CN102704667A - Scaffold pre-buried assembled connecting wall device - Google Patents

Scaffold pre-buried assembled connecting wall device Download PDF

Info

Publication number
CN102704667A
CN102704667A CN2012101880601A CN201210188060A CN102704667A CN 102704667 A CN102704667 A CN 102704667A CN 2012101880601 A CN2012101880601 A CN 2012101880601A CN 201210188060 A CN201210188060 A CN 201210188060A CN 102704667 A CN102704667 A CN 102704667A
Authority
CN
China
Prior art keywords
wall
buried
scaffold
pull rod
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101880601A
Other languages
Chinese (zh)
Inventor
张德琪
洪磊
江伟
米军
周裕辉
邱兴建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIHUI CONSTRUCTION GROUP CO Ltd
Original Assignee
SIHUI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIHUI CONSTRUCTION GROUP CO Ltd filed Critical SIHUI CONSTRUCTION GROUP CO Ltd
Priority to CN2012101880601A priority Critical patent/CN102704667A/en
Publication of CN102704667A publication Critical patent/CN102704667A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a scaffold pre-buried assembled connecting wall device. The device comprises a steel bar anchorage piece pre-buried in a wall, a sleeve pre-buried in the wall, welded with one end of the steel bar anchorage piece and provided with an internal thread, and a pull rod of which one end is in threaded connection with the sleeve; the other end of the pull rod is vertically connected with an adjusting pipe; one end of the adjusting pipe penetrates the pull rod through a pull rod hole formed in the radial direction; a nut in threaded connection with the pull rod is arranged on each of two sides of the pull rod hole; and the other end of the adjusting pipe is connected with a small cross rod of a scaffold through a fastener. The threaded pull rod and the wall are connected through the pre-buried sleeve, and the pull rod and the small cross rod of the scaffold are connected through the rotatable adjusting pipe, so that quick and stable connection between the scaffold and the wall can be realized, and steel pipe reserved holes are effectively prevented from being formed in the wall; the pull rod is quickly detached for recycling after construction, so that building consumables are saved; and position error of the pre-buried sleeve is made up by the adjusting pipe capable of rotating to adjust the position, so that the construction difficulty is greatly reduced.

Description

The pre-buried assembling wall attaching parts of a kind of scaffold
Technical field
The present invention relates to a kind of building operations servicing unit, particularly relate to a kind of scaffold connecting device.
Background technology
In building construction process, usually need use scaffold,, need scaffold be fixedly connected on the exterior wall usually in order to prevent toppling of scaffold.Traditional scaffold fixed form is to adopt steel pipe thick pillar method that the tie wall bar is connected with body of wall; Its drawback mainly contains: the steel pipe hole to be provided on the body of wall needs artificial shutoff after construction finishes; Shutoff is lack of standardization or leakage is stifled then can cause wall leakage when raining, and maintenance difficult; Steel pipe hole to be provided on the body of wall influences the heat insulation effect of external-wall heat-insulation material layer etc.
" the pre-buried welded type wall attaching parts of scaffold " and " the pre-buried assembling wall attaching parts of scaffold " two patents of application before the inventor; Though solved the technical problem that on body of wall, stays the steel pipe hole to be provided; But the pre-buried position accuracy demand of its reinforcing bar is higher; Otherwise be difficult to welding or assembling, bring big difficulty to construction.
Summary of the invention
Technical problem to be solved by this invention provides a kind of avoid on body of wall, staying steel pipe hole to be provided and the pre-buried adjustable wall attaching parts of scaffold easy and that scaffold is linked and packed.
In order to solve the problems of the technologies described above; The present invention adopts following technical scheme: the pre-buried adjustable wall attaching parts of a kind of scaffold; Comprise the reinforcing bar anchoring piece that is embedded in the body of wall, be embedded in the body of wall and with the sleeve that has internal thread of reinforcing bar anchoring piece one end welding, the pull bar that an end is connected with bush whorl; The other end of said pull bar vertically is connected with adjustable pipe; One end of said adjustable pipe is through on the pull bar through the tie rod hole of radially offering, and said tie rod hole both sides are equipped with the nut that is connected with pull rod screw, and the other end of said adjustable pipe is connected with the little cross bar of scaffold through fastener.
As preferably, said reinforcing bar anchoring piece is the L shape.
As preferably, the end face of said sleeve cylinder lever connecting rod end flushes with exterior surface of wall.
As preferably, said pull bar diameter is 18 to 25 millimeters.
As preferably, said adjustable pipe is a round steel pipe.
Further, the external diameter of said adjustable pipe is 48 millimeters.
The pre-buried adjustable wall attaching parts of a kind of scaffold of the present invention comes connecting thread pull bar and body of wall through service sleeve, comes cylinder lever connecting rod and putlog (put-lock) through rotatable adjustable pipe again; So both can realize that scaffold was connected with the fast and stable of body of wall, and effectively avoid on body of wall, staying the steel pipe hole to be provided, stop the generation of external wall seepage phenomenon; Can, construction dismantle pull bar apace after finishing again to recycle; Practiced thrift the building consumptive material, reduced building costs, and remedied the site error of service sleeve through adjustable pipe that can its position of rotation adjusting; Greatly reduce difficulty of construction, improved efficiency of construction.The pre-buried adjustable wall attaching parts of a kind of scaffold of the present invention, installation and removal are easy and simple to handle, the safety when having improved work high above the ground greatly.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further explain.
Fig. 1 is the structural representation of the pre-buried adjustable wall attaching parts of a kind of scaffold of the present invention.
Wherein, Reference numeral: 1 is body of wall, and 2 is the reinforcing bar anchoring piece, and 3 is sleeve, and 4 is pull bar, and 5 is adjustable pipe, and 6 is the tie rod hole on the adjustable pipe, and 7 is nut, and 8 is fastener, and 9 is little cross bar.
The specific embodiment
Disclosed all characteristics in this manual, or the step in disclosed all methods or the process except mutually exclusive characteristic and/or the step, all can make up by any way.
Disclosed arbitrary characteristic in this manual is only if special narration all can be replaced by other equivalences or the alternative features with similar purpose.That is, only if special narration, each characteristic is an example in a series of equivalences or the similar characteristics.
As shown in Figure 1; The pre-buried adjustable wall attaching parts of a kind of scaffold of the present invention; Comprise the reinforcing bar anchoring piece 2 that is embedded in the body of wall 1, be embedded in the body of wall 1 and with the sleeve that has internal thread 3 of reinforcing bar anchoring piece 2 one ends welding, the pull bar 4 that an end is threaded with sleeve 3; The other end of said pull bar 4 vertically is connected with adjustable pipe 5; One end of said adjustable pipe 5 is through on the pull bar 4 through the tie rod hole of radially offering 6, and said tie rod hole 6 both sides are equipped with the nut 7 that is threaded with pull bar 4, and the other end of said adjustable pipe 5 is connected with the little cross bar 9 of scaffold through fastener 8.In when assembling, the adjustable pipe 5 that is through on the pull bar 4 can rotate in the plane vertical with pull bar 4, when being adjusted to correct position, fixes adjustable pipe 5 through two nuts 7 that are assemblied on the pull bar 4 again.
As shown in Figure 1, in the pre-buried adjustable wall attaching parts of a kind of scaffold of the present invention, reinforcing bar anchoring piece 2 is the L shape, can satisfy like this and bear the pulling force needs, is convenient to make processing and welding again; For the ease of welding and the inner of shutoff sleeve 3, the diameter of reinforcing bar anchoring piece 2 is slightly less than the internal diameter of sleeve 3, after the grafting again the border weld and get final product.The end face of sleeve 3 cylinder lever connecting rods 4 ends flushes with body of wall 1 external surface, builds Shi Buhui like this and causes sleeve to stop up, and also need not to cut sleeve 3 after withdrawing from pull bar 4 being used to complete.In order to satisfy mechanical property and to draw materials conveniently, pull bar 4 diameters are designed to 18 to 25 millimeters, here its to select diameter for use be 20 millimeters.For the ease of assembling with draw materials, adjustable pipe 5 is designed to round steel pipe, and the external diameter of adjustable pipe 5 is designed to identical with little cross bar 4 48 millimeters.
The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. pre-buried adjustable wall attaching parts of scaffold; It is characterized in that: comprise the reinforcing bar anchoring piece (2) that is embedded in the body of wall (1), be embedded in the body of wall (1) and with the sleeve that has internal thread (3) of reinforcing bar anchoring piece (2) one ends welding, the pull bar (4) that an end is threaded with sleeve (3); The other end of said pull bar (4) vertically is connected with adjustable pipe (5); One end of said adjustable pipe (5) is through on the pull bar (4) through the tie rod hole of radially offering (6); Said tie rod hole (6) both sides are equipped with the nut (7) that is threaded with pull bar (4), and the other end of said adjustable pipe (5) is connected with the little cross bar (9) of scaffold through fastener (8).
2. the pre-buried adjustable wall attaching parts of scaffold according to claim 1 is characterized in that: said reinforcing bar anchoring piece (2) is the L shape.
3. the pre-buried adjustable wall attaching parts of scaffold according to claim 1 is characterized in that: the end face of said sleeve (3) cylinder lever connecting rod (4) end flushes with body of wall (1) external surface.
4. the pre-buried adjustable wall attaching parts of scaffold according to claim 1 is characterized in that: said pull bar (4) diameter is 18 to 25 millimeters.
5. the pre-buried adjustable wall attaching parts of scaffold according to claim 1 is characterized in that: said adjustable pipe (5) is a round steel pipe.
6. the pre-buried adjustable wall attaching parts of scaffold according to claim 5 is characterized in that: the external diameter of said adjustable pipe (5) is 48 millimeters.
CN2012101880601A 2012-06-08 2012-06-08 Scaffold pre-buried assembled connecting wall device Pending CN102704667A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101880601A CN102704667A (en) 2012-06-08 2012-06-08 Scaffold pre-buried assembled connecting wall device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101880601A CN102704667A (en) 2012-06-08 2012-06-08 Scaffold pre-buried assembled connecting wall device

Publications (1)

Publication Number Publication Date
CN102704667A true CN102704667A (en) 2012-10-03

Family

ID=46897696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101880601A Pending CN102704667A (en) 2012-06-08 2012-06-08 Scaffold pre-buried assembled connecting wall device

Country Status (1)

Country Link
CN (1) CN102704667A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074996A (en) * 2013-01-31 2013-05-01 中设建工集团有限公司 Building scaffold wall connecting piece
CN103266756A (en) * 2013-04-28 2013-08-28 中天建设集团有限公司 Wall connector for scaffolding
CN104110125A (en) * 2014-07-18 2014-10-22 浙江万华建设有限公司 Scaffold wall-connecting device and waterproof method after dismantling of scaffold wall-connecting device
CN106337556A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Construction method for wall connecting element assembly
CN106836783A (en) * 2017-04-08 2017-06-13 中天建设集团有限公司珠海分公司 Scaffold wall connecting piece
CN108487625A (en) * 2018-03-14 2018-09-04 徐亦心 A kind of scaffold is built with even wall construction and installation method
CN109372245A (en) * 2018-11-30 2019-02-22 浙江三丰建设有限公司 A kind of intelligence assembled wall-connecting piece system and its construction method
CN110886482A (en) * 2019-10-23 2020-03-17 上海建工四建集团有限公司 Scaffold pulling-connecting device and method
CN111305544A (en) * 2020-03-30 2020-06-19 中国核工业中原建设有限公司 Height-adjustable who adheres to in construction beam's scaffold frame of encorbelmenting is wall device even
CN111706066A (en) * 2020-06-28 2020-09-25 中建七局第四建筑有限公司 Recyclable wall connecting piece for basement exterior wall and construction method thereof
CN111764634A (en) * 2020-06-29 2020-10-13 中天华南建设投资集团有限公司 Novel scaffold wall connecting piece and using method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD296523A5 (en) * 1990-07-09 1991-12-05 Thueringenplan Gmbh Architektur- Und Ingenieurbuero Fuer Bauplanung,De GERUEST ANCHORING IN MULTILAYER EXTERNAL WALL ELEMENTS
EP0839975A1 (en) * 1996-10-30 1998-05-06 Dimos, Société Anonyme Anchor arrangement
CN201254830Y (en) * 2008-09-22 2009-06-10 崔恒均 Convenient wall joint
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof
CN202157529U (en) * 2011-06-17 2012-03-07 江苏省建筑工程集团有限公司 Embedded scaffold wall connector
CN202170630U (en) * 2011-06-17 2012-03-21 江苏省建筑工程集团有限公司 Embedded fastener to wall for scaffold
CN202644965U (en) * 2012-06-08 2013-01-02 四汇建设集团有限公司 Embedded adjustable wall connecting device of scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD296523A5 (en) * 1990-07-09 1991-12-05 Thueringenplan Gmbh Architektur- Und Ingenieurbuero Fuer Bauplanung,De GERUEST ANCHORING IN MULTILAYER EXTERNAL WALL ELEMENTS
EP0839975A1 (en) * 1996-10-30 1998-05-06 Dimos, Société Anonyme Anchor arrangement
CN201254830Y (en) * 2008-09-22 2009-06-10 崔恒均 Convenient wall joint
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof
CN202157529U (en) * 2011-06-17 2012-03-07 江苏省建筑工程集团有限公司 Embedded scaffold wall connector
CN202170630U (en) * 2011-06-17 2012-03-21 江苏省建筑工程集团有限公司 Embedded fastener to wall for scaffold
CN202644965U (en) * 2012-06-08 2013-01-02 四汇建设集团有限公司 Embedded adjustable wall connecting device of scaffold

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074996A (en) * 2013-01-31 2013-05-01 中设建工集团有限公司 Building scaffold wall connecting piece
CN103266756A (en) * 2013-04-28 2013-08-28 中天建设集团有限公司 Wall connector for scaffolding
CN104110125A (en) * 2014-07-18 2014-10-22 浙江万华建设有限公司 Scaffold wall-connecting device and waterproof method after dismantling of scaffold wall-connecting device
CN104110125B (en) * 2014-07-18 2016-08-24 浙江万华建设有限公司 Waterproof method after the dismounting of wall-connecting device of scaffold
CN106337556A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Construction method for wall connecting element assembly
CN106836783A (en) * 2017-04-08 2017-06-13 中天建设集团有限公司珠海分公司 Scaffold wall connecting piece
CN108487625A (en) * 2018-03-14 2018-09-04 徐亦心 A kind of scaffold is built with even wall construction and installation method
CN108487625B (en) * 2018-03-14 2020-05-15 中铁十四局集团建筑工程有限公司 Wall connecting structure for scaffold building and mounting method
CN109372245A (en) * 2018-11-30 2019-02-22 浙江三丰建设有限公司 A kind of intelligence assembled wall-connecting piece system and its construction method
CN110886482A (en) * 2019-10-23 2020-03-17 上海建工四建集团有限公司 Scaffold pulling-connecting device and method
CN111305544A (en) * 2020-03-30 2020-06-19 中国核工业中原建设有限公司 Height-adjustable who adheres to in construction beam's scaffold frame of encorbelmenting is wall device even
CN111706066A (en) * 2020-06-28 2020-09-25 中建七局第四建筑有限公司 Recyclable wall connecting piece for basement exterior wall and construction method thereof
CN111764634A (en) * 2020-06-29 2020-10-13 中天华南建设投资集团有限公司 Novel scaffold wall connecting piece and using method

Similar Documents

Publication Publication Date Title
CN102704667A (en) Scaffold pre-buried assembled connecting wall device
CN107217866B (en) Wood structure mortise and tenon joint of device shape memory alloy wire
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
CN108060718B (en) Detachable assembly type column and foundation ductility node connection mode
CN202644965U (en) Embedded adjustable wall connecting device of scaffold
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN202850476U (en) Scaffold through-wall adjustable tool type wall connection device
CN202954557U (en) Scaffold wall connection part
CN202936996U (en) Wall connecting piece for scaffold
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN202430980U (en) Detachably movable type steel pipe fixing insertion column for cantilever scaffold
CN203603253U (en) Detachable steel corbel structure on reinforced concrete column
CN103981909A (en) Rapid repair method and structure for broken foundation bolt
CN209742404U (en) assembled building stand bearing diagonal structure
CN106320687A (en) Detachable wall connecting component for scaffold
CN206053370U (en) A kind of prefabrication lifting component supports corner brace instrument
CN215906749U (en) Anti-deformation telescopic inner support frame of reinforcement cage and reinforcement cage
CN202577938U (en) Scaffold embedded assembled wall connecting device
CN201635185U (en) Oblique steel support device between beam and column
CN203716477U (en) Connecting tube for building exterior wall scaffold
CN205400025U (en) Detachable even wall spare of scaffold
CN204282394U (en) A kind of blower foundation and the prestressing force assembly for blower foundation
CN103628685B (en) A kind of method and concrete pump pipe bracing means preventing concrete pump pipe lateral displacement
CN209760607U (en) steel bar lapping connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003