CN104110125B - Waterproof method after the dismounting of wall-connecting device of scaffold - Google Patents

Waterproof method after the dismounting of wall-connecting device of scaffold Download PDF

Info

Publication number
CN104110125B
CN104110125B CN201410342798.8A CN201410342798A CN104110125B CN 104110125 B CN104110125 B CN 104110125B CN 201410342798 A CN201410342798 A CN 201410342798A CN 104110125 B CN104110125 B CN 104110125B
Authority
CN
China
Prior art keywords
wall
built
fitting
pull bar
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410342798.8A
Other languages
Chinese (zh)
Other versions
CN104110125A (en
Inventor
翁振华
洪斌
蒋国华
王建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG WANHUA CONSTRUCTION CO Ltd
Original Assignee
ZHEJIANG WANHUA CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG WANHUA CONSTRUCTION CO Ltd filed Critical ZHEJIANG WANHUA CONSTRUCTION CO Ltd
Priority to CN201410342798.8A priority Critical patent/CN104110125B/en
Publication of CN104110125A publication Critical patent/CN104110125A/en
Application granted granted Critical
Publication of CN104110125B publication Critical patent/CN104110125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of wall-connecting device of scaffold, it includes anchoring piece, built-in fitting, even wall pull bar and pull bar fastening nut, built-in fitting is the cuboid with cavity vertically placed, and at the opening of the strip towards the one side of wall outer side with through whole length;Being connected in one end of described company's wall pull bar is slidably connected at built-in fitting and by pull bar fastening nut and built-in fitting are fixing, the other end is fixing with fastener to be connected.Its remove after waterproof method be cleaning cavity, fill up with filling perforation mortar cavity and distance opening a transverse plane reserve groove, fill up with waterproof mortar groove, on whole wall face with exterior wall sand pulp screed-coat come levelling.So, it is not necessary to cutting pull bar, can the company's of recycling wall pull bar finished product, be greatly saved steel, and add the path of current, substantially increase water resistance.

Description

Waterproof method after the dismounting of wall-connecting device of scaffold
Technical field
The present invention relates to the technical field that building is built, be especially the waterproof method after the dismounting of a kind of wall-connecting device of scaffold.
Background technology
When building constructions is constructed, needing to make the operations such as the rendering of exterior wall, veneer, therefore the environment of operation is more special, during construction The scaffold operation platform as workman must be built, otherwise cannot base oneself upon.Along with height and the elevation of building of modern architecture are complicated The increase of property, building scaffold set up difficulty and requirement is more and more higher.In prior art, arrange the most at the construction field (site) Being the steel pipe scaffold of double fastener type, it includes many vertical equity bars, transverse horizontal bar and vertical rod, and these rod members constitute Multilamellar, the framework shape steel construction scaffold of multi-span.And the connector between this framework shape steel construction and body of wall commonly referred to connects Wall part, its effect can not be ignored, and is mainly reflected in:
First, at the fastener node that wall-connecting piece is connected with rod member, there is under the effect of load suitable anti-rotating ability (i.e. Usually said has rigidity), but owing to quality and the degree of tightening of fastener itself all have impact on the rigidity of this node, therefore should Framework is structures with semi-rigid joints framework, and the transverse width of scaffold will be much smaller than its longitudinal length and vertical height, therefore, Scaffold for a face wall can be considered again the flat board of one piece of lattice, and it is poor in the rigidity being perpendicular to building surface direction, Being far smaller than it longitudinally rigid, therefore scaffold must rely on and being reliably connected of building, and i.e. arranges wall-connecting piece, just has Bear its deadweight, construction load and the ability of wind load.
Second, wall-connecting piece is the support pull bar between scaffold and main structure body and the constraint limiting scaffold longitudinal direction Free Transform length Connecting rod, it is as bearing the bearing of horizontal force action, serves following effect: one, it is by scaffold and building structure work Journey is tied, it is ensured that scaffold monolithic stability and use safety;Its two, it retrains scaffold change under vertical load effect Shape, reduces vertical rod computational length, strengthens scaffold lateral stiffness, improves its resistance to capsizing outwardly or inwardly and carrying is stable Property;Its three, its opposing wind load and other horizontal load effects also pass to engineering structure;Its four, resist because ground is uneven heavy The internal force dropped and cause, makes internal force redistribute, to reduce the concentrated stress of lower portion, it is to avoid local failure occurs in framework; Its five, strengthen scaffold overall, or local, or the rigidity in weak direction.
The outrigger that building industry routine is conventional at present has socketed embedded steel tube (or reinforcing bar) and has connected and two kinds of structures of connection by post-installed fastenings.But It is that both structure wall-connecting device of scaffolds exist problem below:
1) first, embedded steel tube (or reinforcing bar) connects, and it is made up of with built-in fitting wall connecting rod, fastener, and its wall connecting rod can hold Pressure can be born again by pulling force, there is bigger rigidity, deform the least under load effect.It waters at concrete in actual use It is embedded in about 20cm in beam with a vertical short steel pipes before building, exposes beam and break an agreement 20cm, after concrete placings completes, by fastener water Flat long fastener for connection vertical rod and vertical short steel pipes, the long steel pipe of level has acted as the role of wall-connecting piece.But, use pre-buried The problem that the structure of part exists has: one, its positional accuracy is not easily controlled, and the patch work amount in later stage is bigger;Its two, During scaffold building, wall-connecting piece is caused to be had any problem normally arranging due to the change of job site;Its three, When building body enters the decoration of exterior wall stage, construction enterprises for ease of external wall construction, are about to after the wall-connecting piece of original setting removes certainly, Cause support body anchorage seriously to reduce;Its four, embedded steel tube connects cannot be pulled out due to pre-buried vertical steel pipe, and needs Masonry hole is carried out later stage closure, thus hidden danger can be brought to external wall waterproof.
2) connection by post-installed fastenings, is the deficiency connected for above-mentioned embedded steel tube and the improvement made, and connection by post-installed fastenings is the side at beam Boring, installs expansion anchor, then with being connected with steel pipe welding all-in-one-piece anchor slab in advance.But, connection by post-installed fastenings exists Problem is to construct extremely to bother, and especially drilling operation bothers very much: being typically with 2 expansion anchors, bearing capacity is the highest, Easily loosen, low all alternate loads can not be born, rigid connecting tube scope can not be included strictly speaking in;According to chemical anchor bolts, Then construction requirement is the highest, must strictly control hole depth and aperture in work progress, and must strictly clear hole, otherwise bearing capacity Cannot be guaranteed;And after having constructed, crab-bolt is also scrapped, it is impossible to reuse, increase construction cost;And removing Time, it is necessary to use naked light to cut, therefore there is serious disaster hidden-trouble.
Summary of the invention
It is longer that the technical problem to be solved is to provide a kind of sealing path, thus substantially increases the foot of water resistance Waterproof method after the dismounting of hand cradle wall attaching parts.
For solving above-mentioned technical problem, the waterproof method after the dismounting of the wall-connecting device of scaffold that the present invention provides, it includes following Several steps:
1) this wall-connecting device of scaffold includes the anchoring piece being embedded in body of wall and by fastener by vertical rod in scaffold and anchoring piece The wall-connecting piece coupled together;Described wall-connecting piece includes built-in fitting, even wall pull bar and pull bar fastening nut, and built-in fitting is for vertically to put The cuboid with cavity put, and at the opening of the strip towards the one side of wall outer side with through whole length;Institute The anchoring piece stated be level to placement, and one end is welded towards the planar ends inside body of wall with built-in fitting;Described company's wall pull bar One end is for spacing stub end, in this stub end is slidably connected at built-in fitting and is fixed with built-in fitting by pull bar fastening nut Connecting, the other end is fixing with fastener to be connected;After this wall-connecting device of scaffold is removed, the first cavity in cleaning built-in fitting;
2) fill up the cavity of built-in fitting with filling perforation mortar, and reserve groove at the transverse plane apart from opening, the groove depth of this groove For 0.8cm~1.2cm;
3) by waterproof mortar filling steps 2) in groove, and having of wiping one's face higher than c-type built-in fitting of this waterproof mortar outer One end transverse plane 0.5cm of opening;
4) come levelling with exterior wall sand pulp screed-coat on whole wall face.
As improvement, in step 2) in, described filling perforation mortar is dry cement mortar, the cement in its composition and sand Ratio be 1 2.5, and this filling perforation mortar is mixed with EAE extender, the consumption of described EAE extender is that cement is used The 3%~5% of amount.
After using said method to carry out water-proofing treatment, the sealing path of the built-in fitting owing to being retained in body of wall is longer, adds water The path of stream, therefore, substantially increases water resistance, also allows for carrying out water-proofing treatment;Further, since even wall pull bar is complete Can take out from built-in fitting, only leave built-in fitting and anchoring piece within the walls, with the structure of traditional built-in iron plate welding rod (i.e. Embedded steel tube or bar connecting) compare, it is not necessary to cutting pull bar, can the company's of recycling wall pull bar finished product, be greatly saved steel; Compared with the structure (i.e. connection by post-installed fastenings) that external iron plate nut reinforces pull bar, built-in fitting is equivalent to a built-in seal plate, Add the path of current, also substantially increase water resistance.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of wall-connecting device of scaffold in the present invention.
Fig. 2 is the plan structure schematic diagram of wall-connecting device of scaffold in the present invention.
Fig. 3 is the partial enlargement structural representation in Fig. 2.
Fig. 4 is the structural representation in A-A direction in Fig. 3.
Fig. 5 is to remove waterproof construction schematic diagram after scaffold in the present invention.
Wherein: 1, body of wall;2, built-in fitting;3, pad;4, spring shim;5, wall pull bar is connected;6, interior vertical rod;7, anchor Firmware;8, pull bar fastening nut;9, pull bar regulating nut;10, fastener;11, positioning boss;12, the shaft shoulder;13, fill out Hole mortar;14, waterproof mortar;15, exterior wall sand pulp screed-coat;16, cavity;17, opening.
Detailed description of the invention
With detailed description of the invention, the present invention is described in more detail below in conjunction with the accompanying drawings.
From the structural representation of the wall-connecting device of scaffold shown in Fig. 1~Fig. 4, it includes the anchoring being embedded in body of wall 1 Part 7 and wall-connecting piece vertical rod in scaffold coupled together with anchoring piece 7 by fastener 10.Described wall-connecting piece includes pre-buried Part 2, even wall pull bar 5 and pull bar fastening nut 8, built-in fitting 2 is the cuboid with cavity 16 vertically placed, and There is the opening 17 of the strip of through whole length towards the one side outside body of wall 1.Described anchoring piece 7 be level to placement, And one end welds towards the planar ends inside body of wall 1 with built-in fitting 2.One end of described company's wall pull bar 5 is for spacing big Head end, is connected in this stub end is slidably connected at built-in fitting 2 and by pull bar fastening nut 8 is fixing with built-in fitting 2, the other end Fix with fastener 10 and be connected.
Described company's wall pull bar 5 also includes polished rod portion and the threaded shank being connected as a single entity with stub end, and the profile of stub end is rectangle, And the part that stub end contacts with built-in fitting 2 is the inclined-plane caved in stub end center, correspondingly contact with stub end is pre-buried The contact surface of part 2 is also inclined-plane.
On the cross section of built-in fitting 2, the stub end size of described company's wall pull bar 5 is more than the size of the opening 17 of built-in fitting 2, The outside dimension in polished rod portion is less than or equal to the size of opening 17, and polished rod portion is slidably connected at opening 17.
The polished rod portion of described company's wall pull bar 5 has the positioning boss 11 that the opening with built-in fitting 2 matches.
Described pull bar fastening nut 8 passes sequentially through spring shim 4 and pad 3 and is fastenedly connected with built-in fitting 2 by even wall pull bar 5.
Described anchoring piece 7 is anti-punching shear bar, and its one end away from built-in fitting 2 inside body of wall 1 has for resisting pulling force The shaft shoulder 12.
What described fastener 10 included two symmetrical shape partly detains unit, and the two ends up and down of half button unit are flat board, and centre is semicircle Arc plate, the upper end after two and half button unit close up by two pull bar regulating nuts 9 and connects wall pull bar 5 one end away from enlarged head Connecting, lower end connects by screw-nut is fixing, and the circular port of intermediate formation is socketed in outside the interior vertical rod 6 of scaffold.
Waterproof construction schematic diagram after the dismounting of wall-connecting device of scaffold of the present invention as shown in Figure 5 understands, and it includes following Step:
1) cavity 16 in cleaning built-in fitting 2;
2) fill up the cavity 16 of built-in fitting 2 with filling perforation mortar 13, and reserve groove at the transverse plane apart from opening 17, The groove depth of this groove is 0.8cm~1.2cm;
3) by waterproof mortar 14 filling steps 2) in groove, and the outer of this waterproof mortar 14 wipe one's face higher than built-in fitting 2 There is a transverse plane 0.5cm of opening 17;
In step 2) in, described filling perforation mortar 13 is dry cement mortar, and the cement in its composition with the ratio of sand is 1 2.5, and this filling perforation mortar 13 are mixed with EAE extender, described EAE extender consumption is cement consumption 3%~ 5%.

Claims (2)

1. the waterproof method after the dismounting of a wall-connecting device of scaffold, it is characterised in that: it includes following step:
1) this wall-connecting device of scaffold includes the anchoring piece (7) being embedded in body of wall (1) and by fastener (10) by foot hands The wall-connecting piece that in frame, vertical rod and anchoring piece (7) couple together;Described wall-connecting piece includes built-in fitting (2), even wall pull bar (5) With pull bar fastening nut (8), built-in fitting (2) is the cuboid with cavity (16) vertically placed, and towards body of wall (1) one side outside has the opening (17) of the strip of through whole length;Described anchoring piece (7) be level to placement, And one end and built-in fitting (2) weld towards the planar ends of body of wall (1) inner side;One end of described company's wall pull bar (5) is for being used for Spacing stub end, in this stub end is slidably connected at built-in fitting (2) and by pull bar fastening nut (8) and built-in fitting (2) Fixing connection, the other end is fixing with fastener (10) to be connected;After being removed by this wall-connecting device of scaffold, first clear up built-in fitting (2) In cavity (16);
2) cavity (16) of built-in fitting (2) is filled up with filling perforation mortar (13), and pre-at a transverse plane of distance opening (17) Reserving groove, the groove depth of this groove is 0.8cm~1.2cm;
3) by waterproof mortar (14) filling steps 2) in groove, and the outer of this waterproof mortar (14) wipe one's face higher than pre-buried The one transverse plane 0.5cm with opening (17) of part (2);
4) come levelling with exterior wall sand pulp screed-coat (15) on whole wall face.
Waterproof method after the dismounting of wall-connecting device of scaffold the most according to claim 1, it is characterised in that: in step 2) In, described filling perforation mortar (13) is dry cement mortar, and the cement in its composition is 1 2.5 with the ratio of sand, and And this filling perforation mortar (13) is mixed with EAE extender, consumption is cement consumption 3%~the 5% of described EAE extender.
CN201410342798.8A 2014-07-18 2014-07-18 Waterproof method after the dismounting of wall-connecting device of scaffold Active CN104110125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410342798.8A CN104110125B (en) 2014-07-18 2014-07-18 Waterproof method after the dismounting of wall-connecting device of scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410342798.8A CN104110125B (en) 2014-07-18 2014-07-18 Waterproof method after the dismounting of wall-connecting device of scaffold

Publications (2)

Publication Number Publication Date
CN104110125A CN104110125A (en) 2014-10-22
CN104110125B true CN104110125B (en) 2016-08-24

Family

ID=51707101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410342798.8A Active CN104110125B (en) 2014-07-18 2014-07-18 Waterproof method after the dismounting of wall-connecting device of scaffold

Country Status (1)

Country Link
CN (1) CN104110125B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762017A (en) * 2016-08-15 2018-03-06 中国二十冶集团有限公司 The connection method of curtain skeleton and the pre-buried anchor slab of major structure of construction
CN113047602A (en) * 2021-03-25 2021-06-29 中国十七冶集团有限公司 Adjustable scaffold wall connecting piece structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207924A (en) * 1994-01-18 1995-08-08 Daiwa House Ind Co Ltd Wall joint receiver reinforcing hardware
CN102661035A (en) * 2012-05-14 2012-09-12 江苏弘盛建设工程集团有限公司 Tool type wall connecting piece for exterior wall scaffold
CN102704667A (en) * 2012-06-08 2012-10-03 四汇建设集团有限公司 Scaffold pre-buried assembled connecting wall device
CN202577613U (en) * 2012-05-21 2012-12-05 江苏江中集团有限公司 Waterproof wall bolt hole structure
CN202627474U (en) * 2012-04-14 2012-12-26 安徽省舒城三乐童车有限责任公司 Wall connecting device of building scaffold
CN103669585A (en) * 2013-12-25 2014-03-26 中建三局建设工程股份有限公司 Concrete embedded bolt assembly allowing to be taken out

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080179477A1 (en) * 2007-01-31 2008-07-31 Regency Innovations, Llc Scaffolding securement system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207924A (en) * 1994-01-18 1995-08-08 Daiwa House Ind Co Ltd Wall joint receiver reinforcing hardware
CN202627474U (en) * 2012-04-14 2012-12-26 安徽省舒城三乐童车有限责任公司 Wall connecting device of building scaffold
CN102661035A (en) * 2012-05-14 2012-09-12 江苏弘盛建设工程集团有限公司 Tool type wall connecting piece for exterior wall scaffold
CN202577613U (en) * 2012-05-21 2012-12-05 江苏江中集团有限公司 Waterproof wall bolt hole structure
CN102704667A (en) * 2012-06-08 2012-10-03 四汇建设集团有限公司 Scaffold pre-buried assembled connecting wall device
CN103669585A (en) * 2013-12-25 2014-03-26 中建三局建设工程股份有限公司 Concrete embedded bolt assembly allowing to be taken out

Also Published As

Publication number Publication date
CN104110125A (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN203939227U (en) Wall-connecting device of scaffold
CN103911951B (en) The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof
CN205400024U (en) Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
CN202227677U (en) Bolt type detachable wall connecting piece
CN113605771B (en) Prestress assembly type frame structure system
CN108999398A (en) The Formwork Installation Method of steel and concrete composite structure beam
CN107762139A (en) Cast-in-place concrete haunch wall aluminium alloy chamfering formwork supporting adn fixing device and method
CN208502206U (en) Assembling the shaped steel suspension scaffolding
CN106150087A (en) A kind of combined frame column template and construction method thereof
CN104110125B (en) Waterproof method after the dismounting of wall-connecting device of scaffold
CN206052969U (en) A kind of connecting node of lower load-bearing parallel-moving type precast concrete exterior wall and girder steel
CN103243900B (en) Wall connecting assembly of steel pipe scaffold
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN106760014A (en) A kind of board-like adjustable damper embedded part of full assembled and installation method
CN111851987B (en) Construction method of attached short-limb I-shaped steel basket pull rod pull-knot type cantilever frame
JP2008095499A (en) Column and beam connecting structure
CN212428042U (en) Scaffold and building body connection fixed knot construct
CN206337668U (en) A kind of board-like adjustable damper embedded part of full assembled
CN108978870A (en) Fold-line-shaped girder steel and concrete combined structure construction method
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN207363019U (en) Concrete-filled steel tubular frame structure non-dismantling formwork fills wall and steel pipe anchor connector
CN106401172B (en) Exempt from plastering typified form component, exempt from plaster typified form component application method and construction method
CN211447712U (en) I-shaped steel beam overhanging scaffold for open caisson

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Weng Zhenhua

Inventor after: Hong Bin

Inventor after: Jiang Guohua

Inventor after: Wang Jianbo

Inventor before: Jiang Guohua

Inventor before: Weng Zhenhua

Inventor before: Hong Bin

Inventor before: Wang Jianbo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIANG GUOHUA WENG ZHENHUA HONG BIN WANG JIANBO TO: WENG ZHENHUA HONG BIN JIANG GUOHUA WANG JIANBO

C14 Grant of patent or utility model
GR01 Patent grant