CN106245673A - A kind of rib stake formula peg board retaining wall and construction method thereof - Google Patents

A kind of rib stake formula peg board retaining wall and construction method thereof Download PDF

Info

Publication number
CN106245673A
CN106245673A CN201610874423.5A CN201610874423A CN106245673A CN 106245673 A CN106245673 A CN 106245673A CN 201610874423 A CN201610874423 A CN 201610874423A CN 106245673 A CN106245673 A CN 106245673A
Authority
CN
China
Prior art keywords
pile body
cantilever segment
floor
retaining wall
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610874423.5A
Other languages
Chinese (zh)
Inventor
周刚
李辉良
骆富强
罗强
石少华
王约斌
薛果
黄伟
闫晨
诸葛宇宇
丁佳根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Geotechniscl & Design Institute Of China Nuclear Industry
Original Assignee
Southwest Geotechniscl & Design Institute Of China Nuclear Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Geotechniscl & Design Institute Of China Nuclear Industry filed Critical Southwest Geotechniscl & Design Institute Of China Nuclear Industry
Priority to CN201610874423.5A priority Critical patent/CN106245673A/en
Publication of CN106245673A publication Critical patent/CN106245673A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of rib stake formula peg board retaining wall and construction method thereof.This rib stake formula peg board retaining wall includes pile body anchoring section (1a), pile body cantilever segment (1b), breast boards (2) longitudinally disposed between adjacent pile body cantilever segment (1b), it is characterised in that: the inner side of described pile body cantilever segment (1b) is fixing with the floor (3) of horizontally set to be connected.This rib stake formula peg board retaining wall is applicable to the retaining engineering of Steep Slope Embankment, have pile body deformation little, gear effective, easy construction, construction costs are relatively low, the feature of good endurance;And the anchorage depth of stake can be reduced, optimize the Cross section Design of stake.

Description

A kind of rib stake formula peg board retaining wall and construction method thereof
Technical field
The present invention relates to a kind of rib stake formula peg board retaining wall and construction method thereof.
Background technology
Retaining structure, the version such as including retaining wall, antiskid (anchoring) stake, anchor cable (bar), it is used to support, reinforce and fill out Soil or slope soil, prevent from collapsing sliding to keep its stable a kind of building.Retaining wall is a gear the most frequently used in engineering construction Structure, is mainly used in supporting embankment filled soil or slope soil, prevents from banketing or soil deformation unstability, bear the lateral soil pressure of the soil body Power.Its purposes specifically includes that reduction execavated rockmass height, reduces excavation quantity, it is to avoid natural slope failure slump;Shrink embankment slope Foot, reduces fill yard and floor space, it is ensured that roadbed reclamation;Avoid roadbed along river to squeeze contracting riverbed, prevent current scour roadbed.
For Steep Slope Embankment location, side slope is high and precipitous, and embankment fill material is difficult in slope stability, needs first to arrange a gear knot Structure is the most filling roadbed, and current stake plate type retaining wall is a gear pattern conventional during Steep Slope Embankment fills.
Free arm formula peg board retaining wall is by the pile body anchoring section being anchored in ground, the pile body cantilever segment basseted And be placed between adjacent pile body cantilever segment and be positioned at the breast boards composition inside stake.The height of pile body free arm section can reach To about 15m, but after free arm section is highly more than 15m, stake will produce excessive lateral displacement, in some instances it may even be possible to stake can occur The engineering accident that body fractures.
In order to solve the problems to be solved of the filled height Steep Slope Embankment retaining wall more than 15m, engineering practice occurs Prestressed anchor pull-type peg board retaining wall.It is between the stable massif inside the stake and stake of above-mentioned cantilevered peg board retaining wall Horizontal prestress anchorage cable is set, to reduce the lateral displacement of stake so that prestressed anchor pull-type peg board retaining wall is more than ground Height can reach 20~25m.But in engineering practice, prestressed anchor pull-type peg board retaining wall there is also problems with: pre- The work progress of stress anchor pull-type peg board retaining wall is complicated, and technical difficulty is high, quality control difficulties;Massif inside stake with stake Between filling roadbed time, Highway Embankment Compaction and prestressed anchor draw the installation of facility to interfere with each other, easily cause Highway Embankment Compaction degree and anchor Rope prestressing force is the most up to standard;Prestressed anchor draws the long-term reliability of facility and durability to be difficult to be guaranteed.
Summary of the invention
The first object of the present invention is to provide a kind of rib stake formula peg board retaining wall.This rib stake formula peg board retaining wall is applicable to suddenly The retaining engineering of slope embankment, have pile body deformation little, gear effective, easy construction, construction costs are relatively low, good endurance Feature;And the anchorage depth of stake can be reduced, optimize the Cross section Design of stake.
The present invention the technical scheme is that a kind of rib stake formula peg board retaining wall for realizing its first goal of the invention, including Pile body anchoring section, pile body cantilever segment, breast boards longitudinally disposed between adjacent pile body cantilever segment, it is characterised in that: described The inner side of pile body cantilever segment is fixing with the floor of horizontally set to be connected.
Compared with prior art, the invention has the beneficial effects as follows:
One, the present invention utilizes being reliably connected between stake and floor, can be effectively improved the bending rigidity of stake, be greatly reduced height The lateral displacement of stake under cantilever position, the further jib-length of raising stake, and the anchorage depth of stake can be reduced, optimize cutting of stake Face size.Floor in the present invention can substitute the effect of prestress anchorage cable, and pours together with between floor with stake Reliable fixing connection, can overcome the defect of the prestressd anchor cable loss become by adulterium, it is ensured that the stability of structure long-term work And durability.
Two, existing prestressed anchor pull-type peg board retaining wall, it needs to carry out the pore-creating of anchor cable in construction, makes anchor, executes The anchor of the series of complexes such as anchor, slip casting, construction anchor plate, stretch-draw, sealing off and covering anchorage draws operation, and anchor draws operation and embankment process Interfering big, difficulty of construction is higher.And floor only need to be hanged with pile body by connection reinforcing bar by the present invention when concreting Arm section is connected, and can realize the fixing connection of integration of the two, and its work progress is simple, and the construction to embankment is disturbed little, Integral construction difficulty is lower, and construction quality is high.
In a word, more traditional peg board retaining wall, the deformation of rib stake formula peg board retaining wall of the present invention reduces, work progress letter Changing, a gear effect strengthens, and the long-term work performance of structure and durability improve.When engineering-environment is not suitable for cast in situs, also Prefabricated components can be used to carry out assembling construction so that the present invention is applied widely, be also beneficial to it and promote the use of.
The second object of the present invention is to provide the construction method of a kind of above-mentioned rib stake formula peg board retaining wall.The method can be fast Speed, constructing out above-mentioned rib stake formula peg board retaining wall easily, and during construction, excavated volume is little, few to soil disturbance, a gear is effective.
The present invention realizes its second goal of the invention and be employed technical scheme comprise that, a kind of above-mentioned rib stake formula peg board retaining wall Construction method, the steps include:
A) excavate the stake holes of pile body anchoring section, the steel reinforcement cage of pile body anchoring section is hung in stake holes, and pour pile body anchoring The concrete of section;
B) after pile body anchoring section shapes, inside pile body anchoring section, excavate horizontal floor groove, and set up pile body cantilever The template of section and the template of floor;
C) in the template of pile body cantilever segment and the template of floor, distinguish reinforcing bar and the steel of floor of colligation pile body cantilever segment Muscle, and connection reinforcing bar is set between pile body cantilever segment and floor;
D) pour the concrete of pile body cantilever segment and the concrete of floor, after reaching curing requirements, remove pile body cantilever segment Template and the template of floor;
E) between pile body cantilever segment, longitudinally disposed prefabricated breast boards it is layered, until wall top.
Compared with prior art, the construction method of the present invention provides the benefit that:
During construction, only need to excavate the vertical interval trough suitable with floor in slope soil, make use of slope soil From steady characteristic, decrease earth excavation workload to greatest extent.On the one hand do so can guarantee that vertical slot is stable, reduces interim Protect quantities;Prior it is the reduction of the construction disturbance to original slope body, improves the safety of construction, also ensure that side slope The stability of the soil body and good supporting effect.
The present invention is described in further detail with detailed description of the invention below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of the embodiment of the present invention.
Fig. 2 is the horizontal sectional structure schematic diagram (the A-A sectional view of Fig. 1) of the embodiment of the present invention.
Fig. 3 is the left view structural representation of the embodiment of the present invention.
In figure: 1a pile body anchoring section, 1b pile body cantilever segment, 2 breast boards, 3 floors, 4 road beds, 5 mountains Body.
Detailed description of the invention
Embodiment
Fig. 1, Fig. 2, Fig. 3 illustrate, a kind of detailed description of the invention of the present invention is, a kind of rib stake formula peg board retaining wall, including Pile body anchoring section 1a, pile body cantilever segment 1b, breast boards 2 longitudinally disposed between adjacent pile body cantilever segment 1b, it is characterised in that: The inner side of described pile body cantilever segment 1b is fixing with the floor 3 of horizontally set to be connected.
The construction method of the rib stake formula peg board retaining wall of this example, the steps include:
A) excavate the stake holes of pile body anchoring section 1a, the steel reinforcement cage of pile body anchoring section 1a is hung in stake holes, and pours pile body The concrete of anchoring section 1a;
B) after pile body anchoring section 1a shapes, inside pile body anchoring section 1a, excavate horizontal floor groove, and set up pile body The template of cantilever segment 1b and the template of floor 3;
C) in the template of pile body cantilever segment 1b and the template of floor 3, distinguish reinforcing bar and the floor of colligation pile body cantilever segment 1b The reinforcing bar of 3, and connection reinforcing bar is set between pile body cantilever segment 1b and floor 3;
D) pour concrete and the concrete of floor 3 of pile body cantilever segment 1b, after reaching curing requirements, remove pile body cantilever The template of section 1b and the template of floor 3;
E) between pile body cantilever segment 1b, longitudinally disposed prefabricated breast boards 2 it is layered, until wall top.

Claims (2)

1. a rib stake formula peg board retaining wall, including pile body anchoring section (1a), pile body cantilever segment (1b), at adjacent pile body cantilever segment (1b) breast boards (2) longitudinally disposed between, it is characterised in that: the inner side of described pile body cantilever segment (1b) and horizontal floor (3) fixing connection.
2. a construction method for the rib stake formula peg board retaining wall described in claim 1, the steps include:
A) stake holes of excavation pile body anchoring section (1a), hangs in the steel reinforcement cage of pile body anchoring section (1a) in stake holes, and pours pile body The concrete of anchoring section (1a);
B) after pile body anchoring section (1a) shapes, at the floor groove that pile body anchoring section (1a) inner side excavation is horizontal, and pile body is set up The template of cantilever segment (1b) and the template of floor (3);
C) in the template of pile body cantilever segment (1b) and the template of floor (3), distinguish reinforcing bar and the rib of colligation pile body cantilever segment (1b) The reinforcing bar of plate (3), and connection reinforcing bar is set between pile body cantilever segment (1b) and floor (3);
D) pour concrete and the concrete of floor (3) of pile body cantilever segment (1b), after reaching curing requirements, remove pile body cantilever The template of section (1b) and the template of floor (3);
E) between pile body cantilever segment (1b), longitudinally disposed prefabricated breast boards (2) it is layered, until wall top.
CN201610874423.5A 2016-10-08 2016-10-08 A kind of rib stake formula peg board retaining wall and construction method thereof Pending CN106245673A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610874423.5A CN106245673A (en) 2016-10-08 2016-10-08 A kind of rib stake formula peg board retaining wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610874423.5A CN106245673A (en) 2016-10-08 2016-10-08 A kind of rib stake formula peg board retaining wall and construction method thereof

Publications (1)

Publication Number Publication Date
CN106245673A true CN106245673A (en) 2016-12-21

Family

ID=57612304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610874423.5A Pending CN106245673A (en) 2016-10-08 2016-10-08 A kind of rib stake formula peg board retaining wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN106245673A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059915A (en) * 2017-01-20 2017-08-18 中铁二院工程集团有限责任公司 A kind of light-duty supporting and retaining system suitable for the upright closing slope in embankment location is constructed
CN108252325A (en) * 2018-03-30 2018-07-06 四川志德岩土工程有限责任公司 A kind of counterfort rib stake formula peg board retaining wall
CN108396773A (en) * 2018-03-30 2018-08-14 四川志德岩土工程有限责任公司 A kind of loose-leaf type peg board retaining wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB104024A (en) * 1916-02-18 1917-02-19 Sylvain Louis Ravier Improvements in Retaining Walls and Process of Making same.
JP2011174228A (en) * 2010-02-23 2011-09-08 Kazumi Saito L-shaped concrete block and retaining wall
CN102839686A (en) * 2012-09-26 2012-12-26 中铁二院工程集团有限责任公司 Stabilizing plate type anchor pile retaining structure
CN103306295A (en) * 2013-07-08 2013-09-18 中铁第四勘察设计院集团有限公司 Rigid frame pile supporting and blocking structure
CN203452092U (en) * 2013-08-20 2014-02-26 中铁第四勘察设计院集团有限公司 T-shaped pile retaining wall
CN104120736A (en) * 2013-04-28 2014-10-29 杨哲 Construction method of reinforced concrete retaining wall
CN104988948A (en) * 2015-06-29 2015-10-21 西南交通大学 Rib plate type retaining wall and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB104024A (en) * 1916-02-18 1917-02-19 Sylvain Louis Ravier Improvements in Retaining Walls and Process of Making same.
JP2011174228A (en) * 2010-02-23 2011-09-08 Kazumi Saito L-shaped concrete block and retaining wall
CN102839686A (en) * 2012-09-26 2012-12-26 中铁二院工程集团有限责任公司 Stabilizing plate type anchor pile retaining structure
CN104120736A (en) * 2013-04-28 2014-10-29 杨哲 Construction method of reinforced concrete retaining wall
CN103306295A (en) * 2013-07-08 2013-09-18 中铁第四勘察设计院集团有限公司 Rigid frame pile supporting and blocking structure
CN203452092U (en) * 2013-08-20 2014-02-26 中铁第四勘察设计院集团有限公司 T-shaped pile retaining wall
CN104988948A (en) * 2015-06-29 2015-10-21 西南交通大学 Rib plate type retaining wall and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059915A (en) * 2017-01-20 2017-08-18 中铁二院工程集团有限责任公司 A kind of light-duty supporting and retaining system suitable for the upright closing slope in embankment location is constructed
CN108252325A (en) * 2018-03-30 2018-07-06 四川志德岩土工程有限责任公司 A kind of counterfort rib stake formula peg board retaining wall
CN108396773A (en) * 2018-03-30 2018-08-14 四川志德岩土工程有限责任公司 A kind of loose-leaf type peg board retaining wall
CN108252325B (en) * 2018-03-30 2023-12-22 四川志德岩土工程有限责任公司 Buttress rib stake formula stake board retaining wall

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN102352590B (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN106638673B (en) A kind of construction method of compound retaining structure
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN108193642B (en) Revetment reinforcing facility and construction method thereof
CN106638663A (en) Foundation reinforcing and integral inclination rectifying and shifting method for high-voltage transmission tower in subsidence area
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
CN107119699A (en) A kind of friction pile and its construction method based on the beam of uniform strength
CN106245673A (en) A kind of rib stake formula peg board retaining wall and construction method thereof
CN105887948A (en) Inclination resetting, deviation correction and reinforcement method for anti-slide pile
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN206667263U (en) A kind of foundation pit supporting construction
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN214832844U (en) Small-size antidumping assembled pile structure
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN206873487U (en) A kind of rib stake formula peg board retaining wall
CN211447000U (en) Foundation pit backfill area construction elevator foundation
CN207092110U (en) A kind of friction pile based on the beam of uniform strength
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
CN206768890U (en) A kind of reinforcement operation platform of the building foundation of river bank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221