CN206036408U - Span pipeline normal position of foundation ditch and suspend protection architecture in midair - Google Patents

Span pipeline normal position of foundation ditch and suspend protection architecture in midair Download PDF

Info

Publication number
CN206036408U
CN206036408U CN201620652993.5U CN201620652993U CN206036408U CN 206036408 U CN206036408 U CN 206036408U CN 201620652993 U CN201620652993 U CN 201620652993U CN 206036408 U CN206036408 U CN 206036408U
Authority
CN
China
Prior art keywords
pipeline
foundation ditch
supporter
concrete pipe
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620652993.5U
Other languages
Chinese (zh)
Inventor
赵星
朱炎兵
沈婷
董俊
王博
王一博
周华海
陈丽萍
慈立坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620652993.5U priority Critical patent/CN206036408U/en
Application granted granted Critical
Publication of CN206036408U publication Critical patent/CN206036408U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a span pipeline normal position of foundation ditch and suspend protection architecture in midair, including supporter and pipeline, its characterized in that: it includes cement pipe corridor and support frame, and the support frame includes the frame bearing structure that its axis of a plurality of edges distributes side by side, the pipeline is followed the cement pipe corridor and is distributed inside it, and the cement pipe corridor cup joints in its inside and rather than bottom fixed connection along a plurality of frame bearing structure's axis direction, the supporter pass the support frame the top and rather than fixed connection. The utility model provides an in the foundation ditch engineering pipeline change that to move the degree of difficulty big, can't change the condition of moving.

Description

Across the pipeline original position suspension protection structure of foundation ditch
Technical field
This utility model belongs to railway traffic engineering, underground space development engineering, underpass engineering, building construction work A kind of engineering fields such as journey, the rebuilding and expansion of the of the existing enterprises, and in particular to pipeline original position suspension protection structure across foundation ditch.
Background technology
Some are frequently encountered in base pit engineering change move the great power pipeline of difficulty and affect foundation pit construction, field condition Require to carry out in-situ conservation to pipeline under limited situation.Pipeline protection method is improper to increase foundation ditch risk, affect design Formulation and enforcement.Pipeline protection method is improper, easily causes engineering accident and risk.Do not have ad hoc approach in prior art Original place protection can be carried out to pipeline.
Utility model content
The purpose of this utility model is aiming at the defect of prior art, there is provided a kind of pipeline across foundation ditch is in situ to suspend in midair Protection structure, solves pipeline in base pit engineering and changes that to move difficulty big, it is impossible to change situation about moving.
This utility model provides a kind of pipeline original position suspension protection structure across foundation ditch, including the support across foundation ditch Body, pipeline, concrete pipe gallery and frame support structure, it is characterised in that:Pipeline is distributed in inside which along concrete pipe gallery, coagulation Axial arranged there are multiple frame support structures along which on the outside of native piping lane;Concrete pipe gallery is supported in support by frame support structure Below body;Frame support structure includes the cross tube and sheer pole of Parallel Symmetric setting, vertical right between cross tube and sheer pole Title is provided with two montants;Concrete pipe gallery is located between two montants above sheer pole;Cross tube is located at the upper of supporter Side, the both sides of supporter are provided with montant.
This utility model also includes two connecting rods, two connecting rods be distributed along the axis of multiple frame support structures and Between being individually fixed at the top of cross tube two ends and corresponding montant;Cross tube is supported in the upper of supporter by connecting rod Side
The supporter is distributed along the axis of concrete pipe gallery.
The supporter is distributed perpendicular to the axis of concrete pipe gallery.
The concrete pipe gallery offers the through hole of rectangle along its axis direction, and pipeline is positioned in through hole.
The utility model proposes a kind of pipeline original position suspension protection structure across foundation ditch, pipeline is by being suspended in supporter On concrete pipe gallery and bracing frame suspension protection, bracing frame can select reasonable distance according to actual loading situation.
Pipeline is positioned in concrete pipe gallery and the backfill of the coarse sand of the space between pipeline and concrete pipe gallery, is effectively ensured The safety of pipeline.The girder steel system that bracing frame is formed mainly is welded to form by two connecting rods and frame support structure, framework Supporting construction is welded to form by upper sheer pole and two montants, and operator can need to adjust framework support at the scene according to construction The size of structure;Can be determined according to actual loading situation simultaneously, the general design per m is together.Pipeline and concrete pipe gallery Deadweight is delivered on supporter by two montants, is realized pipeline protection by the original existing equipment in job site, is effectively saved About construction cost and man-hour.This utility model can pipeline hang down perpendicular and parallel support while pipeline oblique also can be using this when supporting Utility model, specifically can be according to pipeline and the oblique situation reasonable combination for supporting.
Description of the drawings
Fig. 1 is this utility model structural representation one;
Fig. 2 is sectional view of this utility model structural representation one along a-a directions;
Fig. 3 is sectional view of this utility model structural representation one along b-b directions;
Fig. 4 is this utility model structural representation two;
Fig. 5 is sectional view of this utility model structural representation two along a-a directions;
Fig. 6 is sectional view of this utility model structural representation two along b-b directions;
Wherein, 1- supporters, 2- connecting rods ,-montant, 4- cross tubes, 5- concrete pipe galleries, 6- sheer poles, 7- coarse sands, 8- Frame support structure, 9- pipelines.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, is easy to be well understood to This utility model, but they do not constitute restriction to this utility model.
As illustrated, this utility model provides a kind of pipeline original position suspension protection structure across foundation ditch, including support Body 1, pipeline 9, concrete pipe gallery 5 and bracing frame, bracing frame include multiple frame support structures 8 along its axis column distribution; The frame support structure 8 includes the cross tube 4 and sheer pole 6 of Parallel Symmetric setting, vertical between cross tube 4 and sheer pole 6 It is symmetrically arranged with two montants.Upper sheer pole 6 and two montants are engaged the tower structure to form rectangle.Cross tube 4, lower horizontal stroke Bar 6 and montant adopt channel-section steel.
Support frame as described above also includes two connecting rods 2, two connecting rods 2 along frame support structure 8 axis distribution and Between being individually fixed at the top of 4 two ends of cross tube and corresponding montant.Two connecting rods 2 adopt channel-section steel.
As Figure 1-3, when supporter 1 is arranged perpendicular to the axis of frame support structure 8, connecting rod 2 is fixed on perpendicular The outside of bar, is easy to 1 stress of supporter.Now width of the spacing of adjacent frame posture supporting construction more than supporter 1, is easy to prop up Support body 1 is from passing through and realized to bracing frame by support connection bar 2 between two frame supporting structures and below connecting rod 2 It is overall to support.
As Figure 4-Figure 6, when supporter 1 is arranged along the axis of frame support structure 8, connecting rod 2 is fixed on montant Inner side, is easy to 1 stress of supporter.The rectangular frame cross-sectional width that now adjacent frame posture supporting construction is formed is more than supporter 1 Width, be easy to supporter 1 to pass through and realize to bracing frame by support connection bar 2 from multiple frame supporting structure tops It is overall to support.
Pipeline 9 is distributed in inside which along concrete pipe gallery 5, and concrete pipe gallery 5 is along the axis side of multiple frame support structures 8 To being socketed on inside which and being fixedly connected with its bottom, by girder steel system and the cooperation of concrete pipe gallery 5 of bracing frame formation, Realize that the protection to pipeline 9 is suspended in midair.The pipeline 9 and concrete pipe gallery are provided with coarse sand 7 between 5 inside, it is ensured that pipeline 9 is outstanding Hang the safety of process, reduce adjacent lines 9 and the friction between pipeline 9 and concrete inner wall, it is to avoid which is again in work progress There is excessive displacement.The many pipelines 9 are uniformly distributed in inside concrete pipe gallery 5 side by side side by side, it is ensured that the distribution of pipeline 9 Make rational planning for, be easy to arrange.
Working procedure of the present utility model is as follows:
1st, locating pipeling exploratory trench, while to being marked in the range of pipeline trend;
2nd, fender post (wall, Guan Liang and first road Construction of Supporting;
3rd, soil body excavation section by section in the range of pipeline, reserves concrete pipe gallery and supporting frame construction scope;
4th, merogenesis construction concrete pipe gallery and girder steel system suspension protection is carried out to pipeline.
The content that this specification is not described in detail belongs to prior art known to professional and technical personnel in the field.

Claims (7)

1. a kind of pipeline original position suspension protection structure across foundation ditch, including the supporter (1) across foundation ditch, pipeline (9), coagulation Native piping lane (5) and frame support structure (8), it is characterised in that:Pipeline (9) is distributed in inside which along concrete pipe gallery (5), coagulation Axial arranged there are multiple frame support structures (8) along which on the outside of native piping lane (5);Concrete pipe gallery (5) passes through frame support structure (8) it is supported in below supporter (1);Frame support structure (8) includes the cross tube (4) and sheer pole (6) of Parallel Symmetric setting, Between cross tube (4) and sheer pole (6), vertical symmetry is provided with two montants (3);Concrete pipe gallery is located above sheer pole (6) Two montants (3) between;Cross tube is located at the top of supporter (1), and the both sides of supporter (1) are provided with montant (3).
2. the pipeline original position suspension protection structure across foundation ditch according to claim 1, it is characterised in that also including two Connecting rod (2), two connecting rods (2) are distributed along the axis of multiple frame support structures (8) and are individually fixed in cross tube (4) Between at the top of two ends and corresponding montant (3);Cross tube is supported in the top of supporter (1) by connecting rod (2).
3. the pipeline original position suspension protection structure across foundation ditch according to claim 1, it is characterised in that supporter (1) edge The axis distribution of concrete pipe gallery (5).
4. the pipeline original position suspension protection structure across foundation ditch according to claim 2, it is characterised in that supporter (1) hangs down The straight axis in concrete pipe gallery (5) is distributed.
5. the pipeline original position suspension protection structure across foundation ditch according to claim 1, it is characterised in that concrete pipe gallery The through hole of rectangle is offered along its axis direction, pipeline is positioned in through hole.
6. the pipeline original position suspension protection structure across foundation ditch according to claim 3, it is characterised in that pipeline (9) and mix Coarse sand (7) is provided between solidifying soil piping lane (5) inside.
7. the pipeline original position suspension protection structure across foundation ditch according to claim 6, it is characterised in that many pipelines (9) It is uniformly distributed in concrete pipe gallery (5) side by side side by side internal.
CN201620652993.5U 2016-06-27 2016-06-27 Span pipeline normal position of foundation ditch and suspend protection architecture in midair Withdrawn - After Issue CN206036408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620652993.5U CN206036408U (en) 2016-06-27 2016-06-27 Span pipeline normal position of foundation ditch and suspend protection architecture in midair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620652993.5U CN206036408U (en) 2016-06-27 2016-06-27 Span pipeline normal position of foundation ditch and suspend protection architecture in midair

Publications (1)

Publication Number Publication Date
CN206036408U true CN206036408U (en) 2017-03-22

Family

ID=58313083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620652993.5U Withdrawn - After Issue CN206036408U (en) 2016-06-27 2016-06-27 Span pipeline normal position of foundation ditch and suspend protection architecture in midair

Country Status (1)

Country Link
CN (1) CN206036408U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402503A (en) * 2016-06-27 2017-02-15 中铁第四勘察设计院集团有限公司 Pipeline in-situ suspending protection structure stretching across foundation pit
CN110644799A (en) * 2019-09-26 2020-01-03 殷茜东 Pipeline suspension protection method and suspension structure thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402503A (en) * 2016-06-27 2017-02-15 中铁第四勘察设计院集团有限公司 Pipeline in-situ suspending protection structure stretching across foundation pit
CN110644799A (en) * 2019-09-26 2020-01-03 殷茜东 Pipeline suspension protection method and suspension structure thereof

Similar Documents

Publication Publication Date Title
CN106402503B (en) Across the pipeline original position suspension protection structure of foundation pit
CN105256812B (en) Foundation ditch prefabricated assembled concrete supporting construction and its construction method
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN102900076A (en) Continuous construction method for concrete pile steel pipe column
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN208702421U (en) The tunnel support structure of existing pile foundation building is worn under a kind of
CN105972313B (en) One kind is across base pit engineering conduit wiring suspension method and overhung construction
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN206036408U (en) Span pipeline normal position of foundation ditch and suspend protection architecture in midair
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN106193051A (en) Upper-soft lower-hard ground Metro station excavation support system and construction method thereof
CN104184097B (en) Non-migration suspension protection system and method for communication pipes and cables
CN107313628A (en) A kind of basic digging-free assembled tower-type space garage and its construction method
CN103161474B (en) Construction method of down hole interchange roadway
CN109723081A (en) Subway station lattice column construction method
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN110994523B (en) Method and system for protecting cable
CN202273233U (en) Deep foundation pit of three-dimensional garage
CN208106458U (en) Supporting structure for ultra-shallow soil-covering rectangular large section
CN115977696A (en) Soft rock tunnel intersection supporting construction method
CN206070541U (en) Upper-soft lower-hard ground Metro station excavation support system
CN211266407U (en) System for protecting cable
CN209704560U (en) Build the scaffolding structure that an ultra shallow buries Large Underground space

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170322

Effective date of abandoning: 20190201