CN104988948B - A kind of construction method of fin-plate type retaining wall - Google Patents

A kind of construction method of fin-plate type retaining wall Download PDF

Info

Publication number
CN104988948B
CN104988948B CN201510367005.2A CN201510367005A CN104988948B CN 104988948 B CN104988948 B CN 104988948B CN 201510367005 A CN201510367005 A CN 201510367005A CN 104988948 B CN104988948 B CN 104988948B
Authority
CN
China
Prior art keywords
shingle nail
floor
reinforcing bar
soil
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510367005.2A
Other languages
Chinese (zh)
Other versions
CN104988948A (en
Inventor
罗强
张玉广
蒋良潍
张良
姚阳
刘刚
谢涛
连继峰
宋鑫
洛飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201510367005.2A priority Critical patent/CN104988948B/en
Publication of CN104988948A publication Critical patent/CN104988948A/en
Application granted granted Critical
Publication of CN104988948B publication Critical patent/CN104988948B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Retaining Walls (AREA)

Abstract

A kind of fin-plate type retaining wall and construction method thereof.Retaining wall include basis, on the basis of shingle nail and spilled water hole on shingle nail, its structure is: shingle nail faces the soil face vertical floor of equally spaced consolidation, and between floor, shingle nail faces soil face position and is provided with loaded filter.The construction method of retaining wall is: a excavates the vertical slot mated with floor in slope soil;B is colligation floor reinforcing bar the connection reinforcing bar of reserved connection wall panel in the vertical slot that a walks, and in vertical slot, casting concrete forms floor;C builds basis by laying bricks or stones;D on the basis of colligation shingle nail reinforcing bar, connection wall slab reinforcement be connected reinforcing bar, set up shingle nail template, pre-buried spilled water hole pipe, in shingle nail template casting concrete formed shingle nail;E shingle nail between floor faces soil face position and lays loaded filter, backfills the soil body and tamp between loaded filter and side slope, until wall top.This barricade is applicable to a gear of gradient slope, embankment location or cutting steep slope region, constructs low cost, it is easy to promote.

Description

A kind of construction method of fin-plate type retaining wall
Technical field
The present invention relates to a kind of slope earth-retaining wall and construction method thereof, particularly relate to one and be applicable to gradient slope, embankment location or road Moat steep slope region props up retaining wall and the construction method thereof of gear.
Background technology
Retaining structure, the version such as including retaining wall, antiskid (anchoring) stake, anchor cable (bar), it is used to support, reinforce Banket or slope soil, prevent from collapsing sliding to keep its stable a kind of building.Retaining wall is a gear the most frequently used in engineering construction Works, is mainly used in supporting embankment filled soil or slope soil, prevents from banketing or soil deformation unstability, bear the lateral soil pressure of the soil body Power, its purposes specifically includes that (1) reduces execavated rockmass height, reduces excavation quantity, it is to avoid natural slope failure slump;(2) receive Contracting embankment toe, reduces fill yard and floor space, it is ensured that roadbed reclamation;(3) avoid roadbed along river to squeeze contracting riverbed, prevent Current scour roadbed.
For gradient slope, embankment location or cutting steep slope region etc., side slope is high and precipitous, the shallow-layer soil body be difficult to domatic fixing or Owing to large area excavation ground destroys the original balance of massif, needing, retaining structure is set and prevents slope soil or cunning of collapsing of banketing, mesh Before conventional have gravity retaining wall.Gravity retaining wall maintains retaining wall under soil lateral pressure effect with the deadweight of wall body Stable, wall body is from great so that produces bigger frictional force at the bottom of wall with basic earth, thus balances wall back of the body active earth pressure.Gravity Multiplex sheet (block) barnacle that grouts of formula retaining wall is built, and lacking building stones area sometimes can be with concrete precast block as masonry, or directly With concreting, typically it is unworthy of reinforcing bar or only configures a small amount of reinforcing bar at subrange.This barricade form is simple, easy construction, Can gather materials on the spot, applied widely.But in engineering practice, gravity retaining wall there is also problems with: (1) gravity type is kept off During cob wall construction, the first excavation slope soil body the most from top to bottom, then masonry panel or pour walls concrete from the bottom up, when body of wall relatively Gao Shi, whole excavated surface is big and steep, to original slope soil produce strong unloading disturbance, slope collapsing slide when being easily caused construction, Especially more prominent in heavy cut location;(2) gravity retaining wall relies on self gravitation to maintain balance and stability, therefore from great, High to ground requirement for bearing capacity, earthen foundation is built the restriction suffering from bearing capacity;(3), when barricade is higher, wall body cuts Volume is big, and bricklaying quantity is big, uneconomical.
Summary of the invention
First goal of the invention of the present invention is to provide a kind of fin-plate type retaining wall, and this fin-plate type retaining wall is applicable to gradient slope, embankment Location or a gear of cutting steep slope region, little to soil disturbance during construction, low to ground requirement for bearing capacity, construct low cost, easily In popularization.
The present invention realizes its first goal of the invention and be employed technical scheme comprise that, a kind of fin-plate type retaining wall, including basis, basis On shingle nail and spilled water hole on shingle nail, it is structurally characterized in that: described shingle nail face soil face equally spaced be consolidated with vertical Floor, the shingle nail between floor faces soil face position and is provided with loaded filter.
Compared with prior art, the fin-plate type retaining wall of the present invention provides the benefit that:
When floor space is bigger, after wall, the plane of fracture of the soil body is positioned in the soil between adjacent floor, floor stretch into the plane of fracture after stablize In the soil body.The frictional resistance stablizing between soil body inner rib plate sidewall and the soil body is utilized jointly to bear soil body side with shingle nail and floor deadweight To soil pressure, it is achieved slope soil to be propped up gear.Only the lateral soil pressure of the soil body is born by body of wall deadweight than existing Gravity Retaining Wall Power, its gear effect is remarkably reinforced.
When fin-plate type floor space is less, intercostal soil is by floor side friction power effect, and mobile formation is overall native together with floor Wall, the plane of fracture is positioned at after floor end in the soil body.The overall cob wall being made up of shingle nail, floor and the intercostal soil body bears wall jointly The soil pressure that the rear soil body produces, it is achieved slope soil props up gear, only bears soil by body of wall deadweight than existing Gravity Retaining Wall Body soil lateral pressure, its gear effect is remarkably reinforced especially.
In a word, than gravity retaining wall, a gear effect for fin-plate type retaining wall of the present invention is remarkably reinforced, and total body concrete Consumption is reduced, and bricklaying quantity is few, lightweight, low to ground requirement for bearing capacity, constructs low cost, it is easy to promote.
When engineering-environment is not suitable for cast in situs, it is possible to use prefabricated components to carry out assembling construction so that the scope of application of the present invention Extensively, also it is beneficial to it promote the use of.
Second goal of the invention of the present invention is to provide the construction method of a kind of above-mentioned fin-plate type retaining wall, this kind of method can quickly, Construct out above-mentioned fin-plate type retaining wall easily, and little to soil disturbance during construction, construct the fin-plate type retaining wall obtained With being firmly combined with of side slope, a gear is effective.
The present invention realizes its second goal of the invention and be employed technical scheme comprise that, the construction method of a kind of above-mentioned fin-plate type retaining wall, The steps include:
A. in slope soil, excavate the vertical slot mated with floor;
B. colligation floor reinforcing bar the connection reinforcing bar of reserved connection wall panel in the vertical slot of a step, pour coagulation subsequently in vertical slot Soil is formed and exposes the floor connecting reinforcing bar;
C. excavation shingle nail foundation trench, builds basis by laying bricks or stones;
D. on the basis of, colligation shingle nail reinforcing bar, and make shingle nail reinforcing bar and be connected bar connecting, then set up shingle nail template, And pre-buried spilled water hole pipe, finally casting concrete in shingle nail template, after concrete setting, remove shingle nail template, formed Shingle nail;
E. the shingle nail between floor faces soil face position laying loaded filter, backfills the soil body subsequently and tamp between loaded filter and side slope, Until wall top.
Compared with prior art, the construction method of fin-plate type retaining wall of the present invention provides the benefit that:
During construction, be vertically spaced, at slope soil, the groove that only excavation is adaptive with floor, make use of slope soil from steady characteristic, Limits decreases earth excavation workload, on the one hand can guarantee that vertical slot is stable, reduces gib quantities, it is often more important that Decrease the construction disturbance to original slope body, improve working security, also ensure that the stability of slope soil and good propping up Protect effect.
The present invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the sectional structure schematic diagram of embodiment of the present invention fin-plate type retaining wall.
Fig. 2 is the C-C sectional structure schematic diagram of Fig. 1.
Detailed description of the invention
Embodiment
Fig. 1, Fig. 2 illustrate, a kind of detailed description of the invention of the present invention is, a kind of fin-plate type retaining wall, including basis 1, basis Shingle nail 2 on 1 and the spilled water hole 3 on shingle nail 2, it is structurally characterized in that: described shingle nail 2 faces the equally spaced consolidation in soil face Having vertical floor 4, the shingle nail 2 between floor 4 faces soil face position and is provided with loaded filter 5.
The construction method of the fin-plate type retaining wall of a kind of example, the steps include:
A. in slope soil, excavate the vertical slot mated with floor 4;
B. colligation floor reinforcing bar 6 the connection reinforcing bar 7 of reserved connection wall panel in the vertical slot of a step, pour mixed subsequently in vertical slot Solidifying soil is formed and exposes the floor 4 connecting reinforcing bar 7;
C. excavation shingle nail 2 foundation trench, builds basis 1 by laying bricks or stones;
D. on basis 1, colligation shingle nail reinforcing bar 8, and make shingle nail reinforcing bar 8 and be connected reinforcing bar and 7 connect, then set up metope Template die plate, and pre-buried spilled water hole 3 manages, finally casting concrete in shingle nail template, after concrete setting, removes shingle nail Template, forms shingle nail 2;
E. the shingle nail 2 between floor 4 faces soil face position laying loaded filter 5, backfills the soil body subsequently between loaded filter 5 and side slope And tamping, until wall top.

Claims (1)

1. the construction method of a fin-plate type retaining wall, described fin-plate type retaining wall includes the shingle nail (2) on basis (1), basis (1) and the spilled water hole (3) on shingle nail (2), it is characterized in that: described shingle nail (2) Lin Tumian is equally spaced is consolidated with vertical floor (4), the shingle nail (2) between floor (4) faces soil face position and is provided with loaded filter (5);The construction method of described fin-plate type retaining wall, the steps include:
A. in slope soil, excavate the vertical slot mated with floor (4);
B. colligation floor reinforcing bar (6) the connection reinforcing bar (7) of reserved connection wall panel in the vertical slot of a step, in vertical slot, casting concrete forms the floor (4) exposing connection reinforcing bar (7) subsequently;
C. excavate shingle nail (2) foundation trench, build basis (1) by laying bricks or stones;
D. on basis (1), colligation shingle nail reinforcing bar (8), and make shingle nail reinforcing bar (8) be connected reinforcing bar (7) connect, then shingle nail template is set up, and pre-buried spilled water hole (3) pipe, finally casting concrete in shingle nail template, after concrete setting, remove shingle nail template, form shingle nail (2);
E. the shingle nail (2) between floor (4) faces soil face position laying loaded filter (5), then backfills the soil body between loaded filter (5) and slope soil and tamp, until wall top.
CN201510367005.2A 2015-06-29 2015-06-29 A kind of construction method of fin-plate type retaining wall Active CN104988948B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510367005.2A CN104988948B (en) 2015-06-29 2015-06-29 A kind of construction method of fin-plate type retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510367005.2A CN104988948B (en) 2015-06-29 2015-06-29 A kind of construction method of fin-plate type retaining wall

Publications (2)

Publication Number Publication Date
CN104988948A CN104988948A (en) 2015-10-21
CN104988948B true CN104988948B (en) 2016-08-17

Family

ID=54300830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510367005.2A Active CN104988948B (en) 2015-06-29 2015-06-29 A kind of construction method of fin-plate type retaining wall

Country Status (1)

Country Link
CN (1) CN104988948B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245673A (en) * 2016-10-08 2016-12-21 核工业西南勘察设计研究院有限公司 A kind of rib stake formula peg board retaining wall and construction method thereof
CN107974876A (en) * 2017-12-14 2018-05-01 中铁二院工程集团有限责任公司 Existing railway increases road construction dike multiline pile earth-retaining construction
CN108252325B (en) * 2018-03-30 2023-12-22 四川志德岩土工程有限责任公司 Buttress rib stake formula stake board retaining wall
CN110644297A (en) * 2019-10-31 2020-01-03 中铁二院工程集团有限责任公司 Anti-bulging supporting structure of ballastless track high-speed railway and construction method
CN111074933B (en) * 2019-12-25 2021-05-25 中国路桥集团西安实业发展有限公司 Construction method of plate rib type cast-in-place anchor rod high retaining wall
CN111364503A (en) * 2020-03-14 2020-07-03 山西交科公路勘察设计院 Prefabricated base of road or bridge temporary retaining wall
CN115059112B (en) * 2022-07-22 2023-09-19 兰州交通大学 Split mounting type retaining wall structure for wide existing roadbed and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787710B (en) * 2010-03-19 2012-03-14 黄靓 Integrally-assembled buttressed retaining wall and construction method thereof
CN202466620U (en) * 2012-01-20 2012-10-03 广州城建开发设计院有限公司 Reinforced concrete buttress retaining wall
CN103266622B (en) * 2013-06-09 2015-10-14 中铁第四勘察设计院集团有限公司 Great-leap-forward abnormity counterfort L-type wall-retaining structure
CN203795465U (en) * 2014-02-20 2014-08-27 中铁第四勘察设计院集团有限公司 Counterfort retaining wall structure suitable for deep and yielding ground foundation
CN204780991U (en) * 2015-06-29 2015-11-18 西南交通大学 Floor formula retaining wall

Also Published As

Publication number Publication date
CN104988948A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104988948B (en) A kind of construction method of fin-plate type retaining wall
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN104631440B (en) A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method
EA027027B1 (en) Method for forming a retaining wall
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN112081155B (en) Reinforcing and lifting method for bar-shaped or box-shaped foundation building
CN102561721B (en) Building jacking deviation rectifying method
CN206070508U (en) Device for reinforcing foundation
CN204780991U (en) Floor formula retaining wall
CN107142959A (en) A kind of geotechnical grid reinforcement foam concrete retaining wall fills structure and its method
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN113832991A (en) Reverse construction method of pile plate wall
CN109680703A (en) Soft Soil Layer open caisson construction method
KR101081343B1 (en) Compaction grouting system
KR101041264B1 (en) Displacement control tunnelling reinforcing structure using pressurizing support
CN218346137U (en) Foundation with strong bearing capacity
KR101884663B1 (en) Construction method for soil retaining wall using cap slab
CN107761759B (en) L-shaped concrete retaining wall
CN115506382A (en) Construction method for pile plate wall of island building platform
KR102289576B1 (en) Top-down type underground structure construction method using earth support plate
CN212774294U (en) Pipe jacking construction working well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant