will be built transfers, make the anti-hook wheel on side form top hang on the rail beam of suspension bracket, mould will be built and be divided into front and back two parts, below the nose girder longitudinally moving to rear and front end respectively,
By traversing to precalculated position along the width of bridge for the first width beam of having built,
Move back into original position by building the nose girder of mould from rear and front end again, and repeat above-mentioned steps, build with traversing until horizontal all concrete beam all complete,
Mobile formwork entirety is moved forward, completes via hole.
2. be applicable to the construction method of the mobile formwork of several beams as claimed in claim 1, it is characterized in that, utilize hydraulic means or jack device promote or transfer side form.
3. be applicable to the construction method of the mobile formwork of several beams as claimed in claim 1, it is characterized in that, time fixing, add reinforcement, adopt bearing pin to fix suspension bracket, side form and described reinforcement, and make three form three-legged structure.
4. be applicable to the mobile formwork of several beams, it is characterized in that, comprising:
The girder be fixedly connected with for a pair consistent with bridge length direction, its front-end and back-end are provided with nose girder, slide and be provided with front leg strut, middle supporting leg and rear support leg in its bottom surface,
Be arranged on the suspension bracket outside girder described in two, the bottom surface of described suspension bracket is provided with elongated rail beam,
Be movably arranged on and build mould under described suspension bracket, comprise side form and be vertically set on the bed die below described side form, the top of described side form is provided with and instead hooks wheel, and the cross section of described rail beam is I shape, and described anti-hook wheel is movably arranged in the I-shaped chamber of described rail beam.
5. be applicable to the mobile formwork of several beams as claimed in claim 4, it is characterized in that, described suspension bracket is provided with stub axis hole, and described side form is provided with the secondary pin shaft hole measure-alike with described stub axis hole.
6. be applicable to the mobile formwork of several beams as claimed in claim 4, it is characterized in that, described side form is also provided with reinforcement, form three-legged structure with described suspension bracket, described side form.
7. be applicable to the mobile formwork of several beams as claimed in claim 4, it is characterized in that, described side form is provided with hydraulic means or the jack device of the vertical distance for controlling itself and described suspension bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510825147.9A CN105463993B (en) | 2015-11-24 | 2015-11-24 | Movable formwork suitable for multiple beams and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510825147.9A CN105463993B (en) | 2015-11-24 | 2015-11-24 | Movable formwork suitable for multiple beams and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105463993A true CN105463993A (en) | 2016-04-06 |
CN105463993B CN105463993B (en) | 2017-04-26 |
Family
ID=55602114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510825147.9A Active CN105463993B (en) | 2015-11-24 | 2015-11-24 | Movable formwork suitable for multiple beams and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105463993B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887688A (en) * | 2016-04-27 | 2016-08-24 | 中建五局土木工程有限公司 | Elevation adjusting device of suspended beam template, movable template and elevation adjusting method |
CN106149639A (en) * | 2016-08-30 | 2016-11-23 | 郑州新大方重工科技有限公司 | A kind of mobile formwork for single rectangle top opening enclosed type water conservancy aqueduct construction |
CN106758863A (en) * | 2016-11-17 | 2017-05-31 | 中交路桥华东工程有限公司 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
CN107881925A (en) * | 2017-12-20 | 2018-04-06 | 长沙理工大学 | Gantry crane system and its construction method that a kind of mobile formwork of arranging in pairs or groups uses |
CN108086169A (en) * | 2017-12-13 | 2018-05-29 | 中国铁建大桥工程局集团有限公司 | The installation method for improving of bridge construction mobile formwork |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201003145Y (en) * | 2007-02-12 | 2008-01-09 | 郑州大方桥梁机械有限公司 | Upward and self-walking type mobile die carrier |
JP2009127317A (en) * | 2007-11-26 | 2009-06-11 | Sanshin Kogyo Kk | Bridge construction apparatus |
CN201713764U (en) * | 2010-04-29 | 2011-01-19 | 郑州市华中建机有限公司 | Movable formwork apparatus |
KR101462202B1 (en) * | 2013-10-16 | 2014-12-24 | 주식회사 비엔지컨설턴트 | Form traveller for through bridge |
CN204401473U (en) * | 2015-01-15 | 2015-06-17 | 中铁四局集团第二工程有限公司 | Upstroke movable framework steel bar overall binding lifting construction device |
-
2015
- 2015-11-24 CN CN201510825147.9A patent/CN105463993B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201003145Y (en) * | 2007-02-12 | 2008-01-09 | 郑州大方桥梁机械有限公司 | Upward and self-walking type mobile die carrier |
JP2009127317A (en) * | 2007-11-26 | 2009-06-11 | Sanshin Kogyo Kk | Bridge construction apparatus |
CN201713764U (en) * | 2010-04-29 | 2011-01-19 | 郑州市华中建机有限公司 | Movable formwork apparatus |
KR101462202B1 (en) * | 2013-10-16 | 2014-12-24 | 주식회사 비엔지컨설턴트 | Form traveller for through bridge |
CN204401473U (en) * | 2015-01-15 | 2015-06-17 | 中铁四局集团第二工程有限公司 | Upstroke movable framework steel bar overall binding lifting construction device |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887688A (en) * | 2016-04-27 | 2016-08-24 | 中建五局土木工程有限公司 | Elevation adjusting device of suspended beam template, movable template and elevation adjusting method |
CN105887688B (en) * | 2016-04-27 | 2018-04-03 | 中建五局土木工程有限公司 | Drop in beam formwork elevation measuring adjusting means, mobile formwork and absolute altitude adjusting method |
CN106149639A (en) * | 2016-08-30 | 2016-11-23 | 郑州新大方重工科技有限公司 | A kind of mobile formwork for single rectangle top opening enclosed type water conservancy aqueduct construction |
CN106758863A (en) * | 2016-11-17 | 2017-05-31 | 中交路桥华东工程有限公司 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
CN106758863B (en) * | 2016-11-17 | 2018-05-04 | 中交路桥华东工程有限公司 | A kind of overall fan-shaped across the width method for traversing of mobile formwork girder |
CN108086169A (en) * | 2017-12-13 | 2018-05-29 | 中国铁建大桥工程局集团有限公司 | The installation method for improving of bridge construction mobile formwork |
CN107881925A (en) * | 2017-12-20 | 2018-04-06 | 长沙理工大学 | Gantry crane system and its construction method that a kind of mobile formwork of arranging in pairs or groups uses |
Also Published As
Publication number | Publication date |
---|---|
CN105463993B (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105463993A (en) | Movable formwork suitable for multiple beams and construction method | |
CN102094392B (en) | Lower supported hanging basket in bridge construction and application thereof | |
CN105649654A (en) | Automatic hydraulic inverted arch trestle trolley and construction method thereof | |
CN105155423A (en) | Upward moving type movable formwork for continuous box girder construction | |
CN109629440B (en) | Steel box girder pushing construction method based on walking type three-dimensional hydraulic pushing equipment | |
CN109629441A (en) | PLC Multipoint synchronous three-dimensional hydraulic bridge incremental launching system and pushing method | |
CN103556578A (en) | Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system | |
CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
CN108086170B (en) | The hole construction method excessively of mobile formwork and mobile formwork | |
CN103195450A (en) | Hydraulic tunnel inverted arch operation trolley and inverted arch construction method | |
CN104594198B (en) | For the method for setting up juxtaposition case beam in tunnel | |
CN201261866Y (en) | Down moving type movable mould frame | |
CN109629439A (en) | A kind of single pylon cable stayed bridge construction method | |
CN208380591U (en) | Send rail tunnel hydraulic two linings trolley automatically | |
CN102134832A (en) | Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane | |
CN107675725A (en) | Large-scale component support system conversion equipment and its conversion method | |
CN102605720A (en) | Integrated construction equipment for binding and lifting continuous beam steel reinforcement framework and construction method | |
CN205062678U (en) | Be applied to construction of case roof beam of wave form steel web structure and hang basket | |
CN108086169B (en) | The installation method for improving of bridge construction mobile formwork | |
KR100928063B1 (en) | Self-launching movable formwork | |
CN106978783B (en) | Hanging basket for pouring inclined web type continuous beam cantilever | |
CN201972099U (en) | Through type hanging basket in bridge construction | |
CN103866699A (en) | Rail-free type walking hanging basket | |
CN107724247B (en) | A kind of box bridge tunnel face changes the outfit technique | |
CN103061262B (en) | A kind of deck erection gantry and application process thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |