CN204401473U - Upstroke movable framework steel bar overall binding lifting construction device - Google Patents

Upstroke movable framework steel bar overall binding lifting construction device Download PDF

Info

Publication number
CN204401473U
CN204401473U CN201520025152.7U CN201520025152U CN204401473U CN 204401473 U CN204401473 U CN 204401473U CN 201520025152 U CN201520025152 U CN 201520025152U CN 204401473 U CN204401473 U CN 204401473U
Authority
CN
China
Prior art keywords
movable framework
upstroke movable
mold
reinforcement
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520025152.7U
Other languages
Chinese (zh)
Inventor
赵飞
王杰
钱有伟
詹崇谦
王瑞
陈学鲁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HENGHUN MACHINERY Co Ltd
Second Engineering Co Ltd of CTCE Group
Original Assignee
SHANDONG HENGHUN MACHINERY Co Ltd
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HENGHUN MACHINERY Co Ltd, Second Engineering Co Ltd of CTCE Group filed Critical SHANDONG HENGHUN MACHINERY Co Ltd
Priority to CN201520025152.7U priority Critical patent/CN204401473U/en
Application granted granted Critical
Publication of CN204401473U publication Critical patent/CN204401473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to upstroke movable framework steel bar overall binding lifting construction device, and the cage of reinforcement place concreting in exterior sheathing is formed case beam; Strong health, stretch-draw, mud jacking and the sealing off and covering anchorage working procedure such as to carry out to building shaping case beam; Meanwhile, last hole is built on shaping concrete box girder mold has been set, assembling reinforcement skeleton along the longitudinal direction on mold.Afterwards upstroke movable framework via hole advance to next across, after adjusting to the right place, the construction period in each hole cage of reinforcement is delivered in upstroke movable framework by mold, and achieves synchronization job by boom hoisting by cage of reinforcement handling to exterior sheathing, about can shorten sky.Relative to traditional construction technique, meet the requirement of large span, large-tonnage and high headroom.The situation that cannot arrange straddle truck walking track under the bridge floors such as offshore construction is suitable for too simultaneously.

Description

Upstroke movable framework steel bar overall binding lifting construction device
Technical field
The present invention relates to bridge construction technical field, be specifically related to a kind of upstroke movable framework steel bar overall binding lifting construction device.
Background technology
Mobile formwork bridge fabrication machine is that one carries template, utilizes cushion cap or pier stud as supporting, bridge is carried out to the construction machinery of cast in situs.Construction Through Form on Traveler operation is continuous productive process, and operation is followed successively by: 1. mobile formwork via hole, adjust in place; 2. at the bottom of colligation, web reinforcement, arrangement prestress steel bundle; 3. assembled internal mold; 4. colligation roof steel bar, steel strand; 5. build case beam concrete; 6. strong health such as grade; 7. stretch-draw, mud jacking, sealing off and covering anchorage.The construction period of every Kong Liang is about 18 days.Construction Through Form on Traveler operation just must can carry out next process after last process completes.At present, existing cage of reinforcement integral hoisting scheme is: in steel bar binding clamping fixture, tie with reinforcing bar is shaping, and cage of reinforcement is installed truss hoisting increases cage of reinforcement rigidity, by 2 straddle trucks, cage of reinforcement integral hoisting is entered mould.What this scheme was more is applied in the precast concrete beam construction of Liang Chang.If Construction Through Form on Traveler takes this kind of scheme, so straddle truck across construction bridges, and need meet large span, high Clearance requirement, needs under bridge floor, arrange straddle truck walking track simultaneously.This kind of scheme major part situation is difficult to implement, and main cause is as follows: 1. pair straddle truck requires high, must meet the requirements such as large span, large-tonnage, high headroom; 2., when pier stud excessive height, straddle truck cannot meet construction requirement; 3., for straddle truck walking track cannot be arranged under the bridge floors such as offshore construction, construction requirement cannot be met.
Summary of the invention
The present invention, in order to overcome the deficiency of above technology, provides a kind of effective shortening construction period and meets large span, the upstroke movable framework steel bar overall binding lifting construction engineering method of high Clearance requirement and construction equipment.
The present invention overcomes the technical scheme that its technical problem adopts:
The construction equipment of this upstroke movable framework steel bar overall binding lifting construction engineering method, comprise the mold be longitudinally arranged on concrete box girder, longitudinally be installed on the guide rail II on mold, be arranged on mold for cage of reinforcement being transported to the longitudinal conveying device I of upstroke movable framework rear end, be arranged in upstroke movable framework for cage of reinforcement being longitudinally moved to the longitudinal conveying device II in upstroke movable framework from concrete box girder and being used for the cage of reinforcement handling in upstroke movable framework to the handling apparatus in exterior sheathing, the groove matched with cage of reinforcement profile is provided with in described mold, the length of described groove and the interior required case beam quantity length sum of upstroke movable framework match, spacing between two side legs of both sides, described upstroke movable framework rear end is greater than the width of cage of reinforcement.
Conveniently in mold, make cage of reinforcement, also comprise the guide rail I be longitudinally arranged on concrete box girder, tower crane and be installed on the road wheel I of tower crane lower end, described tower crane is positioned at the rear end of mold.
Above-mentioned longitudinal conveying device I comprises the guide rail II being longitudinally arranged at both sides, mold upper end respectively, the lifting truss being positioned at mold upper end and is installed on some jack of both sides, lifting truss lower end respectively, the lower end of described jack is provided with road wheel II, described mold is slided by road wheel II and is arranged on guide rail II, and cage of reinforcement utilizes fastening nuts to be hung on the lower end of lifting truss by screw rod.
Above-mentioned longitudinal conveying device II comprises and is longitudinally installed on guide rail III in upstroke movable framework and some travelling jacks respectively, the both sides, lower end of described travelling jack are respectively arranged with several rows travelling wheel III, and described travelling jack is slided by road wheel III and is arranged on guide rail III.
Above-mentioned handling apparatus comprises the crossbeam I and crossbeam II that are horizontally set at upstroke movable framework rear end and front end, and described crossbeam I and crossbeam II are slidably fitted with lifting overhead traveling crane I and lifting overhead traveling crane II respectively.
In order to prevent interfering, the some supporting legs being arranged in two side leg middle position are installed on the rear end of upstroke movable framework by hinge, the tail end of oil cylinder is hinged to be installed on upstroke movable framework, its piston rod head end is hinged to be installed on middle supporting leg, when the piston rod of oil cylinder all stretches out, described middle supporting leg turns to parallel with concrete box girder.
For the ease of mobile mold, above-mentioned mold is slided by consignment trolley and is arranged on guide rail I.
The invention has the beneficial effects as follows: due to when cage of reinforcement is watered build up concrete box girder time, can carry out at the bottom of colligation simultaneously, the manufacturing process of the cage of reinforcement of web reinforcement, arrangement prestress steel bundle and assembled internal mold so that continue during upstroke movable framework via hole fast the cage of reinforcement made to be transported in exterior sheathing.Achieve synchronization job, the construction period in each hole can shorten about 5 days.Relative to traditional construction technique, do not need straddle truck, therefore meet the requirement of large span, large-tonnage and high headroom.Solve the problem that the straddle truck handling cage of reinforcement traditional when pier stud is too high cannot meet construction requirement.The situation that cannot arrange straddle truck walking track under the bridge floors such as offshore construction is suitable for too simultaneously.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present invention;
Fig. 2 is that A-A in Fig. 1 is to cross-sectional view;
Fig. 3 is that B-B in Fig. 1 is to cross-sectional view;
Fig. 4 is that C in Fig. 1 is to structural representation;
Fig. 5 is that D-D in Fig. 1 is to cross-sectional view;
Fig. 6 is that E-E in Fig. 1 is to cross-sectional view;
In figure, 1. in concrete box girder 2. upstroke movable framework 3. tower crane 4. mold 5. consignment trolley 6., supporting leg 7. side leg 8. crossbeam I 9. crossbeam II 10. lifting overhead traveling crane I 11. lifts by crane overhead traveling crane II 12. travelling jack 13. guide rail I 14. road wheel I 15. lifting truss 16. guide rail II 17. road wheel II 18. cage of reinforcement 19. screw rod 20. guide rail III 21. road wheel III 22. exterior sheathing.
Detailed description of the invention
Below in conjunction with accompanying drawing 1 to accompanying drawing 6, the present invention will be further described.
The present invention overcomes the technical scheme that its technical problem adopts:
The construction equipment of upstroke movable framework steel bar overall binding lifting construction engineering method of the present invention, comprise the mold 4 be longitudinally arranged on concrete box girder 1, longitudinally be installed on the guide rail II 16 on mold 4, be arranged on mold 4 for cage of reinforcement 18 being transported to the longitudinal conveying device I of upstroke movable framework 2 rear end, be arranged in upstroke movable framework 2 for cage of reinforcement 18 being longitudinally moved to the longitudinal conveying device II in upstroke movable framework 2 from concrete box girder 1 and being used for cage of reinforcement 18 handling in upstroke movable framework 2 to the handling apparatus in exterior sheathing 22, the groove matched with cage of reinforcement 18 profile is provided with in mold 4, the length of groove and the interior required case beam quantity length sum of upstroke movable framework 2 match, spacing between two side legs 7 of both sides, upstroke movable framework 2 rear end is greater than the width of cage of reinforcement 18.Make complete in mold 4 by needing the cage of reinforcement 18 used, and be transported in exterior sheathing 22 with this by longitudinal conveying device I, longitudinal conveying device II and handling apparatus, can realize building case beam concrete, etc. strong health and stretch-draw, mud jacking and sealing off and covering anchorage time, synchronously carry out the making of cage of reinforcement 18, improve efficiency of construction, meet the requirement of large span, high headroom.
Can also comprise the guide rail I 13 be longitudinally arranged on concrete box girder 1, tower crane 3 and be installed on the road wheel I 14 of tower crane 3 lower end, described tower crane 3 is positioned at the rear end of mold 4.When can make cage of reinforcement 18 in mold 4 by tower crane 3, the effect playing handling accelerates the make efficiency of cage of reinforcement 18.Tower crane 3 by road wheel I 14 along guide rail I 13 vertical shift, can further increase the convenience of use.
Longitudinal conveying device I can be following structure, they some jack comprising the guide rail II 16 being longitudinally arranged at both sides, mold 4 upper end respectively, the lifting truss 15 being positioned at mold 4 upper end and be installed on both sides, lifting truss 15 lower end respectively, the lower end of jack is provided with road wheel II 17, mold 4 is slided by road wheel II 17 and is arranged on guide rail II 16, and cage of reinforcement 18 utilizes fastening nuts to be hung on the lower end of lifting truss 15 by screw rod 19.After make cage of reinforcement 18 in mold 4, screw rod 19 is utilized lifting truss 15 and cage of reinforcement 18 to be connected and fixed by nut.Make jack drive lifting truss 15 to rise afterwards, cage of reinforcement 18 is departed from from mold.Lifting truss 15 passes through the tail end of road wheel II 17 vertical shift to upstroke movable framework 2 afterwards.And cage of reinforcement 18 is fixed on lifting truss 15 transports, the integral rigidity of cage of reinforcement 18 can be improved.
Longitudinal conveying device II can be following structure, it comprises and is longitudinally installed on guide rail III 20 in upstroke movable framework 2 and some travelling jacks 12 respectively, the both sides, lower end of travelling jack 12 are respectively arranged with several rows travelling wheel III 21, and travelling jack 12 is slided by road wheel III 21 and is arranged on guide rail III 20.After the head end of cage of reinforcement 18 enters in upstroke movable framework 2, lifting truss is utilized below fastening nuts and travelling jack 12 by screw rod 19, and progressively vertically move in upstroke movable framework 2, and progressively successively lifting truss 15 and remaining travelling jack 12 are connected and fixed, finally realize lifting truss 15 to drive cage of reinforcement 18 vertical shift in upstroke movable framework 2.
Handling apparatus can be following structure, and it comprises the crossbeam I 8 and crossbeam II 9 that are horizontally set at upstroke movable framework 2 rear end and front end, and crossbeam I 8 and crossbeam II 9 are slidably fitted with lifting overhead traveling crane I 10 and lifting overhead traveling crane II 11 respectively.After cage of reinforcement 18 conveying puts in place by travelling jack 12, lifting truss 15 two ends hang by lifting overhead traveling crane I 10 and lifting overhead traveling crane II 11, and laterally move along crossbeam I 8 and crossbeam II 9, cage of reinforcement 18 handling goes out to exterior sheathing 22 the most at last, realizes cage of reinforcement 18 transfer to put in place.
The some supporting legs 6 being arranged in two side leg 7 middle position are installed on the rear end of upstroke movable framework 2 by hinge, the tail end of oil cylinder is hinged to be installed on upstroke movable framework 2, its piston rod head end is hinged to be installed on middle supporting leg 6, when the piston rod of oil cylinder all stretches out, middle supporting leg 6 turns to parallel with concrete box girder 1.Swung so that cage of reinforcement 18 enters by supporting leg in hydraulic oil cylinder driving 6, do not affect again the support strength of upstroke movable framework.
Mold 4 is slided by consignment trolley 5 and is arranged on guide rail I 13.Consignment trolley 5 and tower crane 3 common guide rails I 13, when upstroke movable framework via hole advance to next across time, mold 4 can by the complete concrete box girder 1 of the construction of the longitudinal walking of consignment trolley 5, so that next stage continues construction.Further increase convenience.

Claims (7)

1. a upstroke movable framework steel bar overall binding lifting construction device, it is characterized in that: comprise the mold (4) be longitudinally arranged on concrete box girder (1), longitudinally be installed on the guide rail II (16) on mold (4), be arranged on mold (4) for cage of reinforcement (18) being transported to the longitudinal conveying device I of upstroke movable framework (2) rear end, be arranged in upstroke movable framework (2) for by cage of reinforcement (18) from concrete box girder (1) longitudinally move to longitudinal conveying device II in upstroke movable framework (2) and for by cage of reinforcement (18) handling in upstroke movable framework (2) to the handling apparatus in exterior sheathing (22), the groove matched with cage of reinforcement (18) profile is provided with in described mold (4), the length of described groove and the interior required case beam quantity length sum of upstroke movable framework (2) match, spacing between two side legs (7) of described upstroke movable framework (2) both sides, rear end is greater than the width of cage of reinforcement (18).
2. upstroke movable framework steel bar overall binding lifting construction device according to claim 1, it is characterized in that: also comprise the guide rail I (13) be longitudinally arranged on concrete box girder (1), tower crane (3) and be installed on the road wheel I (14) of tower crane (3) lower end, described tower crane (3) is positioned at the rear end of mold (4).
3. upstroke movable framework steel bar overall binding lifting construction device according to claim 1, it is characterized in that: described longitudinal conveying device I comprises the guide rail II (16) being longitudinally arranged at mold (4) both sides, upper end respectively, be positioned at the lifting truss (15) of mold (4) upper end and be installed on some jack of lifting truss (15) both sides, lower end respectively, the lower end of described jack is provided with road wheel II (17), described mold (4) is slided by road wheel II (17) and is arranged on guide rail II (16), cage of reinforcement (18) utilizes fastening nuts to be hung on the lower end of lifting truss (15) by screw rod (19).
4. upstroke movable framework steel bar overall binding lifting construction device according to claim 1, it is characterized in that: described longitudinal conveying device II comprises and is longitudinally installed on guide rail III (20) in upstroke movable framework (2) and some travelling jacks (12) respectively, the both sides, lower end of described travelling jack (12) are respectively arranged with several rows travelling wheel III (21), and described travelling jack (12) is slided by road wheel III (21) and is arranged on guide rail III (20).
5. upstroke movable framework steel bar overall binding lifting construction device according to claim 1, it is characterized in that: described handling apparatus comprises the crossbeam I (8) and crossbeam II (9) that are horizontally set at upstroke movable framework (2) rear end and front end, described crossbeam I (8) and crossbeam II (9) are slidably fitted with lifting overhead traveling crane I (10) and lifting overhead traveling crane II (11) respectively.
6. upstroke movable framework steel bar overall binding lifting construction device as claimed in any of claims 1 to 5, it is characterized in that: the some supporting legs (6) being arranged in two side leg (7) middle position are installed on the rear end of upstroke movable framework (2) by hinge, the tail end of oil cylinder is hinged to be installed on upstroke movable framework (2), its piston rod head end is hinged to be installed on middle supporting leg (6), when the piston rod of oil cylinder all stretches out, described middle supporting leg (6) turns to parallel with concrete box girder (1).
7. upstroke movable framework steel bar overall binding lifting construction device as claimed in any of claims 1 to 5, is characterized in that: described mold (4) is slided by consignment trolley (5) and is arranged on guide rail I (13).
CN201520025152.7U 2015-01-15 2015-01-15 Upstroke movable framework steel bar overall binding lifting construction device Expired - Fee Related CN204401473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520025152.7U CN204401473U (en) 2015-01-15 2015-01-15 Upstroke movable framework steel bar overall binding lifting construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520025152.7U CN204401473U (en) 2015-01-15 2015-01-15 Upstroke movable framework steel bar overall binding lifting construction device

Publications (1)

Publication Number Publication Date
CN204401473U true CN204401473U (en) 2015-06-17

Family

ID=53425349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520025152.7U Expired - Fee Related CN204401473U (en) 2015-01-15 2015-01-15 Upstroke movable framework steel bar overall binding lifting construction device

Country Status (1)

Country Link
CN (1) CN204401473U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105463993A (en) * 2015-11-24 2016-04-06 中铁大桥局集团有限公司 Movable formwork suitable for multiple beams and construction method
CN105970822A (en) * 2016-06-03 2016-09-28 中铁四局集团有限公司 50 m twin-deck overlane type movable scaffold and corresponding beam manufacturing construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105463993A (en) * 2015-11-24 2016-04-06 中铁大桥局集团有限公司 Movable formwork suitable for multiple beams and construction method
CN105463993B (en) * 2015-11-24 2017-04-26 中铁大桥局集团有限公司 Movable formwork suitable for multiple beams and construction method
CN105970822A (en) * 2016-06-03 2016-09-28 中铁四局集团有限公司 50 m twin-deck overlane type movable scaffold and corresponding beam manufacturing construction method thereof

Similar Documents

Publication Publication Date Title
CN104695335B (en) Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN201010860Y (en) Downgoing movable mould base integral construction bridging machine
CN108442255B (en) Movable formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN205370595U (en) Automatic hydraulic pressure inverted arch landing stage platform truck
CN201704630U (en) Slippage die carrier of concrete cast-in-situ continuous beam
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN101082280A (en) Single-track railway tunnel lining trolley
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN206800212U (en) The Bridge Erector constructed by cross for precast segmental beam
CN109267491B (en) Movable formwork and construction method thereof
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN106758872A (en) Wavelike steel webplate SCC engineering methods hang movable hanging basket and the method using its construction with car convolution
CN204401473U (en) Upstroke movable framework steel bar overall binding lifting construction device
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN203419675U (en) Traveling track for girder crane
CN102071641A (en) Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof
CN104179123A (en) Bridge fabrication machine capable of building and assembling two bridge segments
CN207919265U (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge
CN111042003A (en) Construction method of cable-stayed bridge concrete beam combined hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20170115