CN104418567B - A kind of preparation method of seabed artificial reef - Google Patents

A kind of preparation method of seabed artificial reef Download PDF

Info

Publication number
CN104418567B
CN104418567B CN201310377407.1A CN201310377407A CN104418567B CN 104418567 B CN104418567 B CN 104418567B CN 201310377407 A CN201310377407 A CN 201310377407A CN 104418567 B CN104418567 B CN 104418567B
Authority
CN
China
Prior art keywords
cement
artificial reef
seabed artificial
seabed
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310377407.1A
Other languages
Chinese (zh)
Other versions
CN104418567A (en
Inventor
汪峻峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Material Chemical Science And Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310377407.1A priority Critical patent/CN104418567B/en
Publication of CN104418567A publication Critical patent/CN104418567A/en
Application granted granted Critical
Publication of CN104418567B publication Critical patent/CN104418567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Artificial Fish Reefs (AREA)

Abstract

The invention belongs to building material technical field, and in particular to a kind of seabed artificial reef, is formulated by a certain percentage by cement, sulphate aluminium cement, mortar modifier, anti-dispersant, silicon ash, flyash, slag, aggregate and mixing water.The present invention as seabed artificial reef basic material, directly uses seawater as the seabed artificial reef obtained by mixing water, under water good fluidity by using modified cement-based gelling material, it is not easy to disperse, setting time is fast, its 1 day compression strength is 5 30MPa or so, and 28 days are 10 70MPa or so.The present invention uses cement, and composite aggregate, the seabed artificial reef that seawater etc. is formulated, especially suitable for lacking building sandstone and fresh water, while transportation range is remote, islands and reefs engineering construction and repairing away from mainland coastline.Preparation method of the present invention is easy, is widely used.

Description

A kind of preparation method of seabed artificial reef
Technical field
The invention belongs to building material technical field, and in particular to a kind of seabed artificial reef.
Background technology:
The 18 of party explicitly point out greatly, and it is national great strategy to build ocean power, and the development of marine economy be unable to do without ocean The construction of engineering, the particularly offshore engineering on island and Hai Jiao away from mainland coastline.Due to the tidal bulge of seawater The random navigation for being distributed to ship and the life of islander, the work of falling, island periphery bare rock and submerged reef bring all More inconvenience, therefore on island and foundation engineering is quickly built and rushes to repair on Hai Jiao, for example, underwater submerged reef is quickly built up Bare rock and bare rock build up basis implementation etc. engineering construction to accelerate ocean depths islands and reefs development and utilization have it is very heavy The realistic meaning wanted.But traditional construction material currently on the market, such as:Cement, river sand, stone and fresh water etc. are for away from continent For the island in coastline, transport, handling, storage and construction of these raw material etc. will become very difficult.Not only transport into This is excessive, while under the marine environmental conditions away from mainland coastline, it is several to be particularly the work such as handling and the storage of raw material It is difficult to try out, and traditional underwater construction technology also is difficult to adapt to the environmental condition of islands and reefs.Therefore a kind of be adapted to is researched and developed In engineering material and the construction technology of simplicity that seabed artificial reef is quickly built in off-lying sea islands and reefs or coastline, to away from big Engineering construction on the island and Hai Jiao of land-sea water front has highly important strategic importance.
The content of the invention:
It is a kind of suitable for quickly building artificial creation under the high-performance water of artificial reef in seabed it is an object of the invention to propose Reef mortar, this underwater artificial creation reef mortar not only has good underwater anti-dispersibility, while setting time is fast, under water 24 it is small when compression strength can reach 5-30MPa, in addition this mortar later strength is quickly grown, and can reach 10- within 28 days 70MPa, due to the mortar excellent mobility and penetrating power, the seabed artificial reef formed after curing has with existing reef disk There are engagement and cementitiousness well, finally can be built into a novel seabed artificial reef from seabed primary concreting to sea level Disk.
Underwater artificial creation reef mortar proposed by the present invention, by cement, sulphate aluminium cement, mortar modifier, anti-dispersant, Silicon ash, flyash, slag, aggregate and mixing water are formed, and the percentage by weight of each component is:
Its total amount meets 100%.
In the present invention, the cement is portland cement, Portland cement, slag cements, pulverized fuel ash cement or fire It is one or more compound in the ash concrete of mountain.
In the present invention, the sulphate aluminium cement is in early-strength sulphate aluminium cement or high-strength sulphate aluminium cement It is one or more compound.
In the present invention, the mortar modifier is acrylic acid, ethene and polyvinyl chloride copolymer, naphthalene sulfonic salt, poly- carboxylic Hydrochlorate, it is one or more compound in melamine polymers.
In the present invention, the anti-dispersant is polyacrylamide.
In the present invention, the silicon ash is by the ultra-fine SiO that is formed during smelting duriron ore2Powder.
In the present invention, industrial residue that the flyash is discharged by coal-burning power plant, one kind of I grades of ashes or II grades of ashes.
In the present invention, the slag is levigate blast-furnace cinder.
In the present invention, the aggregate is sea sand, river sand, stone, and the polyphosphazene polymer of formation is expanded after dead coral reef and water suction It is one or more compound in resin.
In the present invention, the mixing water is one kind of fresh water or natural sea-water.
The preparation method of the present invention can be divided into following 2 kinds:
1. Extemporaneous method:Raw material is accurately weighed in proportion, weighs cement first, sulphate aluminium cement, mortar modifier, Silicon ash, flyash, slag and aggregate add mixer, after weigh seawater, add seawater while stirring, stir 5-10 minutes, stop After machine 1-3 minutes, continue stirring 1-2 minutes, up to required product.
2. dry-mixed mortar method:Cement, sulphate aluminium cement, mortar modifier, anti-dispersant, silicon are accurately weighed in proportion Ash, flyash, slag and aggregate, add dry-mixed mortar batch mixer, stir 5-10 minutes, dry blend are made, then according to certain Specification carries out quantitative package, and packaging should have moisture-proof impervious effect.In use site, dry-mixed mortar and seawater are proportionally added into In mixer, mixing 5-10 minute after, shutdown 1-3 minutes, if recipe requirements, then accurately weigh at the scene dead coral reef and Polyphosphazene polymer resin after water suction etc. is added in mixer, continues stirring 3-5 minutes, up to required product.
The manufacturing process and construction technology of the present invention is easy, is suitable for large batch of production, transport and storage.
It is 5-30MPa that artificial creation reef mortar of the invention underwater detects the compression strength of 1 day through relevant department, the resistance to compression of 28 days Intensity is 10-70MPa
The present invention has the advantage that:
1st, since the underwater artificial creation reef mortar of the present invention has good underwater anti-dispersibility, while also have fine Underwater mobility, you can direct pouring molding under water, the seabed artificial reef formed after curing have with existing reef disk Engagement and cementitiousness well.
2nd, since the seabed artificial reef of the present invention not only has higher early strength, (24 can reach 5-30MPa when small), Later strength quickly grows and (can reach 10-70MPa within 28 days) at the same time, therefore available in seabed fast pouring seabed artificial reef.
3rd, due to the present invention underwater artificial creation reef mortar by using the macromolecule copolymer resin after water suction as people Work aggregate, so as to change all using sandstone as the concrete making technology of aggregate in conventional concrete material, such as remote Using this underwater artificial creation reef mortar in the islands and reefs engineering construction of mainland coastline, can not only save substantial amounts of sandstone transport, Handling and storage charges are used, and then reduce the construction cost of engineering, while can provide one to lack the islands and reefs engineering construction of sandstone again The construction technology of the new underwater quick rush construction of kind.
4th, due to present invention uses the flyash of large dosage and slag, therefore the manufacture cost of engineering can be significantly reduced.
5th, since the raw material of the present invention are all using the market finished product largely produced, so raw material are easy to get, it is adapted to wide General application.
Embodiment
Technical scheme is further described with reference to embodiments.
Embodiment 1
The seabed artificial reef prepared using Portland cement.
Table 1:Raw materials
The seabed artificial reef prepared using portland cement:
42.5 Portland cements 32.40%, 42.5 early-strength sulphate aluminium cements 1.60%, mortar modifier 2.94%, anti-dispersant 0.02%, silicon ash 1.87%, flyash 5.10%, slag 2.37%, aggregate 38.30%, seawater 15.40%,.After accurately weighing raw material in proportion, it is stirred with mortar mixer, adds seawater while stirring, stirs 5-10 After minute, shut down 1-3 minutes, continue stirring 1-2 minutes, the mortar being stirred is poured into the 4cm for having been placed in 20cm depths in water In x4cm x16cm moulds, 6 it is small when after die trial is taken out from water, after doctor blade die surface, insert in water and conserve again To 24 it is small when, the mortar compression strength of 1 day is surveyed after form removal, other test blocks are put into room temperature seawater maintenance to test age.
After tested, which is 28.1MPa, and 28 days compression strength is 62.7MPa.
Embodiment 2
The seabed artificial reef prepared using slag cements.
Table 2:Raw materials
The seabed artificial reef prepared using slag cements:
42.5 slag cements 35.20%, 42.5 early-strength sulphate aluminium cements 2.10%, mortar modifier 2.72%, resists Dispersant 0.03%, silicon ash 2.36%, flyash 6.89%, aggregate 37.10%, seawater 13.60%.Original is accurately weighed in proportion After material, it is stirred with mortar mixer, adds seawater while stirring, after stirring 5-10 minutes, is shut down 1-3 minutes, continue to stir Mix 1-2 minutes, the mortar being stirred poured into and is had been placed in the 4cm x4cm x16cm moulds of 20cm depths in water, 6 it is small when after from Die trial is taken out in water, after doctor blade die surface, insert again in water maintenance to 24 it is small when, mortar 1 day is surveyed after form removal Compression strength, other test blocks are put into room temperature seawater and conserve to test age.
After tested, which is 10.0MPa, and 28 days compression strength is 32.2MPa.

Claims (6)

  1. A kind of 1. seabed artificial reef, it is characterised in that by cement, sulphate aluminium cement, mortar modifier, anti-dispersant, silicon ash, Flyash, slag, aggregate and mixing water are formed, and the percentage by weight of each component is:
    Cement 15.00%--45.00%
    Sulphate aluminium cement 1.60%--8.00%
    Mortar modifier 0.50%--5.00%
    Anti-dispersant 0.02%--4.00%
    Silicon ash 0.10%--20.00%
    Flyash 1.00%--25.00%
    Slag 0.00%--15.00%
    Aggregate 10.00%--55.00%
    Mixing water 6.50%--25.00%
    Its total amount meets 100%;
    The cement is portland cement, Portland cement, slag cements, one in pulverized fuel ash cement or pozzolan cement Kind is a variety of compound;The sulphate aluminium cement is one kind in early-strength sulphate aluminium cement or high-strength sulphate aluminium cement It is or a variety of compound;The mortar modifier is acrylic acid, ethene and polyvinyl chloride copolymer, polycarboxylate, melamine polymerization It is one or more compound in thing;The aggregate is sea sand, river sand, stone, and the high score of formation is expanded after dead coral reef and water suction It is one or more compound in sub- polymer resin.
  2. 2. seabed artificial reef according to claim 1, it is characterised in that the anti-dispersant is polyacrylamide.
  3. 3. seabed artificial reef according to claim 1, it is characterised in that the silicon ash during smelting duriron ore by forming Ultra-fine SiO2Powder.
  4. 4. seabed artificial reef according to claim 1, it is characterised in that the work that the flyash is discharged by coal-burning power plant Industry waste residue, I grades of ashes or II grades of ashes.
  5. 5. seabed artificial reef according to claim 1, it is characterised in that the slag is levigate blast-furnace cinder.
  6. 6. seabed artificial reef according to claim 1, it is characterised in that the mixing water is one of fresh water or natural sea-water Kind.
CN201310377407.1A 2013-08-27 2013-08-27 A kind of preparation method of seabed artificial reef Active CN104418567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310377407.1A CN104418567B (en) 2013-08-27 2013-08-27 A kind of preparation method of seabed artificial reef

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310377407.1A CN104418567B (en) 2013-08-27 2013-08-27 A kind of preparation method of seabed artificial reef

Publications (2)

Publication Number Publication Date
CN104418567A CN104418567A (en) 2015-03-18
CN104418567B true CN104418567B (en) 2018-04-13

Family

ID=52968781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310377407.1A Active CN104418567B (en) 2013-08-27 2013-08-27 A kind of preparation method of seabed artificial reef

Country Status (1)

Country Link
CN (1) CN104418567B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105837107B (en) * 2016-03-15 2018-08-24 青岛太平洋海洋工程有限公司 A kind of underwater static fracturing agent and preparation method thereof
CN108341629A (en) * 2018-03-05 2018-07-31 沙焕焕 As bottom reinforcing regardless of aproll soil and its construction method
CN112408922A (en) * 2020-10-14 2021-02-26 湘潭大学 Novel island reef rapid first-aid repair concrete
CN113004003B (en) * 2021-03-05 2022-05-31 上海建工建材科技集团股份有限公司 Underwater anti-dispersion mortar and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101224968A (en) * 2008-01-31 2008-07-23 山东省路桥集团有限公司 Marine durable cement concrete
CN101445351A (en) * 2008-12-25 2009-06-03 戴春燕 Marine C50 pumpcrete
CN101462843A (en) * 2008-12-17 2009-06-24 同济大学 Marine concrete corrosion resistant additive and preparation thereof
CN101659535A (en) * 2008-08-27 2010-03-03 浙江明峰水泥有限公司 Maritime concrete cement
CN101913826A (en) * 2010-08-30 2010-12-15 中铁十九局集团第五工程有限公司 Durable prestressed concrete for ocean engineering
CN103253911A (en) * 2013-04-24 2013-08-21 中国石油大学(北京) Ocean-engineering anti-erosion cement-based composite material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101224968A (en) * 2008-01-31 2008-07-23 山东省路桥集团有限公司 Marine durable cement concrete
CN101659535A (en) * 2008-08-27 2010-03-03 浙江明峰水泥有限公司 Maritime concrete cement
CN101462843A (en) * 2008-12-17 2009-06-24 同济大学 Marine concrete corrosion resistant additive and preparation thereof
CN101445351A (en) * 2008-12-25 2009-06-03 戴春燕 Marine C50 pumpcrete
CN101913826A (en) * 2010-08-30 2010-12-15 中铁十九局集团第五工程有限公司 Durable prestressed concrete for ocean engineering
CN103253911A (en) * 2013-04-24 2013-08-21 中国石油大学(北京) Ocean-engineering anti-erosion cement-based composite material

Also Published As

Publication number Publication date
CN104418567A (en) 2015-03-18

Similar Documents

Publication Publication Date Title
CN104370510B (en) A kind of preparation method of high-performance underwater concrete
CN104446115B (en) A kind of Concrete synergist
CN104177015B (en) Non-burning brick and the natural curing preparation method that lake, a kind of river dredging bed mud is major ingredient
CN103253921B (en) Cement concrete preventing corrosion of chlorine salt and preparation method thereof
CN104150840B (en) C60 full-manufactured sand super high-rise pump concrete
CN112759320B (en) High-fluidity low-density grouting material for offshore wind power suction pile foundation
CN103992078B (en) A kind of gravity flowing levelling mortar being mixed with phosphorus slag powder
CN102173709B (en) Property-adjustable gypsum-based grouting material
CN111995339A (en) Anti-scouring solidified soil for ocean platform and preparation method thereof
CN101648783A (en) Method for preparing gypsum-based self-leveling material by using desulfurization gypsum
CN104418567B (en) A kind of preparation method of seabed artificial reef
CN102775106A (en) Recyclable red brick sand premixed dry mortar and manufacturing method thereof
CN105622023B (en) A kind of sludge curing agent using clinker
CN105272020A (en) C40 pump concrete with heat resisting temperature of 500 DEG C
CN109400080A (en) A kind of inorganic solidified flyash filler and preparation method thereof
CN113880516A (en) Non-autoclaved fly ash aerated concrete thermal insulation building block and preparation method thereof
CN103848607A (en) Maritime work mortar prepared by using artificial aggregate
CN101492274B (en) Titanium gypsum dry mixed mortar
CN102503295A (en) Non-sintered brick prepared from river and lake silt and preparation process thereof
CN103265256A (en) Non-dispersible underwater fast-setting inorganic grouting material and preparation method thereof
CN110510970A (en) A kind of gypsum base Ceramic Tiles adhesive and preparation method thereof
CN111333392A (en) Seawater mixed culture coral reef sand C120UHPC and preparation method thereof
CN107344822A (en) One kind is containing bentonitic premixing mortar water-keeping thickening material and preparation method thereof
CN102659352A (en) Preparation method of super-retarded large-volume concrete and super-retarded ground pit concrete
CN114716213A (en) Underwater grouting pile foundation anti-scouring early-strength grouting material and application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190510

Address after: Room 1103, 11th floor, No. 2 Changfeng Building, 14 Xinghuo Road, Jiangbei New District, Nanjing City, Jiangsu Province

Patentee after: Nanjing Bo Xin with the new Mstar Technology Ltd

Address before: 100013 Building 50G, Minwangyuan 30, Pingli East Street, Dongcheng District, Beijing

Patentee before: Wang Junfeng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200903

Address after: Room 153, 1 / F, building 7, Qijiahuozi a 2, Haidian District, Beijing

Patentee after: (Beijing) material chemical science and Technology Development Co.,Ltd.

Address before: Room 1103, 11th floor, No. 2 Changfeng Building, 14 Xinghuo Road, Jiangbei New District, Nanjing City, Jiangsu Province

Patentee before: Nanjing Bo Xin with the new Mstar Technology Ltd.